Skip to content
SafetyRecord logoSafetyRecord
UAV SOLUTIONS, INC.
$2,561
penalties
20
viol.
2
insp.

UAV SOLUTIONS, INC.

8280 PATUXENT RANGE ROAD SUITE E, JESSUP, MD 20794NAICS 332710 Machine Shops

Inspections
2
Sep 2017 to Nov 2017 · 1 safety, 1 health
Violations
20
across 2 inspections
Penalties on record
$2,561
latest amounts in DOL records
By classification
Serious 10Willful 0Repeat 0Other 10

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Nov 28, 2017Referral (C) · Partial scope, Health#342792637$1,54914 viol.

Inspection #342792637

Dates

Opened
Nov 28, 2017
Closing Conference Date
Nov 28, 2017
Final Order
May 17, 2018
Closed
Jun 6, 2018

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
21
Related Activity
1 referral

Violations and Penalties

Total Violations
14
Violation Types
7 serious, 7 other-than-serious
Initial Penalties
$2,875
Penalties on Record
$1,549
Site Address
8280 Patuxent Range Road Suite E, Jessup, MD 20794
Industry
332710 Machine Shops

Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.

Violations

Violation list (14 of 14 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.106
Flammable Liquids
OSHA citation code: 19100106 D02 I
Serious12$625$312Feb 22, 2018-May 17, 2018
01002A1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 I
Serious11$625$375Feb 22, 2018-May 17, 2018
01002B1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 IV
Serious11$0$0Feb 22, 2018-May 17, 2018
01002C1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B06
Serious11$0$0Feb 22, 2018-May 17, 2018
010031910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 B
Serious11$250$175-May 17, 2018
010041910.303
Electrical - General Requirements
OSHA citation code: 19100303 B02
Serious62$750$375Feb 22, 2018-May 17, 2018
010051910.307
Electrical - Hazardous (Classified) Locations
OSHA citation code: 19100307 C
Serious11$625$312Feb 22, 2018-May 17, 2018
020011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G03
Other11$0$0Feb 22, 2018-May 17, 2018
020021910.132
Personal Protective Equipment - General Requirements
OSHA citation code: 19100132 D02
Other13$0$0Feb 22, 2018-May 17, 2018
020031910.134
Respiratory Protection
OSHA citation code: 19100134 C01 I
Other11$0$0Mar 19, 2018-May 17, 2018
020041910.134
Respiratory Protection
OSHA citation code: 19100134 C01 V
Other11$0$0Mar 19, 2018-May 17, 2018
020051910.134
Respiratory Protection
OSHA citation code: 19100134 C01 VII
Other11$0$0Mar 19, 2018-May 17, 2018
020061910.303
Electrical - General Requirements
OSHA citation code: 19100303 G01
Other12$0$0Feb 22, 2018-May 17, 2018
020071910.1200
Hazard Communication
OSHA citation code: 19101200 F06 II
Other12$0$0Feb 22, 2018-May 17, 2018
Sep 14, 2017Planned (H) · Complete scope, Safety#342637824$1,0126 viol.

Inspection #342637824

Dates

Opened
Sep 14, 2017
Closing Conference Date
Sep 25, 2017
Final Order
Dec 12, 2017
Closed
Jan 2, 2018

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
20

Violations and Penalties

Total Violations
6
Violation Types
3 serious, 3 other-than-serious
Initial Penalties
$1,012
Penalties on Record
$1,012
Site Address
8280 Patuxent Range Road Suite E, Jessup, MD 20794
Industry
332710 Machine Shops

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious42$450$450-Dec 12, 2017
010021910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Serious11$187$187-Dec 12, 2017
010031910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 B01 II
Serious44$375$375-Dec 12, 2017
020011910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A04
Other21$0$0-Dec 12, 2017
020021910.303
Electrical - General Requirements
OSHA citation code: 19100303 B02
Other12$0$0-Dec 12, 2017
020031910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G01 IV A
Other12$0$0-Dec 12, 2017
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.107Spray Finishing Using Flammable and Combustible Materials4 citations · $375
1910.134Respiratory Protection3 citations · $0
1910.303Electrical - General Requirements3 citations · $375

Industry comparison

Violations per inspection
This employer10.0
Industry average3.3
Penalties per inspection
This employer$1,281
Industry average$2,308

Fabricated Metal Product Manufacturing, 47,284 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: machine shops reported 2.7 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 7.0%; NAICS 33271 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in JESSUP, MD

All employers in JESSUP →