NADINE CORPORATION
184 SANDY CREEK ROAD, VERONA, PA 15147 · NAICS 332410 Power Boiler and Heat Exchanger Manufacturing
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Feb 12, 2019#343790044Feb 12, 2019Planned (H) · Partial scope, Health#343790044$00 viol.0 violations$0 in penalties
Inspection #343790044
Dates
- Opened
- Feb 12, 2019
- Closing Conference Date
- Jul 11, 2019
- Closed
- Jul 11, 2019
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 16
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332312 Fabricated Structural Metal Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Oct 28, 2011#315558395Oct 28, 2011Planned (H) · Complete scope, Health#315558395$1,9908 viol.8 violations$1,990 in penalties
Inspection #315558395
Dates
- Opened
- Oct 28, 2011
- Closing Conference Date
- Nov 17, 2011
- Closed
- Feb 6, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 17
Violations and Penalties
- Total Violations
- 8
- Violation Types
- 7 serious, 1 other-than-serious
- Initial Penalties
- $3,060
- Penalties on Record
- $1,990
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332312 Fabricated Structural Metal Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 8 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 C01 | Serious | 1 | 4 | $1,530 | $995 | Jan 4, 2012 | - | - |
| 01001B | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 K02 | Serious | 1 | 4 | $0 | $0 | Jan 4, 2012 | - | - |
| 01001C | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 L01 | Serious | 1 | 4 | $0 | $0 | Jan 4, 2012 | - | - |
| 01001D | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 G06 | Serious | 1 | 3 | $0 | $0 | Dec 7, 2011 | - | - |
| 01002A | 1910.132 Personal Protective Equipment - General Requirements OSHA citation code: 19100132 D02 | Serious | 1 | 5 | $1,530 | $995 | Jan 4, 2012 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
May 8, 2008#311326185May 8, 2008Planned (H) · Partial scope, Health#311326185$9804 viol.4 violations$980 in penalties
Inspection #311326185
Dates
- Opened
- May 8, 2008
- Closing Conference Date
- May 8, 2008
- Closed
- Sep 8, 2008
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 19
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 4 serious
- Initial Penalties
- $1,400
- Penalties on Record
- $980
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Chemical Exposure Sampling2 substances sampled
Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.
| Substance | Samples | Result Range | Unit |
|---|---|---|---|
| Chromic Acid and Chromates (as CrO3) | 1 | 0.002103 | mg/m³ |
| Chromium (VI) - TWA | 1 | 0.001094 | mg/m³ |
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 C01 | Serious | 1 | 16 | $1,400 | $980 | Jul 11, 2008 | - | - |
| 01001B | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 D01 | Serious | 1 | 16 | $0 | $0 | Jun 12, 2008 | - | - |
| 01001C | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 G01 | Serious | 1 | 16 | $0 | $0 | Jul 12, 2008 | - | - |
| 01001D | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 K02 | Serious | 1 | 16 | $0 | $0 | Aug 2, 2008 | - | - |
Jun 21, 2006#309040145Jun 21, 2006Planned (H) · Partial scope, Safety#309040145$2,8356 viol.6 violations$2,835 in penalties
Inspection #309040145
Dates
- Opened
- Jun 21, 2006
- Closing Conference Date
- Jun 21, 2006
- Closed
- Oct 4, 2006
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 18
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 6 serious
- Initial Penalties
- $4,050
- Penalties on Record
- $2,835
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332312 Fabricated Structural Metal Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 G01 V | Serious | 1 | 2 | $600 | $420 | Jul 3, 2006 | - | - |
| 01002A | 1910.184 Slings OSHA citation code: 19100184 C01 | Serious | 1 | 1 | $1,050 | $735 | Jul 3, 2006 | - | - |
| 01002B | 1910.184 Slings OSHA citation code: 19100184 I01 | Serious | 1 | 1 | $0 | $0 | Jul 3, 2006 | - | - |
| 01003 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A03 II | Serious | 1 | 1 | $1,050 | $735 | Sep 30, 2006 | - | - |
| 01004 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 I01 | Serious | 1 | 3 | $750 | $525 | Jul 3, 2006 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 6 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Jan 14, 1998#123306730Jan 14, 1998Planned (H) · Complete scope, Safety#123306730$1,66516 viol.16 violations$1,665 in penalties
Inspection #123306730
Dates
- Opened
- Jan 14, 1998
- Closing Conference Date
- Jan 14, 1998
- Closed
- Mar 2, 1998
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 21
Violations and Penalties
- Total Violations
- 16
- Violation Types
- 11 serious, 5 other-than-serious
- Initial Penalties
- $2,775
- Penalties on Record
- $1,665
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 16 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 L01 | Serious | 4 | 10 | $300 | $185 | Feb 24, 1998 | - | - |
