Valley Springs Quarry
Metal/Non-Metal, Surface·Crushed, Broken Stone NEC·Boone, Arkansas·Mine ID 0300040
Operator APAC-Central, Inc.·Controller CRH PLC·MSHA status Active since Oct 5, 2021
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Compliance Follow-up InspectionJun 10 to Jun 11, 2026Inspectors 1 | Hours on site 10.5Began: Jun 10, 2026Ended: Jun 11, 2026Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 10.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 10, 2026
- Closed outINSPECTION_END_DT
- Jun 11, 2026
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- F03A7E6
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 1, 2026Inspectors 1 | Hours on site 6Began: Apr 1, 2026Ended: Apr 1, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 1, 2026
- Closed outINSPECTION_END_DT
- Apr 1, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03A7D2
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionMar 30 to Mar 31, 2026Inspectors 1 | Hours on site 11.75Began: Mar 30, 2026Ended: Mar 31, 2026Activity: Spot InspectionInspectors: 1Hours on site: 11.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 30, 2026
- Closed outINSPECTION_END_DT
- Mar 31, 2026
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- F03A7D1
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 23.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 25 to Nov 26, 2025Inspectors 1 | Hours on site 8.25Began: Nov 25, 2025Ended: Nov 26, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 25, 2025
- Closed outINSPECTION_END_DT
- Nov 26, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03A504
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
103 (g) Written Notification Hazard Complaint InspectioAug 13, 2025Inspectors 1 | Hours on site 2Began: Aug 13, 2025Ended: Aug 13, 2025Activity: 103 (g) Written Notification Hazard Complaint InspectioInspectors: 1Hours on site: 2Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 13, 2025
- Closed outINSPECTION_END_DT
- Aug 13, 2025
- ActivityACTIVITY
- 103 (g) Written Notification Hazard Complaint Inspectio
- Activity codeACTIVITY_CODE
- E03
- Program areaPROGRAM_AREA
- M/NM--103 (g) Written Notification Hazard Complaint Inspecti
- Event numberEVENT_NO
- 6938285
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.5
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 2
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 7.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Regular Safety and Health InspectionJun 11 to Jun 13, 2025Inspectors 1 | Hours on site 7Began: Jun 11, 2025Ended: Jun 13, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 11, 2025
- Closed outINSPECTION_END_DT
- Jun 13, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6804553
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 15 to Jan 16, 2025Inspectors 1 | Hours on site 7Began: Jan 15, 2025Ended: Jan 16, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 15, 2025
- Closed outINSPECTION_END_DT
- Jan 16, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6937394
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 18 to Jul 19, 2024Inspectors 1 | Hours on site 9Began: Jul 18, 2024Ended: Jul 19, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 18, 2024
- Closed outINSPECTION_END_DT
- Jul 19, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6804537
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 31 to Nov 1, 2023Inspectors 1 | Hours on site 6Began: Oct 31, 2023Ended: Nov 1, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 31, 2023
- Closed outINSPECTION_END_DT
- Nov 1, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6804534
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 31, 2023Inspectors 1 | Hours on site 5.25Began: Aug 31, 2023Ended: Aug 31, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 31, 2023
- Closed outINSPECTION_END_DT
- Aug 31, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6910478
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsMay 17, 2023Inspectors 1 | Hours on site 0.5Began: May 17, 2023Ended: May 17, 2023Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2023
- Closed outINSPECTION_END_DT
- May 17, 2023
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6804533
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 6 to Mar 7, 2023Inspectors 1 | Hours on site 3.75Began: Mar 6, 2023Ended: Mar 7, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 6, 2023
- Closed outINSPECTION_END_DT
- Mar 7, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6935008
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 4 to Apr 7, 2022Inspectors 1 | Hours on site 27Began: Apr 4, 2022Ended: Apr 7, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 27Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Closed outINSPECTION_END_DT
- Apr 7, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6889645
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 27
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 33
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 5 to Oct 7, 2021Inspectors 1 | Hours on site 20Began: Oct 5, 2021Ended: Oct 7, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 5, 2021
- Closed outINSPECTION_END_DT
- Oct 7, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6889602
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 23
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 7 to Dec 8, 2020Inspectors 1 | Hours on site 0.75Began: Dec 7, 2020Ended: Dec 8, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 7, 2020
- Closed outINSPECTION_END_DT
- Dec 8, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6804518
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 28, 2020Inspectors 1 | Hours on site 5Began: Jan 28, 2020Ended: Jan 28, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 28, 2020
- Closed outINSPECTION_END_DT
- Jan 28, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6808183
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 10 to Oct 12, 2018Inspectors 1 | Hours on site 7Began: Oct 10, 2018Ended: Oct 12, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 10, 2018
- Closed outINSPECTION_END_DT
- Oct 12, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6606397
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 31 to Nov 2, 2017Inspectors 1 | Hours on site 20Began: Oct 31, 2017Ended: Nov 2, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 31, 2017
- Closed outINSPECTION_END_DT
- Nov 2, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6737381
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 31 to Nov 1, 2016Inspectors 1 | Hours on site 10Began: Oct 31, 2016Ended: Nov 1, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 31, 2016
- Closed outINSPECTION_END_DT
- Nov 1, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6737519
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 19 to Oct 21, 2015Inspectors 1 | Hours on site 12Began: Oct 19, 2015Ended: Oct 21, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 19, 2015
- Closed outINSPECTION_END_DT
- Oct 21, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6606380
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 24.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 9, 2015Inspectors 1 | Hours on site 6Began: Jul 9, 2015Ended: Jul 9, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 9, 2015
- Closed outINSPECTION_END_DT
- Jul 9, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6655995
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 7, 2013Inspectors 1 | Hours on site 2Began: Nov 7, 2013Ended: Nov 7, 2013Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 7, 2013
- Closed outINSPECTION_END_DT
- Nov 7, 2013
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6606099
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 16, 2013Inspectors 1 | Hours on site 4Began: Jan 16, 2013Ended: Jan 16, 2013Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 16, 2013
- Closed outINSPECTION_END_DT
- Jan 16, 2013
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6602294
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 11 to Jan 12, 2012Inspectors 1 | Hours on site 16Began: Jan 11, 2012Ended: Jan 12, 2012Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 11, 2012
- Closed outINSPECTION_END_DT
- Jan 12, 2012
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6549282
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Part 50 AuditJun 14, 2011Inspectors 1 | Hours on site 5Began: Jun 14, 2011Ended: Jun 14, 2011Activity: Part 50 AuditInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 14, 2011
- Closed outINSPECTION_END_DT
- Jun 14, 2011
- ActivityACTIVITY
- Part 50 Audit
- Activity codeACTIVITY_CODE
- E25
- Program areaPROGRAM_AREA
- M/NM--Part 50 Audit
- Event numberEVENT_NO
- 6543997
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 58 inspections and other MSHA visits since Feb 23, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Apr 8, 2026Type: CitationStandard: 56.5001(a)/.5005S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009166
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1600
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 31, 2026
- 30 CFR part and sectionPART_SECTION
- 56.5001(a)/.5005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 17, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 1, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jun 17, 2026
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 25, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 28, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- F03A7D1
- Inspection beganINSPECTION_BEGIN_DT
- Mar 30, 2026
- Inspection closed outINSPECTION_END_DT
- Mar 31, 2026
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 1, 2026Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009163
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 1, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0907
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 1, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 1, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Apr 1, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Apr 1, 2026
- Terminated, timeTERMINATION_TIME
- 0935
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 25, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 28, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- F03A7D2
- Inspection beganINSPECTION_BEGIN_DT
- Apr 1, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 1, 2026
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 25, 2025Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170026
