TIMBERLAND DRYWALL
7 CUSTOM HOUSE STREET, PORTLAND, ME 04101
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jul 13, 2018#343299160Jul 13, 2018Programmed Related (I) · Complete scope, Safety#343299160$02 viol.2 violations$0 in penalties
Inspection #343299160
Dates
- Opened
- Jul 13, 2018
- Closing Conference Date
- Jul 13, 2018
- Final Order
- Aug 21, 2018
- Closed
- Oct 4, 2018
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $12,934
- Penalties on Record
- $0
- Site Address
- 230 Commercial Street, Portland, ME 04101
- Industry
- 238310 Drywall and Insulation Contractors
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B02 | Other | 1 | 5 | $6,467 | $0 | Aug 6, 2018 | - | Aug 21, 2018 |
| 01002 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B14 | Other | 4 | 5 | $6,467 | $0 | Aug 6, 2018 | - | Aug 21, 2018 |
Jun 3, 2013#339101503Jun 3, 2013Programmed Related (I) · Complete scope, Safety#339101503$8001 viol.1 violation$800 in penalties
Inspection #339101503
Dates
- Opened
- Jun 3, 2013
- Closing Conference Date
- Jun 3, 2013
- Final Order
- Jun 14, 2013
- Closed
- Jun 24, 2013
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $1,600
- Penalties on Record
- $800
- Site Address
- 364 Maine Mall Road, Portland, ME 04106
- Industry
- 238310 Drywall and Insulation Contractors
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 B01 I | Serious | 1 | 1 | $1,600 | $800 | Jun 12, 2013 | - | Jun 14, 2013 |
Oct 2, 2002#113799852Oct 2, 2002Planned (H) · Complete scope, Safety#113799852$3,0003 viol.3 violations$3,000 in penalties
Inspection #113799852
Dates
- Opened
- Oct 2, 2002
- Closing Conference Date
- Oct 2, 2002
- Closed
- Feb 13, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 1
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 2 serious, 1 repeat
- Initial Penalties
- $4,800
- Penalties on Record
- $3,000
- Site Address
- 7 Custom House Street, Portland, ME 04101
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 | Serious | 1 | 1 | $1,400 | $800 | Nov 6, 2002 | - | - |
| 01002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 C02 | Serious | 1 | 1 | $600 | $300 | Nov 6, 2002 | - | - |
| 02001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 B01 I | Repeat | 1 | 1 | $2,800 | $1,900 | Nov 6, 2002 | - | - |
Jan 25, 2001#117919068Jan 25, 2001Planned (H) · Complete scope, Safety#117919068$1,2251 viol.1 violation$1,225 in penalties
Inspection #117919068
Dates
- Opened
- Jan 25, 2001
- Closing Conference Date
- Jan 25, 2001
- Closed
- Apr 6, 2001
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $1,225
- Penalties on Record
- $1,225
- Site Address
- Commercial Custom House Street, Portland, ME 04101
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 B01 I | Serious | 1 | 2 | $1,225 | $1,225 | Feb 22, 2001 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
4 inspections, 2001 to 2018. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.