TANMAR COMPANIES LLC
WOLFBONE REV GF STATE T7-50-38 C RIG #278, PECOS, TX 79772 · NAICS 213112 Support Activities for Oil and Gas Operations
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Mar 27, 2024#347374597Mar 27, 2024Planned (H) · Complete scope, Safety#347374597$11,0002 viol.2 violations$11,000 in penalties
Inspection #347374597
Dates
- Opened
- Mar 27, 2024
- Closing Conference Date
- Mar 27, 2024
- Final Order
- Jul 26, 2024
- Closed
- Aug 7, 2024
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 2
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 serious, 1 repeat
- Initial Penalties
- $18,433
- Penalties on Record
- $11,000
- Site Address
- 14.2 Miles Ne Direction From Pecos Rig 803, Pecos, TX 79772
- Industry
- 213112 Support Activities for Oil and Gas Operations
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 B07 I | Serious | 1 | 8 | $6,913 | $4,000 | - | Jul 26, 2024 | |
| 02001 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B02 I | Repeat | 2 | 8 | $11,520 | $7,000 | - | Jul 26, 2024 |
Apr 4, 2023#346609902Apr 4, 2023Planned (H) · Partial scope, Safety#346609902$1,3781 viol.1 violation$1,378 in penalties
Inspection #346609902
Dates
- Opened
- Apr 4, 2023
- Closing Conference Date
- Apr 4, 2023
- Final Order
- Aug 2, 2023
- Closed
- Aug 4, 2023
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 47
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $1,378
- Penalties on Record
- $1,378
- Site Address
- Wolfbone (trend) Field, Rev Gf State T7-50-381 Lease, Well 0131wa Patterson Uti Rig 258, 18.5 Mile Se From Pecos, Pecos, TX 79772
- Industry
- 213112 Support Activities for Oil and Gas Operations
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.22 Walking-Working Surfaces - General Requirements OSHA citation code: 19100022 D01 | Other | 1 | 3 | $1,378 | $1,378 | Jul 17, 2023 | - | Aug 2, 2023 |
Apr 4, 2023#346609845Apr 4, 2023Planned (H) · Complete scope, Safety#346609845$1,2531 viol.1 violation$1,253 in penalties
Inspection #346609845
Dates
- Opened
- Apr 4, 2023
- Closing Conference Date
- Apr 4, 2023
- Final Order
- Aug 2, 2023
- Closed
- Aug 4, 2023
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 394
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $1,253
- Penalties on Record
- $1,253
- Site Address
- Wolfbone Rev Gf State T7-50-38 C Rig #278, Pecos, TX 79772
- Industry
- 213112 Support Activities for Oil and Gas Operations
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 I | Other | 1 | 1 | $1,253 | $1,253 | - | Aug 2, 2023 |
Feb 27, 2019#343847364Feb 27, 2019Planned (H) · Complete scope, Health#343847364$2,6536 viol.6 violations$2,653 in penalties
Inspection #343847364
Dates
- Opened
- Feb 27, 2019
- Closing Conference Date
- Feb 27, 2019
- Final Order
- Aug 30, 2019
- Closed
- Aug 30, 2019
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 423
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 2 repeat, 4 other-than-serious
- Initial Penalties
- $4,423
- Penalties on Record
- $2,653
- Site Address
- Waler State Unit4 Lease, Well 3wa, Cactus Drilling Rig #139, 16.74 Miles Se From Pecos., Pecos, TX 79772
- Industry
- 532490 Other Commercial and Industrial Machinery and Equipment Rental and Leasing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (6 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 I | Repeat | 2 | 2 | $2,085 | $1,251 | Aug 21, 2019 | - | Aug 30, 2019 |
| 01001B | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 II | Repeat | 1 | 4 | $0 | $0 | Aug 21, 2019 | - | Aug 30, 2019 |
| 02001 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 I | Other | 1 | 1 | $1,169 | $701 | Aug 21, 2019 | - | Aug 30, 2019 |
| 02002A | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B02 I | Other | 2 | 5 | $1,169 | $701 | Aug 21, 2019 | - | Aug 30, 2019 |
| 02002B | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G01 IV C | Other | 1 | 6 | $0 | $0 | Aug 21, 2019 | - | Aug 30, 2019 |
| 02002C | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G02 III | Other | 3 | 6 | $0 | $0 | Aug 21, 2019 | - | Aug 30, 2019 |
Mar 3, 2015#340444579Mar 3, 2015Planned (H) · Complete scope, Safety#340444579$2,8051 viol.1 violation$2,805 in penalties
Inspection #340444579
Dates
- Opened
- Mar 3, 2015
- Closing Conference Date
- Mar 3, 2015
- Final Order
- Apr 16, 2015
- Closed
- Apr 16, 2015
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $2,805
- Penalties on Record
- $2,805
- Site Address
- Rig 138, 7.68 Miles Sw Of Mentone, Pecos, TX 79772
- Industry
- 213112 Support Activities for Oil and Gas Operations
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01002 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 A02 X | Other | 1 | 3 | $2,805 | $2,805 | Apr 8, 2015 | - | Apr 16, 2015 |
Mar 2, 2015#340445386Mar 2, 2015Planned (H) · Complete scope, Safety#340445386$00 viol.0 violations$0 in penalties
Inspection #340445386
Dates
- Opened
- Mar 2, 2015
- Closing Conference Date
- Mar 2, 2015
- Closed
- May 12, 2015
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 318
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Rig #639 Collie B 2h, Pecos, TX 79772
- Industry
- 213112 Support Activities for Oil and Gas Operations
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
6 inspections, 2015 to 2024. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Support Activities for Mining, 8,909 employers with OSHA inspections. Arithmetic from DOL records.