This page displays public OSHA enforcement data. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
The Occupational Safety and Health Administration (OSHA) conducted a complaint inspection of STONE FOREST INDUSTRIES, INC. at 4th Street And Alabama Street, Graceville, FL 32440 on Jun 15, 1988. The inspection scope was complete. The case was closed on Apr 6, 1989.
OSHA documented 78 violations (64 serious, 14 other-than-serious) with total penalties on record of $9,090. This inspection is linked to 2 complaints in OSHA records.
This employer has 4 other OSHA inspections on record at this establishment.
Other OSHA inspections of the same establishment. Linked via establishment ID (exact government key).
| Citation | Standard | Type | Initial | Current | Abatement |
|---|---|---|---|---|---|
| 01001 | 5A0001 General Duty Clause, Section 5(a)(1) | Serious | $720 | $360 | Nov 8, 1988 |
| 01002A | 19100027 D01 IV Scaffolds and Rope Descent Systems | Serious | $540 | $270 | Nov 8, 1988 |
| 01002B | 19100022 A02 Walking-Working Surfaces - General Requirements | Serious | $0 |
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment matching are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Establishment matching is based on employer name and location as reported in inspection records; some establishments may appear under multiple name variations. Chemical exposure sampling data and OSHA Permissible Exposure Limits (PELs) are sourced from the OSHA Occupational Chemical Database, matched via IMIS analyte codes. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.
| $0 |
| Nov 8, 1988 |
| 01003A | 19100038 A01 Emergency Action Plans | Serious | $630 | $315 | Nov 30, 1988 |
| 01003B | 19100038 B01 Emergency Action Plans | Serious | $0 | $0 | Nov 30, 1988 |
| 01003C | 19100265 I Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01003D | 19100265 I Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01003E | 19100265 I Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01003F | 19100265 I Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01004 | 19100151 C Medical Services and First Aid | Serious | $450 | $225 | Nov 8, 1988 |
| 01005B | 19100177 C01 Servicing Multi-Piece and Single Piece Rim Wheels | Serious | $0 | $315 | Nov 30, 1988 |
| 01005C | 19100177 D05 Servicing Multi-Piece and Single Piece Rim Wheels | Serious | $0 | $0 | Nov 8, 1988 |
| 01005D | 19100177 F Servicing Multi-Piece and Single Piece Rim Wheels | Serious | $0 | $0 | Nov 30, 1988 |
| 01005E | 19100177 G Servicing Multi-Piece and Single Piece Rim Wheels | Serious | $0 | $0 | Nov 30, 1988 |
| 01006 | 19100212 A05 General Requirements for All Machines (Machine Guarding) | Serious | $450 | $225 | Nov 8, 1988 |
| 01007A | 19100213 H01 Woodworking Machinery Requirements | Serious | $540 | $270 | Nov 8, 1988 |
| 01007B | 19100213 H04 Woodworking Machinery Requirements | Serious | $0 | $0 | Nov 8, 1988 |
| 01007C | 19100213 H03 Woodworking Machinery Requirements | Serious | $0 | $0 | Nov 8, 1988 |
| 01007D | 19100213 B03 Woodworking Machinery Requirements | Serious | $0 | $0 | Nov 8, 1988 |
| 01008A | 19100215 A02 Abrasive Wheel Machinery | Serious | $270 | $135 | Nov 8, 1988 |
| 01008B | 19100215 A04 Abrasive Wheel Machinery | Serious | $0 | $0 | Nov 8, 1988 |
| 01008C | 19100215 B09 Abrasive Wheel Machinery | Serious | $0 | $0 | Nov 8, 1988 |
| 01009 | 19100265 C01 Sawmills | Serious | $720 | $360 | Nov 8, 1988 |
| 01010 | 19100265 C03 I Sawmills | Serious | $450 | $225 | Nov 8, 1988 |
| 01011 | 19100265 C04 IV Sawmills | Serious | $360 | $180 | Nov 8, 1988 |
| 01012 | 19100265 C04 V Sawmills | Serious | $360 | $180 | Nov 8, 1988 |
| 01013 | 19100265 C05 I Sawmills | Serious | $450 | $225 | Nov 8, 1988 |
| 01014A | 19100265 C10 Sawmills | Serious | $360 | $180 | Nov 8, 1988 |
