STORM-VULCAN INC
2225 BURBANK ST, Dallas, TX 75235
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jun 10, 1982#16505570Jun 10, 1982Planned (H) · Partial scope, Safety#16505570$06 viol.6 violations$0 in penalties
Inspection #16505570
Dates
- Opened
- Jun 10, 1982
- Closing Conference Date
- Jun 10, 1982
- Closed
- Jul 21, 1982
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 95
- Related Activity
- 1 referral
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 6 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 2225 Burbank St, Dallas, TX 75235
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (6 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.157 Portable Fire Extinguishers OSHA citation code: 19100157 G01 | Other | 1 | - | $0 | $0 | Jul 30, 1982 | - | - |
| 01002 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 B05 I | Other | 1 | - | $0 | $0 | Jul 30, 1982 | - | - |
| 01003 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 B06 | Other | 1 | - | $0 | $0 | Jul 30, 1982 | - | - |
| 01004 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 G02 | Other | 1 | - | $0 | $0 | Jul 30, 1982 | - | - |
| 01005 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A03 II | Other | 1 | - | $0 | $0 | Aug 6, 1982 | - | - |
| 01006 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 A02 | Other | 1 | - | $0 | $0 | Jun 10, 1982 | - | - |
May 25, 1982#16554669May 25, 1982Planned (H) · Complete scope, Health#16554669$03 viol.3 violations$0 in penalties
Inspection #16554669
Dates
- Opened
- May 25, 1982
- Closing Conference Date
- May 26, 1982
- Closed
- Jul 22, 1982
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 95
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 2225 Burbank St, Dallas, TX 75235
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.134 Respiratory Protection OSHA citation code: 19100134 B05 | Other | 1 | - | $0 | $0 | Jul 1, 1982 | - | - |
| 01002 | 1910.134 Respiratory Protection OSHA citation code: 19100134 B06 | Other | 1 | - | $0 | $0 | Jul 1, 1982 | - | - |
| 01003 | 1910.134 Respiratory Protection OSHA citation code: 19100134 B07 | Other | 1 | - | $0 | $0 | Jul 1, 1982 | - | - |
Dec 5, 1975#16485187Dec 5, 1975Follow-Up (F) · Partial scope, Safety#16485187$00 viol.0 violations$0 in penalties
Inspection #16485187
Dates
- Opened
- Dec 5, 1975
- Closing Conference Date
- Dec 5, 1975
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 100
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 2225 Burbank, Dallas, TX 75235
- Industry
- Not classified in OSHA's inspection record.
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Nov 20, 1975#16485138Nov 20, 1975Planned (H) · Complete scope, Safety#16485138$88515 viol.15 violations$885 in penalties
Inspection #16485138
Dates
- Opened
- Nov 20, 1975
- Closing Conference Date
- Nov 20, 1975
- Closed
- Feb 6, 1976
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 100
Violations and Penalties
- Total Violations
- 15
- Violation Types
- 1 serious, 14 other-than-serious
- Initial Penalties
- $885
- Penalties on Record
- $885
- Site Address
- 2225 Burbank, Dallas, TX 75235
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (12 of 15 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.106 Flammable Liquids OSHA citation code: 19100106 D03 II | Other | 1 | - | $65 | $65 | Dec 3, 1975 | - | - |
| 01001B | 1910.106 Flammable Liquids OSHA citation code: 19100106 D03 II | Other | 1 | - | $0 | $0 | Dec 29, 1975 | - | - |
| 01001C | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 C02 | Other | 1 | - | $0 | $0 | Dec 3, 1975 | - | - |
| 01001D | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 G03 | Other | 1 | - | $0 | $0 | Dec 3, 1975 | - | - |
| 01001E | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 G07 | Other | 1 | - | $0 | $0 | Dec 3, 1975 | - | - |
| 01002A | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 J02 III | Other | 20 | - | $105 | $105 | Dec 3, 1975 | - | - |
| 01002B | 1910.179 Overhead and Gantry Cranes OSHA citation code: 19100179 J02 IV | Other | 20 | - | $0 | $0 | Dec 3, 1975 | - | - |
| 01003 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A03 II | Other | 1 | - | $50 | $50 | Dec 29, 1975 | - | - |
| 01004 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 I01 | Other | 1 | - | $35 | $35 | Dec 29, 1975 | - | - |
| 01005A | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A01 | Other | 2 | - | $30 | $30 | Dec 29, 1975 | - | - |
| 01005B | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Other | 1 | - | $0 | $0 | Dec 29, 1975 | - | - |
| 01006 | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 D01 | Other | 5 | - | $0 | $0 | Dec 29, 1975 | - | - |
Showing the 12 violations listed first by citation identifier. This inspection has 15 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
4 inspections, 1975 to 1982. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.