Regular Safety and Health InspectionMay 11 to May 14, 2026Inspectors 1 | Hours on site 11Began: May 11, 2026Ended: May 14, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 11, 2026
- Closed outINSPECTION_END_DT
- May 14, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03B76E
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 1 to Oct 3, 2025Inspectors 1 | Hours on site 19.25Began: Oct 1, 2025Ended: Oct 3, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Closed outINSPECTION_END_DT
- Oct 3, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F02458D
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 23.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 7 to Jul 10, 2025Inspectors 1 | Hours on site 24.75Began: Jul 7, 2025Ended: Jul 10, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 24.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 7, 2025
- Closed outINSPECTION_END_DT
- Jul 10, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F014217
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 24.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 39
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 27 to Jan 30, 2025Inspectors 1 | Hours on site 21.5Began: Jan 27, 2025Ended: Jan 30, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 21.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 27, 2025
- Closed outINSPECTION_END_DT
- Jan 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6937396
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 21.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 16 to Sep 19, 2024Inspectors 1 | Hours on site 25.75Began: Sep 16, 2024Ended: Sep 19, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 25.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Closed outINSPECTION_END_DT
- Sep 19, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F003523
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 25.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 35.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Other Technical Compliance InvestigationsApr 24 to Apr 26, 2024Inspectors 1 | Hours on site 3.25Began: Apr 24, 2024Ended: Apr 26, 2024Activity: Other Technical Compliance InvestigationsInspectors: 1Hours on site: 3.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 24, 2024
- Closed outINSPECTION_END_DT
- Apr 26, 2024
- ActivityACTIVITY
- Other Technical Compliance Investigations
- Activity codeACTIVITY_CODE
- E24
- Program areaPROGRAM_AREA
- M/NM--Other Technical Compliance Investigations
- Event numberEVENT_NO
- 6938237
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.25
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 3.25
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 3.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Compliance Follow-up InspectionNov 6 to Nov 7, 2023Inspectors 1 | Hours on site 1.5Began: Nov 6, 2023Ended: Nov 7, 2023Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 6, 2023
- Closed outINSPECTION_END_DT
- Nov 7, 2023
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6935060
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 31 to Nov 2, 2023Inspectors 2 | Hours on site 26.25Began: Oct 31, 2023Ended: Nov 2, 2023Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 26.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 31, 2023
- Closed outINSPECTION_END_DT
- Nov 2, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6932177
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 38
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 6
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 11
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Regular Safety and Health InspectionJul 25 to Jul 28, 2023Inspectors 1 | Hours on site 25.5Began: Jul 25, 2023Ended: Jul 28, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 25.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 25, 2023
- Closed outINSPECTION_END_DT
- Jul 28, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6934562
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 25.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionApr 19, 2023Inspectors 1 | Hours on site 4Began: Apr 19, 2023Ended: Apr 19, 2023Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 19, 2023
- Closed outINSPECTION_END_DT
- Apr 19, 2023
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6932123
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Verbal Hazard Complaint InspectionsApr 12, 2023Inspectors 1 | Hours on site 2.5Began: Apr 12, 2023Ended: Apr 12, 2023Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 12, 2023
- Closed outINSPECTION_END_DT
- Apr 12, 2023
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 6932119
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionApr 12 to Apr 13, 2023Inspectors 1 | Hours on site 4.25Began: Apr 12, 2023Ended: Apr 13, 2023Activity: Spot InspectionInspectors: 1Hours on site: 4.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 12, 2023
- Closed outINSPECTION_END_DT
- Apr 13, 2023
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6932120
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionFeb 27 to Mar 2, 2023Inspectors 1 | Hours on site 27.5Began: Feb 27, 2023Ended: Mar 2, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 27.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 27, 2023
- Closed outINSPECTION_END_DT
- Mar 2, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6932114
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 27.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 18 to Jul 22, 2022Inspectors 2 | Hours on site 31Began: Jul 18, 2022Ended: Jul 22, 2022Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 31Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 18, 2022
- Closed outINSPECTION_END_DT
- Jul 22, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6890238
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 31
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 43.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 13 to Dec 16, 2021Inspectors 1 | Hours on site 21Began: Dec 13, 2021Ended: Dec 16, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 21Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 13, 2021
- Closed outINSPECTION_END_DT
- Dec 16, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6889613
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 21
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 26.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 16 to Aug 19, 2021Inspectors 1 | Hours on site 29.5Began: Aug 16, 2021Ended: Aug 19, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 29.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 16, 2021
- Closed outINSPECTION_END_DT
- Aug 19, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884088
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 29.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 18 to Nov 19, 2020Inspectors 1 | Hours on site 15Began: Nov 18, 2020Ended: Nov 19, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 15Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 18, 2020
- Closed outINSPECTION_END_DT
- Nov 19, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884341
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 15
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 23.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
103 (g) Written Notification Hazard Complaint InspectioNov 17 to Nov 18, 2020Inspectors 1 | Hours on site 4.75Began: Nov 17, 2020Ended: Nov 18, 2020Activity: 103 (g) Written Notification Hazard Complaint InspectioInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 17, 2020
- Closed outINSPECTION_END_DT
- Nov 18, 2020
- ActivityACTIVITY
- 103 (g) Written Notification Hazard Complaint Inspectio
- Activity codeACTIVITY_CODE
- E03
- Program areaPROGRAM_AREA
- M/NM--103 (g) Written Notification Hazard Complaint Inspecti
- Event numberEVENT_NO
- 6884340
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 22 to Jul 16, 2020Inspectors 1 | Hours on site 30.75Began: Jun 22, 2020Ended: Jul 16, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 30.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 22, 2020
- Closed outINSPECTION_END_DT
- Jul 16, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6809700
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 30.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 44.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 16 to Mar 19, 2020Inspectors 1 | Hours on site 30.5Began: Mar 16, 2020Ended: Mar 19, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 30.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 16, 2020
- Closed outINSPECTION_END_DT
- Mar 19, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6809678
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 30.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 38.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 20 to May 22, 2019Inspectors 1 | Hours on site 27.75Began: May 20, 2019Ended: May 22, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 27.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 20, 2019
- Closed outINSPECTION_END_DT
- May 22, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6807630
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 27.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 37.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 14 to Oct 19, 2018Inspectors 1 | Hours on site 26.75Began: Oct 14, 2018Ended: Oct 19, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 26.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 14, 2018
- Closed outINSPECTION_END_DT
- Oct 19, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802688
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 38
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 7 to May 10, 2018Inspectors 1 | Hours on site 23.25Began: May 7, 2018Ended: May 10, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 23.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 7, 2018
- Closed outINSPECTION_END_DT
- May 10, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802738
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 23.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 33
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 13 to Nov 16, 2017Inspectors 1 | Hours on site 24.5Began: Nov 13, 2017Ended: Nov 16, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 24.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 13, 2017
- Closed outINSPECTION_END_DT
- Nov 16, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802710
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 24.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 31.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 19 to Jun 22, 2017Inspectors 1 | Hours on site 26.5Began: Jun 19, 2017Ended: Jun 22, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 26.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 19, 2017
- Closed outINSPECTION_END_DT
- Jun 22, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6739025
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 38
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 74 inspections and other MSHA visits since Mar 29, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: May 13, 2026Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5171177
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0849
- Date of occurrenceVIOLATION_OCCUR_DT
- May 13, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 13, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 13, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 13, 2026
- Terminated, timeTERMINATION_TIME
- 0904
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 17, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F03B76E
- Inspection beganINSPECTION_BEGIN_DT
- May 11, 2026
- Inspection closed outINSPECTION_END_DT
- May 14, 2026
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 13, 2026Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $165.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5171178
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1001
- Date of occurrenceVIOLATION_OCCUR_DT
- May 13, 2026
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 15, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 5, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jun 8, 2026
- Terminated, timeTERMINATION_TIME
- 0801
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 165
- Current proposed assessmentAMOUNT_DUE
- 165
- Amount paidAMOUNT_PAID
- 165
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 17, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F03B76E
- Inspection beganINSPECTION_BEGIN_DT
- May 11, 2026
- Inspection closed outINSPECTION_END_DT
- May 14, 2026
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 12, 2026Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5171175
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 12, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1612
- Date of occurrenceVIOLATION_OCCUR_DT
- May 12, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 13, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 13, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 13, 2026
- Terminated, timeTERMINATION_TIME
- 0620
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 17, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F03B76E
- Inspection beganINSPECTION_BEGIN_DT
- May 11, 2026
- Inspection closed outINSPECTION_END_DT
- May 14, 2026
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 12, 2026Type: CitationStandard: 56.12019S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $193.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5171174
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 12, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0952
- Date of occurrenceVIOLATION_OCCUR_DT
- May 12, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12019
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 12, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1020
- Latest dueLATEST_TERM_DUE_DT
- May 12, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1020
- TerminatedTERMINATION_DT
- May 12, 2026
- Terminated, timeTERMINATION_TIME
- 1003
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 193
- Current proposed assessmentAMOUNT_DUE
- 193
- Amount paidAMOUNT_PAID
- 193
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 17, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F03B76E
- Inspection beganINSPECTION_BEGIN_DT
- May 11, 2026
- Inspection closed outINSPECTION_END_DT
- May 14, 2026
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2025Type: CitationStandard: 56.14100(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008242
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0806
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14100(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 2, 2025
- Terminated, timeTERMINATION_TIME
- 1505
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F02458D
- Inspection beganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 3, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2025Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008244
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1001
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 2, 2025
- Terminated, timeTERMINATION_TIME
- 1330
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F02458D
- Inspection beganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 3, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2025Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008243
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0853
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 2, 2025
- Terminated, timeTERMINATION_TIME
- 0916
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F02458D
- Inspection beganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 3, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 1, 2025Type: CitationStandard: 56.4201(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008240
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 1, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1441
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 1, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 16, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 16, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 3, 2025
- Terminated, timeTERMINATION_TIME
- 1033
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F02458D
- Inspection beganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 3, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 1, 2025Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008239
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 1, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1221
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 1, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 1, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 1, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 1, 2025
- Terminated, timeTERMINATION_TIME
- 1243
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F02458D
- Inspection beganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 3, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 1, 2025Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008241
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 1, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1730
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 1, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 2, 2025
- Terminated, timeTERMINATION_TIME
- 0842
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F02458D
- Inspection beganINSPECTION_BEGIN_DT
- Oct 1, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 3, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 8, 2025Type: CitationStandard: 56.4201(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994589
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0809
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 8, 2025
- Terminated, timeTERMINATION_TIME
- 0830
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 15, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 27, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F014217
- Inspection beganINSPECTION_BEGIN_DT
- Jul 7, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 10, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 8, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994590
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0825
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1229
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1229
- TerminatedTERMINATION_DT
- Jul 8, 2025
- Terminated, timeTERMINATION_TIME
- 1229
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 15, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 27, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F014217
- Inspection beganINSPECTION_BEGIN_DT
- Jul 7, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 10, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 8, 2025Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $336.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994588
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0739
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 8, 2025
- Terminated, timeTERMINATION_TIME
- 0828
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 336
- Current proposed assessmentAMOUNT_DUE
- 336
- Amount paidAMOUNT_PAID
- 336
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 15, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 27, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F014217
- Inspection beganINSPECTION_BEGIN_DT
- Jul 7, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 10, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2025Type: CitationStandard: 56.17001S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994462
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1030
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.17001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1420
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- May 9, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 11, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6937396
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994460
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0930
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1030
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- May 9, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 11, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6937396
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2025Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994461
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1020
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1025
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- May 9, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 11, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6937396
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 27, 2025Type: CitationStandard: 56.4200(b)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $177.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9994459
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 27, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1300
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 27, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4200(b)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 27, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jan 27, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jan 27, 2025
- Terminated, timeTERMINATION_TIME
- 1330
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 177
- Current proposed assessmentAMOUNT_DUE
- 177
- Amount paidAMOUNT_PAID
- 177
- Bill first printedBILL_PRINT_DT
- Feb 27, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6937396
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 19, 2024Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749167
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 19, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0605
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 19, 2024
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 19, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 0835
- Latest dueLATEST_TERM_DUE_DT
- Sep 19, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 0835
- TerminatedTERMINATION_DT
- Sep 19, 2024
- Terminated, timeTERMINATION_TIME
- 0615
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 21, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 17
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F003523
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 19, 2024Type: CitationStandard: 56.23002(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749168
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 19, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0625
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 19, 2024
- 30 CFR part and sectionPART_SECTION
- 56.23002(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 31, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 0600
- Latest dueLATEST_TERM_DUE_DT
- Oct 31, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 0600
- TerminatedTERMINATION_DT
- Oct 31, 2024
- Terminated, timeTERMINATION_TIME
- 1620
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 21, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 17
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F003523
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2024Type: CitationStandard: 56.4200(b)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $260.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749163
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1125
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.4200(b)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Sep 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Sep 17, 2024
- Terminated, timeTERMINATION_TIME
- 1600
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 260
- Current proposed assessmentAMOUNT_DUE
- 260
- Amount paidAMOUNT_PAID
- 260
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 21, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F003523
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2024Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $861.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749165
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1415
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Sep 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Sep 18, 2024
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 861
- Current proposed assessmentAMOUNT_DUE
- 861
- Amount paidAMOUNT_PAID
- 861
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 21, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F003523
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2024Type: CitationStandard: 56.12040S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $861.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749164
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1355
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12040
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Sep 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Sep 18, 2024
- Terminated, timeTERMINATION_TIME
- 1100
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 861
- Current proposed assessmentAMOUNT_DUE
- 861
- Amount paidAMOUNT_PAID
- 861
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 21, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F003523
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2024Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $861.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749166
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1500
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1510
- Latest dueLATEST_TERM_DUE_DT
- Sep 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1510
- TerminatedTERMINATION_DT
- Sep 17, 2024
- Terminated, timeTERMINATION_TIME
- 1505
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 861
- Current proposed assessmentAMOUNT_DUE
- 861
- Amount paidAMOUNT_PAID
- 861
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 21, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F003523
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 1, 2023Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9742542
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 1, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1500
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 1, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 1, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Nov 1, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Nov 1, 2023
- Terminated, timeTERMINATION_TIME
- 1510
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 2, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6932177
- Inspection beganINSPECTION_BEGIN_DT
- Oct 31, 2023
- Inspection closed outINSPECTION_END_DT
- Nov 2, 2023
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 1, 2023Type: CitationStandard: 56.9300(a)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $6,688.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9742541
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 1, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1135
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 1, 2023
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 1, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1205
- Latest dueLATEST_TERM_DUE_DT
- Nov 2, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Nov 6, 2023
- Terminated, timeTERMINATION_TIME
- 1346
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 6688
- Current proposed assessmentAMOUNT_DUE
- 6688
- Amount paidAMOUNT_PAID
- 6688
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 2, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDVIOLATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6932177
- Inspection beganINSPECTION_BEGIN_DT
- Oct 31, 2023
- Inspection closed outINSPECTION_END_DT
- Nov 2, 2023
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