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 25, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0909
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 25, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 25, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 25, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 25, 2025
- Terminated, timeTERMINATION_TIME
- 1357
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 21, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 25, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- F03A504
- Inspection beganINSPECTION_BEGIN_DT
- Nov 25, 2025
- Inspection closed outINSPECTION_END_DT
- Nov 26, 2025
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 25, 2025Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170027
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 25, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0954
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 25, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 25, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Nov 25, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Nov 25, 2025
- Terminated, timeTERMINATION_TIME
- 1401
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 21, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 25, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- F03A504
- Inspection beganINSPECTION_BEGIN_DT
- Nov 25, 2025
- Inspection closed outINSPECTION_END_DT
- Nov 26, 2025
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 18, 2024Type: CitationStandard: 56.12008S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9458450
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 18, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1015
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 18, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 18, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Jul 18, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Jul 18, 2024
- Terminated, timeTERMINATION_TIME
- 1045
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 16, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 24, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6804537
- Inspection beganINSPECTION_BEGIN_DT
- Jul 18, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 19, 2024
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 7, 2023Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9740836
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 7, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0825
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 7, 2023
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 7, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Mar 7, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Mar 7, 2023
- Terminated, timeTERMINATION_TIME
- 1000
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- May 10, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 17, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 21, 2023
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6935008
- Inspection beganINSPECTION_BEGIN_DT
- Mar 6, 2023
- Inspection closed outINSPECTION_END_DT
- Mar 7, 2023
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 5, 2022Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9649098
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 5, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1015
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 5, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 5, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1020
- Latest dueLATEST_TERM_DUE_DT
- Apr 5, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1020
- TerminatedTERMINATION_DT
- Apr 5, 2022
- Terminated, timeTERMINATION_TIME
- 1018
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Sep 21, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 26, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 29, 2022
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- RCR Construction
- Operator IDVIOLATOR_ID
- C0289
- Contractor IDCONTRACTOR_ID
- C0289
- Inspection eventEVENT_NO
- 6889645
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2022
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Apr 5, 2022Type: CitationStandard: 56.14100(a)S&S: NNegligence: HighNegligenceIssued to: ContractorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9649093
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 5, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 0910
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 5, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14100(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 5, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 0930
- Latest dueLATEST_TERM_DUE_DT
- Apr 5, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 0930
- TerminatedTERMINATION_DT
- Apr 5, 2022
- Terminated, timeTERMINATION_TIME
- 0930
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 18, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 23, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 9, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- Operator IDVIOLATOR_ID
- P003
- Contractor IDCONTRACTOR_ID
- P003
- Inspection eventEVENT_NO
- 6889645
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2022
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Apr 5, 2022Type: CitationStandard: 56.14100(a)S&S: NNegligence: HighNegligenceIssued to: ContractorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9649097
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 5, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1010
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 5, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14100(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 5, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1015
- Latest dueLATEST_TERM_DUE_DT
- Apr 5, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1015
- TerminatedTERMINATION_DT
- Apr 5, 2022
- Terminated, timeTERMINATION_TIME
- 1015
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Sep 21, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 26, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 29, 2022
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- RCR Construction
- Operator IDVIOLATOR_ID
- C0289
- Contractor IDCONTRACTOR_ID
- C0289
- Inspection eventEVENT_NO
- 6889645
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2022
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Apr 5, 2022Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9649094
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 5, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 0922
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 5, 2022
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 5, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Apr 5, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Apr 6, 2022
- Terminated, timeTERMINATION_TIME
- 0903
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- May 24, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 30, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 26, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- Operator IDVIOLATOR_ID
- P003
- Contractor IDCONTRACTOR_ID
- P003
- Inspection eventEVENT_NO
- 6889645
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2022
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Apr 5, 2022Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9649096
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 5, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1001
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 5, 2022
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 5, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Apr 5, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Apr 6, 2022
- Terminated, timeTERMINATION_TIME
- 0909
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- May 25, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 3, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 8, 2022
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- RCR Construction
- Operator IDVIOLATOR_ID
- C0289
- Contractor IDCONTRACTOR_ID
- C0289
- Inspection eventEVENT_NO
- 6889645
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2022
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Apr 5, 2022Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9649095
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 5, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1000
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 5, 2022
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 5, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Apr 5, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Apr 6, 2022
- Terminated, timeTERMINATION_TIME
- 0923
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- May 25, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 3, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 8, 2022
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- RCR Construction
- Operator IDVIOLATOR_ID
- C0289
- Contractor IDCONTRACTOR_ID
- C0289
- Inspection eventEVENT_NO
- 6889645
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2022
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Oct 5, 2021Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642187
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 5, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1300
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 5, 2021
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Oct 6, 2021
- Terminated, timeTERMINATION_TIME
- 0800
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Nov 23, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 8, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 3, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- Operator IDVIOLATOR_ID
- P003
- Contractor IDCONTRACTOR_ID
- P003
- Inspection eventEVENT_NO
- 6889602
- Inspection beganINSPECTION_BEGIN_DT
- Oct 5, 2021
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2021
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Oct 5, 2021Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642185
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 5, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1250
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 5, 2021
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Oct 6, 2021
- Terminated, timeTERMINATION_TIME
- 0800
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Nov 23, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 8, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 3, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- Operator IDVIOLATOR_ID
