GARY WEBER CONSTRUCTION, INC.
6TH AVE. & N. 18TH, BILLINGS, MT 59101 · NAICS 237110 Water and Sewer Line and Related Structures Construction
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Oct 1, 2020#344952478Oct 1, 2020Planned (H) · Partial scope, Safety#344952478$1,7902 viol.2 violations$1,790 in penalties
Inspection #344952478
Dates
- Opened
- Oct 1, 2020
- Closing Conference Date
- Oct 1, 2020
- Final Order
- Mar 23, 2021
- Closed
- Mar 23, 2021
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $2,984
- Penalties on Record
- $1,790
- Site Address
- Greenbriar & Wentworth Dr., Billings, MT 59105
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 C02 | Serious | 1 | 1 | $1,492 | $895 | Mar 22, 2021 | - | Mar 23, 2021 |
| 01002 | 1926.652 Excavations - Protection of Employees OSHA citation code: 19260652 A01 | Serious | 1 | 1 | $1,492 | $895 | Mar 22, 2021 | - | Mar 23, 2021 |
Mar 20, 2019#343865994Mar 20, 2019Planned (H) · Partial scope, Safety#343865994$00 viol.0 violations$0 in penalties
Inspection #343865994
Dates
- Opened
- Mar 20, 2019
- Closing Conference Date
- Mar 20, 2019
- Closed
- Mar 20, 2019
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 8
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1212 Mullowney Lane Holiday Station Store Project #0470, Billings, MT 59102
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Oct 6, 2016#341820348Oct 6, 2016Planned (H) · Complete scope, Safety#341820348$01 viol.1 violation$0 in penalties
Inspection #341820348
Dates
- Opened
- Oct 6, 2016
- Closing Conference Date
- Oct 6, 2016
- Final Order
- Dec 22, 2016
- Closed
- Dec 22, 2016
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 8
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Near East Airport Rd, Billings, MT 59105
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 K01 | Other | 1 | 2 | $0 | $0 | Dec 22, 2016 | - | Dec 22, 2016 |
Mar 6, 2015#340448125Mar 6, 2015Planned (H) · Complete scope, Safety#340448125$8,5003 viol.3 violations$8,500 in penalties
Inspection #340448125
Dates
- Opened
- Mar 6, 2015
- Closing Conference Date
- Mar 6, 2015
- Final Order
- Aug 6, 2015
- Closed
- Aug 12, 2015
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 repeat
- Initial Penalties
- $12,320
- Penalties on Record
- $8,500
- Site Address
- 1/2 Mile Sw Of 44th South Street West, Billings, MT 59106
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.100 Head Protection (Construction) OSHA citation code: 19260100 A | Repeat | 1 | 2 | $3,520 | $2,500 | Aug 13, 2015 | - | Aug 6, 2015 |
| 01002 | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 C02 | Repeat | 1 | 2 | $4,400 | $3,000 | Aug 13, 2015 | - | Aug 6, 2015 |
| 01003 | 1926.652 Excavations - Protection of Employees OSHA citation code: 19260652 A01 | Repeat | 1 | 2 | $4,400 | $3,000 | Aug 13, 2015 | - | Aug 6, 2015 |
Oct 16, 2012#336876982Oct 16, 2012Planned (H) · Complete scope, Safety#336876982$7,7408 viol.8 violations$7,740 in penalties
Inspection #336876982
Dates
- Opened
- Oct 16, 2012
- Closing Conference Date
- Oct 16, 2012
- Final Order
- Dec 20, 2012
- Closed
- Jan 8, 2013
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
Violations and Penalties
- Total Violations
- 8
- Violation Types
- 8 serious
- Initial Penalties
- $15,480
- Penalties on Record
- $7,740
- Site Address
- Airport Rd & Main St, Billings, MT 59105
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 8 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.21 Safety Training and Education OSHA citation code: 19260021 B02 | Serious | 1 | 3 | $2,520 | $1,260 | Jan 2, 2013 | - | Dec 20, 2012 |
| 01002 | 1926.100 Head Protection (Construction) OSHA citation code: 19260100 A | Serious | 1 | 3 | $1,800 | $940 | Dec 17, 2012 | - | Dec 20, 2012 |
| 01003 | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 C02 | Serious | 1 | 3 | $2,520 | $1,260 | Dec 17, 2012 | - | Dec 20, 2012 |
| 01004 | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 K02 | Serious | 1 | 3 | $2,520 | $1,260 | Dec 17, 2012 | - | Dec 20, 2012 |
| 01005 | 1926.652 Excavations - Protection of Employees OSHA citation code: 19260652 A01 | Serious | 1 | 3 | $2,520 | $1,260 | Dec 17, 2012 | - | Dec 20, 2012 |
Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Sep 18, 2008#311216147Sep 18, 2008Complaint (B) · Complete scope, Safety#311216147$00 viol.0 violations$0 in penalties
Inspection #311216147
Dates
- Opened
- Sep 18, 2008
- Closing Conference Date
- Sep 18, 2008
- Closed
- Sep 18, 2008
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 6th Ave. & N. 18th, Billings, MT 59101
- Industry
- 238910 Site Preparation Contractors
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Jun 26, 2007#308311539Jun 26, 2007Planned (H) · Complete scope, Safety#308311539$00 viol.0 violations$0 in penalties
Inspection #308311539
Dates
- Opened
- Jun 26, 2007
- Closing Conference Date
- Jun 26, 2007
- Closed
- Jun 26, 2007
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 9
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Shilo And Broadwater, Billings, MT 59106
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jun 15, 2006#308305374Jun 15, 2006Complaint (B) · Complete scope, Safety#308305374$00 viol.0 violations$0 in penalties
Inspection #308305374
Dates
- Opened
- Jun 15, 2006
- Closing Conference Date
- Jun 15, 2006
- Closed
- Jun 15, 2006
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Hawthorn & Victory, Billings, MT 59101
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Jan 29, 1999#301365896Jan 29, 1999Planned (H) · Complete scope, Safety#301365896$2,5002 viol.2 violations$2,500 in penalties
Inspection #301365896
Dates
- Opened
- Jan 29, 1999
- Closing Conference Date
- Jan 29, 1999
- Closed
- Feb 19, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 repeat
- Initial Penalties
- $4,000
- Penalties on Record
- $2,500
- Site Address
- King Ave & S. Billing Blvd., Billings, MT 59101
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.652 Excavations - Protection of Employees OSHA citation code: 19260652 A01 | Repeat | 1 | 2 | $4,000 | $2,500 | Feb 5, 1999 | - | - |
| 01001B | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 J02 | Repeat | 1 | 2 | $0 | $0 | Feb 5, 1999 | - | - |
Apr 21, 1998#301362075Apr 21, 1998Planned (H) · Partial scope, Health#301362075$00 viol.0 violations$0 in penalties
Inspection #301362075
Dates
- Opened
- Apr 21, 1998
- Closing Conference Date
- Apr 21, 1998
- Closed
- Apr 21, 1998
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 204 Main Street, Billings, MT 59105
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Chemical Exposure Sampling1 substance sampled
Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.
| Substance | Samples | Result Range | Unit |
|---|---|---|---|
| Gravimetric DeterminationQC | 1 | 1.0714 | mg/m³ |
| Sample WeightQC | 2 | 0 - 0.102 | mg |
| Silica, Crystalline Quartz (Respirable Fraction) | 1 | 15 | % |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
10 inspections, 1998 to 2020. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Chemical exposure sampling
Industry comparison
Heavy and Civil Engineering Construction, 70,282 employers with OSHA inspections. Arithmetic from DOL records.