| 01002A | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 N04 I | Serious | 4 | 10 | $300 | $185 | Jan 28, 1998 | - | - |
| 01002B | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 G01 V | Serious | 4 | 10 | $0 | $0 | Jan 28, 1998 | - | - |
| 01003A | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Serious | 3 | 3 | $225 | $185 | Feb 9, 1998 | - | - |
| 01003B | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 D01 | Serious | 3 | 3 | $0 | $0 | Feb 9, 1998 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 16 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Mar 12, 1993#107461824Mar 12, 1993Planned (H) · Complete scope, Health#107461824$6256 viol.6 violations$625 in penalties
Inspection #107461824
Dates
- Opened
- Mar 12, 1993
- Closing Conference Date
- Mar 12, 1993
- Closed
- May 26, 1993
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 12
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 6 serious
- Initial Penalties
- $625
- Penalties on Record
- $625
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.147 Control of Hazardous Energy (Lockout/Tagout) OSHA citation code: 19100147 C01 | Serious | 1 | 1 | $125 | $125 | May 24, 1993 | - | - |
| 01002 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Serious | 1 | 6 | $100 | $100 | Apr 13, 1993 | - | - |
| 01003 | 1910.253 Oxygen-Fuel Gas Welding and Cutting OSHA citation code: 19100253 B04 III | Serious | 1 | 6 | $150 | $150 | Apr 13, 1993 | - | - |
| 01004 | 1910.1200 Hazard Communication OSHA citation code: 19101200 E01 | Serious | 1 | 12 | $125 | $125 | May 24, 1993 | - | - |
| 01005A | 1910.1200 Hazard Communication OSHA citation code: 19101200 H | Serious | 1 | 12 | $125 | $125 | May 24, 1993 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 6 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Jan 4, 1985#883181Jan 4, 1985Planned (H) · Complete scope, Safety#883181$1503 viol.3 violations$150 in penalties
Inspection #883181
Dates
- Opened
- Jan 4, 1985
- Closing Conference Date
- Jan 4, 1985
- Closed
- Feb 11, 1985
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 11
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 1 serious, 2 other-than-serious
- Initial Penalties
- $150
- Penalties on Record
- $150
- Site Address
- 184 Sandy Creek Road, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A01 | Serious | 1 | 2 | $150 | $150 | Feb 11, 1985 | - | - |
| 02001 | 1910.157 Portable Fire Extinguishers OSHA citation code: 19100157 G01 | Other | 1 | 11 | $0 | $0 | Feb 11, 1985 | - | - |
| 02002 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 II | Other | 1 | 2 | $0 | $0 | Jan 11, 1985 | - | - |
Jun 7, 1983#12812715Jun 7, 1983Planned (H) · Records Only scope, Safety#12812715$00 viol.0 violations$0 in penalties
Inspection #12812715
Dates
- Opened
- Jun 7, 1983
- Closing Conference Date
- Jun 7, 1983
- Closed
- Jul 26, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 12
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 184 Sandy Creek Rd, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Mar 11, 1982#12902987Mar 11, 1982Planned (H) · Records Only scope, Safety#12902987$00 viol.0 violations$0 in penalties
Inspection #12902987
Dates
- Opened
- Mar 11, 1982
- Closing Conference Date
- Mar 11, 1982
- Closed
- Mar 24, 1982
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 14
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 184 Sandy Creek Rd, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jan 24, 1974#12918025Jan 24, 1974Planned (H) · Complete scope, Safety#12918025$655 viol.5 violations$65 in penalties
Inspection #12918025
Dates
- Opened
- Jan 24, 1974
- Closing Conference Date
- Jan 24, 1974
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Not displayed
- Number of Employees
- 15
Violations and Penalties
- Total Violations
- 5
- Violation Types
- 5 other-than-serious
- Initial Penalties
- $65
- Penalties on Record
- $65
- Site Address
- 184 Sandy Creekroad, Verona, PA 15147
- Industry
- 332410 Power Boiler and Heat Exchanger Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 5 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 Q05 III | Other | 2 | - | $35 | $35 | Mar 7, 1974 | - | - |
| 01002 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H01 | Other | 1 | - | $30 | $30 | Mar 7, 1974 | - | - |
| 01003 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H04 | Other | 1 | - | $0 | $0 | Mar 7, 1974 | - | - |
| 01004 | 1910.252 Welding, Cutting, and Brazing - General Requirements OSHA citation code: 19100252 A02 IVC0 | Other | 1 | - | $0 | $0 | Feb 20, 1974 | - | - |
| 01005 | 1910.141 Sanitation OSHA citation code: 19100141 C02 I | Other | 1 | - | $0 | $0 | Mar 7, 1974 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
10 inspections, 1974 to 2019. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Chemical exposure sampling
Industry comparison
Fabricated Metal Product Manufacturing, 48,574 employers with OSHA inspections. Arithmetic from DOL records.