- P003
- Contractor IDCONTRACTOR_ID
- P003
- Inspection eventEVENT_NO
- 6889602
- Inspection beganINSPECTION_BEGIN_DT
- Oct 5, 2021
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2021
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Oct 5, 2021Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642186
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 5, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1250
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 5, 2021
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Oct 6, 2021
- Terminated, timeTERMINATION_TIME
- 0800
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Nov 23, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 8, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 3, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- Operator IDVIOLATOR_ID
- P003
- Contractor IDCONTRACTOR_ID
- P003
- Inspection eventEVENT_NO
- 6889602
- Inspection beganINSPECTION_BEGIN_DT
- Oct 5, 2021
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2021
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jan 28, 2020Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9458921
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1633
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2020
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 29, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jan 29, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jan 28, 2020
- Terminated, timeTERMINATION_TIME
- 1715
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Mar 17, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 20, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 5, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6808183
- Inspection beganINSPECTION_BEGIN_DT
- Jan 28, 2020
- Inspection closed outINSPECTION_END_DT
- Jan 28, 2020
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 11, 2018Type: CitationStandard: 56.4201(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8684590
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 11, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 1415
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 10, 2018
- 30 CFR part and sectionPART_SECTION
- 56.4201(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 11, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Oct 11, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Oct 11, 2018
- Terminated, timeTERMINATION_TIME
- 1450
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Nov 16, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 27, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 15, 2019
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6606397
- Inspection beganINSPECTION_BEGIN_DT
- Oct 10, 2018
- Inspection closed outINSPECTION_END_DT
- Oct 12, 2018
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 1, 2016Type: CitationStandard: 50.30(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $114.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8965354
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 1, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 1327
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 1, 2016
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 1, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Nov 1, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Nov 1, 2016
- Terminated, timeTERMINATION_TIME
- 1328
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 114
- Current proposed assessmentAMOUNT_DUE
- 114
- Amount paidAMOUNT_PAID
- 114
- Bill first printedBILL_PRINT_DT
- Dec 14, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 20, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 25, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6737519
- Inspection beganINSPECTION_BEGIN_DT
- Oct 31, 2016
- Inspection closed outINSPECTION_END_DT
- Nov 1, 2016
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 1, 2016Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $114.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8965353
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 1, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 0845
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 1, 2016
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 1, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Nov 1, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Nov 1, 2016
- Terminated, timeTERMINATION_TIME
- 0850
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 114
- Current proposed assessmentAMOUNT_DUE
- 114
- Amount paidAMOUNT_PAID
- 114
- Bill first printedBILL_PRINT_DT
- Dec 14, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 20, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 25, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6737519
- Inspection beganINSPECTION_BEGIN_DT
- Oct 31, 2016
- Inspection closed outINSPECTION_END_DT
- Nov 1, 2016
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (3)
Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 1, 2016Type: CitationStandard: 56.12028S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $134.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8965355
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 1, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 1430
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 1, 2016
- 30 CFR part and sectionPART_SECTION
- 56.12028
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 2, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Nov 2, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Nov 2, 2016
- Terminated, timeTERMINATION_TIME
- 1513
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 134
- Current proposed assessmentAMOUNT_DUE
- 134
- Amount paidAMOUNT_PAID
- 134
- Bill first printedBILL_PRINT_DT
- Dec 14, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 20, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 25, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6737519
- Inspection beganINSPECTION_BEGIN_DT
- Oct 31, 2016
- Inspection closed outINSPECTION_END_DT
- Nov 1, 2016
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 20, 2015Type: CitationStandard: 56.18002(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $243.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8684540
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 20, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1155
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 20, 2015
- 30 CFR part and sectionPART_SECTION
- 56.18002(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 20, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 20, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 21, 2015
- Terminated, timeTERMINATION_TIME
- 1125
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 243
- Current proposed assessmentAMOUNT_DUE
- 243
- Amount paidAMOUNT_PAID
- 243
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 4, 2016
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6606380
- Inspection beganINSPECTION_BEGIN_DT
- Oct 19, 2015
- Inspection closed outINSPECTION_END_DT
- Oct 21, 2015
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 20, 2015Type: CitationStandard: 56.20011S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8684537
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 20, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 0910
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 20, 2015
- 30 CFR part and sectionPART_SECTION
- 56.20011
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 20, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 20, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 21, 2015
- Terminated, timeTERMINATION_TIME
- 1100
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 4, 2016
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6606380
- Inspection beganINSPECTION_BEGIN_DT
- Oct 19, 2015
- Inspection closed outINSPECTION_END_DT
- Oct 21, 2015
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 20, 2015Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8684539
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 20, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1015
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 20, 2015
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 20, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 20, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 21, 2015
- Terminated, timeTERMINATION_TIME
- 1050
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 4, 2016
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6606380
- Inspection beganINSPECTION_BEGIN_DT
- Oct 19, 2015
- Inspection closed outINSPECTION_END_DT
- Oct 21, 2015
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 20, 2015Type: CitationStandard: 56.20003(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $540.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8684538
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 20, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 0920
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 20, 2015
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 20, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 20, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 21, 2015
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 540
- Current proposed assessmentAMOUNT_DUE
- 540
- Amount paidAMOUNT_PAID
- 540
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 4, 2016
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6606380
- Inspection beganINSPECTION_BEGIN_DT
- Oct 19, 2015
- Inspection closed outINSPECTION_END_DT
- Oct 21, 2015
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 11, 2012Type: CitationStandard: 56.16006S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8627650
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 11, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 0955
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 11, 2012
- 30 CFR part and sectionPART_SECTION
- 56.16006
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 11, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 11, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 12, 2012
- Terminated, timeTERMINATION_TIME
- 0823
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Feb 28, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 5, 2012
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 26, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- APAC-Central, Inc.
- Operator IDVIOLATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Inspection eventEVENT_NO
- 6549282
- Inspection beganINSPECTION_BEGIN_DT
- Jan 11, 2012
- Inspection closed outINSPECTION_END_DT
- Jan 12, 2012
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
89 citations and orders since Oct 17, 2000: 79 issued to the operator, 10 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Apr 8, 2026Citation number: 5009166Standard: 56.5001(a)/.5005Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009166
- Assessment control numberASSESS_CASE_NO
- 000641396
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 28, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Mar 31, 2026
- Final order dateFINAL_ORDER_DT
- Jun 25, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.5001(a)/.5005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 12448
- Size of mineSIZE_OF_MINE
- 12448
- Controller hours workedCONTROLLER_HRS
- 12785904
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 12785904
- History period startHISTORY_START_DT
- Dec 31, 2024
- History period endHISTORY_END_DT
- Mar 30, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A7D1
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 1, 2026Citation number: 5009163Standard: 56.14112(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009163
- Assessment control numberASSESS_CASE_NO
- 000641396
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 28, 2026
- Citation issuedISSUE_DT
- Apr 1, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 1, 2026
- Final order dateFINAL_ORDER_DT
- Jun 25, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.29
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.143
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 12448
- Size of mineSIZE_OF_MINE
- 12448
- Controller hours workedCONTROLLER_HRS
- 12785904
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 12785904
- History period startHISTORY_START_DT
- Jan 1, 2025
- History period endHISTORY_END_DT
- Mar 31, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A7D2
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 25, 2025Citation number: 5170027Standard: 56.14112(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170027
- Assessment control numberASSESS_CASE_NO
- 000634628
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 25, 2026
- Citation issuedISSUE_DT
- Nov 25, 2025
- Date of occurrenceOCCURRENCE_DT
- Nov 25, 2025
- Final order dateFINAL_ORDER_DT
- Feb 21, 2026
- Bill first printedBILL_PRINT_DT
- Jan 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 21, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10385
- Size of mineSIZE_OF_MINE
- 10385
- Controller hours workedCONTROLLER_HRS
- 13036314
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13036314
- History period startHISTORY_START_DT
- Aug 25, 2024
- History period endHISTORY_END_DT
- Nov 24, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A504
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 25, 2025Citation number: 5170026Standard: 56.14107(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170026
- Assessment control numberASSESS_CASE_NO
- 000634628
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 25, 2026
- Citation issuedISSUE_DT
- Nov 25, 2025
- Date of occurrenceOCCURRENCE_DT
- Nov 25, 2025
- Final order dateFINAL_ORDER_DT
- Feb 21, 2026
- Bill first printedBILL_PRINT_DT
- Jan 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 21, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10385
- Size of mineSIZE_OF_MINE
- 10385
- Controller hours workedCONTROLLER_HRS
- 13036314
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13036314
- History period startHISTORY_START_DT
- Aug 25, 2024
- History period endHISTORY_END_DT
- Nov 24, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A504
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 18, 2024Citation number: 9458450Standard: 56.12008Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9458450
- Assessment control numberASSESS_CASE_NO
- 000606478
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 24, 2024
- Citation issuedISSUE_DT
- Jul 18, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 18, 2024
- Final order dateFINAL_ORDER_DT
- Nov 21, 2024
- Bill first printedBILL_PRINT_DT
- Oct 16, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11135
- Size of mineSIZE_OF_MINE
- 11135
- Controller hours workedCONTROLLER_HRS
- 11786290
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11786290
- History period startHISTORY_START_DT
- Apr 18, 2023
- History period endHISTORY_END_DT
- Jul 17, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6804537
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 7, 2023Citation number: 9740836Standard: 56.4101Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9740836
- Assessment control numberASSESS_CASE_NO
- 000576060
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 21, 2023
- Citation issuedISSUE_DT
- Mar 7, 2023
- Date of occurrenceOCCURRENCE_DT
- Mar 7, 2023
- Final order dateFINAL_ORDER_DT
- Jun 17, 2023
- Bill first printedBILL_PRINT_DT
- May 10, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 17, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11927
- Size of mineSIZE_OF_MINE
- 11927
- Controller hours workedCONTROLLER_HRS
- 11651152
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11651152
- History period startHISTORY_START_DT
- Dec 7, 2021
- History period endHISTORY_END_DT
- Mar 6, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935008
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 5, 2022Citation number: 9649098Standard: 56.14207Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9649098
- Assessment control numberASSESS_CASE_NO
- 000563430
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 27, 2022
- Citation issuedISSUE_DT
- Apr 5, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_DT
- Oct 26, 2022
- Bill first printedBILL_PRINT_DT
- Sep 21, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 26, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 57
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10795
- Size of mineSIZE_OF_MINE
- 10795
- History period startHISTORY_START_DT
- Jan 5, 2021
- History period endHISTORY_END_DT
- Apr 4, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- RCR Construction
- IDVIOLATOR_ID
- C0289
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 5, 2022
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889645
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Apr 5, 2022Citation number: 9649095Standard: 56.4101Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9649095
- Assessment control numberASSESS_CASE_NO
- 000555590
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 24, 2022
- Citation issuedISSUE_DT
- Apr 5, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_DT
- Jul 3, 2022
- Bill first printedBILL_PRINT_DT
- May 25, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 3, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10795
- Size of mineSIZE_OF_MINE
- 10795
- History period startHISTORY_START_DT
- Jan 5, 2021
- History period endHISTORY_END_DT
- Apr 4, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- RCR Construction
- IDVIOLATOR_ID
- C0289
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 5, 2022
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889645
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Apr 5, 2022Citation number: 9649094Standard: 56.4101Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9649094
- Assessment control numberASSESS_CASE_NO
- 000555473
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 26, 2022
- Citation issuedISSUE_DT
- Apr 5, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_DT
- Jun 30, 2022
- Bill first printedBILL_PRINT_DT
