Skip to content
SafetyRecord logoSafetyRecord
SPORTS MOLDING INC
$3,775
penalties
27
viol.
9
insp.

SPORTS MOLDING INC

FREEPORT CENTER BUILDING Z-13, CLEARFIELD, UT 84016

Inspections
9
Dec 1982 to Feb 2022 · 5 safety, 4 health
Violations
27
across 9 inspections
Penalties on record
$3,775
latest amounts in DOL records
By classification
Serious 8Willful 0Repeat 0Other 19

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Feb 3, 2022Planned (H) · Partial scope, Safety#345761977$01 viol.

Inspection #345761977

Dates

Opened
Feb 3, 2022
Closing Conference Date
Feb 3, 2022
Final Order
Apr 28, 2022
Closed
Apr 4, 2022

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
117

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Freeport Center Building Z-13, Clearfield, UT 84016
Industry
326199 All Other Plastics Product Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C01
Other1117$0$0Mar 22, 2022-Apr 28, 2022
Dec 8, 2014Planned (H) · Partial scope, Safety#340122878$6252 viol.

Inspection #340122878

Dates

Opened
Dec 8, 2014
Closing Conference Date
Dec 19, 2014
Final Order
Feb 9, 2015
Closed
Apr 9, 2015

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
75

Violations and Penalties

Total Violations
2
Violation Types
2 serious
Initial Penalties
$1,250
Penalties on Record
$625
Site Address
Freeport Center Bldg Z-13, Clearfield, UT 84016
Industry
326199 All Other Plastics Product Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C01
Serious12$1,250$625-Feb 9, 2015
01001B1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C07 IV
Serious18$0$0Mar 4, 2015-Feb 9, 2015
Dec 19, 2012Planned (H) · Partial scope, Safety#315881748$00 viol.

Inspection #315881748

Dates

Opened
Dec 19, 2012
Closing Conference Date
Dec 19, 2012
Closed
Dec 19, 2012

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
72

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Freeport Center Building Z-13, Clearfield, UT 84016
Industry
326199 All Other Plastics Product Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Mar 2, 1998Planned (H) · Complete scope, Health#126784255$05 viol.

Inspection #126784255

Dates

Opened
Mar 2, 1998
Closing Conference Date
Mar 2, 1998
Closed
Dec 30, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
70

Violations and Penalties

Total Violations
5
Violation Types
5 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Freeport Center Building Z-13, Clearfield, UT 84016
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.134
Respiratory Protection
OSHA citation code: 19100134 A02
Other12$0$0Apr 28, 1998--
010021910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C07 IV
Other170$0$0Apr 28, 1998--
010041910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Other23$0$0Mar 18, 1998--
010051910.1200
Hazard Communication
OSHA citation code: 19101200 E01 I
Other170$0$0Apr 28, 1998--
010061910.1200
Hazard Communication
OSHA citation code: 19101200 G01
Other170$0$0Apr 28, 1998--
Mar 28, 1994Follow-Up (F) · Complete scope, Health#124627092$00 viol.

Inspection #124627092

Dates

Opened
Mar 28, 1994
Closing Conference Date
Mar 28, 1994
Closed
Mar 28, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
37

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Freeport Center Building Z-13, Clearfield, UT 84016
Industry
Not classified in OSHA's inspection record.

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Jan 4, 1994Planned (H) · Complete scope, Safety#124623620$3,15012 viol.

Inspection #124623620

Dates

Opened
Jan 4, 1994
Closing Conference Date
Jan 11, 1994
Closed
Mar 22, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
37

Violations and Penalties

Total Violations
12
Violation Types
6 serious, 6 other-than-serious
Initial Penalties
$3,150
Penalties on Record
$3,150
Site Address
Freeport Center Building Z-13, Clearfield, UT 84016
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 12 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.36
Design and Construction Requirements for Exit Routes
OSHA citation code: 19100036 B05
Serious337$1,050$1,050Mar 5, 1994--
01001B1910.36
Design and Construction Requirements for Exit Routes
OSHA citation code: 19100036 B08
Serious137$0$0Mar 5, 1994--
01001C1910.37
Maintenance, Safeguards, and Operational Features for Exit Routes
OSHA citation code: 19100037 Q01
Serious137$0$0Mar 5, 1994--
01001D1910.37
Maintenance, Safeguards, and Operational Features for Exit Routes
OSHA citation code: 19100037 Q02
Serious137$0$0Mar 5, 1994--
010021910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C01
Serious120$1,050$1,050Feb 13, 1994--

Showing the 5 violations listed first by citation identifier. This inspection has 12 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Mar 13, 1990Planned (H) · Complete scope, Health#105598874$03 viol.

Inspection #105598874

Dates

Opened
Mar 13, 1990
Closing Conference Date
May 8, 1990
Closed
Jun 27, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
30

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
D11 Freeport Center, Clearfield, UT 84016
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
0100110100040401Other11$0$0Jun 4, 1990--
010021910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H03
Other11$0$0May 21, 1990--
010031910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Other11$0$0Jun 28, 1990--
Dec 16, 1982Planned (H) · Complete scope, Safety#217991074$04 viol.

Inspection #217991074

Dates

Opened
Dec 16, 1982
Closing Conference Date
Dec 16, 1982
Closed
Feb 4, 1983

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
7

Violations and Penalties

Total Violations
4
Violation Types
4 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Bld D 11 Freeport Center, Clearfield, UT 84016
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001GEN0212011Other1-$0$0Jan 14, 1983--
01002GEN0304061400001Other1-$0$0Jan 14, 1983--
01003GEN0305021Other2-$0$0Jan 14, 1983--
01004GEN03050723Other1-$0$0Jan 7, 1983--
Dec 16, 1982Planned (H) · Complete scope, Health#217982354$00 viol.

Inspection #217982354

Dates

Opened
Dec 16, 1982
Closing Conference Date
Dec 16, 1982
Closed
Dec 20, 1982

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
7

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Bldg D 11 Freeport Center, Clearfield, UT 84016
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 9 of 9, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.147Control of Hazardous Energy (Lockout/Tagout)5 citations · $1,675
1910.1200Hazard Communication4 citations · $0
1910.37Maintenance, Safeguards, and Operational Features for Exit Routes2 citations · $0

Other inspected employers in CLEARFIELD, UT

All employers in CLEARFIELD →