ATTICA HYDRAULIC EXCHANGE CORP
48175 GRATIOT AVE, CHESTERFIELD, MI 48051 · NAICS 333996 Fluid Power Pump and Motor Manufacturing
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Aug 6, 2010#312012099Aug 6, 2010Planned (H) · Complete scope, Safety#312012099$502 viol.2 violations$50 in penalties
Inspection #312012099
Dates
- Opened
- Aug 6, 2010
- Closing Conference Date
- Aug 11, 2010
- Closed
- Sep 16, 2010
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 105
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 repeat, 1 other-than-serious
- Initial Penalties
- $100
- Penalties on Record
- $50
- Site Address
- 48175 Gratiot, Chesterfield, MI 48051
- Industry
- 333996 Fluid Power Pump and Motor Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 G05 | Other | 2 | 1 | $0 | $0 | Sep 20, 2010 | - | - |
| 02001 | 1910.147 Control of Hazardous Energy (Lockout/Tagout) OSHA citation code: 19100147 C07 IB | Repeat | 1 | 3 | $100 | $50 | Sep 20, 2010 | - | - |
Apr 23, 2008#308874304Apr 23, 2008Planned (H) · Complete scope, Safety#308874304$5,13029 viol.29 violations$5,130 in penalties
Inspection #308874304
Dates
- Opened
- Apr 23, 2008
- Closing Conference Date
- May 12, 2008
- Closed
- Aug 21, 2008
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 99
Violations and Penalties
- Total Violations
- 29
- Violation Types
- 9 serious, 4 repeat, 16 other-than-serious
- Initial Penalties
- $8,550
- Penalties on Record
- $5,130
- Site Address
- 48175 Gratiot Ave, Chesterfield, MI 48051
- Industry
- 333996 Fluid Power Pump and Motor Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (16 of 29 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 4081003407 | Serious | 2 | 3 | $750 | $450 | Jul 24, 2008 | - | - |
| 01002 | 4081003409 | Serious | 3 | 3 | $750 | $450 | Aug 11, 2008 | - | - |
| 01003 | 4081073101 | Serious | 3 | 3 | $750 | $450 | Aug 11, 2008 | - | - |
| 01004 | 4081.716 | Serious | 5 | 5 | $750 | $450 | Aug 11, 2008 | - | - |
| 01005 | 4081142104 | Serious | 2 | 3 | $750 | $450 | Aug 11, 2008 | - | - |
| 01006 | 4081263501 OSHA citation code: 4081263501 B | Serious | 1 | 1 | $750 | $450 | Aug 11, 2008 | - | - |
| 01007 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 I | Serious | 2 | 3 | $750 | $450 | Aug 11, 2008 | - | - |
| 01008 | 1910.147 Control of Hazardous Energy (Lockout/Tagout) OSHA citation code: 19100147 C07 IA | Serious | 1 | 3 | $750 | $450 | Aug 11, 2008 | - | - |
| 01009 | 3254720103 | Serious | 1 | 6 | $750 | $450 | Sep 2, 2008 | - | - |
| 02001 | 4081072701 | Repeat | 7 | 7 | $1,500 | $900 | Aug 11, 2008 | - | - |
| 03001 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 II | Other | 4 | 4 | $0 | $0 | Aug 11, 2008 | - | - |
| 03002 | 4081003301 | Other | 1 | 2 | $0 | $0 | Jul 24, 2008 | - | - |
| 03003 | 4081003601 | Other | 2 | 5 | $0 | $0 | Aug 11, 2008 | - | - |
| 03004 | 4081043305 | Other | 3 | 6 | $0 | $0 | Aug 11, 2008 | - | - |
| 03005 | 4081045403 | Other | 2 | 2 | $0 | $0 | Jul 24, 2008 | - | - |
| 03006 | 4081063201 | Other | 1 | 5 | $0 | $0 | Aug 11, 2008 | - | - |
Showing the 16 violations listed first by citation identifier. This inspection has 29 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Dec 12, 2005#308856152Dec 12, 2005Planned (H) · Complete scope, Safety#308856152$1,20016 viol.16 violations$1,200 in penalties
Inspection #308856152
Dates
- Opened
- Dec 12, 2005
- Closing Conference Date
- Dec 19, 2005
- Closed
- Mar 27, 2006
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 80
Violations and Penalties
- Total Violations
- 16
- Violation Types
- 5 serious, 11 other-than-serious
- Initial Penalties
- $2,400
- Penalties on Record
- $1,200
- Site Address
- 48175 Gratiot Ave, Chesterfield, MI 48051
- Industry
- 333996 Fluid Power Pump and Motor Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (16 of 16 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 4081.11 OSHA citation code: 40810011 A | Serious | 1 | 1 | $600 | $300 | Mar 13, 2006 | - | - |
| 01002 | 4081072701 | Serious | 1 | 5 | $600 | $300 | Mar 13, 2006 | - | - |
| 01003 | 4081072201 | Serious | 1 | 2 | $600 | $300 | Feb 21, 2006 | - | - |
| 01004A | 4081273001 | Serious | 1 | 5 | $600 | $300 | Mar 13, 2006 | - | - |
| 01004B | 4081273006 | Serious | 1 | 5 | $0 | $0 | Mar 13, 2006 | - | - |
| 02001 | 4081018701 | Other | 2 | 10 | $0 | $0 | Mar 13, 2006 | - | - |
| 02002 | 4081021302 | Other | 3 | 10 | $0 | $0 | Mar 13, 2006 | - | - |
| 02003 | 4081111501 | Other | 1 | 10 | $0 | $0 | Mar 13, 2006 | - | - |
| 02004 | 4081111502 | Other | 3 | 10 | $0 | $0 | Mar 13, 2006 | - | - |
| 02005 | 4081122206 | Other | 1 | 10 | $0 | $0 | Mar 13, 2006 | - | - |
| 02006 | 4081330802 | Other | 1 | 10 | $0 | $0 | Mar 13, 2006 | - | - |
| 02007 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 | Other | 1 | 5 | $0 | $0 | Feb 21, 2006 | - | - |
| 02008 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G01 | Other | 1 | 2 | $0 | $0 | Feb 21, 2006 | - | - |
| 02009 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G02 III | Other | 1 | 5 | $0 | $0 | Feb 21, 2006 | - | - |
| 02010 | 4081492301 | Other | 1 | 10 | $0 | $0 | Feb 21, 2006 | - | - |
| 02011 | 1910.147 Control of Hazardous Energy (Lockout/Tagout) OSHA citation code: 19100147 C01 | Other | 1 | 2 | $0 | $0 | Mar 13, 2006 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 2005 to 2010. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Machinery Manufacturing, 18,435 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: fluid power pump and motor manufacturing reported 1.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 10.5%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source