THERMO ELECTRIC COMPANY INC.
109 5TH STREET, SADDLE BROOK, NJ 07662
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Feb 16, 1994#109914655Feb 16, 1994Monitoring (D) · Partial scope, Safety#109914655$00 viol.0 violations$0 in penalties
Inspection #109914655
Dates
- Opened
- Feb 16, 1994
- Closing Conference Date
- Feb 16, 1994
- Closed
- Feb 17, 1994
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 180
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 109 5th Street, Saddle Brook, NJ 07662
- Industry
- Not classified in OSHA's inspection record.
Monitoring Inspection: This inspection record is categorized as a monitoring inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Nov 4, 1993#109876284Nov 4, 1993Planned (H) · Complete scope, Safety#109876284$8,10016 viol.16 violations$8,100 in penalties
Inspection #109876284
Dates
- Opened
- Nov 4, 1993
- Closing Conference Date
- Nov 5, 1993
- Closed
- Jul 1, 1994
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 180
Violations and Penalties
- Total Violations
- 16
- Violation Types
- 16 serious
- Initial Penalties
- $13,300
- Penalties on Record
- $8,100
- Site Address
- 109 5th Street, Saddle Brook, NJ 07662
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (16 of 16 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.25 Stairways OSHA citation code: 19100025 D02 XII | Serious | 1 | 1 | $1,400 | $900 | Jan 19, 1994 | - | - |
| 01002A | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 J02 III | Serious | 6 | 5 | $1,400 | $900 | Feb 15, 1994 | - | - |
| 01002B | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 J02 IV | Serious | 6 | 5 | $0 | $0 | Feb 15, 1994 | - | - |
| 01002C | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 L01 | Serious | 6 | 4 | $0 | $0 | Feb 15, 1994 | - | - |
| 01003 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A01 | Serious | 4 | 5 | $1,400 | $900 | Mar 15, 1994 | - | - |
| 01004 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H01 | Serious | 3 | 2 | $1,750 | $900 | Jan 19, 1994 | - | - |
| 01005A | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A02 | Serious | 1 | 4 | $1,400 | $900 | Jan 19, 1994 | - | - |
| 01005B | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Serious | 2 | 4 | $0 | $0 | Jan 19, 1994 | - | - |
| 01005C | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Serious | 8 | 8 | $0 | $0 | Jan 31, 1994 | - | - |
| 01006A | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 D01 | Serious | 3 | 8 | $1,750 | $900 | Feb 15, 1994 | - | - |
| 01006B | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 E03 I | Serious | 3 | 8 | $0 | $0 | Feb 15, 1994 | - | - |
| 01007 | 1910.242 Hand and Portable Powered Tools and Equipment, General OSHA citation code: 19100242 B | Serious | 2 | 2 | $1,400 | $900 | Feb 15, 1994 | - | - |
| 01008A | 1910.253 Oxygen-Fuel Gas Welding and Cutting OSHA citation code: 19100253 B02 II | Serious | 2 | 3 | $1,400 | $900 | Jan 19, 1994 | - | - |
| 01008B | 1910.253 Oxygen-Fuel Gas Welding and Cutting OSHA citation code: 19100253 B02 IV | Serious | 1 | 3 | $0 | $0 | Jan 19, 1994 | - | - |
| 01008C | 1910.253 Oxygen-Fuel Gas Welding and Cutting OSHA citation code: 19100253 B04 III | Serious | 1 | 3 | $0 | $0 | Jan 19, 1994 | - | - |
| 01009 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 | Serious | 3 | 2 | $1,400 | $900 | Jan 19, 1994 | - | - |
Mar 21, 1988#100708072Mar 21, 1988Planned (H) · Records Only scope, Safety#100708072$00 viol.0 violations$0 in penalties
Inspection #100708072
Dates
- Opened
- Mar 21, 1988
- Closing Conference Date
- Mar 22, 1988
- Closed
- May 2, 1988
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 295
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 109 5th Street, Saddle Brook, NJ 07662
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 1988 to 1994. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.