ALOMAR STAMPING & DIE MFG CO
12125 BENNINGTON AVENUE, Cleveland, OH 44135 · NAICS 332214
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Feb 8, 1990#105934079Feb 8, 1990Complaint (B) · Partial scope, Safety#105934079$5606 viol.6 violations$560 in penalties
Inspection #105934079
Dates
- Opened
- Feb 8, 1990
- Closing Conference Date
- Feb 8, 1990
- Closed
- Apr 12, 1990
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 15
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 4 serious, 2 other-than-serious
- Initial Penalties
- $560
- Penalties on Record
- $560
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44130
- Industry
- 332214
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Violations
Violation list (5 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A03 II | Serious | 1 | 1 | $100 | $100 | Apr 12, 1990 | - | - |
| 01002 | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 C01 I | Serious | 1 | 1 | $210 | $210 | Mar 4, 1990 | - | - |
| 01003 | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 E01 I | Serious | 1 | 1 | $150 | $150 | Apr 12, 1990 | - | - |
| 01004 | 1910.1200 Hazard Communication OSHA citation code: 19101200 H | Serious | 1 | 10 | $100 | $100 | Apr 12, 1990 | - | - |
| 02001 | 1910.37 Maintenance, Safeguards, and Operational Features for Exit Routes OSHA citation code: 19100037 Q02 | Other | 1 | 3 | $0 | $0 | Mar 4, 1990 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 6 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Aug 31, 1983#214791725Aug 31, 1983Planned (H) · Records Only scope, Safety#214791725$00 viol.0 violations$0 in penalties
Inspection #214791725
Dates
- Opened
- Aug 31, 1983
- Closing Conference Date
- Aug 31, 1983
- Closed
- Aug 31, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 15
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 12125 Bennington Ave, Cleveland, OH 44135
- Industry
- 332214
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jun 21, 1979#215001223Jun 21, 1979Follow-Up (F) · Partial scope, Safety#215001223$5003 viol.3 violations$500 in penalties
Inspection #215001223
Dates
- Opened
- Jun 21, 1979
- Closing Conference Date
- Jun 21, 1979
- Contested
- Jul 15, 1979
- Closed
- Dec 7, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 31
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 repeat
- Initial Penalties
- $1,240
- Penalties on Record
- $500
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 B03 I | Repeat | 2 | - | $540 | $200 | Aug 8, 1979 | Jul 15, 1979 | - |
| 01002 | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 C02 IA | Repeat | 2 | - | $540 | $200 | Sep 7, 1979 | Jul 15, 1979 | - |
| 01003 | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 E01 II | Repeat | 1 | - | $160 | $100 | Jul 9, 1979 | Jul 15, 1979 | - |
Aug 3, 1978#214798043Aug 3, 1978Complaint (B) · Partial scope, Safety#214798043$7819 viol.19 violations$78 in penalties
Inspection #214798043
Dates
- Opened
- Aug 3, 1978
- Closing Conference Date
- Aug 8, 1978
- Closed
- Jun 21, 1979
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 42
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 19
- Violation Types
- 13 serious, 2 repeat, 4 other-than-serious
- Initial Penalties
- $78
- Penalties on Record
- $78
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Violations
Violation list (5 of 19 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.106 Flammable Liquids OSHA citation code: 19100106 E02 IVD | Serious | 1 | - | $0 | $0 | Sep 22, 1978 | - | - |
| 01002 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 B05 I | Serious | 1 | - | $5 | $5 | Oct 23, 1978 | - | - |
| 01003 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 C05 | Serious | 1 | - | $5 | $5 | Nov 22, 1978 | - | - |
| 01004 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 E02 | Serious | 1 | - | $5 | $5 | Oct 23, 1978 | - | - |
| 01005 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 E09 | Serious | 1 | - | $5 | $5 | Sep 7, 1978 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 19 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Oct 22, 1976#214797110Oct 22, 1976Follow-Up (F) · Complete scope, Safety#214797110$00 viol.0 violations$0 in penalties
Inspection #214797110
Dates
- Opened
- Oct 22, 1976
- Closing Conference Date
- Nov 2, 1976
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 30
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Apr 26, 1974#214966707Apr 26, 1974Follow-Up (F) · Complete scope, Safety#214966707$00 viol.0 violations$0 in penalties
Inspection #214966707
Dates
- Opened
- Apr 26, 1974
- Closing Conference Date
- Apr 26, 1974
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Not displayed
- Number of Employees
- 35
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Mar 6, 1974#214915233Mar 6, 1974Follow-Up (F) · Complete scope, Safety#214915233$00 viol.0 violations$0 in penalties
Inspection #214915233
Dates
- Opened
- Mar 6, 1974
- Closing Conference Date
- Mar 6, 1974
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Not displayed
- Number of Employees
- 35
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Feb 12, 1974#214966426Feb 12, 1974Planned (H) · Complete scope, Health#214966426$451 viol.1 violation$45 in penalties
Inspection #214966426
Dates
- Opened
- Feb 12, 1974
- Closing Conference Date
- Feb 12, 1974
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Not displayed
- Number of Employees
- 35
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $45
- Penalties on Record
- $45
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.95 Occupational Noise Exposure OSHA citation code: 19100095 B01 | Other | 2 | - | $45 | $45 | Apr 22, 1974 | - | - |
Jan 30, 1974#214915050Jan 30, 1974Follow-Up (F) · Complete scope, Safety#214915050$252 viol.2 violations$25 in penalties
Inspection #214915050
Dates
- Opened
- Jan 30, 1974
- Closing Conference Date
- Jan 30, 1974
- Closed
- Apr 1, 1974
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Not displayed
- Number of Employees
- 35
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $25
- Penalties on Record
- $25
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 C02 | Other | 1 | - | $0 | $0 | Feb 7, 1974 | - | - |
| 01002 | 1910.151 Medical Services and First Aid OSHA citation code: 19100151 B | Other | 1 | - | $25 | $25 | Mar 1, 1974 | - | - |
Nov 6, 1973#214914616Nov 6, 1973Planned (H) · Complete scope, Safety#214914616$16015 viol.15 violations$160 in penalties
Inspection #214914616
Dates
- Opened
- Nov 6, 1973
- Closing Conference Date
- Nov 6, 1973
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Not displayed
- Number of Employees
- 35
Violations and Penalties
- Total Violations
- 15
- Violation Types
- 15 other-than-serious
- Initial Penalties
- $160
- Penalties on Record
- $160
- Site Address
- 12125 Bennington Avenue, Cleveland, OH 44135
- Industry
- 332214
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 15 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.22 Walking-Working Surfaces - General Requirements OSHA citation code: 19100022 D01 | Other | 2 | - | $0 | $0 | Dec 28, 1973 | - | - |
| 01002 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 B09 | Other | 1 | - | $0 | $0 | Dec 21, 1973 | - | - |
| 01003 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 E03 | Other | 1 | - | $25 | $25 | Dec 21, 1973 | - | - |
| 01004 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 F04 | Other | 1 | - | $0 | $0 | Jan 11, 1974 | - | - |
| 01005 | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 G03 | Other | 1 | - | $0 | $0 | Dec 28, 1973 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 15 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
10 inspections, 1973 to 1990. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Fabricated Metal Product Manufacturing, 48,574 employers with OSHA inspections. Arithmetic from DOL records.