- May 24, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 30, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24
- Size of mineSIZE_OF_MINE
- 24
- History period startHISTORY_START_DT
- Jan 5, 2021
- History period endHISTORY_END_DT
- Apr 4, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- IDVIOLATOR_ID
- P003
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Oct 5, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889645
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Apr 5, 2022Citation number: 9649093Standard: 56.14100(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9649093
- Assessment control numberASSESS_CASE_NO
- 000565270
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 9, 2022
- Citation issuedISSUE_DT
- Apr 5, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_DT
- Nov 23, 2022
- Bill first printedBILL_PRINT_DT
- Oct 18, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 23, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24
- Size of mineSIZE_OF_MINE
- 24
- History period startHISTORY_START_DT
- Jan 5, 2021
- History period endHISTORY_END_DT
- Apr 4, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- IDVIOLATOR_ID
- P003
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Oct 5, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889645
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Apr 5, 2022Citation number: 9649097Standard: 56.14100(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9649097
- Assessment control numberASSESS_CASE_NO
- 000563430
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 27, 2022
- Citation issuedISSUE_DT
- Apr 5, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_DT
- Oct 26, 2022
- Bill first printedBILL_PRINT_DT
- Sep 21, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 26, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 57
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10795
- Size of mineSIZE_OF_MINE
- 10795
- History period startHISTORY_START_DT
- Jan 5, 2021
- History period endHISTORY_END_DT
- Apr 4, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- RCR Construction
- IDVIOLATOR_ID
- C0289
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 5, 2022
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889645
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Apr 5, 2022Citation number: 9649096Standard: 47.41(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9649096
- Assessment control numberASSESS_CASE_NO
- 000555590
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 24, 2022
- Citation issuedISSUE_DT
- Apr 5, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_DT
- Jul 3, 2022
- Bill first printedBILL_PRINT_DT
- May 25, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 3, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10795
- Size of mineSIZE_OF_MINE
- 10795
- History period startHISTORY_START_DT
- Jan 5, 2021
- History period endHISTORY_END_DT
- Apr 4, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- RCR Construction
- IDVIOLATOR_ID
- C0289
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 5, 2022
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889645
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Oct 5, 2021Citation number: 9642186Standard: 56.4101Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642186
- Assessment control numberASSESS_CASE_NO
- 000545809
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2021
- Citation issuedISSUE_DT
- Oct 5, 2021
- Date of occurrenceOCCURRENCE_DT
- Oct 5, 2021
- Final order dateFINAL_ORDER_DT
- Jan 8, 2022
- Bill first printedBILL_PRINT_DT
- Nov 23, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 8, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24
- Size of mineSIZE_OF_MINE
- 24
- History period startHISTORY_START_DT
- Jul 5, 2020
- History period endHISTORY_END_DT
- Oct 4, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- IDVIOLATOR_ID
- P003
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Oct 5, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889602
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Oct 5, 2021Citation number: 9642187Standard: 56.4201(a)(2)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642187
- Assessment control numberASSESS_CASE_NO
- 000545809
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2021
- Citation issuedISSUE_DT
- Oct 5, 2021
- Date of occurrenceOCCURRENCE_DT
- Oct 5, 2021
- Final order dateFINAL_ORDER_DT
- Jan 8, 2022
- Bill first printedBILL_PRINT_DT
- Nov 23, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 8, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24
- Size of mineSIZE_OF_MINE
- 24
- History period startHISTORY_START_DT
- Jul 5, 2020
- History period endHISTORY_END_DT
- Oct 4, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- IDVIOLATOR_ID
- P003
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Oct 5, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889602
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Oct 5, 2021Citation number: 9642185Standard: 47.41(a)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642185
- Assessment control numberASSESS_CASE_NO
- 000545809
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2021
- Citation issuedISSUE_DT
- Oct 5, 2021
- Date of occurrenceOCCURRENCE_DT
- Oct 5, 2021
- Final order dateFINAL_ORDER_DT
- Jan 8, 2022
- Bill first printedBILL_PRINT_DT
- Nov 23, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 8, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24
- Size of mineSIZE_OF_MINE
- 24
- History period startHISTORY_START_DT
- Jul 5, 2020
- History period endHISTORY_END_DT
- Oct 4, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Superior ROCK DRILLING and Blasting
- IDVIOLATOR_ID
- P003
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Oct 5, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6889602
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jan 28, 2020Citation number: 9458921Standard: 47.41(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9458921
- Assessment control numberASSESS_CASE_NO
- 000510669
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 22, 2021
- Citation issuedISSUE_DT
- Jan 28, 2020
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2020
- Final order dateFINAL_ORDER_DT
- Apr 20, 2020
- Bill first printedBILL_PRINT_DT
- Mar 17, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 20, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Mine Act interestMINEACT_INTEREST_AMT
- 6.05
- Excessive late payment interestEXLATE_INTEREST_AMT
- 3.62
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 6.05
- Paid against late payment interestPAID_EXLATE_INTEREST_AMT
- 3.62
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11232
- Size of mineSIZE_OF_MINE
- 11232
- Controller hours workedCONTROLLER_HRS
- 11010629
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11010629
- History period startHISTORY_START_DT
- Oct 28, 2018
- History period endHISTORY_END_DT
- Jan 27, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6808183
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 11, 2018Citation number: 8684590Standard: 56.4201(b)Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8684590
- Assessment control numberASSESS_CASE_NO
- 000477509
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 13, 2019
- Citation issuedISSUE_DT
- Oct 11, 2018
- Date of occurrenceOCCURRENCE_DT
- Oct 10, 2018
- Final order dateFINAL_ORDER_DT
- Dec 27, 2018
- Bill first printedBILL_PRINT_DT
- Nov 16, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 27, 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.16
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 22
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10432
- Size of mineSIZE_OF_MINE
- 10432
- Controller hours workedCONTROLLER_HRS
- 10996976
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10996976
- History period startHISTORY_START_DT
- Jul 10, 2017
- History period endHISTORY_END_DT
- Oct 9, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6606397
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 1, 2016Citation number: 8965355Standard: 56.12028Proposed penalty: $134.00Current assessment: $134.00Paid against proposed penalty: $134.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8965355
- Assessment control numberASSESS_CASE_NO
- 000426651
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 25, 2017
- Citation issuedISSUE_DT
- Nov 1, 2016
- Date of occurrenceOCCURRENCE_DT
- Nov 1, 2016
- Final order dateFINAL_ORDER_DT
- Jan 20, 2017
- Bill first printedBILL_PRINT_DT
- Dec 14, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 20, 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12028
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 134.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 134.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 134.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 62
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10112
- Size of mineSIZE_OF_MINE
- 10112
- Controller hours workedCONTROLLER_HRS
- 7717857
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7717857
- History period startHISTORY_START_DT
- Aug 1, 2015
- History period endHISTORY_END_DT
- Oct 31, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6737519
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 1, 2016Citation number: 8965353Standard: 56.14207Proposed penalty: $114.00Current assessment: $114.00Paid against proposed penalty: $114.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8965353
- Assessment control numberASSESS_CASE_NO
- 000426651
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 25, 2017
- Citation issuedISSUE_DT
- Nov 1, 2016
- Date of occurrenceOCCURRENCE_DT
- Nov 1, 2016
- Final order dateFINAL_ORDER_DT
- Jan 20, 2017
- Bill first printedBILL_PRINT_DT
- Dec 14, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 20, 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 114.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 114.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 114.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10112
- Size of mineSIZE_OF_MINE
- 10112
- Controller hours workedCONTROLLER_HRS
- 7717857
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7717857
- History period startHISTORY_START_DT
- Aug 1, 2015
- History period endHISTORY_END_DT
- Oct 31, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6737519
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 1, 2016Citation number: 8965354Standard: 50.30(a)Proposed penalty: $114.00Current assessment: $114.00Paid against proposed penalty: $114.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8965354
- Assessment control numberASSESS_CASE_NO
- 000426651
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 25, 2017
- Citation issuedISSUE_DT
- Nov 1, 2016
- Date of occurrenceOCCURRENCE_DT
- Nov 1, 2016
- Final order dateFINAL_ORDER_DT
- Jan 20, 2017
- Bill first printedBILL_PRINT_DT
- Dec 14, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 20, 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 114.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 114.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 114.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10112
- Size of mineSIZE_OF_MINE
- 10112
- Controller hours workedCONTROLLER_HRS
- 7717857
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7717857
- History period startHISTORY_START_DT
- Aug 1, 2015
- History period endHISTORY_END_DT
- Oct 31, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6737519
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 20, 2015Citation number: 8684538Standard: 56.20003(a)Proposed penalty: $540.00Current assessment: $540.00Paid against proposed penalty: $540.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8684538
- Assessment control numberASSESS_CASE_NO
- 000399190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 4, 2016
- Citation issuedISSUE_DT
- Oct 20, 2015
- Date of occurrenceOCCURRENCE_DT
- Oct 20, 2015
- Final order dateFINAL_ORDER_DT
- Jan 21, 2016
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 21, 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 540.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 540.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 540.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 81
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6519
- Size of mineSIZE_OF_MINE
- 6519
- Controller hours workedCONTROLLER_HRS
- 7330107
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7330107
- History period startHISTORY_START_DT
- Jul 20, 2014
- History period endHISTORY_END_DT
- Oct 19, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6606380
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 20, 2015Citation number: 8684540Standard: 56.18002(a)Proposed penalty: $243.00Current assessment: $243.00Paid against proposed penalty: $243.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8684540
- Assessment control numberASSESS_CASE_NO
- 000399190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 4, 2016
- Citation issuedISSUE_DT
- Oct 20, 2015
- Date of occurrenceOCCURRENCE_DT
- Oct 20, 2015
- Final order dateFINAL_ORDER_DT
- Jan 21, 2016
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 21, 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.18002(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 243.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 243.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 243.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 71
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6519
- Size of mineSIZE_OF_MINE
- 6519
- Controller hours workedCONTROLLER_HRS
- 7330107
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7330107
- History period startHISTORY_START_DT
- Jul 20, 2014
- History period endHISTORY_END_DT
- Oct 19, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6606380
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 20, 2015Citation number: 8684537Standard: 56.20011Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8684537
- Assessment control numberASSESS_CASE_NO
- 000399190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 4, 2016
- Citation issuedISSUE_DT
- Oct 20, 2015
- Date of occurrenceOCCURRENCE_DT
- Oct 20, 2015
- Final order dateFINAL_ORDER_DT
- Jan 21, 2016
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 21, 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20011
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6519
- Size of mineSIZE_OF_MINE
- 6519
- Controller hours workedCONTROLLER_HRS
- 7330107
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7330107
- History period startHISTORY_START_DT
- Jul 20, 2014
- History period endHISTORY_END_DT
- Oct 19, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6606380
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 20, 2015Citation number: 8684539Standard: 56.4101Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8684539
- Assessment control numberASSESS_CASE_NO
- 000399190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 4, 2016
- Citation issuedISSUE_DT
- Oct 20, 2015
- Date of occurrenceOCCURRENCE_DT
- Oct 20, 2015
- Final order dateFINAL_ORDER_DT
- Jan 21, 2016
- Bill first printedBILL_PRINT_DT
- Dec 16, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 21, 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6519
- Size of mineSIZE_OF_MINE
- 6519
- Controller hours workedCONTROLLER_HRS
- 7330107
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7330107
- History period startHISTORY_START_DT
- Jul 20, 2014
- History period endHISTORY_END_DT
- Oct 19, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central, Inc.
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6606380
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 11, 2012Citation number: 8627650Standard: 56.16006Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8627650
- Assessment control numberASSESS_CASE_NO
- 000281623
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 23, 2012
- Citation issuedISSUE_DT
- Jan 11, 2012
- Date of occurrenceOCCURRENCE_DT
- Jan 11, 2012
- Final order dateFINAL_ORDER_DT
- Apr 5, 2012
- Bill first printedBILL_PRINT_DT
- Feb 28, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2012
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 5, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16006
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1.25
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 7294
- Size of mineSIZE_OF_MINE
- 7294
- Controller hours workedCONTROLLER_HRS
- 7101400
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7101400
- History period startHISTORY_START_DT
- Oct 11, 2010
- History period endHISTORY_END_DT
- Jan 10, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- APAC-Central
- IDVIOLATOR_ID
- L11502
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1987
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6549282
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 88 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Aug 9, 2010Citation issued: May 11, 2010Docket: CENT 2010-1120MStandard: 41.12Proposed penalty: $100.00Penalty after decision: $0.00Decided: Feb 2, 2011Decision type: VacateDetails
The contest
- Citation or order numberCITATION_NO
- 6569483
- Citation issuedCITATION_ISSUE_DT
- May 11, 2010
- Hearing request receivedCONTEST_DT
- Aug 9, 2010
- Docket numberDOCKET_NO
- CENT 2010-1120M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Vacate
- DecidedDECISION_DT
- Feb 2, 2011
- Petition duePETITION_DUE_DT
- Sep 23, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 41.12
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- NoLikelihood
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (2)
Penalty after the decisionDECISION_PENALTY_AMT, Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (10)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jan 10, 2011Citation issued: May 10, 2010Docket: CENT 2011-344MStandard: 56.14207Proposed penalty: $1,200.00Penalty after decision: $343.00Decided: Jul 13, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6569480
- Citation issuedCITATION_ISSUE_DT
- May 10, 2010
- Hearing request receivedCONTEST_DT
- Jan 10, 2011
- Docket numberDOCKET_NO
- CENT 2011-344M
- Assessment typeASSESS_TYPE_CODE
- Special
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jul 13, 2011
- Petition duePETITION_DUE_DT
- Feb 24, 2011
- Petition filedPETITION_FILED_DT
- Jan 28, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1200.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 343.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14207
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- HighNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Aug 9, 2010Citation issued: May 10, 2010Docket: CENT 2010-1120MStandard: 56.12018Proposed penalty: $499.00Penalty after decision: $100.00Decided: Feb 2, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6569472
- Citation issuedCITATION_ISSUE_DT
- May 10, 2010
- Hearing request receivedCONTEST_DT
- Aug 9, 2010
- Docket numberDOCKET_NO
- CENT 2010-1120M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Feb 2, 2011
- Petition duePETITION_DUE_DT
- Sep 23, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 499.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12018
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Aug 9, 2010Citation issued: May 10, 2010Docket: CENT 2010-1120MStandard: 56.9300(a)Proposed penalty: $540.00Penalty after decision: $109.00Decided: Feb 2, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6569477
- Citation issuedCITATION_ISSUE_DT
- May 10, 2010
- Hearing request receivedCONTEST_DT
- Aug 9, 2010
- Docket numberDOCKET_NO
- CENT 2010-1120M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Feb 2, 2011
- Petition duePETITION_DUE_DT
- Sep 23, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 540.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 109.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.9300(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 2
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 2
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Nov 6, 2008Citation issued: Aug 20, 2008Docket: CENT 2009-79MStandard: 56.4201(b)Proposed penalty: $100.00Penalty after decision: $100.00Decided: Feb 24, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7874714
- Citation issuedCITATION_ISSUE_DT
- Aug 20, 2008
- Hearing request receivedCONTEST_DT
- Nov 6, 2008
- Docket numberDOCKET_NO
- CENT 2009-79M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Feb 24, 2010
- Petition duePETITION_DUE_DT
- Dec 22, 2008
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4201(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- NoLikelihood
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- NoLikelihood
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- NoLostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (2)
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
5 contested citations and orders; decision types are MSHA's own text.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS RESTRICTED ACTIVITY ONLY
- 3
- NO DYS AWY FRM WRK,NO RSTR ACT
- 1
Date: May 12, 2025Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220251410010
- DateACCIDENT_DT
- May 12, 2025
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320251550006
Injury
- Activity at the timeACTIVITY
- Front-end loader
- Activity codeACTIVITY_CD
- 053
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- CHEST (RIBS/BREAST BONE/CHEST ORGNS)
- Part of body codeINJ_BODY_PART_CD
- 430
- Days of restricted workDAYS_RESTRICT
- 15
- Returned to workRETURN_TO_WORK_DT
- Jun 3, 2025
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 980M
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Aug 28, 2009Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220092510028
- DateACCIDENT_DT
- Aug 28, 2009
- TimeACCIDENT_TIME
- 1330
- Shift beganSHIFT_BEGIN_TIME
- 0800
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- MACHINE-MILL,CLEANING PLT
- Source of injury codeINJURY_SOURCE_CD
- 075
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 5
- Returned to workRETURN_TO_WORK_DT
- Sep 4, 2009
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Screen, Vibrator, Shaker, Rock screener, Scalper
- Equipment codeMINING_EQUIP_CD
- 58
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- 32LP
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Contractor IDCONTRACTOR_ID
- 1UB
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO
Date: Jan 11, 2008Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220080220015
- DateACCIDENT_DT
- Jan 11, 2008
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 7
- Returned to workRETURN_TO_WORK_DT
- Jan 18, 2008
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
- Equipment codeMINING_EQUIP_CD
- 60
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: May 29, 2007Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Flash burns (welding)Days lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220071510040
- DateACCIDENT_DT
- May 29, 2007
- TimeACCIDENT_TIME
- 1700
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Flash burns (welding)
- Accident type codeACCIDENT_TYPE_CD
- 40
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- MACHINE,NEC-WELDR,OFC MAC
- Source of injury codeINJURY_SOURCE_CD
- 074
- Nature of injuryNATURE_INJURY
- ELECT.ARC BURN-NOT CONTAC
- Nature of injury codeNATURE_INJURY_CD
- 301
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- May 30, 2007
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Welding machine, Torch, Cutting torch, Arc welder, Air arc
- Equipment codeMINING_EQUIP_CD
- 70
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Controller at the timeCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2007
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2007
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
4 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 3,034Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 3034
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1517
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 13,832Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 13832
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1976
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 4,099Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4099
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1366
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 12,448Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 12448
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2075
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 4,600Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4600
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1533
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 10,385Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 10385
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2077
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 4,375Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 4375
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2188
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 11,135Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 11135
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1856
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 4,728Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4728
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1576
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 11,927Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 11927
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1988
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 5,413Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 5413
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1804
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 8,056Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 8056
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2014
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 4,970Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4970
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1657
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 10,327Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 10327
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2065
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 3,496Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 3496
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1165
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 11,232Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 11232
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1872
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileCURR_MINE_NM
- Valley Springs Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Harrison
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 2
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Valley Springs Quarry
- Mine IDMINE_ID
- 0300040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Oct 5, 2021
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- APAC-Central, Inc.
- Operator IDCURRENT_OPERATOR_ID
- L11502
- ControllerCURRENT_CONTROLLER_NAME
- CRH PLC
- Controller IDCURRENT_CONTROLLER_ID
- M06183
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Jan 1, 1987
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 009
- FIPS county nameFIPS_CNTY_NM
- Boone
- Nearest townNEAREST_TOWN
- Harrison
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 130
- Most recent assessment control numberASSESS_CTRL_NO
- 000641396
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Stone NEC
- Primary commodity codePRIMARY_SIC_CD
- 142900
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 2
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: APAC-Central, Inc.From: Jan 1, 1987To: No end dateController: CRH PLCFrom : Aug 28, 2006To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Operator fromOPERATOR_START_DT
- Jan 1, 1987
Controller
- ControllerCONTROLLER_NAME
- CRH PLC
- Controller IDCONTROLLER_ID
- M06183
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Aug 28, 2006
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: APAC-Central, Inc.From: Jan 1, 1987To: No end dateController: Ashland IncFrom : Jan 1, 1950To : Aug 27, 2006Details
Operator
- OperatorOPERATOR_NAME
- APAC-Central, Inc.
- Operator IDOPERATOR_ID
- L11502
- Operator fromOPERATOR_START_DT
- Jan 1, 1987
Controller
- ControllerCONTROLLER_NAME
- Ashland Inc
- Controller IDCONTROLLER_ID
- M00049
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
- Controller toCONTROLLER_END_DT
- Aug 27, 2006
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Operator toOPERATOR_END_DT
Operator: Mc Clinton IncFrom: Jan 1, 1950To: Dec 31, 1986Controller: Not shownFrom : Jan 1, 1950To : Dec 31, 1986Details
Operator
- OperatorOPERATOR_NAME
- Mc Clinton Inc
- Operator IDOPERATOR_ID
- L03039
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
- Operator toOPERATOR_END_DT
- Dec 31, 1986
Controller
- Controller IDCONTROLLER_ID
- M00996
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
- Controller toCONTROLLER_END_DT
- Dec 31, 1986
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
ControllerCONTROLLER_NAME
As MSHA records it, newest operator first.
Address of record
APAC-Central, Inc.·Contact title Safety Manager·755 East Millsap Road, Fayetteville AR 72703
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- APAC-Central, Inc.
- Contact titleCONTACT_TITLE
- Safety Manager
- StreetSTREET
- 755 East Millsap Road
- CityCITY
- Fayetteville
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 72703
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0300040
- Mine name in this fileMINE_NAME
- Valley Springs Quarry
- Nearest townNEAREST_TOWN
- Harrison
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Oct 5, 2021
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Stone NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology