CLAIBORNE COUNTY-POWELL VALLEY HIGH
815 DAVIS DR, TAZEWELL, TN 37879
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 20, 2004#307205799Jan 20, 2004Planned (H) · Complete scope, Safety#307205799$02 viol.2 violations$0 in penalties
Inspection #307205799
Dates
- Opened
- Jan 20, 2004
- Closing Conference Date
- Jan 20, 2004
- Closed
- Mar 2, 2004
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 38
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- 611110 Elementary and Secondary Schools
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Serious | 1 | 1 | $0 | $0 | Feb 27, 2004 | - | - |
| 01002 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 J03 | Serious | 1 | 1 | $0 | $0 | Feb 27, 2004 | - | - |
Jul 12, 2001#304496672Jul 12, 2001Planned (H) · Complete scope, Safety#304496672$03 viol.3 violations$0 in penalties
Inspection #304496672
Dates
- Opened
- Jul 12, 2001
- Closing Conference Date
- Jul 12, 2001
- Closed
- Sep 24, 2001
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 50
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 2 serious, 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 C03 | Serious | 1 | 1 | $0 | $0 | Sep 28, 2001 | - | - |
| 01002 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 J03 | Serious | 1 | 1 | $0 | $0 | Sep 28, 2001 | - | - |
| 02001 | 1910.132 Personal Protective Equipment - General Requirements OSHA citation code: 19100132 D02 | Other | 1 | 1 | $0 | $0 | Sep 28, 2001 | - | - |
Sep 16, 1999#127341402Sep 16, 1999Planned (H) · Complete scope, Safety#127341402$010 viol.10 violations$0 in penalties
Inspection #127341402
Dates
- Opened
- Sep 16, 1999
- Closing Conference Date
- Sep 16, 1999
- Closed
- Dec 16, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 25
Violations and Penalties
- Total Violations
- 10
- Violation Types
- 7 serious, 3 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 10 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 G02 | Serious | 1 | 1 | $0 | $0 | Dec 8, 1999 | - | - |
| 01002 | 1910.134 Respiratory Protection OSHA citation code: 19100134 A02 | Serious | 1 | 1 | $0 | $0 | Dec 8, 1999 | - | - |
| 01003 | 1910.157 Portable Fire Extinguishers OSHA citation code: 19100157 C04 | Serious | 2 | 1 | $0 | $0 | Dec 8, 1999 | - | - |
| 01004 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H01 | Serious | 1 | 1 | $0 | $0 | Dec 8, 1999 | - | - |
| 01005 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H04 | Serious | 1 | 1 | $0 | $0 | Dec 8, 1999 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 10 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Sep 16, 1999#127341360Sep 16, 1999Planned (H) · Complete scope, Safety#127341360$09 viol.9 violations$0 in penalties
Inspection #127341360
Dates
- Opened
- Sep 16, 1999
- Closing Conference Date
- Sep 16, 1999
- Closed
- Nov 19, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 26
Violations and Penalties
- Total Violations
- 9
- Violation Types
- 8 serious, 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 9 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.157 Portable Fire Extinguishers OSHA citation code: 19100157 C04 | Serious | 1 | 1 | $0 | $0 | Nov 8, 1999 | - | - |
| 01002 | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 L03 III | Serious | 1 | 1 | $0 | $0 | Nov 8, 1999 | - | - |
| 01003 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H04 | Serious | 1 | 1 | $0 | $0 | Nov 8, 1999 | - | - |
| 01004 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Serious | 2 | 1 | $0 | $0 | Nov 8, 1999 | - | - |
| 01005 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 B01 | Serious | 1 | 1 | $0 | $0 | Nov 8, 1999 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 9 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Feb 11, 1998#127330546Feb 11, 1998Follow-Up (F) · Complete scope, Safety#127330546$00 viol.0 violations$0 in penalties
Inspection #127330546
Dates
- Opened
- Feb 11, 1998
- Closing Conference Date
- Feb 11, 1998
- Closed
- Feb 11, 1998
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 25
