Skip to content
SafetyRecord logoSafetyRecord
CARLOS CANOPY
$13,125
penalties
29
viol.
2
insp.

CARLOS CANOPY

335 SE COURT AVE, PENDLETON, OR 97801

Inspections
2
Aug 1992 to Dec 1992 · 2 safety, 0 health
Violations
29
across 2 inspections
Penalties on record
$13,125
latest amounts in DOL records
By classification
Serious 18Willful 0Repeat 8Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Dec 17, 1992Planned (H) · Partial scope, Safety#115709834$6,8509 viol.

Inspection #115709834

Dates

Opened
Dec 17, 1992
Closing Conference Date
Dec 17, 1992
Contested
Mar 8, 1993
Final Order
Jul 8, 1993
Closed
Feb 23, 1995

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
9
Violation Types
1 serious, 8 repeat
Initial Penalties
$9,780
Penalties on Record
$6,850
Site Address
335 Se Court Ave, Pendleton, OR 97801
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (9 of 9 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.50
Medical Services and First Aid (Construction)
OSHA citation code: 19260050 E
Serious13$180$50Mar 18, 1993Mar 8, 1993Jul 8, 1993
020021926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Repeat11$600$400Dec 17, 1992Mar 8, 1993Jul 8, 1993
02003703004001Repeat12$3,000$2,200Dec 17, 1992Mar 8, 1993Jul 8, 1993
020041926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E10
Repeat23$600$400Dec 17, 1992Mar 8, 1993Jul 8, 1993
020051926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E04
Repeat23$600$400Dec 17, 1992Mar 8, 1993Jul 8, 1993
020061926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E08
Repeat23$600$400Dec 17, 1992Mar 8, 1993Jul 8, 1993
020071926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E03
Repeat13$600$400Dec 17, 1992Mar 8, 1993Jul 8, 1993
020081926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E05
Repeat23$600$400Dec 17, 1992Mar 8, 1993Jul 8, 1993
020091926.21
Safety Training and Education
OSHA citation code: 19260021 B02
Repeat13$3,000$2,200Feb 21, 1993Mar 8, 1993Jul 8, 1993
Aug 7, 1992Planned (H) · Complete scope, Safety#115709313$6,27520 viol.

Inspection #115709313

Dates

Opened
Aug 7, 1992
Closing Conference Date
Aug 7, 1992
Contested
Sep 25, 1992
Final Order
Aug 3, 1993
Closed
Aug 26, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
20
Violation Types
17 serious, 3 other-than-serious
Initial Penalties
$9,025
Penalties on Record
$6,275
Site Address
335 Se Court Ave, Pendleton, OR 97801
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (20 of 20 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.751
Steel Erection - Definitions
OSHA citation code: 19260751 D
Serious12$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010021926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Serious12$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010031926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A07
Serious13$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010041926.350
Gas Welding and Cutting
OSHA citation code: 19260350 H
Serious13$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010051926.251
Rigging Equipment for Material Handling
OSHA citation code: 19260251 A01
Serious12$1,250$750Aug 7, 1992Sep 25, 1992Aug 3, 1993
010061926.251
Rigging Equipment for Material Handling
OSHA citation code: 19260251 A01
Serious12$1,250$750Aug 7, 1992Sep 25, 1992Aug 3, 1993
010071926.251
Rigging Equipment for Material Handling
OSHA citation code: 19260251 E01 II
Serious12$1,250$750Aug 7, 1992Sep 25, 1992Aug 3, 1993
010081926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E03
Serious22$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010091926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E04
Serious22$250$250Aug 7, 1992Sep 25, 1992Aug 3, 1993
010101926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E06
Serious11$250$250Aug 7, 1992Sep 25, 1992Aug 3, 1993
010111926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E08
Serious22$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010121926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E07 II
Serious11$75$75Aug 7, 1992Sep 25, 1992Aug 3, 1993
010131926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E10
Serious22$250$250Aug 7, 1992Sep 25, 1992Aug 3, 1993
01014763006704Serious11$1,250$750Aug 7, 1992Sep 25, 1992Aug 3, 1993
01015703004002
OSHA citation code: 703004002 B
Serious11$500$500Aug 7, 1992Sep 25, 1992Aug 3, 1993
01016763030511
OSHA citation code: 763030511 A
Serious11$500$500Aug 7, 1992Sep 25, 1992Aug 3, 1993
010171926.21
Safety Training and Education
OSHA citation code: 19260021 B02
Serious13$1,750$1,000Sep 18, 1992Sep 25, 1992Aug 3, 1993
020181926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E05
Other22$0$0Aug 7, 1992Sep 25, 1992Aug 3, 1993
020191926.251
Rigging Equipment for Material Handling
OSHA citation code: 19260251 E01 III
Other12$0$0Aug 7, 1992Sep 25, 1992Aug 3, 1993
020201926.251
Rigging Equipment for Material Handling
OSHA citation code: 19260251 E01 I
Other12$0$0Aug 7, 1992Sep 25, 1992Aug 3, 1993
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.451Scaffolding - General Requirements12 citations · $2,975
1926.251Rigging Equipment for Material Handling5 citations · $2,250
1926.350Gas Welding and Cutting2 citations · $150

Other inspected employers in PENDLETON, OR

All employers in PENDLETON →