Skip to content
SafetyRecord logoSafetyRecord
BLUE STAR ELECTRIC, INC.
$11,000
penalties
26
viol.
42
insp.

BLUE STAR ELECTRIC, INC.

103 E ALAMEDA, TUCSON, AZ 85701

Inspections
42
Aug 1982 to Apr 2006 · 40 safety, 2 health
Violations
26
across 42 inspections
Penalties on record
$11,000
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 5Other 20

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Apr 27, 2006Planned (H) · Complete scope, Safety#310067905$01 viol.

Inspection #310067905

Dates

Opened
Apr 27, 2006
Closing Conference Date
Apr 27, 2006
Closed
Oct 3, 2007

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1301 West Lambert Lane, Tucson, AZ 85737
Industry
238210 Electrical Contractors and Other Wiring Installation Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011904.1
Partial Exemption for Employers with 10 or Fewer Employees
OSHA citation code: 19040001 A02
Other15$0$0Jul 29, 2006--
Oct 18, 2004Unprogrammed Related (G) · Complete scope, Safety#308281021$03 viol.

Inspection #308281021

Dates

Opened
Oct 18, 2004
Closing Conference Date
Oct 18, 2004
Closed
Feb 7, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
6255 North Camino Primeria Alta, Tucson, AZ 85705
Industry
238210 Electrical Contractors and Other Wiring Installation Contractors

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Other11$0$0Feb 8, 2005--
010021910.1200
Hazard Communication
OSHA citation code: 19101200 H
Other11$0$0Feb 8, 2005--
010031904.1
Partial Exemption for Employers with 10 or Fewer Employees
OSHA citation code: 19040001 A02
Other11$0$0Feb 8, 2005--
Apr 18, 2003Planned (H) · Complete scope, Health#306674755$00 viol.

Inspection #306674755

Dates

Opened
Apr 18, 2003
Closing Conference Date
Apr 18, 2003
Closed
Apr 25, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1800 N. Stone Avenue, Tucson, AZ 85705
Industry
238210 Electrical Contractors and Other Wiring Installation Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Apr 16, 1999Programmed Related (I) · Partial scope, Safety#301440962$00 viol.

Inspection #301440962

Dates

Opened
Apr 16, 1999
Closing Conference Date
Apr 16, 1999
Closed
Apr 19, 1999

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
18

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
850 E. Wetmore, Tucson, AZ 85719
Industry
Not classified in OSHA's inspection record.

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Jan 10, 1995Planned (H) · Complete scope, Safety#115619884$10,2002 viol.

Inspection #115619884

Dates

Opened
Jan 10, 1995
Closing Conference Date
Jan 10, 1995
Contested
Mar 15, 1995
Final Order
Aug 14, 1995
Closed
Jul 13, 1999

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
2
Violation Types
2 repeat
Initial Penalties
$10,200
Penalties on Record
$10,200
Site Address
7374 North Mona Lisa, Tucson, AZ 85741
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Repeat125$6,000$6,000Feb 21, 1995Mar 15, 1995Aug 14, 1995
010021926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 B01
Repeat325$4,200$4,200Feb 21, 1995Mar 15, 1995Aug 14, 1995
Oct 20, 1994Planned (H) · Complete scope, Safety#115620361$01 viol.

Inspection #115620361

Dates

Opened
Oct 20, 1994
Closing Conference Date
Oct 20, 1994
Closed
Apr 28, 1995

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
4414 E. 2nd Street, Tucson, AZ 85711
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.25
Housekeeping
OSHA citation code: 19260025 A
Other15$0$0Nov 22, 1994--
Oct 11, 1994Planned (H) · Complete scope, Safety#115620205$01 viol.

Inspection #115620205

Dates

Opened
Oct 11, 1994
Closing Conference Date
Oct 11, 1994
Closed
Nov 21, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
8252 N. Northern Ave., Tucson, AZ 85704
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Other150$0$0Nov 1, 1994--
Apr 12, 1994Planned (H) · Complete scope, Safety#115608242$02 viol.

Inspection #115608242

Dates

Opened
Apr 12, 1994
Closing Conference Date
Apr 12, 1994
Closed
Jun 6, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
6

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
6280 S Campbell, Tucson, AZ 85706
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Other120$0$0Apr 29, 1994--
010021926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 B01
Other220$0$0Apr 29, 1994--
Mar 31, 1992Follow-Up (F) · Partial scope, Safety#115593311$00 viol.

Inspection #115593311

Dates

Opened
Mar 31, 1992
Closing Conference Date
Mar 31, 1992
Closed
Apr 2, 1992

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
7

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
6280 S Campbell, Tucson, AZ 85706
Industry
Not classified in OSHA's inspection record.

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Feb 19, 1992Planned (H) · Complete scope, Safety#115592578$3202 viol.

Inspection #115592578

Dates

Opened
Feb 19, 1992
Closing Conference Date
Feb 19, 1992
Closed
Aug 11, 1992

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
6

Violations and Penalties

Total Violations
2
Violation Types
1 repeat, 1 other-than-serious
Initial Penalties
$320
Penalties on Record
$320
Site Address
6280 S Campbell, Tucson, AZ 85706
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.416
Electrical - Safety Requirements (Construction)
OSHA citation code: 19260416 E01
Repeat11$320$320Mar 13, 1992--
020011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Other11$0$0Mar 13, 1992--
Inspections 1 to 10 of 42, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.404Electrical - Wiring Design and Protection (Construction)7 citations · $6,160
1926.405Electrical - Wiring Methods (Construction)4 citations · $4,200
1926.59Hazard Communication2 citations · $120

Industry comparison

BLS 2024 survey: electrical contractors and other wiring installation contractors reported 1.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.7%; NAICS 23821 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in TUCSON, AZ

All employers in TUCSON →