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Oct 27, 1997#127326726Oct 27, 1997Planned (H) · Complete scope, Safety#127326726$03 viol.3 violations$0 in penalties
Inspection #127326726
Dates
- Opened
- Oct 27, 1997
- Closing Conference Date
- Oct 27, 1997
- Closed
- Dec 8, 1997
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 25
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 2 serious, 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.242 Hand and Portable Powered Tools and Equipment, General OSHA citation code: 19100242 B | Serious | 1 | 2 | $0 | $0 | Dec 10, 1997 | - | - |
| 01002 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 F04 | Serious | 2 | 2 | $0 | $0 | Dec 10, 1997 | - | - |
| 02001 | 900.601 OSHA citation code: 9000601 A | Other | 2 | 2 | $0 | $0 | Dec 10, 1997 | - | - |
Nov 8, 1995#120516901Nov 8, 1995Planned (H) · Complete scope, Safety#120516901$07 viol.7 violations$0 in penalties
Inspection #120516901
Dates
- Opened
- Nov 8, 1995
- Closing Conference Date
- Nov 8, 1995
- Closed
- Feb 5, 1996
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 7
- Violation Types
- 4 serious, 3 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 7 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 C01 | Serious | 1 | 2 | $0 | $0 | Dec 28, 1995 | - | - |
| 01002 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 J03 | Serious | 1 | 2 | $0 | $0 | Dec 28, 1995 | - | - |
| 01003 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Serious | 1 | 2 | $0 | $0 | Dec 28, 1995 | - | - |
| 01004 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Serious | 1 | 2 | $0 | $0 | Dec 28, 1995 | - | - |
| 02001 | 1910.22 Walking-Working Surfaces - General Requirements OSHA citation code: 19100022 A01 | Other | 2 | 2 | $0 | $0 | Dec 28, 1995 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 7 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Sep 10, 1993#120570270Sep 10, 1993Planned (H) · Complete scope, Safety#120570270$01 viol.1 violation$0 in penalties
Inspection #120570270
Dates
- Opened
- Sep 10, 1993
- Closing Conference Date
- Sep 10, 1993
- Closed
- Oct 25, 1993
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 15
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 F05 IVA | Serious | 2 | 2 | $0 | $0 | Oct 22, 1993 | - | - |
Sep 30, 1991#111081477Sep 30, 1991Planned (H) · Complete scope, Safety#111081477$04 viol.4 violations$0 in penalties
Inspection #111081477
Dates
- Opened
- Sep 30, 1991
- Closing Conference Date
- Sep 30, 1991
- Closed
- Mar 16, 1992
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 12
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 2 serious, 2 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.101 Compressed Gases (General Requirements) OSHA citation code: 19100101 B | Serious | 1 | 2 | $0 | $0 | Nov 15, 1991 | - | - |
| 01002 | 1910.252 Welding, Cutting, and Brazing - General Requirements OSHA citation code: 19100252 A02 IVC | Serious | 1 | 2 | $0 | $0 | Nov 15, 1991 | - | - |
| 02001 | 1910.22 Walking-Working Surfaces - General Requirements OSHA citation code: 19100022 A01 | Other | 1 | 2 | $0 | $0 | Nov 15, 1991 | - | - |
| 02002 | 1910.1200 Hazard Communication OSHA citation code: 19101200 H | Other | 1 | 2 | $0 | $0 | Nov 15, 1991 | - | - |
Oct 31, 1989#107893869Oct 31, 1989Planned (H) · Complete scope, Safety#107893869$01 viol.1 violation$0 in penalties
Inspection #107893869
Dates
- Opened
- Oct 31, 1989
- Closing Conference Date
- Oct 31, 1989
- Closed
- May 3, 1990
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 12
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 815 Davis Dr, Tazewell, TN 37879
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 F05 IVA | Other | 1 | 2 | $0 | $0 | Nov 9, 1989 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
13 inspections, 1985 to 2004. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
BLS 2024 survey: elementary and secondary schools reported 2.4 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 4.7%; NAICS 6111 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source