Jul 14, 2009#312004294Jul 14, 2009Planned (H) · No Inspection scope, Safety#312004294$00 viol.0 violations$0 in penalties
Inspection #312004294
Dates
- Opened
- Jul 14, 2009
- Closing Conference Date
- Jul 14, 2009
- Closed
- Jul 14, 2009
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Not recorded
- Number of Employees
- Not recorded
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 705 N Centerville Rd, Sturgis, MI 49091
- Industry
- 332323 Ornamental and Architectural Metal Work Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
May 16, 2006#308803584May 16, 2006Planned (H) · Complete scope, Safety#308803584$24020 viol.20 violations$240 in penalties
Inspection #308803584
Dates
- Opened
- May 16, 2006
- Closing Conference Date
- Jun 16, 2006
- Closed
- Oct 12, 2006
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
Violations and Penalties
- Total Violations
- 20
- Violation Types
- 7 serious, 13 other-than-serious
- Initial Penalties
- $475
- Penalties on Record
- $240
- Site Address
- 705 N Centerville Rd, Sturgis, MI 49091
- Industry
- 332420 Metal Tank (Heavy Gauge) Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (16 of 20 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 4081003403 | Serious | 1 | 5 | $75 | $38 | Aug 14, 2006 | - | - |
| 01002 | 4081003603 | Serious | 1 | 6 | $75 | $38 | Aug 14, 2006 | - | - |
| 01003 | 4081072701 | Serious | 1 | 5 | $75 | $38 | Aug 14, 2006 | - | - |
| 01004A | 4081073101 | Serious | 1 | 5 | $75 | $38 | Aug 14, 2006 | - | - |
| 01004B | 4081.716 | Serious | 1 | 5 | $0 | $0 | Aug 14, 2006 | - | - |
| 01005 | 4081263101 | Serious | 1 | 4 | $100 | $50 | Aug 14, 2006 | - | - |
| 01006 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 I | Serious | 2 | 5 | $75 | $38 | Jul 10, 2006 | - | - |
| 02001 | 4081003601 | Other | 1 | 6 | $0 | $0 | Jul 10, 2006 | - | - |
| 02002 | 4081022001 | Other | 1 | 6 | $0 | $0 | Jul 10, 2006 | - | - |
| 02003 | 4081045403 | Other | 1 | 5 | $0 | $0 | Aug 14, 2006 | - | - |
| 02004 | 4081127603 | Other | 1 | 6 | $0 | $0 | Aug 14, 2006 | - | - |
| 02005 | 4081213101 | Other | 1 | 4 | $0 | $0 | Aug 14, 2006 | - | - |
| 02006 | 4081.3834 | Other | 1 | 5 | $0 | $0 | Aug 14, 2006 | - | - |
| 02007 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 B02 | Other | 1 | 5 | $0 | $0 | Aug 14, 2006 | - | - |
| 02008 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 A01 I | Other | 1 | 5 | $0 | $0 | Aug 14, 2006 | - | - |
| 02009 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G02 III | Other | 1 | 5 | $0 | $0 | Aug 14, 2006 | - | - |
Showing the 16 violations listed first by citation identifier. This inspection has 20 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Apr 15, 1999#127146736Apr 15, 1999Planned (H) · Complete scope, Safety#127146736$1,35014 viol.14 violations$1,350 in penalties
Inspection #127146736
Dates
- Opened
- Apr 15, 1999
- Closing Conference Date
- Apr 16, 1999
- Closed
- Jul 21, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 12
Violations and Penalties
- Total Violations
- 14
- Violation Types
- 5 serious, 9 other-than-serious
- Initial Penalties
- $2,700
- Penalties on Record
- $1,350
- Site Address
- 705 N Centerville Rd, Sturgis, MI 49091
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (14 of 14 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 4081003403 | Serious | 2 | 8 | $600 | $300 | Jun 10, 1999 | - | - |
| 01002 | 4081003405 | Serious | 2 | 8 | $600 | $300 | Jul 19, 1999 | - | - |
| 01003 | 4081072701 | Serious | 2 | 8 | $450 | $225 | Jun 10, 1999 | - | - |
| 01004 | 4081073101 | Serious | 3 | 8 | $450 | $225 | Jun 10, 1999 | - | - |
| 01005 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 I | Serious | 1 | 8 | $600 | $300 | Jun 10, 1999 | - | - |
| 02001 | 4081.125 | Other | 1 | 8 | $0 | $0 | Jun 10, 1999 | - | - |
| 02002 | 4081.1254 OSHA citation code: 40811254 B | Other | 2 | 8 | $0 | $0 | Jul 19, 1999 | - | - |
| 02003 | 4081216303 | Other | 1 | 8 | $0 | $0 | Jun 10, 1999 | - | - |
| 02004 | 4081216701 | Other | 1 | 8 | $0 | $0 | Jul 19, 1999 | - | - |
| 02005 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 B02 | Other | 2 | 8 | $0 | $0 | Jul 19, 1999 | - | - |
| 02006 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 A02 | Other | 1 | 8 | $0 | $0 | Jun 10, 1999 | - | - |
| 02007 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G01 III | Other | 1 | 8 | $0 | $0 | Jul 19, 1999 | - | - |
| 02008 | 4081388103 | Other | 2 | 8 | $0 | $0 | Jun 10, 1999 | - | - |
| 02009 | 1910.106 Flammable Liquids OSHA citation code: 19100106 D03 II | Other | 1 | 8 | $0 | $0 | Jun 10, 1999 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 1999 to 2009. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).