Skip to content
SafetyRecord logoSafetyRecord
MCLAUGHLIN MFG CO
$230
penalties
16
viol.
4
insp.

MCLAUGHLIN MFG CO

RT 59 NORTH, Plainfield, IL 60544

Inspections
4
Aug 1976 to Mar 1984 · 4 safety, 0 health
Violations
16
across 4 inspections
Penalties on record
$230
latest amounts in DOL records
By classification
Serious 3Willful 0Repeat 0Other 13

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Mar 13, 1984Planned (H) · Complete scope, Safety#568931$1506 viol.

Inspection #568931

Dates

Opened
Mar 13, 1984
Closing Conference Date
Mar 13, 1984
Closed
Apr 3, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
18

Violations and Penalties

Total Violations
6
Violation Types
3 serious, 3 other-than-serious
Initial Penalties
$150
Penalties on Record
$150
Site Address
1351 N Division St, Plainfield, IL 60544
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.252
Welding, Cutting, and Brazing - General Requirements
OSHA citation code: 19100252 B04 IXC
Serious3-$150$150Mar 22, 1984--
01001B1910.252
Welding, Cutting, and Brazing - General Requirements
OSHA citation code: 19100252 C06
Serious1-$0$0Mar 26, 1984--
01001C1910.303
Electrical - General Requirements
OSHA citation code: 19100303 F
Serious1-$0$0Mar 26, 1984--
020011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 I
Other1-$0$0Mar 28, 1984--
020021910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Other1-$0$0Mar 26, 1984--
020031910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 D01
Other1-$0$0Mar 26, 1984--
May 19, 1982Planned (H) · Records Only scope, Safety#15790686$00 viol.

Inspection #15790686

Dates

Opened
May 19, 1982
Closing Conference Date
May 19, 1982
Closed
May 19, 1982

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
20

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1351 N Division St, Plainfield, IL 60544
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Feb 19, 1981Planned (H) · Complete scope, Safety#14424642$00 viol.

Inspection #14424642

Dates

Opened
Feb 19, 1981
Closing Conference Date
Feb 19, 1981
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
18

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Rt 59, Plainfield, IL 60544
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Aug 3, 1976Planned (H) · Complete scope, Safety#14430532$8010 viol.

Inspection #14430532

Dates

Opened
Aug 3, 1976
Closing Conference Date
Aug 3, 1976
Closed
Feb 16, 1977

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
20

Violations and Penalties

Total Violations
10
Violation Types
10 other-than-serious
Initial Penalties
$80
Penalties on Record
$80
Site Address
Rt 59 North, Plainfield, IL 60544
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (10 of 10 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.184
Slings
OSHA citation code: 19100184 E03 II
Other1-$0$0Aug 20, 1976--
01002A1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Other2-$0$0Aug 20, 1976--
01002B1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E03 I
Other2-$0$0Aug 20, 1976--
01002C1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E01 I
Other2-$0$0Aug 20, 1976--
010031910.252
Welding, Cutting, and Brazing - General Requirements
OSHA citation code: 19100252 A02 IVC
Other1-$0$0Aug 20, 1976--
010041910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 IV
Other1-$25$25Sep 30, 1976--
010051910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G02
Other1-$30$30Aug 30, 1976--
010061910.22
Walking-Working Surfaces - General Requirements
OSHA citation code: 19100022 D01
Other1-$0$0Sep 10, 1976--
010071910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B09
Other1-$25$25Aug 20, 1976--
010081910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G02
Other1-$0$0Aug 30, 1976--
Inspections 1 to 4 of 4, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.107Spray Finishing Using Flammable and Combustible Materials5 citations · $80
1910.219Mechanical Power-Transmission Apparatus3 citations · $0
1910.252Welding, Cutting, and Brazing - General Requirements3 citations · $150

Other inspected employers in Plainfield, IL

All employers in Plainfield →