PRESTON SPECIALTIES INC
103 COFFEE ST, Lanesboro, MN 55949
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 5, 2012#316231166Jan 5, 2012Planned (H) · Complete scope, Safety#316231166$2282 viol.2 violations$228 in penalties
Inspection #316231166
Dates
- Opened
- Jan 5, 2012
- Closing Conference Date
- Jan 5, 2012
- Closed
- Jan 30, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 14
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 serious, 1 other-than-serious
- Initial Penalties
- $325
- Penalties on Record
- $228
- Site Address
- 103 Coffee Street, Po Box 315, Lanesboro, MN 55949
- Industry
- 322299 All Other Converted Paper Product Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 5206070001 OSHA citation code: 5206070001 G | Serious | 1 | 6 | $225 | $158 | Feb 11, 2012 | - | - |
| 02001 | 5206100001 | Other | 1 | 6 | $100 | $70 | Jan 28, 2012 | - | - |
Mar 14, 2006#309763423Mar 14, 2006Planned (H) · Complete scope, Safety#309763423$4902 viol.2 violations$490 in penalties
Inspection #309763423
Dates
- Opened
- Mar 14, 2006
- Closing Conference Date
- Mar 14, 2006
- Closed
- Apr 12, 2006
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 26
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $700
- Penalties on Record
- $490
- Site Address
- 103 Coffee Street, Po Box 315, Lanesboro, MN 55949
- Industry
- 322299 All Other Converted Paper Product Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.37 Maintenance, Safeguards, and Operational Features for Exit Routes OSHA citation code: 19100037 A03 | Serious | 1 | 2 | $400 | $280 | Mar 28, 2006 | - | - |
| 01002 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G01 III | Serious | 2 | 1 | $300 | $210 | Apr 17, 2006 | - | - |
Jul 21, 2004#307940155Jul 21, 2004Planned (H) · Complete scope, Health#307940155$3502 viol.2 violations$350 in penalties
Inspection #307940155
Dates
- Opened
- Jul 21, 2004
- Closing Conference Date
- Jul 21, 2004
- Closed
- Sep 1, 2004
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 28
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $500
- Penalties on Record
- $350
- Site Address
- 103 Coffee St W, Lanesboro, MN 55949
- Industry
- 322299 All Other Converted Paper Product Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 C01 | Serious | 1 | 2 | $200 | $140 | Sep 2, 2004 | - | - |
| 01002 | 182065302 | Serious | 1 | 28 | $300 | $210 | Sep 2, 2004 | - | - |
Mar 22, 1983#15374374Mar 22, 1983Follow-Up (F) · Partial scope, Safety#15374374$00 viol.0 violations$0 in penalties
Inspection #15374374
Dates
- Opened
- Mar 22, 1983
- Closing Conference Date
- Mar 22, 1983
- Closed
- May 17, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 10
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 103 Coffee St, Lanesboro, MN 55949
- Industry
- Not classified in OSHA's inspection record.
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Aug 19, 1982#15375249Aug 19, 1982Planned (H) · Complete scope, Safety#15375249$9810 viol.10 violations$98 in penalties
Inspection #15375249
Dates
- Opened
- Aug 19, 1982
- Closing Conference Date
- Aug 19, 1982
- Contested
- Sep 15, 1982
- Closed
- May 17, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 14
Violations and Penalties
- Total Violations
- 10
- Violation Types
- 2 serious, 8 other-than-serious
- Initial Penalties
- $154
- Penalties on Record
- $98
- Site Address
- 103 Coffee St, Lanesboro, MN 55949
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (10 of 10 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 F | Other | 4 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 01002 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 B06 | Other | 1 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 01003 | 1910.133 Eye and Face Protection OSHA citation code: 19100133 A01 | Other | 1 | - | $42 | $42 | Sep 28, 1982 | - | - |
| 01004 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 I | Other | 2 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 01005 | 1910.178 Powered Industrial Trucks OSHA citation code: 19100178 P01 | Other | 1 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 01006 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 A11 | Other | 2 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 01007 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 I01 | Other | 1 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 01008 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 P04 | Other | 1 | - | $0 | $0 | Sep 28, 1982 | - | - |
| 02001 | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 D01 | Serious | 1 | - | $56 | $0 | Sep 28, 1982 | Sep 15, 1982 | - |
| 02002 | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 F01 | Serious | 1 | - | $56 | $56 | Sep 28, 1982 | Sep 15, 1982 | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
5 inspections, 1982 to 2012. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
BLS 2024 survey: all other converted paper product manufacturing reported 2.5 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 14.5%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source