CHERNE CONTRACTING CORP
$630
penalties
15
viol.
2
insp.

CHERNE CONTRACTING CORP

WESTON POWER PLANT 3, Rothschild, WI 54474

Inspections
2
Apr 1980 to Aug 1980 · 2 safety, 0 health
Violations
15
across 2 inspections
Penalties on record
$630
latest amounts in DOL records
By classification
Serious 4Willful 0Repeat 0Other 11

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Aug 5, 1980Planned (H) · Complete scope, Safety#14379952$48013 viol.

Inspection #14379952

Dates

Opened
Aug 5, 1980
Closing Conference Date
Aug 18, 1980
Closed
Oct 2, 1980

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
60

Violations and Penalties

Total Violations
13
Violation Types
2 serious, 11 other-than-serious
Initial Penalties
$480
Penalties on Record
$480
Site Address
Weston Power Plant 3, Rothschild, WI 54474
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (13 of 13 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 D01
Serious10-$480$480Sep 9, 1980--
01001B1926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 D01
Serious10-$0$0Sep 9, 1980--
020021926.151
Fire Prevention
OSHA citation code: 19260151 A03
Other1-$0$0Aug 30, 1980--
02003A1926.152
Flammable Liquids
OSHA citation code: 19260152 A01
Other1-$0$0Sep 9, 1980--
02003B1926.152
Flammable Liquids
OSHA citation code: 19260152 A01
Other1-$0$0Aug 30, 1980--
020051926.351
Arc Welding and Cutting
OSHA citation code: 19260351 B04
Other1-$0$0Aug 30, 1980--
020061926.402
Applicability (Electrical - Construction)
OSHA citation code: 19260402 A08
Other1-$0$0Aug 30, 1980--
02007A1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E04
Other1-$0$0Aug 30, 1980--
02007B1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E07 II
Other1-$0$0Aug 30, 1980--
02007C1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E10
Other1-$0$0Aug 30, 1980--
020081926.550
Cranes and Derricks
OSHA citation code: 19260550 A05
Other1-$0$0Aug 30, 1980--
02009A1926.550
Cranes and Derricks
OSHA citation code: 19260550 B02
Other2-$0$0Aug 30, 1980--
02009B1926.550
Cranes and Derricks
OSHA citation code: 19260550 B02
Other2-$0$0Sep 9, 1980--
Apr 25, 1980Complaint (B) · Partial scope, Safety#14324172$1502 viol.

Inspection #14324172

Dates

Opened
Apr 25, 1980
Closing Conference Date
May 1, 1980
Closed
Jul 7, 1980

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
30
Related Activity
1 complaint

Violations and Penalties

Total Violations
2
Violation Types
2 serious
Initial Penalties
$150
Penalties on Record
$150
Site Address
Weston #3 Jct Us Bus 51 So & 5, Rothschild, WI 54474
Industry
Not classified in OSHA's inspection record.

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.556
Aerial Tramways
OSHA citation code: 19260556 B02 V
Serious1-$150$150May 22, 1980--
01001B1926.556
Aerial Tramways
OSHA citation code: 19260556 B02 IV
Serious1-$0$0May 22, 1980--
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.550Cranes and Derricks3 citations · $0
1926.451Scaffolding - General Requirements3 citations · $0
1926.556Aerial Tramways2 citations · $150

Other inspected employers in Rothschild, WI

All employers in Rothschild →