| 01014B | 19100265 C10 Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01014C | 19100265 C10 Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01015A | 19100265 C12 I Sawmills | Serious | $360 | $180 | Oct 9, 1988 |
| 01015B | 19100265 C12 I Sawmills | Serious | $0 | $0 | Oct 9, 1988 |
| 01016 | 19100265 C12 V Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01017A | 19100265 C12 VIII Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01017B | 19100265 C03 IV Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01017C | 19100022 A02 Walking-Working Surfaces - General Requirements | Serious | $0 | $0 | Nov 8, 1988 |
| 01018A | 19100265 C16 Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01018D | 19100265 C16 Sawmills | Serious | $0 | $0 | Nov 30, 1988 |
| 01019 | 19100265 C18 I Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01020 | 19100265 C20 VI Sawmills | Serious | $450 | $225 | Oct 9, 1988 |
| 01021 | 19100265 C22 Sawmills | Serious | $720 | $360 | Nov 8, 1988 |
| 01022 | 19100265 C22 Sawmills | Serious | $720 | $360 | Nov 1, 1988 |
| 01023A | 19100265 C22 Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01023B | 19100265 C22 Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01024 | 19100265 C23 IV Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01025A | 19100265 C26 VIII Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01025B | 19100265 C04 IV Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01026A | 19100265 C30 X Sawmills | Serious | $630 | $315 | Oct 9, 1988 |
| 01026B | 19100265 C30 X Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01026C | 19100265 C30 II Sawmills | Serious | $0 | $0 | Nov 30, 1988 |
| 01027A | 19100265 D04 III Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01027B | 19100022 A02 Walking-Working Surfaces - General Requirements | Serious | $0 | $0 | Oct 9, 1988 |
| 01027C | 19100265 C20 III Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01027D | 19100265 C20 III Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01028A | 19100265 E01 III Sawmills | Serious | $720 | $360 | Nov 8, 1988 |
| 01028B | 19100265 E01 I Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01028C | 19100265 E01 VIII Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01028D | 19100265 E01 IV Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01029A | 19100265 E05 IIIB Sawmills | Serious | $540 | $270 | Nov 8, 1988 |
| 01029B | 19100265 E02 IC Sawmills | Serious | $0 | $0 | Nov 8, 1988 |
| 01030 | 19100265 E06 IC Sawmills | Serious | $540 | $270 | Nov 30, 1988 |
| 01031 | 19100265 F05 Sawmills | Serious | $450 | $225 | Nov 8, 1988 |
| 01032 | 19100265 G Sawmills | Serious | $630 | $315 | Nov 8, 1988 |
| 01033 | 19100265 G Sawmills | Serious | $450 | $225 | Oct 2, 1988 |
| 02001 | 19100215 B09 Abrasive Wheel Machinery | Other | $0 | $0 | Nov 8, 1988 |
| 02002 | 19100252 A02 IIB Welding, Cutting, and Brazing - General Requirements | Other | $0 | $0 | Oct 9, 1988 |
| 02003 | 19100252 A02 IID Welding, Cutting, and Brazing - General Requirements | Other | $0 | $0 | Oct 9, 1988 |
| 02004 | 19100252 A02 IVC Welding, Cutting, and Brazing - General Requirements | Other | $0 | $0 | Oct 9, 1988 |
| 02005 | 19100265 C05 I Sawmills | Other | $0 | $0 | Nov 8, 1988 |
| 02006A | 19100265 C12 I Sawmills | Other | $0 | $0 | Nov 8, 1988 |
| 02006B | 19100265 C12 I Sawmills | Other | $0 | $0 | Nov 8, 1988 |
| 02006C | 19100265 C12 I Sawmills | Other | $0 | $0 | Oct 9, 1988 |
| 02006D | 19100265 C12 I Sawmills | Other | $0 | $0 | Nov 8, 1988 |
| 02006E | 19100265 C12 I Sawmills | Other | $0 | $0 | Oct 9, 1988 |
| 02006F | 19100265 C12 I Sawmills | Other | $0 | $0 | Nov 8, 1988 |
| 02006G | 19100265 C12 I Sawmills | Other | $0 | $0 | Oct 9, 1988 |
| 02008 | 19100265 D02 I Sawmills | Other | $0 | $0 | Nov 30, 1988 |
| 02009 | 19100265 E04 IIC Sawmills | Other | $0 | $0 | Nov 8, 1988 |