Skip to content
SafetyRecord logoSafetyRecord
BLANCHE P FIELD INC
$6,751
penalties
42
viol.
4
insp.

BLANCHE P FIELD INC

569 BOYLSTON ST, BOSTON, MA 02116

Inspections
4
Mar 1985 to Jan 2010 · 3 safety, 1 health
Violations
42
across 4 inspections
Penalties on record
$6,751
latest amounts in DOL records
By classification
Serious 36Willful 0Repeat 0Other 6

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jan 4, 2010Planned (H) · Partial scope, Safety#313796617$6754 viol.

Inspection #313796617

Dates

Opened
Jan 4, 2010
Closing Conference Date
Jan 4, 2010
Closed
Jun 8, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
12

Violations and Penalties

Total Violations
4
Violation Types
4 serious
Initial Penalties
$1,350
Penalties on Record
$675
Site Address
One Design Center Place Suite 336, Boston, MA 02210
Industry
339999 All Other Miscellaneous Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 I01
Serious12$750$375Jun 11, 2010--
01002A1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A02
Serious11$600$300Jul 2, 2010--
01002B1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A04
Serious11$0$0Jul 2, 2010--
01002C1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Serious11$0$0Jul 2, 2010--
Feb 10, 2003Complaint (B) · Partial scope, Health#305547119$5,40022 viol.

Inspection #305547119

Dates

Opened
Feb 10, 2003
Closing Conference Date
Feb 26, 2003
Closed
Apr 16, 2004

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
32
Related Activity
1 complaint

Violations and Penalties

Total Violations
22
Violation Types
21 serious, 1 other-than-serious
Initial Penalties
$15,250
Penalties on Record
$5,400
Site Address
One Design Center Place Suite 336, Boston, MA 02210
Industry
337124 Metal Household Furniture Manufacturing

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Chemical Exposure Sampling3 substances sampled

Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.

SubstanceSamplesResult RangeUnit
Toluene23.5887349 - 4.1803942ppm
Turpentine20ppm
Xylene20ppm

Violations

Violation list (12 of 22 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.38
Emergency Action Plans
OSHA citation code: 19100038 A01
Serious115$750$300Jul 29, 2003--
01002A1910.106
Flammable Liquids
OSHA citation code: 19100106 E09 III
Serious13$750$300Jul 29, 2003--
01002B1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G03
Serious132$0$0Jul 29, 2003--
010031910.132
Personal Protective Equipment - General Requirements
OSHA citation code: 19100132 D01
Serious14$750$300Aug 29, 2003--
010041910.134
Respiratory Protection
OSHA citation code: 19100134 C02 I
Serious13$750$300Jul 29, 2003--
01005A1910.134
Respiratory Protection
OSHA citation code: 19100134 D01 I
Serious12$1,000$400Jul 29, 2003--
01005B1910.134
Respiratory Protection
OSHA citation code: 19100134 E01
Serious11$0$0Sep 29, 2003--
01005C1910.134
Respiratory Protection
OSHA citation code: 19100134 K01
Serious11$0$0Jul 29, 2003--
010061910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 B
Serious13$1,000$400Jul 29, 2003--
010071910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 B03
Serious13$1,000$350Jul 29, 2003--
01008A1910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 C01
Serious13$1,750$500Jul 29, 2003--
01008B1910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 C02
Serious13$0$0Jul 29, 2003--

Showing the 12 violations listed first by citation identifier. This inspection has 22 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Aug 9, 1994Planned (H) · Complete scope, Safety#109164038$67616 viol.

Inspection #109164038

Dates

Opened
Aug 9, 1994
Closing Conference Date
Aug 9, 1994
Closed
Dec 12, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
16
Violation Types
11 serious, 5 other-than-serious
Initial Penalties
$1,350
Penalties on Record
$676
Site Address
One Design Center Place, Suite 647, Boston, MA 02210
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (12 of 16 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 B03
Serious42$375$188Oct 4, 1994--
010021910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Serious21$375$188Oct 4, 1994--
01003A1910.303
Electrical - General Requirements
OSHA citation code: 19100303 G02 I
Serious11$300$150Oct 4, 1994--
01003B1910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F05 V
Serious42$0$0Oct 4, 1994--
01003C1910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G01 I
Serious11$0$0Oct 4, 1994--
01003D1910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G02 III
Serious12$0$0Oct 4, 1994--
01003E1910.332
Electrical Safety-Related Work Practices - Training
OSHA citation code: 19100332 B01
Serious115$0$0Oct 4, 1994--
01003F1910.332
Electrical Safety-Related Work Practices - Training
OSHA citation code: 19100332 B02
Serious115$0$0Oct 4, 1994--
01003G1910.334
Electrical - Use of Equipment
OSHA citation code: 19100334 A02 I
Serious115$0$0Oct 4, 1994--
01003H1910.334
Electrical - Use of Equipment
OSHA citation code: 19100334 A02 II
Serious115$0$0Oct 4, 1994--
010041910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Serious115$300$150Oct 4, 1994--
020011910.38
Emergency Action Plans
OSHA citation code: 19100038 A01
Other115$0$0Oct 4, 1994--

Showing the 12 violations listed first by citation identifier. This inspection has 16 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Mar 5, 1985Planned (H) · Records Only scope, Safety#2068799$00 viol.

Inspection #2068799

Dates

Opened
Mar 5, 1985
Closing Conference Date
Mar 5, 1985
Closed
Mar 5, 1985

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
18

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
569 Boylston St, Boston, MA 02116
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 4 of 4, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.213Woodworking Machinery Requirements8 citations · $2,213
1910.134Respiratory Protection5 citations · $700
1910.305Electrical - Wiring Methods, Components, and Equipment4 citations · $350

Chemical exposure sampling

Samples
6
Substances
3
Inspections
1

Other inspected employers in BOSTON, MA

All employers in BOSTON →