Skip to content
SafetyRecord logoSafetyRecord

Foreman Quarry & Plant

Metal/Non-Metal, FacilityCementLittle River, ArkansasMine ID 0300256

Operator Ash Grove Cement CompanyController CRH PLCMSHA status Active since Feb 15, 1973

What MSHA has on file for this mine

Citations and orders
1,431
since Mar 25, 2000 · 1,122 to the operator, 309 to contractors · 375 marked S&S
Imminent danger orders, section 107(a)
3
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

103 (g) Written Notification Hazard Complaint Inspectio
Oct 5 to Oct 8, 2026Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 5, 2026
Closed outINSPECTION_END_DT
Oct 8, 2026
ActivityACTIVITY
103 (g) Written Notification Hazard Complaint Inspectio
Activity codeACTIVITY_CODE
E03
Program areaPROGRAM_AREA
M/NM--103 (g) Written Notification Hazard Complaint Inspecti
Event numberEVENT_NO
F0451D3
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Aug 10, 2026Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 10, 2026
Closed outINSPECTION_END_DT
Aug 10, 2026
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F043156
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 13 to Jun 22, 2026Inspectors 3 | Hours on site 84

The inspection

BeganINSPECTION_BEGIN_DT
Jun 13, 2026
Closed outINSPECTION_END_DT
Jun 22, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F042D06
InspectorsNBR_INSPECTOR
3
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
84
Total inspection hoursSUM_TOTAL_INSP_HOURS
130.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Verbal Hazard Complaint Inspections
May 11, 2026Inspectors 1 | Hours on site 5.5

The inspection

BeganINSPECTION_BEGIN_DT
May 11, 2026
Closed outINSPECTION_END_DT
May 11, 2026
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
F042CFA
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 11 to Jan 23, 2026Inspectors 3 | Hours on site 86.25

The inspection

BeganINSPECTION_BEGIN_DT
Jan 11, 2026
Closed outINSPECTION_END_DT
Jan 23, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0207BE
InspectorsNBR_INSPECTOR
3
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
86.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
140.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Dec 17 to Dec 18, 2025Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Dec 17, 2025
Closed outINSPECTION_END_DT
Dec 18, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6938300
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.25
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
1.5
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
8.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Spot Inspection
Jul 30, 2025Inspectors 1 | Hours on site 2.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 30, 2025
Closed outINSPECTION_END_DT
Jul 30, 2025
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6938280
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.75
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
2.25
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
7.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Compliance Follow-up Inspection
Jun 16, 2025Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 16, 2025
Closed outINSPECTION_END_DT
Jun 16, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F014210
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Jun 9 to Jun 11, 2025Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 9, 2025
Closed outINSPECTION_END_DT
Jun 11, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F01420E
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 30 to Jun 4, 2025Inspectors 2 | Hours on site 67.5

The inspection

BeganINSPECTION_BEGIN_DT
May 30, 2025
Closed outINSPECTION_END_DT
Jun 4, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F01420D
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
67.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
105

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
May 12 to Jun 11, 2025Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
May 12, 2025
Closed outINSPECTION_END_DT
Jun 11, 2025
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
F0151FB
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
0.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Non-Fatal Accident Investigation
May 11 to Aug 14, 2025Inspectors 1 | Hours on site 35

The inspection

BeganINSPECTION_BEGIN_DT
May 11, 2025
Closed outINSPECTION_END_DT
Aug 14, 2025
ActivityACTIVITY
Non-Fatal Accident Investigation
Activity codeACTIVITY_CODE
E07
Program areaPROGRAM_AREA
M/NM--Non-Fatal Accident Investigation
Event numberEVENT_NO
F0151FA
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
35
Total inspection hoursSUM_TOTAL_INSP_HOURS
76.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Dec 30, 2024Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Dec 30, 2024
Closed outINSPECTION_END_DT
Dec 30, 2024
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F006908
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Dec 15 to Dec 18, 2024Inspectors 3 | Hours on site 83.5

The inspection

BeganINSPECTION_BEGIN_DT
Dec 15, 2024
Closed outINSPECTION_END_DT
Dec 18, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F003531
InspectorsNBR_INSPECTOR
3
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
83.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
136

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Special Emphasis Programs
May 22, 2024Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
May 22, 2024
Closed outINSPECTION_END_DT
May 22, 2024
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6935985
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
May 6 to May 7, 2024Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
May 6, 2024
Closed outINSPECTION_END_DT
May 7, 2024
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6935975
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 22 to Apr 26, 2024Inspectors 4 | Hours on site 84

The inspection

BeganINSPECTION_BEGIN_DT
Apr 22, 2024
Closed outINSPECTION_END_DT
Apr 26, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6938722
InspectorsNBR_INSPECTOR
4
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
84
Total inspection hoursSUM_TOTAL_INSP_HOURS
128
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
14.75
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
14.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Compliance Follow-up Inspection
Feb 26, 2024Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Feb 26, 2024
Closed outINSPECTION_END_DT
Feb 26, 2024
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6932193
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 28 to Feb 1, 2024Inspectors 2 | Hours on site 71

The inspection

BeganINSPECTION_BEGIN_DT
Jan 28, 2024
Closed outINSPECTION_END_DT
Feb 1, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6935957
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
71
Total inspection hoursSUM_TOTAL_INSP_HOURS
104

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

103 (g) Written Notification Hazard Complaint Inspectio
Sep 6 to Sep 8, 2023Inspectors 1 | Hours on site 5.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 6, 2023
Closed outINSPECTION_END_DT
Sep 8, 2023
ActivityACTIVITY
103 (g) Written Notification Hazard Complaint Inspectio
Activity codeACTIVITY_CODE
E03
Program areaPROGRAM_AREA
M/NM--103 (g) Written Notification Hazard Complaint Inspecti
Event numberEVENT_NO
6932158
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 27 to Aug 31, 2023Inspectors 2 | Hours on site 76.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 27, 2023
Closed outINSPECTION_END_DT
Aug 31, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6932157
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
76.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
100

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Verbal Hazard Complaint Inspections
Aug 21, 2023Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Aug 21, 2023
Closed outINSPECTION_END_DT
Aug 21, 2023
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
6886406
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Non-Injury Accident Investigation
Apr 28, 2023 to Mar 13, 2024Inspectors 4 | Hours on site 109.5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 28, 2023
Closed outINSPECTION_END_DT
Mar 13, 2024
ActivityACTIVITY
Non-Injury Accident Investigation
Activity codeACTIVITY_CODE
E08
Program areaPROGRAM_AREA
M/NM--Non-Injury Accident Investigation
Event numberEVENT_NO
6935023
InspectorsNBR_INSPECTOR
4
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
109.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
190.5
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Regular Safety and Health Inspection
Mar 12 to Mar 21, 2023Inspectors 2 | Hours on site 85

The inspection

BeganINSPECTION_BEGIN_DT
Mar 12, 2023
Closed outINSPECTION_END_DT
Mar 21, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6932116
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
85
Total inspection hoursSUM_TOTAL_INSP_HOURS
120

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 17 to May 26, 2022Inspectors 1 | Hours on site 65.75

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2022
Closed outINSPECTION_END_DT
May 26, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6890231
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
65.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
84.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

25 most recent of 117 inspections and other MSHA visits since Mar 24, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 5, 2026
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
5175894
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2026
Time issuedVIOLATION_ISSUE_TIME
1227
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 5, 2026
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Oct 8, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Oct 8, 2026
Terminated, timeTERMINATION_TIME
0948
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F0451D3
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2026
Inspection closed outINSPECTION_END_DT
Oct 8, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (21)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID

Issued: Oct 5, 2026
Type: Citation
Standard: 56.20003(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
5175895
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2026
Time issuedVIOLATION_ISSUE_TIME
1242
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2026
30 CFR part and sectionPART_SECTION
56.20003(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 8, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Oct 8, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1603
TerminatedTERMINATION_DT
Oct 8, 2026
Terminated, timeTERMINATION_TIME
0953
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F0451D3
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2026
Inspection closed outINSPECTION_END_DT
Oct 8, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (21)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID

Issued: Jun 16, 2026
Type: Citation
Standard: 50.20(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5175831
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 16, 2026
Time issuedVIOLATION_ISSUE_TIME
0815
Date of occurrenceVIOLATION_OCCUR_DT
Jun 16, 2026
30 CFR part and sectionPART_SECTION
50.20(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 16, 2026
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Jun 16, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Jun 16, 2026
Terminated, timeTERMINATION_TIME
0820
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
56

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 15, 2026
Type: Citation
Standard: 56.14105
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $3,184.00
Details

The citation

Citation or order numberVIOLATION_NO
5172277
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 15, 2026
Time issuedVIOLATION_ISSUE_TIME
1019
Date of occurrenceVIOLATION_OCCUR_DT
Jun 15, 2026
30 CFR part and sectionPART_SECTION
56.14105
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Jun 29, 2026
Terminated, timeTERMINATION_TIME
0707
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
3184
Current proposed assessmentAMOUNT_DUE
3184
Amount paidAMOUNT_PAID
3184
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
50

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 15, 2026
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $3,736.00
Details

The citation

Citation or order numberVIOLATION_NO
5176046
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 15, 2026
Time issuedVIOLATION_ISSUE_TIME
0812
Date of occurrenceVIOLATION_OCCUR_DT
Jun 15, 2026
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1106
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
3736
Current proposed assessmentAMOUNT_DUE
3736
Amount paidAMOUNT_PAID
3736
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
50

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 15, 2026
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: HighNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5176047
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 15, 2026
Time issuedVIOLATION_ISSUE_TIME
1700
Date of occurrenceVIOLATION_OCCUR_DT
Jun 15, 2026
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1715
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1715
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1705
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 18, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 3, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Equipment Pro, Inc.
Operator IDVIOLATOR_ID
N249
Contractor IDCONTRACTOR_ID
N249
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jun 15, 2026
Type: Citation
Standard: 56.12019
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $642.00
Details

The citation

Citation or order numberVIOLATION_NO
5175830
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 15, 2026
Time issuedVIOLATION_ISSUE_TIME
0907
Date of occurrenceVIOLATION_OCCUR_DT
Jun 15, 2026
30 CFR part and sectionPART_SECTION
56.12019
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
0909
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
642
Current proposed assessmentAMOUNT_DUE
642
Amount paidAMOUNT_PAID
642
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
50

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 15, 2026
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: HighNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5176048
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 15, 2026
Time issuedVIOLATION_ISSUE_TIME
1710
Date of occurrenceVIOLATION_OCCUR_DT
Jun 15, 2026
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1720
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1720
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1715
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 18, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 3, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Equipment Pro, Inc.
Operator IDVIOLATOR_ID
N249
Contractor IDCONTRACTOR_ID
N249
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $642.00
Details

The citation

Citation or order numberVIOLATION_NO
5172276
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1415
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1417
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
642
Current proposed assessmentAMOUNT_DUE
642
Amount paidAMOUNT_PAID
642
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $642.00
Details

The citation

Citation or order numberVIOLATION_NO
5175828
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1126
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1126
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
642
Current proposed assessmentAMOUNT_DUE
642
Amount paidAMOUNT_PAID
642
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $1,679.00
Details

The citation

Citation or order numberVIOLATION_NO
5175826
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0854
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1208
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1679
Current proposed assessmentAMOUNT_DUE
1679
Amount paidAMOUNT_PAID
1679
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $2,936.00
Details

The citation

Citation or order numberVIOLATION_NO
5176045
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1119
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1059
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2936
Current proposed assessmentAMOUNT_DUE
2936
Amount paidAMOUNT_PAID
2936
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.4430(b)(3)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $4,749.00
Details

The citation

Citation or order numberVIOLATION_NO
5176044
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0840
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.4430(b)(3)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1040
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
4749
Current proposed assessmentAMOUNT_DUE
4749
Amount paidAMOUNT_PAID
4749
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $2,936.00
Details

The citation

Citation or order numberVIOLATION_NO
5175824
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0827
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1515
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1515
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1105
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2936
Current proposed assessmentAMOUNT_DUE
2936
Amount paidAMOUNT_PAID
2936
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.4104(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $959.00
Details

The citation

Citation or order numberVIOLATION_NO
5172273
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1350
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.4104(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1405
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
959
Current proposed assessmentAMOUNT_DUE
959
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Last actionLAST_ACTION_CD
Hearing Case Filed
Last action dateLAST_ACTION_DT
Oct 1, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Amount paidAMOUNT_PAID

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.12032
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $3,184.00
Details

The citation

Citation or order numberVIOLATION_NO
5176043
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0751
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
0812
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
3184
Current proposed assessmentAMOUNT_DUE
3184
Amount paidAMOUNT_PAID
3184
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $2,936.00
Details

The citation

Citation or order numberVIOLATION_NO
5175827
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0906
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1345
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2936
Current proposed assessmentAMOUNT_DUE
2936
Amount paidAMOUNT_PAID
2936
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $14,557.00
Details

The citation

Citation or order numberVIOLATION_NO
5175829
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1145
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1215
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1215
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1719
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
14557
Current proposed assessmentAMOUNT_DUE
14557
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Last actionLAST_ACTION_CD
Hearing Case Filed
Last action dateLAST_ACTION_DT
Oct 1, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Amount paidAMOUNT_PAID

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $1,679.00
Details

The citation

Citation or order numberVIOLATION_NO
5175823
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0709
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
0753
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1679
Current proposed assessmentAMOUNT_DUE
1679
Amount paidAMOUNT_PAID
1679
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.4104(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
5172275
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1409
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.4104(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 19, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 31, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 10, 2026
Terminated, timeTERMINATION_TIME
1140
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (21)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.4201(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $959.00
Details

The citation

Citation or order numberVIOLATION_NO
5172272
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1128
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.4201(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1131
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
959
Current proposed assessmentAMOUNT_DUE
959
Amount paidAMOUNT_PAID
959
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $2,936.00
Details

The citation

Citation or order numberVIOLATION_NO
5175825
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
0841
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
1107
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2936
Current proposed assessmentAMOUNT_DUE
2936
Amount paidAMOUNT_PAID
2936
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 14, 2026
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $959.00
Details

The citation

Citation or order numberVIOLATION_NO
5172274
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 14, 2026
Time issuedVIOLATION_ISSUE_TIME
1405
Date of occurrenceVIOLATION_OCCUR_DT
Jun 14, 2026
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 15, 2026
Terminated, timeTERMINATION_TIME
1100
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
959
Current proposed assessmentAMOUNT_DUE
959
Amount paidAMOUNT_PAID
959
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 13, 2026
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $14,557.00
Details

The citation

Citation or order numberVIOLATION_NO
5172270
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 13, 2026
Time issuedVIOLATION_ISSUE_TIME
1350
Date of occurrenceVIOLATION_OCCUR_DT
Jun 13, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 13, 2026
Originally due, timeORIG_TERM_DUE_TIME
1430
Latest dueLATEST_TERM_DUE_DT
Jun 13, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1430
TerminatedTERMINATION_DT
Jun 14, 2026
Terminated, timeTERMINATION_TIME
0724
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
14557
Current proposed assessmentAMOUNT_DUE
14557
Amount paidAMOUNT_PAID
14557
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 13, 2026
Type: Citation
Standard: 56.4200(b)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $642.00
Details

The citation

Citation or order numberVIOLATION_NO
5176042
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 13, 2026
Time issuedVIOLATION_ISSUE_TIME
1441
Date of occurrenceVIOLATION_OCCUR_DT
Jun 13, 2026
30 CFR part and sectionPART_SECTION
56.4200(b)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 13, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 13, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 13, 2026
Terminated, timeTERMINATION_TIME
1501
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
642
Current proposed assessmentAMOUNT_DUE
642
Amount paidAMOUNT_PAID
642
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 10, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 21, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ash Grove Cement Company
Operator IDVIOLATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Inspection eventEVENT_NO
F042D06
Inspection beganINSPECTION_BEGIN_DT
Jun 13, 2026
Inspection closed outINSPECTION_END_DT
Jun 22, 2026
Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

1,431 citations and orders since Mar 25, 2000: 1,122 issued to the operator, 309 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Jun 16, 2026
Citation number: 5175831
Standard: 50.20(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175831
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 16, 2026
Date of occurrenceOCCURRENCE_DT
Jun 16, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.20(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Negligence pointsNEGLIGENCE_POINTS
10
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
56
Violations per inspection dayVPID
2.27
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 16, 2025
History period endHISTORY_END_DT
Jun 15, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 15, 2026
Citation number: 5172277
Standard: 56.14105
Proposed penalty: $3,184.00
Current assessment: $3,184.00
Paid against proposed penalty: $3,184.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172277
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 15, 2026
Date of occurrenceOCCURRENCE_DT
Jun 15, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14105
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
3184.00
Current assessmentCURRENT_ASSESSMENT_AMT
3184.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
3184.00

Penalty points

Violation history pointsPENALTY_POINTS
98
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
50
Violations per inspection dayVPID
2.54
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.02
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 15, 2025
History period endHISTORY_END_DT
Jun 14, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 15, 2026
Citation number: 5175830
Standard: 56.12019
Proposed penalty: $642.00
Current assessment: $642.00
Paid against proposed penalty: $642.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175830
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 15, 2026
Date of occurrenceOCCURRENCE_DT
Jun 15, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12019
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
642.00
Current assessmentCURRENT_ASSESSMENT_AMT
642.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
642.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
50
Violations per inspection dayVPID
2.54
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 15, 2025
History period endHISTORY_END_DT
Jun 14, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 15, 2026
Citation number: 5176046
Standard: 56.14112(b)
Proposed penalty: $3,736.00
Current assessment: $3,736.00
Paid against proposed penalty: $3,736.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5176046
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 15, 2026
Date of occurrenceOCCURRENCE_DT
Jun 15, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
3736.00
Current assessmentCURRENT_ASSESSMENT_AMT
3736.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
3736.00

Penalty points

Violation history pointsPENALTY_POINTS
100
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
17
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
50
Violations per inspection dayVPID
2.54
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
16
Repeat violations per inspection dayRPID
0.32
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 15, 2025
History period endHISTORY_END_DT
Jun 14, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 15, 2026
Citation number: 5176047
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5176047
Assessment control numberASSESS_CASE_NO
000646967
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 3, 2026
Citation issuedISSUE_DT
Jun 15, 2026
Date of occurrenceOCCURRENCE_DT
Jun 15, 2026
Final order dateFINAL_ORDER_DT
Sep 25, 2026
Bill first printedBILL_PRINT_DT
Aug 18, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
35
Negligence pointsNEGLIGENCE_POINTS
35

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
849
Size of mineSIZE_OF_MINE
849
History period startHISTORY_START_DT
Mar 15, 2025
History period endHISTORY_END_DT
Jun 14, 2026

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Equipment Pro, Inc.
IDVIOLATOR_ID
N249
Operator start at the mine, as assessedVIOLATOR_START_DT
Jun 13, 2026
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (21)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jun 15, 2026
Citation number: 5176048
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5176048
Assessment control numberASSESS_CASE_NO
000646967
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 3, 2026
Citation issuedISSUE_DT
Jun 15, 2026
Date of occurrenceOCCURRENCE_DT
Jun 15, 2026
Final order dateFINAL_ORDER_DT
Sep 25, 2026
Bill first printedBILL_PRINT_DT
Aug 18, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
35
Negligence pointsNEGLIGENCE_POINTS
35

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
849
Size of mineSIZE_OF_MINE
849
History period startHISTORY_START_DT
Mar 15, 2025
History period endHISTORY_END_DT
Jun 14, 2026

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Equipment Pro, Inc.
IDVIOLATOR_ID
N249
Operator start at the mine, as assessedVIOLATOR_START_DT
Jun 13, 2026
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (21)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jun 14, 2026
Citation number: 5172276
Standard: 56.20003(c)
Proposed penalty: $642.00
Current assessment: $642.00
Paid against proposed penalty: $642.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172276
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
642.00
Current assessmentCURRENT_ASSESSMENT_AMT
642.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
642.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5176043
Standard: 56.12032
Proposed penalty: $3,184.00
Current assessment: $3,184.00
Paid against proposed penalty: $3,184.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5176043
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
3184.00
Current assessmentCURRENT_ASSESSMENT_AMT
3184.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
3184.00

Penalty points

Violation history pointsPENALTY_POINTS
98
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
5
Repeat violations per inspection dayRPID
0.111
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5172274
Standard: 56.4101
Proposed penalty: $959.00
Current assessment: $959.00
Paid against proposed penalty: $959.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172274
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
959.00
Current assessmentCURRENT_ASSESSMENT_AMT
959.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
959.00

Penalty points

Violation history pointsPENALTY_POINTS
83
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.022
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175825
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Current assessment: $2,936.00
Paid against proposed penalty: $2,936.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175825
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2936.00
Current assessmentCURRENT_ASSESSMENT_AMT
2936.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2936.00

Penalty points

Violation history pointsPENALTY_POINTS
97
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
19
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
27
Repeat violations per inspection dayRPID
0.6
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5172273
Standard: 56.4104(b)
Proposed penalty: $959.00
Current assessment: $959.00
Paid against proposed penalty: $0.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172273
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4104(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
959.00
Current assessmentCURRENT_ASSESSMENT_AMT
959.00

Penalty points

Violation history pointsPENALTY_POINTS
83
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
0.044
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175824
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Current assessment: $2,936.00
Paid against proposed penalty: $2,936.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175824
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2936.00
Current assessmentCURRENT_ASSESSMENT_AMT
2936.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2936.00

Penalty points

Violation history pointsPENALTY_POINTS
97
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
19
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
27
Repeat violations per inspection dayRPID
0.6
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5176044
Standard: 56.4430(b)(3)
Proposed penalty: $4,749.00
Current assessment: $4,749.00
Paid against proposed penalty: $4,749.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5176044
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4430(b)(3)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
4749.00
Current assessmentCURRENT_ASSESSMENT_AMT
4749.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
4749.00

Penalty points

Violation history pointsPENALTY_POINTS
103
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175827
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Current assessment: $2,936.00
Paid against proposed penalty: $2,936.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175827
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2936.00
Current assessmentCURRENT_ASSESSMENT_AMT
2936.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2936.00

Penalty points

Violation history pointsPENALTY_POINTS
97
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
19
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
27
Repeat violations per inspection dayRPID
0.6
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5176045
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Current assessment: $2,936.00
Paid against proposed penalty: $2,936.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5176045
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2936.00
Current assessmentCURRENT_ASSESSMENT_AMT
2936.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2936.00

Penalty points

Violation history pointsPENALTY_POINTS
97
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
19
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
27
Repeat violations per inspection dayRPID
0.6
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175823
Standard: 56.14107(a)
Proposed penalty: $1,679.00
Current assessment: $1,679.00
Paid against proposed penalty: $1,679.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175823
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1679.00
Current assessmentCURRENT_ASSESSMENT_AMT
1679.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1679.00

Penalty points

Violation history pointsPENALTY_POINTS
90
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
12
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
7
Repeat violations per inspection dayRPID
0.156
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175828
Standard: 56.20003(c)
Proposed penalty: $642.00
Current assessment: $642.00
Paid against proposed penalty: $642.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175828
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
642.00
Current assessmentCURRENT_ASSESSMENT_AMT
642.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
642.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175826
Standard: 56.14107(a)
Proposed penalty: $1,679.00
Current assessment: $1,679.00
Paid against proposed penalty: $1,679.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175826
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1679.00
Current assessmentCURRENT_ASSESSMENT_AMT
1679.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1679.00

Penalty points

Violation history pointsPENALTY_POINTS
90
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
12
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
7
Repeat violations per inspection dayRPID
0.156
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5172272
Standard: 56.4201(a)(1)
Proposed penalty: $959.00
Current assessment: $959.00
Paid against proposed penalty: $959.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172272
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
959.00
Current assessmentCURRENT_ASSESSMENT_AMT
959.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
959.00

Penalty points

Violation history pointsPENALTY_POINTS
83
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
3
Repeat violations per inspection dayRPID
0.067
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 14, 2026
Citation number: 5175829
Standard: 56.20003(a)
Proposed penalty: $14,557.00
Current assessment: $14,557.00
Paid against proposed penalty: $0.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175829
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 14, 2026
Date of occurrenceOCCURRENCE_DT
Jun 14, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
14557.00
Current assessmentCURRENT_ASSESSMENT_AMT
14557.00

Penalty points

Violation history pointsPENALTY_POINTS
117
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
19
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
45
Violations per inspection dayVPID
2.82
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
27
Repeat violations per inspection dayRPID
0.6
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 14, 2025
History period endHISTORY_END_DT
Jun 13, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 13, 2026
Citation number: 5172265
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Current assessment: $2,936.00
Paid against proposed penalty: $2,936.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172265
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 13, 2026
Date of occurrenceOCCURRENCE_DT
Jun 13, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2936.00
Current assessmentCURRENT_ASSESSMENT_AMT
2936.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2936.00

Penalty points

Violation history pointsPENALTY_POINTS
97
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
19
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40
Violations per inspection dayVPID
3.18
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
27
Repeat violations per inspection dayRPID
0.675
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 13, 2025
History period endHISTORY_END_DT
Jun 12, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 13, 2026
Citation number: 5172267
Standard: 56.14112(a)(1)
Proposed penalty: $1,037.00
Current assessment: $1,037.00
Paid against proposed penalty: $1,037.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172267
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 13, 2026
Date of occurrenceOCCURRENCE_DT
Jun 13, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1037.00
Current assessmentCURRENT_ASSESSMENT_AMT
1037.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1037.00

Penalty points

Violation history pointsPENALTY_POINTS
84
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40
Violations per inspection dayVPID
3.18
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
3
Repeat violations per inspection dayRPID
0.075
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 13, 2025
History period endHISTORY_END_DT
Jun 12, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 13, 2026
Citation number: 5175822
Standard: 56.14110
Proposed penalty: $642.00
Current assessment: $642.00
Paid against proposed penalty: $642.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175822
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 13, 2026
Date of occurrenceOCCURRENCE_DT
Jun 13, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14110
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
642.00
Current assessmentCURRENT_ASSESSMENT_AMT
642.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
642.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40
Violations per inspection dayVPID
3.18
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 13, 2025
History period endHISTORY_END_DT
Jun 12, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 13, 2026
Citation number: 5172266
Standard: 56.14112(b)
Proposed penalty: $3,736.00
Current assessment: $3,736.00
Paid against proposed penalty: $3,736.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5172266
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 13, 2026
Date of occurrenceOCCURRENCE_DT
Jun 13, 2026
Final order dateFINAL_ORDER_DT
Sep 10, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
3736.00
Current assessmentCURRENT_ASSESSMENT_AMT
3736.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
3736.00

Penalty points

Violation history pointsPENALTY_POINTS
100
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
17
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40
Violations per inspection dayVPID
3.18
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
16
Repeat violations per inspection dayRPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 13, 2025
History period endHISTORY_END_DT
Jun 12, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (8)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 13, 2026
Citation number: 5175821
Standard: 56.4602
Proposed penalty: $642.00
Current assessment: $642.00
Paid against proposed penalty: $0.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
5175821
Assessment control numberASSESS_CASE_NO
000646296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Aug 19, 2026
Citation issuedISSUE_DT
Jun 13, 2026
Date of occurrenceOCCURRENCE_DT
Jun 13, 2026
Bill first printedBILL_PRINT_DT
Aug 6, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4602
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
642.00
Current assessmentCURRENT_ASSESSMENT_AMT
642.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
7
Controller size pointsCONTROLLER_SIZE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
127
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
40
Violations per inspection dayVPID
3.18
Operator hours worked at the mineVIOLATOR_MINE_HRS
238962
Size of mineSIZE_OF_MINE
238962
Controller hours workedCONTROLLER_HRS
12656287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12656287
History period startHISTORY_START_DT
Mar 13, 2025
History period endHISTORY_END_DT
Jun 12, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ash Grove Cement Company
IDVIOLATOR_ID
L02019
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 1, 1985
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F042D06
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 1,414 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Aug 19, 2026
Citation issued: Jun 14, 2026
Docket: CENT 2026-0271
Standard: 56.20003(a)
Proposed penalty: $14,557.00
Penalty after decision: None recorded
Decided: Not recorded
Decision type: Not recorded
Details

The contest

Citation or order numberCITATION_NO
5175829
Citation issuedCITATION_ISSUE_DT
Jun 14, 2026
Hearing request receivedCONTEST_DT
Aug 19, 2026
Docket numberDOCKET_NO
CENT 2026-0271
Assessment typeASSESS_TYPE_CODE
Regular
Petition duePETITION_DUE_DT
Oct 5, 2026
Petition filedPETITION_FILED_DT
Oct 1, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
14557.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR001
MSHA representative officeMSHA_REP_OFFICE_NAME
MSH Division

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (15)

Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 19, 2026
Citation issued: Jun 14, 2026
Docket: CENT 2026-0271
Standard: 56.4104(b)
Proposed penalty: $959.00
Penalty after decision: None recorded
Decided: Not recorded
Decision type: Not recorded
Details

The contest

Citation or order numberCITATION_NO
5172273
Citation issuedCITATION_ISSUE_DT
Jun 14, 2026
Hearing request receivedCONTEST_DT
Aug 19, 2026
Docket numberDOCKET_NO
CENT 2026-0271
Assessment typeASSESS_TYPE_CODE
Regular
Petition duePETITION_DUE_DT
Oct 5, 2026
Petition filedPETITION_FILED_DT
Oct 1, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
959.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.4104(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR001
MSHA representative officeMSHA_REP_OFFICE_NAME
MSH Division

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (15)

Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 19, 2026
Citation issued: Jun 13, 2026
Docket: CENT 2026-0271
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Penalty after decision: None recorded
Decided: Not recorded
Decision type: Not recorded
Details

The contest

Citation or order numberCITATION_NO
5172271
Citation issuedCITATION_ISSUE_DT
Jun 13, 2026
Hearing request receivedCONTEST_DT
Aug 19, 2026
Docket numberDOCKET_NO
CENT 2026-0271
Assessment typeASSESS_TYPE_CODE
Regular
Petition duePETITION_DUE_DT
Oct 5, 2026
Petition filedPETITION_FILED_DT
Oct 1, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
2936.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR001
MSHA representative officeMSHA_REP_OFFICE_NAME
MSH Division

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (15)

Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 19, 2026
Citation issued: Jun 13, 2026
Docket: CENT 2026-0271
Standard: 56.20003(a)
Proposed penalty: $2,936.00
Penalty after decision: None recorded
Decided: Not recorded
Decision type: Not recorded
Details

The contest

Citation or order numberCITATION_NO
5172268
Citation issuedCITATION_ISSUE_DT
Jun 13, 2026
Hearing request receivedCONTEST_DT
Aug 19, 2026
Docket numberDOCKET_NO
CENT 2026-0271
Assessment typeASSESS_TYPE_CODE
Regular
Petition duePETITION_DUE_DT
Oct 5, 2026
Petition filedPETITION_FILED_DT
Oct 1, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
2936.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR001
MSHA representative officeMSHA_REP_OFFICE_NAME
MSH Division

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (15)

Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 19, 2026
Citation issued: Jun 13, 2026
Docket: CENT 2026-0271
Standard: 56.4602
Proposed penalty: $642.00
Penalty after decision: None recorded
Decided: Not recorded
Decision type: Not recorded
Details

The contest

Citation or order numberCITATION_NO
5175821
Citation issuedCITATION_ISSUE_DT
Jun 13, 2026
Hearing request receivedCONTEST_DT
Aug 19, 2026
Docket numberDOCKET_NO
CENT 2026-0271
Assessment typeASSESS_TYPE_CODE
Regular
Petition duePETITION_DUE_DT
Oct 5, 2026
Petition filedPETITION_FILED_DT
Oct 1, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
642.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.4602
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR001
MSHA representative officeMSHA_REP_OFFICE_NAME
MSH Division

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (15)

Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Apr 2, 2026
Citation issued: Jan 13, 2026
Docket: CENT 2026-0128
Standard: 56.20003(a)
Proposed penalty: $7,676.00
Penalty after decision: $1,550.00
Decided: Oct 21, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5171072
Citation issuedCITATION_ISSUE_DT
Jan 13, 2026
Hearing request receivedCONTEST_DT
Apr 2, 2026
Docket numberDOCKET_NO
CENT 2026-0128
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
David
Judge, last nameJUDGE_LAST_NAME
Simonton
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Oct 21, 2026
Petition duePETITION_DUE_DT
May 18, 2026
Petition filedPETITION_FILED_DT
May 12, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
7676.00
Penalty after the decisionDECISION_PENALTY_AMT
1550.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 8, 2026
Citation issued: Jan 11, 2026
Docket: CENT 2026-0111
Standard: 56.9300(b)
Proposed penalty: $3,184.00
Penalty after decision: $642.00
Decided: Aug 21, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5008318
Citation issuedCITATION_ISSUE_DT
Jan 11, 2026
Hearing request receivedCONTEST_DT
Mar 8, 2026
Docket numberDOCKET_NO
CENT 2026-0111
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
David
Judge, last nameJUDGE_LAST_NAME
Simonton
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Aug 21, 2026
Petition duePETITION_DUE_DT
Apr 22, 2026
Petition filedPETITION_FILED_DT
Apr 8, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
3184.00
Penalty after the decisionDECISION_PENALTY_AMT
642.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.9300(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 8, 2026
Citation issued: Jan 11, 2026
Docket: CENT 2026-0111
Standard: 56.20003(a)
Proposed penalty: $13,436.00
Penalty after decision: $13,436.00
Decided: Aug 21, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5170050
Citation issuedCITATION_ISSUE_DT
Jan 11, 2026
Hearing request receivedCONTEST_DT
Mar 8, 2026
Docket numberDOCKET_NO
CENT 2026-0111
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
David
Judge, last nameJUDGE_LAST_NAME
Simonton
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Aug 21, 2026
Petition duePETITION_DUE_DT
Apr 22, 2026
Petition filedPETITION_FILED_DT
Apr 8, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
13436.00
Penalty after the decisionDECISION_PENALTY_AMT
13436.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 4, 2025
Citation issued: Jun 3, 2025
Docket: CENT 2025-0340
Standard: 56.11027
Proposed penalty: $151.00
Penalty after decision: $151.00
Decided: Nov 17, 2025
Decision type: Default
Details

The contest

Citation or order numberCITATION_NO
5001361
Citation issuedCITATION_ISSUE_DT
Jun 3, 2025
Hearing request receivedCONTEST_DT
Aug 4, 2025
Docket numberDOCKET_NO
CENT 2025-0340
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Glynn
Judge, last nameJUDGE_LAST_NAME
Voisin
Decision typeDOCKET_DECISION_TYPE_CODE
Default
DecidedDECISION_DT
Nov 17, 2025
Petition duePETITION_DUE_DT
Sep 18, 2025
Petition filedPETITION_FILED_DT
Sep 15, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
151.00
Penalty after the decisionDECISION_PENALTY_AMT
151.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.11027
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 3, 2025
Citation issued: Jun 3, 2025
Docket: CENT 2025-0336
Standard: 56.17001
Proposed penalty: $697.00
Penalty after decision: $697.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001360
Citation issuedCITATION_ISSUE_DT
Jun 3, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
697.00
Penalty after the decisionDECISION_PENALTY_AMT
697.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.17001
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 4, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0340
Standard: 50.30(a)
Proposed penalty: $151.00
Penalty after decision: $151.00
Decided: Nov 17, 2025
Decision type: Default
Details

The contest

Citation or order numberCITATION_NO
9994565
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 4, 2025
Docket numberDOCKET_NO
CENT 2025-0340
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Glynn
Judge, last nameJUDGE_LAST_NAME
Voisin
Decision typeDOCKET_DECISION_TYPE_CODE
Default
DecidedDECISION_DT
Nov 17, 2025
Petition duePETITION_DUE_DT
Sep 18, 2025
Petition filedPETITION_FILED_DT
Sep 15, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
151.00
Penalty after the decisionDECISION_PENALTY_AMT
151.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
50.30(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 3, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0336
Standard: 56.20003(a)
Proposed penalty: $15,768.00
Penalty after decision: $3,184.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001357
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
15768.00
Penalty after the decisionDECISION_PENALTY_AMT
3184.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 3, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0336
Standard: 56.20003(a)
Proposed penalty: $15,768.00
Penalty after decision: $15,768.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001356
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
15768.00
Penalty after the decisionDECISION_PENALTY_AMT
15768.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 4, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0340
Standard: 50.30(a)
Proposed penalty: $151.00
Penalty after decision: $151.00
Decided: Nov 17, 2025
Decision type: Default
Details

The contest

Citation or order numberCITATION_NO
9994568
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 4, 2025
Docket numberDOCKET_NO
CENT 2025-0340
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Glynn
Judge, last nameJUDGE_LAST_NAME
Voisin
Decision typeDOCKET_DECISION_TYPE_CODE
Default
DecidedDECISION_DT
Nov 17, 2025
Petition duePETITION_DUE_DT
Sep 18, 2025
Petition filedPETITION_FILED_DT
Sep 15, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
151.00
Penalty after the decisionDECISION_PENALTY_AMT
151.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
50.30(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 3, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0336
Standard: 56.20003(a)
Proposed penalty: $15,768.00
Penalty after decision: $15,768.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001354
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
15768.00
Penalty after the decisionDECISION_PENALTY_AMT
15768.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 3, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0336
Standard: 56.4101
Proposed penalty: $1,037.00
Penalty after decision: $0.00
Decided: Jan 15, 2026
Decision type: Vacate
Details

The contest

Citation or order numberCITATION_NO
9994564
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Young
Decision typeDOCKET_DECISION_TYPE_CODE
Vacate
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1037.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.4101
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 4, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0340
Standard: 50.30(a)
Proposed penalty: $151.00
Penalty after decision: $151.00
Decided: Nov 17, 2025
Decision type: Default
Details

The contest

Citation or order numberCITATION_NO
9994567
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 4, 2025
Docket numberDOCKET_NO
CENT 2025-0340
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Glynn
Judge, last nameJUDGE_LAST_NAME
Voisin
Decision typeDOCKET_DECISION_TYPE_CODE
Default
DecidedDECISION_DT
Nov 17, 2025
Petition duePETITION_DUE_DT
Sep 18, 2025
Petition filedPETITION_FILED_DT
Sep 15, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
151.00
Penalty after the decisionDECISION_PENALTY_AMT
151.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
50.30(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 3, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0336
Standard: 56.20003(a)
Proposed penalty: $15,768.00
Penalty after decision: $0.00
Decided: Jan 15, 2026
Decision type: Vacate
Details

The contest

Citation or order numberCITATION_NO
5001358
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Young
Decision typeDOCKET_DECISION_TYPE_CODE
Vacate
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
15768.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 4, 2025
Citation issued: Jun 2, 2025
Docket: CENT 2025-0340
Standard: 50.30(a)
Proposed penalty: $151.00
Penalty after decision: $151.00
Decided: Nov 17, 2025
Decision type: Default
Details

The contest

Citation or order numberCITATION_NO
9994566
Citation issuedCITATION_ISSUE_DT
Jun 2, 2025
Hearing request receivedCONTEST_DT
Aug 4, 2025
Docket numberDOCKET_NO
CENT 2025-0340
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Glynn
Judge, last nameJUDGE_LAST_NAME
Voisin
Decision typeDOCKET_DECISION_TYPE_CODE
Default
DecidedDECISION_DT
Nov 17, 2025
Petition duePETITION_DUE_DT
Sep 18, 2025
Petition filedPETITION_FILED_DT
Sep 15, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
151.00
Penalty after the decisionDECISION_PENALTY_AMT
151.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
50.30(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 3, 2025
Citation issued: Jun 1, 2025
Docket: CENT 2025-0336
Standard: 56.14107(a)
Proposed penalty: $5,144.00
Penalty after decision: $1,037.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001347
Citation issuedCITATION_ISSUE_DT
Jun 1, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
5144.00
Penalty after the decisionDECISION_PENALTY_AMT
1037.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 3, 2025
Citation issued: Jun 1, 2025
Docket: CENT 2025-0336
Standard: 56.17001
Proposed penalty: $697.00
Penalty after decision: $697.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9994559
Citation issuedCITATION_ISSUE_DT
Jun 1, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
697.00
Penalty after the decisionDECISION_PENALTY_AMT
697.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.17001
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 3, 2025
Citation issued: May 31, 2025
Docket: CENT 2025-0336
Standard: 56.20003(a)
Proposed penalty: $15,768.00
Penalty after decision: $15,768.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9994549
Citation issuedCITATION_ISSUE_DT
May 31, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
15768.00
Penalty after the decisionDECISION_PENALTY_AMT
15768.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 3, 2025
Citation issued: May 31, 2025
Docket: CENT 2025-0336
Standard: 56.11001
Proposed penalty: $3,448.00
Penalty after decision: $3,448.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001341
Citation issuedCITATION_ISSUE_DT
May 31, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
3448.00
Penalty after the decisionDECISION_PENALTY_AMT
3448.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.11001
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Aug 3, 2025
Citation issued: May 31, 2025
Docket: CENT 2025-0336
Standard: 56.20003(a)
Proposed penalty: $15,768.00
Penalty after decision: $3,184.00
Decided: Jan 15, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9994552
Citation issuedCITATION_ISSUE_DT
May 31, 2025
Hearing request receivedCONTEST_DT
Aug 3, 2025
Docket numberDOCKET_NO
CENT 2025-0336
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
N/A
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 15, 2026
Petition duePETITION_DUE_DT
Sep 17, 2025
Petition filedPETITION_FILED_DT
Sep 8, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
15768.00
Penalty after the decisionDECISION_PENALTY_AMT
3184.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (3)

Judge, last nameJUDGE_LAST_NAME, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 4, 2025
Citation issued: Dec 17, 2024
Docket: CENT 2025-0170
Standard: 56.20003(b)
Proposed penalty: $642.00
Penalty after decision: $281.00
Decided: Jul 10, 2025
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
5001004
Citation issuedCITATION_ISSUE_DT
Dec 17, 2024
Hearing request receivedCONTEST_DT
Mar 4, 2025
Docket numberDOCKET_NO
CENT 2025-0170
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Alan
Judge, last nameJUDGE_LAST_NAME
Paez
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 10, 2025
Petition duePETITION_DUE_DT
Apr 18, 2025
Petition filedPETITION_FILED_DT
Apr 17, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
642.00
Penalty after the decisionDECISION_PENALTY_AMT
281.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

25 most recent of 274 contested citations and orders; decision types are MSHA's own text.

Imminent danger orders, section 107(a)

Issued: Dec 8, 2015
Order number: 8862765
Terminated: Dec 8, 2015
Issued to: Contractor
Details

The order

Order numberVIOLATION_NO
8862765
IssuedVIOLATION_DATE_ISSUED
Dec 8, 2015
TerminatedTERMINATION_DATE
Dec 8, 2015
Issued toVIOLATOR_TYPE
Contractor

Who

Operator at the timeOPERATOR_NAME_VIOLATIONS
Ash Grove Cement Company
ContractorCONTRACTOR_NAME
Southern Industrial Contractors LLC
Contractor IDCONTRACTOR_ID
X398

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
StateSTATE_ABBREVIATION
AR
Coal or Metal/Non-MetalCOAL_OR_METAL
M

Not recorded by MSHA (2)

Controller at the timeCONTROLLER_NAME_VIOLATIONS, Controller IDCONTROLLER_ID_VIOLATIONS

Issued: Jun 16, 2015
Order number: 8864650
Terminated: Jun 16, 2015
Issued to: Operator
Details

The order

Order numberVIOLATION_NO
8864650
IssuedVIOLATION_DATE_ISSUED
Jun 16, 2015
TerminatedTERMINATION_DATE
Jun 16, 2015
Issued toVIOLATOR_TYPE
Operator

Who

Operator at the timeOPERATOR_NAME_VIOLATIONS
Ash Grove Cement Company
Controller at the timeCONTROLLER_NAME_VIOLATIONS
Ash Grove Cement Company
Controller IDCONTROLLER_ID_VIOLATIONS
M00051

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
StateSTATE_ABBREVIATION
AR
Coal or Metal/Non-MetalCOAL_OR_METAL
M

Not recorded by MSHA (2)

ContractorCONTRACTOR_NAME, Contractor IDCONTRACTOR_ID

Issued: Jan 26, 2011
Order number: 6568999
Terminated: Jan 26, 2011
Issued to: Contractor
Details

The order

Order numberVIOLATION_NO
6568999
IssuedVIOLATION_DATE_ISSUED
Jan 26, 2011
TerminatedTERMINATION_DATE
Jan 26, 2011
Issued toVIOLATOR_TYPE
Contractor

Who

Operator at the timeOPERATOR_NAME_VIOLATIONS
Ash Grove Cement Company
ContractorCONTRACTOR_NAME
Tri-State Indust Contractors
Contractor IDCONTRACTOR_ID
RXN

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
StateSTATE_ABBREVIATION
AR
Coal or Metal/Non-MetalCOAL_OR_METAL
M

Not recorded by MSHA (2)

Controller at the timeCONTROLLER_NAME_VIOLATIONS, Controller IDCONTROLLER_ID_VIOLATIONS

3 imminent danger orders in MSHA's list, which starts July 1, 2010.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

DAYS RESTRICTED ACTIVITY ONLY
97
NO DYS AWY FRM WRK,NO RSTR ACT
83
DAYS AWAY FROM WORK ONLY
16
DYS AWY FRM WRK & RESTRCTD ACT
14
OCCUPATNAL ILLNESS NOT DEG 1-6
9
ALL OTHER CASES (INCL 1ST AID)
6
ACCIDENT ONLY
4
PERM TOT OR PERM PRTL DISABLTY
2
INJURIES DUE TO NATURAL CAUSES
1
NO VALUE FOUND
1
Date: Oct 16, 2026
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220262920009
DateACCIDENT_DT
Oct 16, 2026
TimeACCIDENT_TIME
0900
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320263030013

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
11
Returned to workRETURN_TO_WORK_DT
Oct 27, 2026

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Sep 10, 2026
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220262990018
DateACCIDENT_DT
Sep 10, 2026
TimeACCIDENT_TIME
1000
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
AXE,HAMMER,SLEDGE
Source of injury codeINJURY_SOURCE_CD
046
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ELBOW
Part of body codeINJ_BODY_PART_CD
312
Returned to workRETURN_TO_WORK_DT
Oct 23, 2026

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Aug 28, 2026
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220262450026
DateACCIDENT_DT
Aug 28, 2026
TimeACCIDENT_TIME
0945
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320262510009

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
2
Returned to workRETURN_TO_WORK_DT
Sep 2, 2026

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jul 31, 2026
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: STEPPING OR KNEELING ON OBJECT
Accident type: Struck against stationary object
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220262150017
DateACCIDENT_DT
Jul 31, 2026
TimeACCIDENT_TIME
1000
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
STEPPING OR KNEELING ON OBJECT
Classification codeCLASSIFICATION_CD
19
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Not recorded by MSHA (8)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jul 26, 2026
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220262090006
DateACCIDENT_DT
Jul 26, 2026
TimeACCIDENT_TIME
0130
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Not recorded by MSHA (8)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: May 20, 2026
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 19
Details

The report

Document numberDOCUMENT_NO
220261470025
DateACCIDENT_DT
May 20, 2026
TimeACCIDENT_TIME
0930
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320262190007

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
MOTORS
Source of injury codeINJURY_SOURCE_CD
039
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
NECK
Part of body codeINJ_BODY_PART_CD
200
Days of restricted workDAYS_RESTRICT
35
Days lostDAYS_LOST
19
Returned to workRETURN_TO_WORK_DT
Aug 6, 2026

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Mar 10, 2026
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 13
Details

The report

Document numberDOCUMENT_NO
220260770009
DateACCIDENT_DT
Mar 10, 2026
TimeACCIDENT_TIME
1520
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320261680011

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
MACHINE-MILL,CLEANING PLT
Source of injury codeINJURY_SOURCE_CD
075
Nature of injuryNATURE_INJURY
HERNIA;RUPTURE
Nature of injury codeNATURE_INJURY_CD
260
Part of bodyINJ_BODY_PART
ABDOMEN/INTERNAL ORGANS
Part of body codeINJ_BODY_PART_CD
410
Days lostDAYS_LOST
13
Returned to workRETURN_TO_WORK_DT
Apr 20, 2026

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
2500
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID

Date: Feb 12, 2026
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220260480015
DateACCIDENT_DT
Feb 12, 2026
TimeACCIDENT_TIME
0900
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
PULVERIZED MINERAL (DUST)
Source of injury codeINJURY_SOURCE_CD
092
Nature of injuryNATURE_INJURY
DUST IN EYES
Nature of injury codeNATURE_INJURY_CD
320
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
Feb 12, 2026

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: May 10, 2025
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: FIRE
Accident type: Contact with hot objects or substances
Days lost: 94
Details

The report

Document numberDOCUMENT_NO
220251400023
DateACCIDENT_DT
May 10, 2025
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
FIRE
Classification codeCLASSIFICATION_CD
08
Accident typeACCIDENT_TYPE
Contact with hot objects or substances
Accident type codeACCIDENT_TYPE_CD
33
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
SERIOUS INJURY
Immediately reportable codeIMMED_NOTIFY_CD
02
MSHA investigation beganINVEST_BEGIN_DT
May 10, 2025
Returned to Duty document numberCLOSED_DOC_NO
320253230004

Injury

Activity at the timeACTIVITY
Inspect equipment or mine
Activity codeACTIVITY_CD
036
Source of injuryINJURY_SOURCE
COAL & PETROL PRODUCT,NEC
Source of injury codeINJURY_SOURCE_CD
033
Nature of injuryNATURE_INJURY
BURN OR SCALD (HEAT)
Nature of injury codeNATURE_INJURY_CD
120
Part of bodyINJ_BODY_PART
MULTIPLE PARTS (MORE THAN ONE MAJOR)
Part of body codeINJ_BODY_PART_CD
700
Days lostDAYS_LOST
94
Returned to workRETURN_TO_WORK_DT
Nov 17, 2025

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Mar 17, 2025
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by falling object
Days lost: 32
Details

The report

Document numberDOCUMENT_NO
220250780016
DateACCIDENT_DT
Mar 17, 2025
TimeACCIDENT_TIME
0135
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by falling object
Accident type codeACCIDENT_TYPE_CD
04
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320251990009

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
Part of body codeINJ_BODY_PART_CD
530
Days of restricted workDAYS_RESTRICT
55
Days lostDAYS_LOST
32
Returned to workRETURN_TO_WORK_DT
Jul 16, 2025

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
226D
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID

Date: Feb 25, 2025
Degree of injury: ACCIDENT ONLY
Classification: ENTRAPMENT
Accident type: Accident type, without injuries
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220250630011
DateACCIDENT_DT
Feb 25, 2025
TimeACCIDENT_TIME
1120
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
ACCIDENT ONLY
Degree of injury codeDEGREE_INJURY_CD
00
ClassificationCLASSIFICATION
ENTRAPMENT
Classification codeCLASSIFICATION_CD
02
Accident typeACCIDENT_TYPE
Accident type, without injuries
Accident type codeACCIDENT_TYPE_CD
44
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
NO VALUE FOUND
Activity codeACTIVITY_CD
?
Source of injuryINJURY_SOURCE
NO VALUE FOUND
Source of injury codeINJURY_SOURCE_CD
?
Nature of injuryNATURE_INJURY
NO VALUE FOUND
Nature of injury codeNATURE_INJURY_CD
?
Part of bodyINJ_BODY_PART
NO VALUE FOUND
Part of body codeINJ_BODY_PART_CD
?

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Elevator, Skip, Cage, Buckets, Mancage, Slope car
Equipment codeMINING_EQUIP_CD
19
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
Us-80-1RN
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Reportable injuries or illnessesNO_INJURIES, Schedule charge, daysSCHEDULE_CHARGE

Not recorded by MSHA (7)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Contractor IDCONTRACTOR_ID

Date: Jan 6, 2025
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220250080004
DateACCIDENT_DT
Jan 6, 2025
TimeACCIDENT_TIME
1325
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
KNIFE
Source of injury codeINJURY_SOURCE_CD
049
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jan 6, 2025

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Dec 23, 2024
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 3
Details

The report

Document numberDOCUMENT_NO
220243620007
DateACCIDENT_DT
Dec 23, 2024
TimeACCIDENT_TIME
1440
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320251200005

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
8
Days lostDAYS_LOST
3
Returned to workRETURN_TO_WORK_DT
Jan 9, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Contractor IDCONTRACTOR_ID
B4793
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO

Date: Sep 10, 2024
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220242600021
DateACCIDENT_DT
Sep 10, 2024
TimeACCIDENT_TIME
1515
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
BARRELS,KEGS,DRUMS
Source of injury codeINJURY_SOURCE_CD
005
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Sep 10, 2024

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Mar 9, 2024
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220240720005
DateACCIDENT_DT
Mar 9, 2024
TimeACCIDENT_TIME
0530
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Mar 9, 2024

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jan 4, 2024
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220240180001
DateACCIDENT_DT
Jan 4, 2024
TimeACCIDENT_TIME
1100
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320240290001

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
CONTAINERS,NEC
Source of injury codeINJURY_SOURCE_CD
008
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
14
Returned to workRETURN_TO_WORK_DT
Jan 26, 2024

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Sep 25, 2023
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: OTHER
Accident type: Bodily reaction, NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220232780014
DateACCIDENT_DT
Sep 25, 2023
TimeACCIDENT_TIME
1030
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Bodily reaction, NEC
Accident type codeACCIDENT_TYPE_CD
26
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320242200007

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
BODILY MOTION
Source of injury codeINJURY_SOURCE_CD
002
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Days of restricted workDAYS_RESTRICT
175
Returned to workRETURN_TO_WORK_DT
Jun 10, 2024

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Sep 25, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220232780016
DateACCIDENT_DT
Sep 25, 2023
TimeACCIDENT_TIME
0700
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
CROWBAR,PRY BAR
Source of injury codeINJURY_SOURCE_CD
048
Nature of injuryNATURE_INJURY
CRUSHING
Nature of injury codeNATURE_INJURY_CD
170
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Sep 25, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jul 12, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Absorption of radiations, caustics, toxic and noxious substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220231950016
DateACCIDENT_DT
Jul 12, 2023
TimeACCIDENT_TIME
0945
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Absorption of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
38
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Environmental tests or checks
Activity codeACTIVITY_CD
021
Source of injuryINJURY_SOURCE
ANIMALS,INSCTS,BRDS,REPTL
Source of injury codeINJURY_SOURCE_CD
001
Nature of injuryNATURE_INJURY
POISONING,SYSTEMIC
Nature of injury codeNATURE_INJURY_CD
280
Part of bodyINJ_BODY_PART
BODY SYSTEMS
Part of body codeINJ_BODY_PART_CD
600
Returned to workRETURN_TO_WORK_DT
Jul 12, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jul 11, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Absorption of radiations, caustics, toxic and noxious substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220231950017
DateACCIDENT_DT
Jul 11, 2023
TimeACCIDENT_TIME
1150
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Absorption of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
38
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
ANIMALS,INSCTS,BRDS,REPTL
Source of injury codeINJURY_SOURCE_CD
001
Nature of injuryNATURE_INJURY
POISONING,SYSTEMIC
Nature of injury codeNATURE_INJURY_CD
280
Part of bodyINJ_BODY_PART
BODY SYSTEMS
Part of body codeINJ_BODY_PART_CD
600
Returned to workRETURN_TO_WORK_DT
Jul 11, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Apr 30, 2023
Degree of injury: ACCIDENT ONLY
Classification: FIRE
Accident type: Accident type, without injuries
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220231250005
DateACCIDENT_DT
Apr 30, 2023
TimeACCIDENT_TIME
0600
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
ACCIDENT ONLY
Degree of injury codeDEGREE_INJURY_CD
00
ClassificationCLASSIFICATION
FIRE
Classification codeCLASSIFICATION_CD
08
Accident typeACCIDENT_TYPE
Accident type, without injuries
Accident type codeACCIDENT_TYPE_CD
44
Immediately reportable typeIMMED_NOTIFY
MINE FIRE
Immediately reportable codeIMMED_NOTIFY_CD
06
MSHA investigation beganINVEST_BEGIN_DT
Apr 30, 2023

Injury

Activity at the timeACTIVITY
NO VALUE FOUND
Activity codeACTIVITY_CD
?
Source of injuryINJURY_SOURCE
NO VALUE FOUND
Source of injury codeINJURY_SOURCE_CD
?
Nature of injuryNATURE_INJURY
NO VALUE FOUND
Nature of injury codeNATURE_INJURY_CD
?
Part of bodyINJ_BODY_PART
NO VALUE FOUND
Part of body codeINJ_BODY_PART_CD
?

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Reportable injuries or illnessesNO_INJURIES, Schedule charge, daysSCHEDULE_CHARGE

Not recorded by MSHA (7)

Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Apr 27, 2023
Degree of injury: ACCIDENT ONLY
Classification: IGNITION OR EXPLOSION OF GAS OR DUST
Accident type: Accident type, without injuries
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220231250004
DateACCIDENT_DT
Apr 27, 2023
TimeACCIDENT_TIME
1502
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
ACCIDENT ONLY
Degree of injury codeDEGREE_INJURY_CD
00
ClassificationCLASSIFICATION
IGNITION OR EXPLOSION OF GAS OR DUST
Classification codeCLASSIFICATION_CD
14
Accident typeACCIDENT_TYPE
Accident type, without injuries
Accident type codeACCIDENT_TYPE_CD
44
Immediately reportable typeIMMED_NOTIFY
GAS OF DUST IGNITION
Immediately reportable codeIMMED_NOTIFY_CD
05
MSHA investigation beganINVEST_BEGIN_DT
Apr 27, 2023

Injury

Activity at the timeACTIVITY
NO VALUE FOUND
Activity codeACTIVITY_CD
?
Source of injuryINJURY_SOURCE
NO VALUE FOUND
Source of injury codeINJURY_SOURCE_CD
?
Nature of injuryNATURE_INJURY
NO VALUE FOUND
Nature of injury codeNATURE_INJURY_CD
?
Part of bodyINJ_BODY_PART
NO VALUE FOUND
Part of body codeINJ_BODY_PART_CD
?

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Reportable injuries or illnessesNO_INJURIES, Schedule charge, daysSCHEDULE_CHARGE

Not recorded by MSHA (7)

Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Mar 6, 2023
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Struck by flying object
Days lost: 136
Details

The report

Document numberDOCUMENT_NO
220230660026
DateACCIDENT_DT
Mar 6, 2023
TimeACCIDENT_TIME
1315
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320240220005

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
PULVERIZED MINERAL (DUST)
Source of injury codeINJURY_SOURCE_CD
092
Nature of injuryNATURE_INJURY
DUST IN EYES
Nature of injury codeNATURE_INJURY_CD
320
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Days lostDAYS_LOST
136
Returned to workRETURN_TO_WORK_DT
Nov 13, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Mar 1, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220230690025
DateACCIDENT_DT
Mar 1, 2023
TimeACCIDENT_TIME
0945
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
CHAIN,ROPE,CABLE-NT CONVY
Source of injury codeINJURY_SOURCE_CD
079
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HEAD,NEC
Part of body codeINJ_BODY_PART_CD
100
Returned to workRETURN_TO_WORK_DT
Mar 2, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Tugger, Air winch, Air hoist, Air jack, Electric winch
Equipment codeMINING_EQUIP_CD
68
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Contractor IDCONTRACTOR_ID
W213
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO

Date: Dec 16, 2022
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220230090012
DateACCIDENT_DT
Dec 16, 2022
TimeACCIDENT_TIME
1600
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320230550003

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days of restricted workDAYS_RESTRICT
33
Returned to workRETURN_TO_WORK_DT
Feb 22, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Controller at the timeCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

25 most recent of 234 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 122
Hours worked: 188,103
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
122
Hours workedANNUAL_HRS
188103
Average hours per employeeAVG_EMPLOYEE_HOURS
1542

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 46
Hours worked: 64,645
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
46
Hours workedANNUAL_HRS
64645
Average hours per employeeAVG_EMPLOYEE_HOURS
1405

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 21
Hours worked: 36,455
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
21
Hours workedANNUAL_HRS
36455
Average hours per employeeAVG_EMPLOYEE_HOURS
1736

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 111
Hours worked: 198,004
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
111
Hours workedANNUAL_HRS
198004
Average hours per employeeAVG_EMPLOYEE_HOURS
1784

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 61
Hours worked: 119,030
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
61
Hours workedANNUAL_HRS
119030
Average hours per employeeAVG_EMPLOYEE_HOURS
1951

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 24
Hours worked: 40,958
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
40958
Average hours per employeeAVG_EMPLOYEE_HOURS
1707

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 135
Hours worked: 276,512
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
135
Hours workedANNUAL_HRS
276512
Average hours per employeeAVG_EMPLOYEE_HOURS
2048

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 36
Hours worked: 64,224
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
36
Hours workedANNUAL_HRS
64224
Average hours per employeeAVG_EMPLOYEE_HOURS
1784

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 20
Hours worked: 47,332
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
20
Hours workedANNUAL_HRS
47332
Average hours per employeeAVG_EMPLOYEE_HOURS
2367

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 115
Hours worked: 245,664
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
115
Hours workedANNUAL_HRS
245664
Average hours per employeeAVG_EMPLOYEE_HOURS
2136

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 26
Hours worked: 48,671
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
26
Hours workedANNUAL_HRS
48671
Average hours per employeeAVG_EMPLOYEE_HOURS
1872

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 16
Hours worked: 42,840
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
16
Hours workedANNUAL_HRS
42840
Average hours per employeeAVG_EMPLOYEE_HOURS
2678

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 111
Hours worked: 204,140
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
111
Hours workedANNUAL_HRS
204140
Average hours per employeeAVG_EMPLOYEE_HOURS
1839

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 25
Hours worked: 46,601
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
25
Hours workedANNUAL_HRS
46601
Average hours per employeeAVG_EMPLOYEE_HOURS
1864

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 16
Hours worked: 58,860
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
16
Hours workedANNUAL_HRS
58860
Average hours per employeeAVG_EMPLOYEE_HOURS
3679

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 112
Hours worked: 202,961
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
112
Hours workedANNUAL_HRS
202961
Average hours per employeeAVG_EMPLOYEE_HOURS
1812

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 26
Hours worked: 44,486
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
26
Hours workedANNUAL_HRS
44486
Average hours per employeeAVG_EMPLOYEE_HOURS
1711

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 17
Hours worked: 54,051
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
54051
Average hours per employeeAVG_EMPLOYEE_HOURS
3179

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 110
Hours worked: 206,220
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
110
Hours workedANNUAL_HRS
206220
Average hours per employeeAVG_EMPLOYEE_HOURS
1875

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 26
Hours worked: 44,542
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
26
Hours workedANNUAL_HRS
44542
Average hours per employeeAVG_EMPLOYEE_HOURS
1713

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 16
Hours worked: 45,680
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
16
Hours workedANNUAL_HRS
45680
Average hours per employeeAVG_EMPLOYEE_HOURS
2855

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 109
Hours worked: 215,214
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
109
Hours workedANNUAL_HRS
215214
Average hours per employeeAVG_EMPLOYEE_HOURS
1974

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 28
Hours worked: 43,336
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
28
Hours workedANNUAL_HRS
43336
Average hours per employeeAVG_EMPLOYEE_HOURS
1548

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 17
Hours worked: 47,606
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
47606
Average hours per employeeAVG_EMPLOYEE_HOURS
2800

Mine

Mine IDMINE_ID
0300256
Mine name in this fileCURR_MINE_NM
Foreman Quarry & Plant
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Little Rock AR Field Office
Nearest town
Foreman
Days worked per week
7
Hours per shift
8
Production shifts per day
3
Maintenance shifts per day
0
Employees, current record
168
Tailing ponds
0
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Foreman Quarry & Plant
Mine IDMINE_ID
0300256
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Facility
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Feb 15, 1973
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Ash Grove Cement Company
Operator IDCURRENT_OPERATOR_ID
L02019
ControllerCURRENT_CONTROLLER_NAME
CRH PLC
Controller IDCURRENT_CONTROLLER_ID
M06183
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Oct 1, 1985

Location and MSHA office

StateSTATE
AR
Bureau of Mines state codeBOM_STATE_CD
03
FIPS county codeFIPS_CNTY_CD
081
FIPS county nameFIPS_CNTY_NM
Little River
Congressional districtCONG_DIST_CD
04
Nearest townNEAREST_TOWN
Foreman
MSHA districtDISTRICT
M5
MSHA office codeOFFICE_CD
M5871
MSHA officeOFFICE_NAME
Little Rock AR Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
175
Most recent assessment control numberASSESS_CTRL_NO
000646967

Commodity

Primary commodity (SIC)PRIMARY_SIC
Cement
Primary commodity codePRIMARY_SIC_CD
324100
Primary SIC codePRIMARY_SIC_CD_1
3241
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
7
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
3
Workers employedNO_EMPLOYEES
168
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Ash Grove Cement Company
From: Oct 1, 1985
To: No end date
Controller: CRH PLC
From : Jun 21, 2018
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Operator fromOPERATOR_START_DT
Oct 1, 1985

Controller

ControllerCONTROLLER_NAME
CRH PLC
Controller IDCONTROLLER_ID
M06183
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jun 21, 2018

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT

Operator: Ash Grove Cement Company
From: Oct 1, 1985
To: No end date
Controller: Ash Grove Cement Company
From : Jan 1, 1950
To : Jun 20, 2018
Details

Operator

OperatorOPERATOR_NAME
Ash Grove Cement Company
Operator IDOPERATOR_ID
L02019
Operator fromOPERATOR_START_DT
Oct 1, 1985

Controller

ControllerCONTROLLER_NAME
Ash Grove Cement Company
Controller IDCONTROLLER_ID
M00051
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Jun 20, 2018

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Operator toOPERATOR_END_DT

Operator: Arkansas Cement Corp
From: Jan 1, 1950
To: Sep 30, 1985
Controller: Arkansas Louisiana Gas Company
From : Jan 1, 1950
To : Sep 30, 1985
Details

Operator

OperatorOPERATOR_NAME
Arkansas Cement Corp
Operator IDOPERATOR_ID
L08106
Operator fromOPERATOR_START_DT
Jan 1, 1950
Operator toOPERATOR_END_DT
Sep 30, 1985

Controller

ControllerCONTROLLER_NAME
Arkansas Louisiana Gas Company
Controller IDCONTROLLER_ID
M06444
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Sep 30, 1985

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

As MSHA records it, newest operator first.

Address of record

Ash Grove Cement Company·Contact title H&S Director-Central Region·11011 Cody, Overland Park KS 66210

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Ash Grove Cement Company
Contact titleCONTACT_TITLE
H&S Director-Central Region
StreetSTREET
11011 Cody
CityCITY
Overland Park
StateSTATE_ABBR
KS
State nameSTATE
Kansas
ZIP codeZIP_CD
66210
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
20

Mine

Mine IDMINE_ID
0300256
Mine name in this fileMINE_NAME
Foreman Quarry & Plant
Nearest townNEAREST_TOWN
Foreman
Mine typeMINE_TYPE_CD
Facility
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Feb 15, 1973
Primary commodity (SIC)PRIMARY_SIC_CD
Cement
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology