OHIO SEMITRONICS INC
$475
penalties
17
viol.
5
insp.

OHIO SEMITRONICS INC

1205 CHESAPEAKE AVENUE, Columbus, OH 43215NAICS 334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Inspections
5
Dec 1974 to Feb 1979 · 4 safety, 1 health
Violations
17
across 5 inspections
Penalties on record
$475
latest amounts in DOL records
By classification
Serious 2Willful 0Repeat 0Other 15

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Feb 14, 1979Follow-Up (F) · Partial scope, Safety#215019423$02 viol.

Inspection #215019423

Dates

Opened
Feb 14, 1979
Closing Conference Date
Feb 14, 1979
Closed
Mar 5, 1979

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
43

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1205 Chesapeake Avenue, Columbus, OH 43212
Industry
334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011904.2
Partial Exemption for Establishments in Certain Industries
OSHA citation code: 19040002 A
Other1-$0$0Mar 1, 1979--
010021904.4
Recording Criteria
Other1-$0$0Mar 1, 1979--
Nov 9, 1978Complaint (B) · Partial scope, Safety#215019183$4002 viol.

Inspection #215019183

Dates

Opened
Nov 9, 1978
Closing Conference Date
Nov 9, 1978
Closed
Jan 14, 1981

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
40
Related Activity
1 complaint

Violations and Penalties

Total Violations
2
Violation Types
2 serious
Initial Penalties
$400
Penalties on Record
$400
Site Address
1205 Chesapeake Avenue, Columbus, OH 43212
Industry
334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B01
Serious1-$200$200Dec 20, 1978--
010021910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 C02
Serious1-$200$200Dec 20, 1978--
Nov 9, 1978Complaint (B) · Partial scope, Health#215013442$01 viol.

Inspection #215013442

Dates

Opened
Nov 9, 1978
Closing Conference Date
Jan 12, 1979
Closed
Mar 5, 1979

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
40
Related Activity
1 complaint

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1205 Chesapeake Avenue, Columbus, OH 43212
Industry
334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.1018
Inorganic Arsenic
OSHA citation code: 19101018 E02
Other1-$0$0Feb 19, 1979--
Feb 26, 1975Follow-Up (F) · Complete scope, Safety#215157058$02 viol.

Inspection #215157058

Dates

Opened
Feb 26, 1975
Closing Conference Date
Feb 26, 1975
Closed
Feb 27, 1975

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
20

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1205 Chesapeake Avenue, Columbus, OH 43215
Industry
334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.22
Walking-Working Surfaces - General Requirements
OSHA citation code: 19100022 A01
Other1-$0$0Mar 3, 1975--
010021910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 A
Other1-$0$0Mar 3, 1975--
Dec 30, 1974Planned (H) · Complete scope, Safety#215156712$7510 viol.

Inspection #215156712

Dates

Opened
Dec 30, 1974
Closing Conference Date
Dec 30, 1974
Closed
Apr 25, 1975

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Not displayed
Number of Employees
20

Violations and Penalties

Total Violations
10
Violation Types
10 other-than-serious
Initial Penalties
$75
Penalties on Record
$75
Site Address
1205 Chesapeake Avenue, Columbus, OH 43212
Industry
334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (10 of 10 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.23
Ladders
OSHA citation code: 19100023 C01
Other1-$0$0Jan 30, 1975--
010021910.36
Design and Construction Requirements for Exit Routes
OSHA citation code: 19100036 D01
Other1-$0$0Jan 30, 1975--
010031910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 I
Other1-$25$25Feb 28, 1975--
010041910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 C02
Other1-$25$25Jan 24, 1975--
010051910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Other2-$25$25Jan 31, 1975--
010061910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 A
Other1-$0$0Jan 20, 1975--
010071910.252
Welding, Cutting, and Brazing - General Requirements
OSHA citation code: 19100252 A02 IVC0
Other1-$0$0Jan 31, 1975--
010081910.309
OSHA citation code: 19100309 A 011017
Other1-$0$0Jan 20, 1975--
010091910.309
OSHA citation code: 19100309 A 040004
Other1-$0$0Jan 31, 1975--
010101910.106
Flammable Liquids
OSHA citation code: 19100106 D02 IIIA2
Other1-$0$0Jan 31, 1975--
Inspections 1 to 5 of 5, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.107Spray Finishing Using Flammable and Combustible Materials4 citations · $450
1910.3092 citations · $0
1910.242Hand and Portable Powered Tools and Equipment, General2 citations · $0

Industry comparison

Violations per inspection
This employer3.4
Industry average2.7
Penalties per inspection
This employer$95
Industry average$1,696

Computer and Electronic Product Manufacturing, 5,598 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in Columbus, OH

All employers in Columbus →