Inspection #126963800
ClosedThis page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
The Occupational Safety and Health Administration (OSHA) conducted a complaint inspection of PACIFIC PAINTING & CONSTRUCTION at Luke Afb Tank #283 Mitchell Street, 26963446ld, AZ 85340 on Mar 19, 1996. The inspection scope was complete. The case was closed on Jun 19, 2000.
OSHA documented 69 violations (12 serious, 49 willful, 8 other-than-serious) with total penalties on record of $354,275. This inspection is linked to 1 complaint in OSHA records.
- Inspection Number
- 126963800
- Type
- Complaint (B)
- Scope
- Complete
- Opened
- Mar 19, 1996
- Closed
- Jun 19, 2000
- Contested
- Jul 2, 1996
- Final Order
- Mar 28, 1997
- Total Violations
- 69
- Penalties on Record
- $354,275
- Initial Penalties
- $354,275
- Related Activity
- 1 complaint
- Address
- Luke Afb Tank #283 Mitchell Street, 26963446ld, AZ 85340
- Industry
- Not classified in OSHA's inspection record.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page.
Inspection closed Jun 19, 2000.
12 serious, 49 willful, 8 other-than-serious.
Citation amounts as first recorded in OSHA's penalty fields.
Current and initial penalty totals are the same on record.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
| Citation | Standard | Type | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|
| 01001A | 1926.62 Lead in Construction OSHA citation code: 19260062 C01 | Willful | $70,000 | $70,000 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001B | 1926.62 Lead in Construction OSHA citation code: 19260062 C03 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001C | 1926.62 Lead in Construction OSHA citation code: 19260062 D07 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001D | 1926.62 Lead in Construction OSHA citation code: 19260062 D08 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001E | 1926.62 Lead in Construction OSHA citation code: 19260062 E01 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001F | 1926.62 Lead in Construction OSHA citation code: 19260062 E02 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001G | 1926.62 Lead in Construction OSHA citation code: 19260062 E02 III | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001H | 1926.62 Lead in Construction OSHA citation code: 19260062 E03 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001I | 1926.62 Lead in Construction OSHA citation code: 19260062 E04 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001J | 1926.62 Lead in Construction OSHA citation code: 19260062 E05 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001K | 1926.62 Lead in Construction OSHA citation code: 19260062 F01 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001L | 1926.62 Lead in Construction OSHA citation code: 19260062 F02 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001M | 1926.62 Lead in Construction OSHA citation code: 19260062 F03 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001N | 1926.62 Lead in Construction OSHA citation code: 19260062 F03 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001O | 1926.62 Lead in Construction OSHA citation code: 19260062 F04 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01001P | 1926.62 Lead in Construction OSHA citation code: 19260062 F04 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002A | 1926.62 Lead in Construction OSHA citation code: 19260062 G01 | Willful | $70,000 | $70,000 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002B | 1926.62 Lead in Construction OSHA citation code: 19260062 G02 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002C | 1926.62 Lead in Construction OSHA citation code: 19260062 G02 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002D | 1926.62 Lead in Construction OSHA citation code: 19260062 G02 III | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002E | 1926.62 Lead in Construction OSHA citation code: 19260062 G02 V | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002F | 1926.62 Lead in Construction OSHA citation code: 19260062 G02 VIII | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002G | 1926.62 Lead in Construction OSHA citation code: 19260062 H01 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002H | 1926.62 Lead in Construction OSHA citation code: 19260062 I01 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002I | 1926.62 Lead in Construction OSHA citation code: 19260062 I02 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002J | 1926.62 Lead in Construction OSHA citation code: 19260062 I02 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002K | 1926.62 Lead in Construction OSHA citation code: 19260062 I02 III | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002L | 1926.62 Lead in Construction OSHA citation code: 19260062 I03 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01002M | 1926.62 Lead in Construction OSHA citation code: 19260062 I04 III | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01003A | 1926.62 Lead in Construction OSHA citation code: 19260062 J01 I | Willful | $70,000 | $70,000 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01003B | 1926.62 Lead in Construction OSHA citation code: 19260062 J01 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01003C | 1926.62 Lead in Construction OSHA citation code: 19260062 J02 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01003D | 1926.62 Lead in Construction OSHA citation code: 19260062 J02 IV | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01003E | 1926.62 Lead in Construction OSHA citation code: 19260062 J03 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01003F | 1926.62 Lead in Construction OSHA citation code: 19260062 K02 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004A | 1926.62 Lead in Construction OSHA citation code: 19260062 L01 I | Willful | $70,000 | $70,000 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004B | 1926.62 Lead in Construction OSHA citation code: 19260062 L01 III | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004C | 1926.62 Lead in Construction OSHA citation code: 19260062 L02 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004D | 1926.62 Lead in Construction OSHA citation code: 19260062 L03 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004E | 1926.62 Lead in Construction OSHA citation code: 19260062 N01 II | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004F | 1926.62 Lead in Construction OSHA citation code: 19260062 N03 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01004G | 1926.62 Lead in Construction OSHA citation code: 19260062 N05 I | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005A | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 D03 | Willful | $70,000 | $70,000 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005B | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 D07 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005C | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 D08 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005D | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 D10 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005E | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 M02 IV | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005F | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 M04 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 01005G | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 M06 | Willful | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02001A | 1926.21 Safety Training and Education OSHA citation code: 19260021 B02 | Serious | $1,500 | $1,500 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02001B | 1926.21 Safety Training and Education OSHA citation code: 19260021 B06 I | Serious | $0 | $0 | Jun 27, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02002 | 1926.51 Sanitation (Construction) OSHA citation code: 19260051 A04 | Serious | $75 | $75 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02003A | 1926.152 Flammable Liquids OSHA citation code: 19260152 C03 | Serious | $600 | $600 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02003B | 1926.152 Flammable Liquids OSHA citation code: 19260152 D02 | Serious | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02003C | 1926.152 Flammable Liquids OSHA citation code: 19260152 E02 | Serious | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02003D | 1926.152 Flammable Liquids OSHA citation code: 19260152 G10 | Serious | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02004 | 1926.403 Electrical - General Requirements (Construction) OSHA citation code: 19260403 I02 I | Serious | $600 | $600 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02005A | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 A02 | Serious | $1,500 | $1,500 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02005B | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 A03 | Serious | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02005C | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 A08 | Serious | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 02005D | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 A13 | Serious | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03001 | 1926.25 Housekeeping OSHA citation code: 19260025 A | Other | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03002 | 1926.25 Housekeeping OSHA citation code: 19260025 C | Other | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03003 | 1926.59 Hazard Communication OSHA citation code: 19260059 E01 | Other | $0 | $0 | Jun 27, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03004 | 1926.59 Hazard Communication OSHA citation code: 19260059 F05 I | Other | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03005 | 1926.59 Hazard Communication OSHA citation code: 19260059 G08 | Other | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03006 | 1926.59 Hazard Communication OSHA citation code: 19260059 H | Other | $0 | $0 | Jun 27, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03007 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 IV | Other | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
| 03008 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 V | Other | $0 | $0 | Jun 9, 1996 | Jul 2, 1996 | Mar 28, 1997 |
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment grouping are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Company pages group inspection records by normalized employer name, city, and state as reported in OSHA records. That grouping is deterministic and non-fuzzy, but it is not a universal legal-entity identifier. On inspection pages, the status display follows the DOL inspection record first. If the DOL inspection feed includes a close date, we show the inspection as closed. If the inspection feed has no close date but all citation records tied to that inspection show a final order date, we label the page "Final Order Recorded" and disclose the citation dates instead of inferring a close date. Chemical exposure sampling data and OSHA Permissible Exposure Limits (PELs) are sourced from the OSHA Occupational Chemical Database, matched via IMIS analyte codes. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.