Skip to content
SafetyRecord logoSafetyRecord

Valley Springs Quarry

Metal/Non-Metal, SurfaceCrushed, Broken Stone NECBoone, ArkansasMine ID 0300040

Operator APAC-Central, Inc.Controller CRH PLCMSHA status Active since Oct 5, 2021

What MSHA has on file for this mine

Citations and orders
89
since Oct 17, 2000 · 79 to the operator, 10 to contractors · 9 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Compliance Follow-up Inspection
Jun 10 to Jun 11, 2026Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 10, 2026
Closed outINSPECTION_END_DT
Jun 11, 2026
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F03A7E6
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
15

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 1, 2026Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Apr 1, 2026
Closed outINSPECTION_END_DT
Apr 1, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03A7D2
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
Mar 30 to Mar 31, 2026Inspectors 1 | Hours on site 11.75

The inspection

BeganINSPECTION_BEGIN_DT
Mar 30, 2026
Closed outINSPECTION_END_DT
Mar 31, 2026
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
F03A7D1
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
11.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
23.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Nov 25 to Nov 26, 2025Inspectors 1 | Hours on site 8.25

The inspection

BeganINSPECTION_BEGIN_DT
Nov 25, 2025
Closed outINSPECTION_END_DT
Nov 26, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03A504
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

103 (g) Written Notification Hazard Complaint Inspectio
Aug 13, 2025Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Aug 13, 2025
Closed outINSPECTION_END_DT
Aug 13, 2025
ActivityACTIVITY
103 (g) Written Notification Hazard Complaint Inspectio
Activity codeACTIVITY_CODE
E03
Program areaPROGRAM_AREA
M/NM--103 (g) Written Notification Hazard Complaint Inspecti
Event numberEVENT_NO
6938285
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.5
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
2
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
7.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Regular Safety and Health Inspection
Jun 11 to Jun 13, 2025Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Jun 11, 2025
Closed outINSPECTION_END_DT
Jun 13, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804553
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 15 to Jan 16, 2025Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Jan 15, 2025
Closed outINSPECTION_END_DT
Jan 16, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6937394
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 18 to Jul 19, 2024Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Jul 18, 2024
Closed outINSPECTION_END_DT
Jul 19, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804537
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 31 to Nov 1, 2023Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Oct 31, 2023
Closed outINSPECTION_END_DT
Nov 1, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804534
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 31, 2023Inspectors 1 | Hours on site 5.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 31, 2023
Closed outINSPECTION_END_DT
Aug 31, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6910478
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Special Emphasis Programs
May 17, 2023Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2023
Closed outINSPECTION_END_DT
May 17, 2023
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6804533
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Mar 6 to Mar 7, 2023Inspectors 1 | Hours on site 3.75

The inspection

BeganINSPECTION_BEGIN_DT
Mar 6, 2023
Closed outINSPECTION_END_DT
Mar 7, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6935008
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 4 to Apr 7, 2022Inspectors 1 | Hours on site 27

The inspection

BeganINSPECTION_BEGIN_DT
Apr 4, 2022
Closed outINSPECTION_END_DT
Apr 7, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6889645
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
27
Total inspection hoursSUM_TOTAL_INSP_HOURS
33

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 5 to Oct 7, 2021Inspectors 1 | Hours on site 20

The inspection

BeganINSPECTION_BEGIN_DT
Oct 5, 2021
Closed outINSPECTION_END_DT
Oct 7, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6889602
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
20
Total inspection hoursSUM_TOTAL_INSP_HOURS
23

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Dec 7 to Dec 8, 2020Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Dec 7, 2020
Closed outINSPECTION_END_DT
Dec 8, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804518
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 28, 2020Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 28, 2020
Closed outINSPECTION_END_DT
Jan 28, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6808183
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
10

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 10 to Oct 12, 2018Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Oct 10, 2018
Closed outINSPECTION_END_DT
Oct 12, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6606397
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 31 to Nov 2, 2017Inspectors 1 | Hours on site 20

The inspection

BeganINSPECTION_BEGIN_DT
Oct 31, 2017
Closed outINSPECTION_END_DT
Nov 2, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6737381
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
20
Total inspection hoursSUM_TOTAL_INSP_HOURS
29

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 31 to Nov 1, 2016Inspectors 1 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Oct 31, 2016
Closed outINSPECTION_END_DT
Nov 1, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6737519
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
16

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 19 to Oct 21, 2015Inspectors 1 | Hours on site 12

The inspection

BeganINSPECTION_BEGIN_DT
Oct 19, 2015
Closed outINSPECTION_END_DT
Oct 21, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6606380
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12
Total inspection hoursSUM_TOTAL_INSP_HOURS
24.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 9, 2015Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Jul 9, 2015
Closed outINSPECTION_END_DT
Jul 9, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6655995
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Nov 7, 2013Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Nov 7, 2013
Closed outINSPECTION_END_DT
Nov 7, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6606099
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 16, 2013Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Jan 16, 2013
Closed outINSPECTION_END_DT
Jan 16, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6602294
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 11 to Jan 12, 2012Inspectors 1 | Hours on site 16

The inspection

BeganINSPECTION_BEGIN_DT
Jan 11, 2012
Closed outINSPECTION_END_DT
Jan 12, 2012
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6549282
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
16
Total inspection hoursSUM_TOTAL_INSP_HOURS
20.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Part 50 Audit
Jun 14, 2011Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 14, 2011
Closed outINSPECTION_END_DT
Jun 14, 2011
ActivityACTIVITY
Part 50 Audit
Activity codeACTIVITY_CODE
E25
Program areaPROGRAM_AREA
M/NM--Part 50 Audit
Event numberEVENT_NO
6543997
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
7

Who and when, as recorded

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

25 most recent of 58 inspections and other MSHA visits since Feb 23, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Apr 8, 2026
Type: Citation
Standard: 56.5001(a)/.5005
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5009166
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 8, 2026
Time issuedVIOLATION_ISSUE_TIME
1600
Date of occurrenceVIOLATION_OCCUR_DT
Mar 31, 2026
30 CFR part and sectionPART_SECTION
56.5001(a)/.5005
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 1, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 17, 2026
Terminated, timeTERMINATION_TIME
1115
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
May 14, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 28, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F03A7D1
Inspection beganINSPECTION_BEGIN_DT
Mar 30, 2026
Inspection closed outINSPECTION_END_DT
Mar 31, 2026
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 1, 2026
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5009163
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 1, 2026
Time issuedVIOLATION_ISSUE_TIME
0907
Date of occurrenceVIOLATION_OCCUR_DT
Apr 1, 2026
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 1, 2026
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Apr 1, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Apr 1, 2026
Terminated, timeTERMINATION_TIME
0935
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
May 14, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 28, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F03A7D2
Inspection beganINSPECTION_BEGIN_DT
Apr 1, 2026
Inspection closed outINSPECTION_END_DT
Apr 1, 2026
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 25, 2025
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170026
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 25, 2025
Time issuedVIOLATION_ISSUE_TIME
0909
Date of occurrenceVIOLATION_OCCUR_DT
Nov 25, 2025
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 25, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 25, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 25, 2025
Terminated, timeTERMINATION_TIME
1357
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 14, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 21, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 25, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F03A504
Inspection beganINSPECTION_BEGIN_DT
Nov 25, 2025
Inspection closed outINSPECTION_END_DT
Nov 26, 2025
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 25, 2025
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170027
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 25, 2025
Time issuedVIOLATION_ISSUE_TIME
0954
Date of occurrenceVIOLATION_OCCUR_DT
Nov 25, 2025
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 25, 2025
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Nov 25, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Nov 25, 2025
Terminated, timeTERMINATION_TIME
1401
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 14, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 21, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 25, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F03A504
Inspection beganINSPECTION_BEGIN_DT
Nov 25, 2025
Inspection closed outINSPECTION_END_DT
Nov 26, 2025
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 18, 2024
Type: Citation
Standard: 56.12008
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9458450
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 18, 2024
Time issuedVIOLATION_ISSUE_TIME
1015
Date of occurrenceVIOLATION_OCCUR_DT
Jul 18, 2024
30 CFR part and sectionPART_SECTION
56.12008
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 18, 2024
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Jul 18, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Jul 18, 2024
Terminated, timeTERMINATION_TIME
1045
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6804537
Inspection beganINSPECTION_BEGIN_DT
Jul 18, 2024
Inspection closed outINSPECTION_END_DT
Jul 19, 2024
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Mar 7, 2023
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9740836
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 7, 2023
Time issuedVIOLATION_ISSUE_TIME
0825
Date of occurrenceVIOLATION_OCCUR_DT
Mar 7, 2023
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 7, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Mar 7, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Mar 7, 2023
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
May 10, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Jun 17, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 21, 2023
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6935008
Inspection beganINSPECTION_BEGIN_DT
Mar 6, 2023
Inspection closed outINSPECTION_END_DT
Mar 7, 2023
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9649098
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1015
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1020
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1020
TerminatedTERMINATION_DT
Apr 5, 2022
Terminated, timeTERMINATION_TIME
1018
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Sep 21, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Oct 26, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 29, 2022

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
RCR Construction
Operator IDVIOLATOR_ID
C0289
Contractor IDCONTRACTOR_ID
C0289
Inspection eventEVENT_NO
6889645
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 7, 2022
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: HighNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9649093
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
0910
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
0930
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
0930
TerminatedTERMINATION_DT
Apr 5, 2022
Terminated, timeTERMINATION_TIME
0930
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Oct 18, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Nov 23, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 9, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
Operator IDVIOLATOR_ID
P003
Contractor IDCONTRACTOR_ID
P003
Inspection eventEVENT_NO
6889645
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 7, 2022
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: HighNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9649097
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1010
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1015
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1015
TerminatedTERMINATION_DT
Apr 5, 2022
Terminated, timeTERMINATION_TIME
1015
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Sep 21, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Oct 26, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 29, 2022

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
RCR Construction
Operator IDVIOLATOR_ID
C0289
Contractor IDCONTRACTOR_ID
C0289
Inspection eventEVENT_NO
6889645
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 7, 2022
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9649094
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
0922
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Apr 6, 2022
Terminated, timeTERMINATION_TIME
0903
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 24, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jun 30, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
Operator IDVIOLATOR_ID
P003
Contractor IDCONTRACTOR_ID
P003
Inspection eventEVENT_NO
6889645
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 7, 2022
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 47.41(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9649096
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1001
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
47.41(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Apr 6, 2022
Terminated, timeTERMINATION_TIME
0909
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 25, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jul 3, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 8, 2022

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
RCR Construction
Operator IDVIOLATOR_ID
C0289
Contractor IDCONTRACTOR_ID
C0289
Inspection eventEVENT_NO
6889645
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 7, 2022
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9649095
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1000
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Apr 6, 2022
Terminated, timeTERMINATION_TIME
0923
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 25, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jul 3, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 8, 2022

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
RCR Construction
Operator IDVIOLATOR_ID
C0289
Contractor IDCONTRACTOR_ID
C0289
Inspection eventEVENT_NO
6889645
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 7, 2022
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Oct 5, 2021
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9642187
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2021
Time issuedVIOLATION_ISSUE_TIME
1300
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2021
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 6, 2021
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 6, 2021
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 6, 2021
Terminated, timeTERMINATION_TIME
0800
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Nov 23, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Jan 8, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 3, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
Operator IDVIOLATOR_ID
P003
Contractor IDCONTRACTOR_ID
P003
Inspection eventEVENT_NO
6889602
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2021
Inspection closed outINSPECTION_END_DT
Oct 7, 2021
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Oct 5, 2021
Type: Citation
Standard: 47.41(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9642185
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2021
Time issuedVIOLATION_ISSUE_TIME
1250
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2021
30 CFR part and sectionPART_SECTION
47.41(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 6, 2021
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 6, 2021
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 6, 2021
Terminated, timeTERMINATION_TIME
0800
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Nov 23, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Jan 8, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 3, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
Operator IDVIOLATOR_ID
P003
Contractor IDCONTRACTOR_ID
P003
Inspection eventEVENT_NO
6889602
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2021
Inspection closed outINSPECTION_END_DT
Oct 7, 2021
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Oct 5, 2021
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9642186
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2021
Time issuedVIOLATION_ISSUE_TIME
1250
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2021
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 6, 2021
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 6, 2021
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 6, 2021
Terminated, timeTERMINATION_TIME
0800
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Nov 23, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Jan 8, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 3, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
Operator IDVIOLATOR_ID
P003
Contractor IDCONTRACTOR_ID
P003
Inspection eventEVENT_NO
6889602
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2021
Inspection closed outINSPECTION_END_DT
Oct 7, 2021
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jan 28, 2020
Type: Citation
Standard: 47.41(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9458921
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 28, 2020
Time issuedVIOLATION_ISSUE_TIME
1633
Date of occurrenceVIOLATION_OCCUR_DT
Jan 28, 2020
30 CFR part and sectionPART_SECTION
47.41(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 29, 2020
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jan 29, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jan 28, 2020
Terminated, timeTERMINATION_TIME
1715
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Mar 17, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Apr 20, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 5, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6808183
Inspection beganINSPECTION_BEGIN_DT
Jan 28, 2020
Inspection closed outINSPECTION_END_DT
Jan 28, 2020
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 11, 2018
Type: Citation
Standard: 56.4201(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8684590
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 11, 2018
Time issuedVIOLATION_ISSUE_TIME
1415
Date of occurrenceVIOLATION_OCCUR_DT
Oct 10, 2018
30 CFR part and sectionPART_SECTION
56.4201(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 11, 2018
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Oct 11, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Oct 11, 2018
Terminated, timeTERMINATION_TIME
1450
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Nov 16, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Dec 27, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 15, 2019
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6606397
Inspection beganINSPECTION_BEGIN_DT
Oct 10, 2018
Inspection closed outINSPECTION_END_DT
Oct 12, 2018
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 1, 2016
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8965354
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2016
Time issuedVIOLATION_ISSUE_TIME
1327
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2016
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2016
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Nov 1, 2016
Terminated, timeTERMINATION_TIME
1328
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Dec 14, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Jan 20, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 25, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6737519
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2016
Inspection closed outINSPECTION_END_DT
Nov 1, 2016
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 1, 2016
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8965353
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2016
Time issuedVIOLATION_ISSUE_TIME
0845
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2016
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2016
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Nov 1, 2016
Terminated, timeTERMINATION_TIME
0850
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Dec 14, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Jan 20, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 25, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6737519
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2016
Inspection closed outINSPECTION_END_DT
Nov 1, 2016
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 1, 2016
Type: Citation
Standard: 56.12028
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $134.00
Details

The citation

Citation or order numberVIOLATION_NO
8965355
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2016
Time issuedVIOLATION_ISSUE_TIME
1430
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2016
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 2, 2016
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Nov 2, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Nov 2, 2016
Terminated, timeTERMINATION_TIME
1513
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
134
Current proposed assessmentAMOUNT_DUE
134
Amount paidAMOUNT_PAID
134
Bill first printedBILL_PRINT_DT
Dec 14, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Jan 20, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 25, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6737519
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2016
Inspection closed outINSPECTION_END_DT
Nov 1, 2016
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 20, 2015
Type: Citation
Standard: 56.18002(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $243.00
Details

The citation

Citation or order numberVIOLATION_NO
8684540
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 20, 2015
Time issuedVIOLATION_ISSUE_TIME
1155
Date of occurrenceVIOLATION_OCCUR_DT
Oct 20, 2015
30 CFR part and sectionPART_SECTION
56.18002(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 20, 2015
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Oct 20, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Oct 21, 2015
Terminated, timeTERMINATION_TIME
1125
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
243
Current proposed assessmentAMOUNT_DUE
243
Amount paidAMOUNT_PAID
243
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 4, 2016
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6606380
Inspection beganINSPECTION_BEGIN_DT
Oct 19, 2015
Inspection closed outINSPECTION_END_DT
Oct 21, 2015
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 20, 2015
Type: Citation
Standard: 56.20011
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8684537
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 20, 2015
Time issuedVIOLATION_ISSUE_TIME
0910
Date of occurrenceVIOLATION_OCCUR_DT
Oct 20, 2015
30 CFR part and sectionPART_SECTION
56.20011
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 20, 2015
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Oct 20, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Oct 21, 2015
Terminated, timeTERMINATION_TIME
1100
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 4, 2016
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6606380
Inspection beganINSPECTION_BEGIN_DT
Oct 19, 2015
Inspection closed outINSPECTION_END_DT
Oct 21, 2015
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 20, 2015
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8684539
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 20, 2015
Time issuedVIOLATION_ISSUE_TIME
1015
Date of occurrenceVIOLATION_OCCUR_DT
Oct 20, 2015
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 20, 2015
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Oct 20, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Oct 21, 2015
Terminated, timeTERMINATION_TIME
1050
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 4, 2016
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6606380
Inspection beganINSPECTION_BEGIN_DT
Oct 19, 2015
Inspection closed outINSPECTION_END_DT
Oct 21, 2015
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 20, 2015
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $540.00
Details

The citation

Citation or order numberVIOLATION_NO
8684538
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 20, 2015
Time issuedVIOLATION_ISSUE_TIME
0920
Date of occurrenceVIOLATION_OCCUR_DT
Oct 20, 2015
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 20, 2015
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Oct 20, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Oct 21, 2015
Terminated, timeTERMINATION_TIME
1115
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
540
Current proposed assessmentAMOUNT_DUE
540
Amount paidAMOUNT_PAID
540
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 4, 2016
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6606380
Inspection beganINSPECTION_BEGIN_DT
Oct 19, 2015
Inspection closed outINSPECTION_END_DT
Oct 21, 2015
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jan 11, 2012
Type: Citation
Standard: 56.16006
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8627650
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 11, 2012
Time issuedVIOLATION_ISSUE_TIME
0955
Date of occurrenceVIOLATION_OCCUR_DT
Jan 11, 2012
30 CFR part and sectionPART_SECTION
56.16006
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 11, 2012
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jan 11, 2012
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jan 12, 2012
Terminated, timeTERMINATION_TIME
0823
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Feb 28, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Apr 5, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 26, 2012
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
APAC-Central, Inc.
Operator IDVIOLATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
6549282
Inspection beganINSPECTION_BEGIN_DT
Jan 11, 2012
Inspection closed outINSPECTION_END_DT
Jan 12, 2012
Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

89 citations and orders since Oct 17, 2000: 79 issued to the operator, 10 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Apr 8, 2026
Citation number: 5009166
Standard: 56.5001(a)/.5005
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5009166
Assessment control numberASSESS_CASE_NO
000641396
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2026
Citation issuedISSUE_DT
Apr 8, 2026
Date of occurrenceOCCURRENCE_DT
Mar 31, 2026
Final order dateFINAL_ORDER_DT
Jun 25, 2026
Bill first printedBILL_PRINT_DT
May 14, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.5001(a)/.5005
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
12448
Size of mineSIZE_OF_MINE
12448
Controller hours workedCONTROLLER_HRS
12785904
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12785904
History period startHISTORY_START_DT
Dec 31, 2024
History period endHISTORY_END_DT
Mar 30, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A7D1
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 1, 2026
Citation number: 5009163
Standard: 56.14112(a)(1)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5009163
Assessment control numberASSESS_CASE_NO
000641396
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2026
Citation issuedISSUE_DT
Apr 1, 2026
Date of occurrenceOCCURRENCE_DT
Apr 1, 2026
Final order dateFINAL_ORDER_DT
Jun 25, 2026
Bill first printedBILL_PRINT_DT
May 14, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.29
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.143
Operator hours worked at the mineVIOLATOR_MINE_HRS
12448
Size of mineSIZE_OF_MINE
12448
Controller hours workedCONTROLLER_HRS
12785904
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12785904
History period startHISTORY_START_DT
Jan 1, 2025
History period endHISTORY_END_DT
Mar 31, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A7D2
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 25, 2025
Citation number: 5170027
Standard: 56.14112(a)(1)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170027
Assessment control numberASSESS_CASE_NO
000634628
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2026
Citation issuedISSUE_DT
Nov 25, 2025
Date of occurrenceOCCURRENCE_DT
Nov 25, 2025
Final order dateFINAL_ORDER_DT
Feb 21, 2026
Bill first printedBILL_PRINT_DT
Jan 14, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 21, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10385
Size of mineSIZE_OF_MINE
10385
Controller hours workedCONTROLLER_HRS
13036314
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
13036314
History period startHISTORY_START_DT
Aug 25, 2024
History period endHISTORY_END_DT
Nov 24, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A504
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 25, 2025
Citation number: 5170026
Standard: 56.14107(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170026
Assessment control numberASSESS_CASE_NO
000634628
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2026
Citation issuedISSUE_DT
Nov 25, 2025
Date of occurrenceOCCURRENCE_DT
Nov 25, 2025
Final order dateFINAL_ORDER_DT
Feb 21, 2026
Bill first printedBILL_PRINT_DT
Jan 14, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 21, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10385
Size of mineSIZE_OF_MINE
10385
Controller hours workedCONTROLLER_HRS
13036314
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
13036314
History period startHISTORY_START_DT
Aug 25, 2024
History period endHISTORY_END_DT
Nov 24, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A504
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 18, 2024
Citation number: 9458450
Standard: 56.12008
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9458450
Assessment control numberASSESS_CASE_NO
000606478
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 24, 2024
Citation issuedISSUE_DT
Jul 18, 2024
Date of occurrenceOCCURRENCE_DT
Jul 18, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12008
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
11135
Size of mineSIZE_OF_MINE
11135
Controller hours workedCONTROLLER_HRS
11786290
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
11786290
History period startHISTORY_START_DT
Apr 18, 2023
History period endHISTORY_END_DT
Jul 17, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6804537
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 7, 2023
Citation number: 9740836
Standard: 56.4101
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9740836
Assessment control numberASSESS_CASE_NO
000576060
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 21, 2023
Citation issuedISSUE_DT
Mar 7, 2023
Date of occurrenceOCCURRENCE_DT
Mar 7, 2023
Final order dateFINAL_ORDER_DT
Jun 17, 2023
Bill first printedBILL_PRINT_DT
May 10, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 17, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
11927
Size of mineSIZE_OF_MINE
11927
Controller hours workedCONTROLLER_HRS
11651152
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
11651152
History period startHISTORY_START_DT
Dec 7, 2021
History period endHISTORY_END_DT
Mar 6, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6935008
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 5, 2022
Citation number: 9649098
Standard: 56.14207
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9649098
Assessment control numberASSESS_CASE_NO
000563430
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 27, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Oct 26, 2022
Bill first printedBILL_PRINT_DT
Sep 21, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 26, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10795
Size of mineSIZE_OF_MINE
10795
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
RCR Construction
IDVIOLATOR_ID
C0289
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 5, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889645
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 5, 2022
Citation number: 9649095
Standard: 56.4101
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9649095
Assessment control numberASSESS_CASE_NO
000555590
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 24, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Jul 3, 2022
Bill first printedBILL_PRINT_DT
May 25, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 3, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10795
Size of mineSIZE_OF_MINE
10795
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
RCR Construction
IDVIOLATOR_ID
C0289
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 5, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889645
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 5, 2022
Citation number: 9649094
Standard: 56.4101
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9649094
Assessment control numberASSESS_CASE_NO
000555473
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Jun 30, 2022
Bill first printedBILL_PRINT_DT
May 24, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 30, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
24
Size of mineSIZE_OF_MINE
24
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
IDVIOLATOR_ID
P003
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 5, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889645
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 5, 2022
Citation number: 9649093
Standard: 56.14100(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9649093
Assessment control numberASSESS_CASE_NO
000565270
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 9, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Nov 23, 2022
Bill first printedBILL_PRINT_DT
Oct 18, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 23, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator hours worked at the mineVIOLATOR_MINE_HRS
24
Size of mineSIZE_OF_MINE
24
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
IDVIOLATOR_ID
P003
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 5, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889645
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 5, 2022
Citation number: 9649097
Standard: 56.14100(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9649097
Assessment control numberASSESS_CASE_NO
000563430
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 27, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Oct 26, 2022
Bill first printedBILL_PRINT_DT
Sep 21, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 26, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10795
Size of mineSIZE_OF_MINE
10795
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
RCR Construction
IDVIOLATOR_ID
C0289
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 5, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889645
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 5, 2022
Citation number: 9649096
Standard: 47.41(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9649096
Assessment control numberASSESS_CASE_NO
000555590
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 24, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Jul 3, 2022
Bill first printedBILL_PRINT_DT
May 25, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 3, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.41(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10795
Size of mineSIZE_OF_MINE
10795
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
RCR Construction
IDVIOLATOR_ID
C0289
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 5, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889645
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Oct 5, 2021
Citation number: 9642186
Standard: 56.4101
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9642186
Assessment control numberASSESS_CASE_NO
000545809
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2021
Citation issuedISSUE_DT
Oct 5, 2021
Date of occurrenceOCCURRENCE_DT
Oct 5, 2021
Final order dateFINAL_ORDER_DT
Jan 8, 2022
Bill first printedBILL_PRINT_DT
Nov 23, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 8, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
24
Size of mineSIZE_OF_MINE
24
History period startHISTORY_START_DT
Jul 5, 2020
History period endHISTORY_END_DT
Oct 4, 2021

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
IDVIOLATOR_ID
P003
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 5, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889602
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Oct 5, 2021
Citation number: 9642187
Standard: 56.4201(a)(2)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9642187
Assessment control numberASSESS_CASE_NO
000545809
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2021
Citation issuedISSUE_DT
Oct 5, 2021
Date of occurrenceOCCURRENCE_DT
Oct 5, 2021
Final order dateFINAL_ORDER_DT
Jan 8, 2022
Bill first printedBILL_PRINT_DT
Nov 23, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 8, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
24
Size of mineSIZE_OF_MINE
24
History period startHISTORY_START_DT
Jul 5, 2020
History period endHISTORY_END_DT
Oct 4, 2021

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
IDVIOLATOR_ID
P003
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 5, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889602
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Oct 5, 2021
Citation number: 9642185
Standard: 47.41(a)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9642185
Assessment control numberASSESS_CASE_NO
000545809
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2021
Citation issuedISSUE_DT
Oct 5, 2021
Date of occurrenceOCCURRENCE_DT
Oct 5, 2021
Final order dateFINAL_ORDER_DT
Jan 8, 2022
Bill first printedBILL_PRINT_DT
Nov 23, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 8, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.41(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
24
Size of mineSIZE_OF_MINE
24
History period startHISTORY_START_DT
Jul 5, 2020
History period endHISTORY_END_DT
Oct 4, 2021

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Superior ROCK DRILLING and Blasting
IDVIOLATOR_ID
P003
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 5, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6889602
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jan 28, 2020
Citation number: 9458921
Standard: 47.41(a)
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9458921
Assessment control numberASSESS_CASE_NO
000510669
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 22, 2021
Citation issuedISSUE_DT
Jan 28, 2020
Date of occurrenceOCCURRENCE_DT
Jan 28, 2020
Final order dateFINAL_ORDER_DT
Apr 20, 2020
Bill first printedBILL_PRINT_DT
Mar 17, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 20, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.41(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Mine Act interestMINEACT_INTEREST_AMT
6.05
Excessive late payment interestEXLATE_INTEREST_AMT
3.62
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
6.05
Paid against late payment interestPAID_EXLATE_INTEREST_AMT
3.62

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
11232
Size of mineSIZE_OF_MINE
11232
Controller hours workedCONTROLLER_HRS
11010629
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
11010629
History period startHISTORY_START_DT
Oct 28, 2018
History period endHISTORY_END_DT
Jan 27, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6808183
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (10)

Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 11, 2018
Citation number: 8684590
Standard: 56.4201(b)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8684590
Assessment control numberASSESS_CASE_NO
000477509
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 13, 2019
Citation issuedISSUE_DT
Oct 11, 2018
Date of occurrenceOCCURRENCE_DT
Oct 10, 2018
Final order dateFINAL_ORDER_DT
Dec 27, 2018
Bill first printedBILL_PRINT_DT
Nov 16, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 27, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Mine Act interestMINEACT_INTEREST_AMT
1.16
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
22
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
10432
Size of mineSIZE_OF_MINE
10432
Controller hours workedCONTROLLER_HRS
10996976
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10996976
History period startHISTORY_START_DT
Jul 10, 2017
History period endHISTORY_END_DT
Oct 9, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606397
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2016
Citation number: 8965355
Standard: 56.12028
Proposed penalty: $134.00
Current assessment: $134.00
Paid against proposed penalty: $134.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8965355
Assessment control numberASSESS_CASE_NO
000426651
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2017
Citation issuedISSUE_DT
Nov 1, 2016
Date of occurrenceOCCURRENCE_DT
Nov 1, 2016
Final order dateFINAL_ORDER_DT
Jan 20, 2017
Bill first printedBILL_PRINT_DT
Dec 14, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 20, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
134.00
Current assessmentCURRENT_ASSESSMENT_AMT
134.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
134.00

Penalty points

Violation history pointsPENALTY_POINTS
62
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10112
Size of mineSIZE_OF_MINE
10112
Controller hours workedCONTROLLER_HRS
7717857
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7717857
History period startHISTORY_START_DT
Aug 1, 2015
History period endHISTORY_END_DT
Oct 31, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6737519
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2016
Citation number: 8965353
Standard: 56.14207
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8965353
Assessment control numberASSESS_CASE_NO
000426651
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2017
Citation issuedISSUE_DT
Nov 1, 2016
Date of occurrenceOCCURRENCE_DT
Nov 1, 2016
Final order dateFINAL_ORDER_DT
Jan 20, 2017
Bill first printedBILL_PRINT_DT
Dec 14, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 20, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10112
Size of mineSIZE_OF_MINE
10112
Controller hours workedCONTROLLER_HRS
7717857
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7717857
History period startHISTORY_START_DT
Aug 1, 2015
History period endHISTORY_END_DT
Oct 31, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6737519
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2016
Citation number: 8965354
Standard: 50.30(a)
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8965354
Assessment control numberASSESS_CASE_NO
000426651
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2017
Citation issuedISSUE_DT
Nov 1, 2016
Date of occurrenceOCCURRENCE_DT
Nov 1, 2016
Final order dateFINAL_ORDER_DT
Jan 20, 2017
Bill first printedBILL_PRINT_DT
Dec 14, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 20, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
46
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10112
Size of mineSIZE_OF_MINE
10112
Controller hours workedCONTROLLER_HRS
7717857
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7717857
History period startHISTORY_START_DT
Aug 1, 2015
History period endHISTORY_END_DT
Oct 31, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6737519
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 20, 2015
Citation number: 8684538
Standard: 56.20003(a)
Proposed penalty: $540.00
Current assessment: $540.00
Paid against proposed penalty: $540.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8684538
Assessment control numberASSESS_CASE_NO
000399190
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2016
Citation issuedISSUE_DT
Oct 20, 2015
Date of occurrenceOCCURRENCE_DT
Oct 20, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
540.00
Current assessmentCURRENT_ASSESSMENT_AMT
540.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
540.00

Penalty points

Violation history pointsPENALTY_POINTS
81
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
6519
Size of mineSIZE_OF_MINE
6519
Controller hours workedCONTROLLER_HRS
7330107
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7330107
History period startHISTORY_START_DT
Jul 20, 2014
History period endHISTORY_END_DT
Oct 19, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606380
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 20, 2015
Citation number: 8684540
Standard: 56.18002(a)
Proposed penalty: $243.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8684540
Assessment control numberASSESS_CASE_NO
000399190
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2016
Citation issuedISSUE_DT
Oct 20, 2015
Date of occurrenceOCCURRENCE_DT
Oct 20, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
243.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
6519
Size of mineSIZE_OF_MINE
6519
Controller hours workedCONTROLLER_HRS
7330107
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7330107
History period startHISTORY_START_DT
Jul 20, 2014
History period endHISTORY_END_DT
Oct 19, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606380
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 20, 2015
Citation number: 8684537
Standard: 56.20011
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8684537
Assessment control numberASSESS_CASE_NO
000399190
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2016
Citation issuedISSUE_DT
Oct 20, 2015
Date of occurrenceOCCURRENCE_DT
Oct 20, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20011
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
6519
Size of mineSIZE_OF_MINE
6519
Controller hours workedCONTROLLER_HRS
7330107
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7330107
History period startHISTORY_START_DT
Jul 20, 2014
History period endHISTORY_END_DT
Oct 19, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606380
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 20, 2015
Citation number: 8684539
Standard: 56.4101
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8684539
Assessment control numberASSESS_CASE_NO
000399190
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2016
Citation issuedISSUE_DT
Oct 20, 2015
Date of occurrenceOCCURRENCE_DT
Oct 20, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
6519
Size of mineSIZE_OF_MINE
6519
Controller hours workedCONTROLLER_HRS
7330107
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7330107
History period startHISTORY_START_DT
Jul 20, 2014
History period endHISTORY_END_DT
Oct 19, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central, Inc.
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606380
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 11, 2012
Citation number: 8627650
Standard: 56.16006
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8627650
Assessment control numberASSESS_CASE_NO
000281623
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 23, 2012
Citation issuedISSUE_DT
Jan 11, 2012
Date of occurrenceOCCURRENCE_DT
Jan 11, 2012
Final order dateFINAL_ORDER_DT
Apr 5, 2012
Bill first printedBILL_PRINT_DT
Feb 28, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 5, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.16006
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
9

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
7294
Size of mineSIZE_OF_MINE
7294
Controller hours workedCONTROLLER_HRS
7101400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7101400
History period startHISTORY_START_DT
Oct 11, 2010
History period endHISTORY_END_DT
Jan 10, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
APAC-Central
IDVIOLATOR_ID
L11502
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6549282
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 88 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Aug 9, 2010
Citation issued: May 11, 2010
Docket: CENT 2010-1120M
Standard: 41.12
Proposed penalty: $100.00
Penalty after decision: $0.00
Decided: Feb 2, 2011
Decision type: Vacate
Details

The contest

Citation or order numberCITATION_NO
6569483
Citation issuedCITATION_ISSUE_DT
May 11, 2010
Hearing request receivedCONTEST_DT
Aug 9, 2010
Docket numberDOCKET_NO
CENT 2010-1120M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Vacate
DecidedDECISION_DT
Feb 2, 2011
Petition duePETITION_DUE_DT
Sep 23, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
41.12
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (2)

Penalty after the decisionDECISION_PENALTY_AMT, Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (10)

Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Jan 10, 2011
Citation issued: May 10, 2010
Docket: CENT 2011-344M
Standard: 56.14207
Proposed penalty: $1,200.00
Penalty after decision: $343.00
Decided: Jul 13, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6569480
Citation issuedCITATION_ISSUE_DT
May 10, 2010
Hearing request receivedCONTEST_DT
Jan 10, 2011
Docket numberDOCKET_NO
CENT 2011-344M
Assessment typeASSESS_TYPE_CODE
Special
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2011
Petition duePETITION_DUE_DT
Feb 24, 2011
Petition filedPETITION_FILED_DT
Jan 28, 2011

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1200.00
Penalty after the decisionDECISION_PENALTY_AMT
343.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14207
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 9, 2010
Citation issued: May 10, 2010
Docket: CENT 2010-1120M
Standard: 56.12018
Proposed penalty: $499.00
Penalty after decision: $100.00
Decided: Feb 2, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6569472
Citation issuedCITATION_ISSUE_DT
May 10, 2010
Hearing request receivedCONTEST_DT
Aug 9, 2010
Docket numberDOCKET_NO
CENT 2010-1120M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Feb 2, 2011
Petition duePETITION_DUE_DT
Sep 23, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
499.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12018
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 9, 2010
Citation issued: May 10, 2010
Docket: CENT 2010-1120M
Standard: 56.9300(a)
Proposed penalty: $540.00
Penalty after decision: $109.00
Decided: Feb 2, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6569477
Citation issuedCITATION_ISSUE_DT
May 10, 2010
Hearing request receivedCONTEST_DT
Aug 9, 2010
Docket numberDOCKET_NO
CENT 2010-1120M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Feb 2, 2011
Petition duePETITION_DUE_DT
Sep 23, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
540.00
Penalty after the decisionDECISION_PENALTY_AMT
109.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.9300(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
2
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
2
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Nov 6, 2008
Citation issued: Aug 20, 2008
Docket: CENT 2009-79M
Standard: 56.4201(b)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Feb 24, 2010
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
7874714
Citation issuedCITATION_ISSUE_DT
Aug 20, 2008
Hearing request receivedCONTEST_DT
Nov 6, 2008
Docket numberDOCKET_NO
CENT 2009-79M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Feb 24, 2010
Petition duePETITION_DUE_DT
Dec 22, 2008

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.4201(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
LowNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (2)

Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE

5 contested citations and orders; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

DAYS RESTRICTED ACTIVITY ONLY
3
NO DYS AWY FRM WRK,NO RSTR ACT
1
Date: May 12, 2025
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: POWERED HAULAGE
Accident type: Struck against a moving object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220251410010
DateACCIDENT_DT
May 12, 2025
TimeACCIDENT_TIME
0900
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Struck against a moving object
Accident type codeACCIDENT_TYPE_CD
02
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320251550006

Injury

Activity at the timeACTIVITY
Front-end loader
Activity codeACTIVITY_CD
053
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Days of restricted workDAYS_RESTRICT
15
Returned to workRETURN_TO_WORK_DT
Jun 3, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
980M
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID

Date: Aug 28, 2009
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220092510028
DateACCIDENT_DT
Aug 28, 2009
TimeACCIDENT_TIME
1330
Shift beganSHIFT_BEGIN_TIME
0800
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
MACHINE-MILL,CLEANING PLT
Source of injury codeINJURY_SOURCE_CD
075
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
5
Returned to workRETURN_TO_WORK_DT
Sep 4, 2009

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Screen, Vibrator, Shaker, Rock screener, Scalper
Equipment codeMINING_EQUIP_CD
58
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
32LP
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Contractor IDCONTRACTOR_ID
1UB
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO

Date: Jan 11, 2008
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220080220015
DateACCIDENT_DT
Jan 11, 2008
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
7
Returned to workRETURN_TO_WORK_DT
Jan 18, 2008

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: May 29, 2007
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Flash burns (welding)
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220071510040
DateACCIDENT_DT
May 29, 2007
TimeACCIDENT_TIME
1700
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Flash burns (welding)
Accident type codeACCIDENT_TYPE_CD
40
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
MACHINE,NEC-WELDR,OFC MAC
Source of injury codeINJURY_SOURCE_CD
074
Nature of injuryNATURE_INJURY
ELECT.ARC BURN-NOT CONTAC
Nature of injury codeNATURE_INJURY_CD
301
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
May 30, 2007

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Welding machine, Torch, Cutting torch, Arc welder, Air arc
Equipment codeMINING_EQUIP_CD
70
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2007
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

4 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 3,034
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3034
Average hours per employeeAVG_EMPLOYEE_HOURS
1517

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 13,832
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
13832
Average hours per employeeAVG_EMPLOYEE_HOURS
1976

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 4,099
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4099
Average hours per employeeAVG_EMPLOYEE_HOURS
1366

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 12,448
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
12448
Average hours per employeeAVG_EMPLOYEE_HOURS
2075

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 4,600
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4600
Average hours per employeeAVG_EMPLOYEE_HOURS
1533

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 10,385
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
10385
Average hours per employeeAVG_EMPLOYEE_HOURS
2077

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 4,375
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
4375
Average hours per employeeAVG_EMPLOYEE_HOURS
2188

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 11,135
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
11135
Average hours per employeeAVG_EMPLOYEE_HOURS
1856

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 4,728
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4728
Average hours per employeeAVG_EMPLOYEE_HOURS
1576

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 11,927
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
11927
Average hours per employeeAVG_EMPLOYEE_HOURS
1988

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 5,413
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
5413
Average hours per employeeAVG_EMPLOYEE_HOURS
1804

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 8,056
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
8056
Average hours per employeeAVG_EMPLOYEE_HOURS
2014

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 4,970
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4970
Average hours per employeeAVG_EMPLOYEE_HOURS
1657

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 10,327
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
10327
Average hours per employeeAVG_EMPLOYEE_HOURS
2065

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 3,496
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
3496
Average hours per employeeAVG_EMPLOYEE_HOURS
1165

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 11,232
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
11232
Average hours per employeeAVG_EMPLOYEE_HOURS
1872

Mine

Mine IDMINE_ID
0300040
Mine name in this fileCURR_MINE_NM
Valley Springs Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Little Rock AR Field Office
Nearest town
Harrison
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
2
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Valley Springs Quarry
Mine IDMINE_ID
0300040
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Oct 5, 2021
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
APAC-Central, Inc.
Operator IDCURRENT_OPERATOR_ID
L11502
ControllerCURRENT_CONTROLLER_NAME
CRH PLC
Controller IDCURRENT_CONTROLLER_ID
M06183
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jan 1, 1987

Location and MSHA office

StateSTATE
AR
Bureau of Mines state codeBOM_STATE_CD
03
FIPS county codeFIPS_CNTY_CD
009
FIPS county nameFIPS_CNTY_NM
Boone
Nearest townNEAREST_TOWN
Harrison
MSHA districtDISTRICT
M5
MSHA office codeOFFICE_CD
M5871
MSHA officeOFFICE_NAME
Little Rock AR Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
130
Most recent assessment control numberASSESS_CTRL_NO
000641396

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Stone NEC
Primary commodity codePRIMARY_SIC_CD
142900
Primary SIC codePRIMARY_SIC_CD_1
1429
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
2
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: APAC-Central, Inc.
From: Jan 1, 1987
To: No end date
Controller: CRH PLC
From : Aug 28, 2006
To : No end date
Details

Operator

OperatorOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

ControllerCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Aug 28, 2006

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT

Operator: APAC-Central, Inc.
From: Jan 1, 1987
To: No end date
Controller: Ashland Inc
From : Jan 1, 1950
To : Aug 27, 2006
Details

Operator

OperatorOPERATOR_NAME
APAC-Central, Inc.
Operator IDOPERATOR_ID
L11502
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

ControllerCONTROLLER_NAME
Ashland Inc
Controller IDCONTROLLER_ID
M00049
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Aug 27, 2006

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Operator toOPERATOR_END_DT

Operator: Mc Clinton Inc
From: Jan 1, 1950
To: Dec 31, 1986
Controller: Not shown
From : Jan 1, 1950
To : Dec 31, 1986
Details

Operator

OperatorOPERATOR_NAME
Mc Clinton Inc
Operator IDOPERATOR_ID
L03039
Operator fromOPERATOR_START_DT
Jan 1, 1950
Operator toOPERATOR_END_DT
Dec 31, 1986

Controller

Controller IDCONTROLLER_ID
M00996
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Dec 31, 1986

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

APAC-Central, Inc.·Contact title Safety Manager·755 East Millsap Road, Fayetteville AR 72703

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
APAC-Central, Inc.
Contact titleCONTACT_TITLE
Safety Manager
StreetSTREET
755 East Millsap Road
CityCITY
Fayetteville
StateSTATE_ABBR
AR
State nameSTATE
Arkansas
ZIP codeZIP_CD
72703
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
05

Mine

Mine IDMINE_ID
0300040
Mine name in this fileMINE_NAME
Valley Springs Quarry
Nearest townNEAREST_TOWN
Harrison
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Oct 5, 2021
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Stone NEC
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology