This page displays public OSHA enforcement data. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
The Occupational Safety and Health Administration (OSHA) conducted a follow-up inspection of E. SMALIS PAINTING COMPANY at Rt 366 Tarentum Bridge Road, Tarentum, PA 15084 on Dec 9, 1993. The inspection scope was partial. The case was closed on Oct 29, 2014.
OSHA documented 234 violations (5 serious, 178 willful, 51 other-than-serious) with total penalties on record of $1,092,750.
OSHA collected 14 air monitoring samples covering 2 substances during this inspection, including Iron Oxide Fume, Lead, Inorganic (as Pb).
This employer has 1 other OSHA inspection on record at this establishment.
Other OSHA inspections of the same establishment. Linked via establishment ID (exact government key).
Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.
| Substance | Samples | Result Range | Unit |
|---|---|---|---|
| Iron Oxide Fume | 7 | 0.21 - 130 | mg/m³ |
| Lead, Inorganic (as Pb) | 7 | 0.17 - 48 | mg/m³ |
Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).
| Citation | Standard | Type | Initial | Current | Abatement |
|---|---|---|---|---|---|
| 01001 | 19260062 F02 I Lead in Construction | Serious | $7,000 | $0 | Jun 8, 1994 |
| 01002 | 19260062 I03 II Lead in Construction | Serious | $7,000 | $3,500 | Jun 8, 1994 |
| 01003 | 19260062 I04 I Lead in Construction | Serious | $7,000 | $3,500 |
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment matching are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Establishment matching is based on employer name and location as reported in inspection records; some establishments may appear under multiple name variations. Chemical exposure sampling data and OSHA Permissible Exposure Limits (PELs) are sourced from the OSHA Occupational Chemical Database, matched via IMIS analyte codes. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.
| Jun 8, 1994 |
| 01004 | 19260062 N03 I Lead in Construction | Serious | $7,000 | $3,500 | Jun 8, 1994 |
| 02001A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02001B | 19260062 E01 Lead in Construction | Willful | $0 | $70,000 | Jun 8, 1994 |
| 02002A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02002B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02003A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02003B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02004A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02004B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02005A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02005B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02006A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02006B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02007A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02007B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02008A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02008B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02009A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02009B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02010A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02010B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02011A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02011B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02012A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02012B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02013A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02013B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02014A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02014B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02015A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02015B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02016A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02016B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02017A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02017B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02018A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02018B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02019A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02019B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02020A | 19260062 C01 Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02020B | 19260062 E01 Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02021 | 19260062 D01 III Lead in Construction | Willful | $7,000 | $35,000 | Jun 8, 1994 |
| 02022 | 19260062 E02 I Lead in Construction | Willful | $14,000 | $0 | Jun 8, 1994 |
| 02023A | 19260062 F02 I Lead in Construction | Willful | $17,500 | $35,000 | Jun 8, 1994 |
| 02023B | 19260062 F03 II Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02024A | 19260062 F04 I Lead in Construction | Willful | $35,000 | $35,000 | Jun 8, 1994 |
| 02024B | 19100134 B03 Respiratory Protection | Willful | $0 | $0 | Jun 8, 1994 |
| 02024C | 19100134 B08 Respiratory Protection | Willful | $0 | $0 | Jun 8, 1994 |
| 02024D | 19100134 D02 II Respiratory Protection | Willful | $0 | $0 | Jun 8, 1994 |
| 02024E | 19100134 E05 I Respiratory Protection | Willful | $0 | $0 | Jun 8, 1994 |
| 02024F | 19100134 F01 Respiratory Protection | Willful | $0 | $0 | Jun 8, 1994 |
| 02025A | 19260062 J01 I Lead in Construction | Willful | $35,000 | $0 | Jun 8, 1994 |
| 02025B | 19260062 J01 I Lead in Construction | Willful | $0 | $25,000 | Jun 8, 1994 |
| 02025C | 19260062 J01 II Lead in Construction | Willful | $0 | $0 | Jun 8, 1994 |
| 02026 | 19260062 J01 II Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02027 | 19260062 J02 IA Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02028 | 19260062 J02 IC Lead in Construction | Willful | $70,000 | $70,000 | Jun 8, 1994 |
| 02029 | 19260062 J02 IC Lead in Construction | Willful | $70,000 | $70,000 | Jun 8, 1994 |
| 02030 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02031 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02032 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02033 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02034 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02035 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02036 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02037 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02038 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02039 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02040 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02041 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02042 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02043 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02044 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02045 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02046 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02047 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02048 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02049 | 19260062 J02 IVA Lead in Construction | Other | $24,500 | $1,000 | Jun 8, 1994 |
| 02050 | 19260062 J02 IVA Lead in Construction | Willful | $24,500 | $0 | Jun 8, 1994 |
| 02051 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02052 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02053 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02054 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02055 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02056 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02057 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $10,500 | Jun 8, 1994 |
| 02058 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02059 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02060 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02061 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02062 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $10,500 | Jun 8, 1994 |
| 02063 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02064 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02065 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02066 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02067 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02068 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02069 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02070 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02071 | 19260062 J02 IVB Lead in Construction | Willful | $10,500 | $0 | Jun 8, 1994 |
| 02072 | 19260062 J03 IB Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02073 | 19260062 J03 IB Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02074 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02075 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02076 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02077 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02078 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02079 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02080 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02081 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02082 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02083 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02084 | 19260062 K01 I Lead in Construction | Willful | $70,000 | $0 | Jun 8, 1994 |
| 02085 | 19260062 K02 I Lead in Construction | Willful | $70,000 | $70,000 | Jun 8, 1994 |
| 02086 | 19260062 K02 I Lead in Construction | Willful | $70,000 | $70,000 | Jun 8, 1994 |
| 02087 | 19260062 K02 I Lead in Construction | Willful | $70,000 | $70,000 | Jun 8, 1994 |
| 02088 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02089 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02090 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02091 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02092 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02093 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02094 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02095 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02096 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02097 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02098 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02099 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02100 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02101 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02102 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02103 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02104 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02105 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02106 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02107 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02108 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02109 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02110 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02111 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02112 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02113 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02114 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02115 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02116 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02117 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02118 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02119 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02120 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02121 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02122 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02123 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02124 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02125 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02126 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02127 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02128 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02129 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02130 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02131 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02132 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02133 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02134 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02135 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02136 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02137 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02138 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02139 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02140 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02141 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02142 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02143 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02144 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02145 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02146 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02147 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02148 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02149 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02150 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02151 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02152 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02153 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02154 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02155 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02156 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02157 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $0 | Jun 8, 1994 |
| 02158 | 19260062 L01 II Lead in Construction | Willful | $17,500 | $17,500 | Jun 8, 1994 |
| 02159 | 19260062 L02 V Lead in Construction | Serious | $35,000 | $3,500 | Jun 8, 1994 |
| 02160 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02161 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02162 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02163 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02164 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02165 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02166 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02167 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02168 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02169 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02170 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02171 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02172 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02173 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02174 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02175 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02176 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02177 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02178 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02179 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02180 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02181 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02182 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02183 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02184 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02185 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02186 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02187 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02188 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02189 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02190 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02191 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02192 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02193 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02194 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02195 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02196 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02197 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02198 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02199 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02200 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02201 | 19040002 A Partial Exemption for Establishments in Certain Industries | Other | $1,000 | $625 | Jun 8, 1994 |
| 02202 | 19100020 E03 Access to Employee Exposure and Medical Records | Other | $17,500 | $1,000 | Jun 8, 1994 |