SHAMBAUGH & SON INC
(NORTH CENTRAL HIGH SCHOOL) 1801 E. 86TH STREET, INDIANAPOLIS, IN 46240
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Aug 18, 2003#306861063Aug 18, 2003Planned (H) · Complete scope, Safety#306861063$02 viol.2 violations$0 in penalties
Inspection #306861063
Dates
- Opened
- Aug 18, 2003
- Closing Conference Date
- Aug 20, 2003
- Closed
- Dec 4, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Franklin Central High School, Indianapolis, IN 46259
- Industry
- 238210 Electrical Contractors and Other Wiring Installation Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.150 Fire Protection (Construction) OSHA citation code: 19260150 E02 | Other | 1 | 6 | $0 | $0 | Nov 10, 2003 | - | - |
| 01002 | 1926.1051 Stairways - General Requirements (Construction) OSHA citation code: 19261051 A | Other | 1 | 6 | $0 | $0 | Nov 10, 2003 | - | - |
Aug 6, 2003#306860545Aug 6, 2003Planned (H) · Complete scope, Safety#306860545$00 viol.0 violations$0 in penalties
Inspection #306860545
Dates
- Opened
- Aug 6, 2003
- Closing Conference Date
- Aug 11, 2003
- Closed
- Oct 20, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1555 Kentucky Ave., Indianapolis, IN 46285
- Industry
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Feb 24, 2003#306032939Feb 24, 2003Planned (H) · Complete scope, Safety#306032939$00 viol.0 violations$0 in penalties
Inspection #306032939
Dates
- Opened
- Feb 24, 2003
- Closing Conference Date
- Feb 25, 2003
- Closed
- May 14, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- East 38th Street Branch Library, Indianapolis, IN 46218
- Industry
- 238210 Electrical Contractors and Other Wiring Installation Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Oct 22, 2002#305815938Oct 22, 2002Planned (H) · Complete scope, Safety#305815938$00 viol.0 violations$0 in penalties
Inspection #305815938
Dates
- Opened
- Oct 22, 2002
- Closing Conference Date
- Oct 24, 2002
- Closed
- Feb 7, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Warren Central H S 9th Gr Wing-Gym-Indoor Pool, Indianapolis, IN 46229
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jun 22, 2001#304051014Jun 22, 2001Unprogrammed Related (G) · Partial scope, Health#304051014$00 viol.0 violations$0 in penalties
Inspection #304051014
Dates
- Opened
- Jun 22, 2001
- Closing Conference Date
- Jul 25, 2001
- Closed
- Sep 25, 2001
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 1,400
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1555 Kentucky Ave., Indianapolis, IN 46285
- Industry
- Not classified in OSHA's inspection record.
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Apr 5, 2000#124054487Apr 5, 2000Unprogrammed Related (G) · Partial scope, Health#124054487$00 viol.0 violations$0 in penalties
Inspection #124054487
Dates
- Opened
- Apr 5, 2000
- Closing Conference Date
- Apr 5, 2000
- Closed
- May 4, 2000
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 55
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 5858 Decatur Blvd., Indianapolis, IN 46221
- Industry
- Not classified in OSHA's inspection record.
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Sep 21, 1998#125356964Sep 21, 1998Planned (H) · Complete scope, Safety#125356964$5621 viol.1 violation$562 in penalties
Inspection #125356964
Dates
- Opened
- Sep 21, 1998
- Closing Conference Date
- Sep 29, 1998
- Closed
- Mar 2, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 11
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $1,125
- Penalties on Record
- $562
- Site Address
- (healthplex) 3630 Guion Rd., Indianapolis, IN 46222
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01002 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 B01 | Serious | 1 | 2 | $1,125 | $562 | Feb 3, 1999 | - | - |
May 21, 1997#125405340May 21, 1997Planned (H) · Complete scope, Safety#125405340$2004 viol.4 violations$200 in penalties
Inspection #125405340
Dates
- Opened
- May 21, 1997
- Closing Conference Date
- May 28, 1997
- Closed
- Aug 1, 1997
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 21
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 1 serious, 1 repeat, 2 other-than-serious
- Initial Penalties
- $2,225
- Penalties on Record
- $200
- Site Address
- (marion Co. Jail Ii) 730 W. Washington St., Indianapolis, IN 46202
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 A02 | Other | 1 | 21 | $1,500 | $0 | Jul 23, 1997 | - | - |
| 01002A | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 A02 IIF | Other | 1 | 21 | $525 | $0 | Jul 23, 1997 | - | - |
| 01002B | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 A02 III | Serious | 1 | 21 | $0 | $0 | Jul 23, 1997 | - | - |
| 02001 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 B02 | Repeat | 1 | 21 | $200 | $200 | Jul 23, 1997 | - | - |
Mar 26, 1996#124030412Mar 26, 1996Planned (H) · Complete scope, Safety#124030412$00 viol.0 violations$0 in penalties
Inspection #124030412
Dates
- Opened
- Mar 26, 1996
- Closing Conference Date
- Mar 28, 1996
- Closed
- Apr 30, 1996
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 2
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- (lincoln Middle School) 71st And Zionsville Road, Indianapolis, IN 46268
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Aug 16, 1995#123974396Aug 16, 1995Planned (H) · Complete scope, Safety#123974396$00 viol.0 violations$0 in penalties
Inspection #123974396
Dates
- Opened
- Aug 16, 1995
- Closing Conference Date
- Aug 18, 1995
- Closed
- Sep 20, 1995
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 22
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- (truck Freight Terminal Expansion) 3915 W. Morris, Indianapolis, IN 46241
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
21 inspections, 1973 to 2003. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.