325 citations and orders since Mar 29, 2000: 299 issued to the operator, 26 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: May 13, 2026Citation number: 5171177Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5171177
- Assessment control numberASSESS_CASE_NO
- 000644091
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 17, 2026
- Citation issuedISSUE_DT
- May 13, 2026
- Date of occurrenceOCCURRENCE_DT
- May 13, 2026
- Final order dateFINAL_ORDER_DT
- Aug 12, 2026
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 5
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 1.18
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 99755
- Size of mineSIZE_OF_MINE
- 99755
- Controller hours workedCONTROLLER_HRS
- 279628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 279628
- History period startHISTORY_START_DT
- Feb 13, 2025
- History period endHISTORY_END_DT
- May 12, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B76E
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 13, 2026Citation number: 5171178Standard: 56.4201(a)(2)Proposed penalty: $165.00Current assessment: $165.00Paid against proposed penalty: $165.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5171178
- Assessment control numberASSESS_CASE_NO
- 000644091
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 17, 2026
- Citation issuedISSUE_DT
- May 13, 2026
- Date of occurrenceOCCURRENCE_DT
- May 13, 2026
- Final order dateFINAL_ORDER_DT
- Aug 12, 2026
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 165.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 165.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 165.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 5
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 1.18
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 99755
- Size of mineSIZE_OF_MINE
- 99755
- Controller hours workedCONTROLLER_HRS
- 279628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 279628
- History period startHISTORY_START_DT
- Feb 13, 2025
- History period endHISTORY_END_DT
- May 12, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B76E
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 12, 2026Citation number: 5171174Standard: 56.12019Proposed penalty: $193.00Current assessment: $193.00Paid against proposed penalty: $193.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5171174
- Assessment control numberASSESS_CASE_NO
- 000644091
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 17, 2026
- Citation issuedISSUE_DT
- May 12, 2026
- Date of occurrenceOCCURRENCE_DT
- May 12, 2026
- Final order dateFINAL_ORDER_DT
- Aug 12, 2026
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12019
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 193.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 193.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 193.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 63
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 5
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.44
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 99755
- Size of mineSIZE_OF_MINE
- 99755
- Controller hours workedCONTROLLER_HRS
- 279628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 279628
- History period startHISTORY_START_DT
- Feb 12, 2025
- History period endHISTORY_END_DT
- May 11, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B76E
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 12, 2026Citation number: 5171175Standard: 56.14100(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5171175
- Assessment control numberASSESS_CASE_NO
- 000644091
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 17, 2026
- Citation issuedISSUE_DT
- May 12, 2026
- Date of occurrenceOCCURRENCE_DT
- May 12, 2026
- Final order dateFINAL_ORDER_DT
- Aug 12, 2026
- Bill first printedBILL_PRINT_DT
- Jul 2, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 5
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.44
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.111
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 99755
- Size of mineSIZE_OF_MINE
- 99755
- Controller hours workedCONTROLLER_HRS
- 279628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 279628
- History period startHISTORY_START_DT
- Feb 12, 2025
- History period endHISTORY_END_DT
- May 11, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B76E
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2025Citation number: 5008242Standard: 56.14100(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008242
- Assessment control numberASSESS_CASE_NO
- 000629801
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Oct 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2025
- Final order dateFINAL_ORDER_DT
- Jan 1, 2026
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
- Violations per inspection dayVPID
- 0.63
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Jul 2, 2024
- History period endHISTORY_END_DT
- Oct 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02458D
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2025Citation number: 5008244Standard: 56.14132(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008244
- Assessment control numberASSESS_CASE_NO
- 000629801
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Oct 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2025
- Final order dateFINAL_ORDER_DT
- Jan 1, 2026
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
- Violations per inspection dayVPID
- 0.63
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Jul 2, 2024
- History period endHISTORY_END_DT
- Oct 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02458D
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2025Citation number: 5008243Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008243
- Assessment control numberASSESS_CASE_NO
- 000629801
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Oct 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2025
- Final order dateFINAL_ORDER_DT
- Jan 1, 2026
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
- Violations per inspection dayVPID
- 0.63
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Jul 2, 2024
- History period endHISTORY_END_DT
- Oct 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02458D
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 1, 2025Citation number: 5008240Standard: 56.4201(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008240
- Assessment control numberASSESS_CASE_NO
- 000629801
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Oct 1, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 1, 2025
- Final order dateFINAL_ORDER_DT
- Jan 1, 2026
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Jul 1, 2024
- History period endHISTORY_END_DT
- Sep 30, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02458D
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 1, 2025Citation number: 5008239Standard: 56.12032Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008239
- Assessment control numberASSESS_CASE_NO
- 000629801
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Oct 1, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 1, 2025
- Final order dateFINAL_ORDER_DT
- Jan 1, 2026
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.67
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.067
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Jul 1, 2024
- History period endHISTORY_END_DT
- Sep 30, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02458D
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 1, 2025Citation number: 5008241Standard: 56.14100(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008241
- Assessment control numberASSESS_CASE_NO
- 000629801
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Oct 1, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 1, 2025
- Final order dateFINAL_ORDER_DT
- Jan 1, 2026
- Bill first printedBILL_PRINT_DT
- Nov 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Jul 1, 2024
- History period endHISTORY_END_DT
- Sep 30, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02458D
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2025Citation number: 9994589Standard: 56.4201(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994589
- Assessment control numberASSESS_CASE_NO
- 000627617
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 21, 2026
- Citation issuedISSUE_DT
- Jul 8, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2025
- Final order dateFINAL_ORDER_DT
- Oct 15, 2025
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 15, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.59
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.59
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.91
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 8, 2024
- History period endHISTORY_END_DT
- Jul 7, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F014217
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2025Citation number: 9994590Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994590
- Assessment control numberASSESS_CASE_NO
- 000627617
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 21, 2026
- Citation issuedISSUE_DT
- Jul 8, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2025
- Final order dateFINAL_ORDER_DT
- Oct 15, 2025
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 15, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.59
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.59
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.91
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 8, 2024
- History period endHISTORY_END_DT
- Jul 7, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F014217
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (7)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2025Citation number: 9994588Standard: 56.12032Proposed penalty: $336.00Current assessment: $336.00Paid against proposed penalty: $336.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994588
- Assessment control numberASSESS_CASE_NO
- 000627617
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 21, 2026
- Citation issuedISSUE_DT
- Jul 8, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2025
- Final order dateFINAL_ORDER_DT
- Oct 15, 2025
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 15, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 336.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 336.00
- Mine Act interestMINEACT_INTEREST_AMT
- 3.53
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 336.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 3.53
Penalty points
- Violation history pointsPENALTY_POINTS
- 70
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.91
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 8, 2024
- History period endHISTORY_END_DT
- Jul 7, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F014217
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (7)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 9994461Standard: 56.12032Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994461
- Assessment control numberASSESS_CASE_NO
- 000617490
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- May 9, 2025
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 9, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.83
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 1.09
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937396
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (8)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 9994460Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994460
- Assessment control numberASSESS_CASE_NO
- 000617490
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- May 9, 2025
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 9, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.83
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 1.09
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937396
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 9994462Standard: 56.17001Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994462
- Assessment control numberASSESS_CASE_NO
- 000617490
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- May 9, 2025
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 9, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.17001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.83
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 1.09
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937396
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 27, 2025Citation number: 9994459Standard: 56.4200(b)(2)Proposed penalty: $177.00Current assessment: $177.00Paid against proposed penalty: $177.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9994459
- Assessment control numberASSESS_CASE_NO
- 000615584
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 6, 2025
- Citation issuedISSUE_DT
- Jan 27, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 27, 2025
- Final order dateFINAL_ORDER_DT
- Apr 25, 2025
- Bill first printedBILL_PRINT_DT
- Feb 27, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4200(b)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 177.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 177.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 177.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 62
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 1.2
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106775
- Size of mineSIZE_OF_MINE
- 106775
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Oct 27, 2023
- History period endHISTORY_END_DT
- Jan 26, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937396
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 19, 2024Citation number: 9749168Standard: 56.23002(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749168
- Assessment control numberASSESS_CASE_NO
- 000609224
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 21, 2024
- Citation issuedISSUE_DT
- Sep 19, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 19, 2024
- Final order dateFINAL_ORDER_DT
- Dec 19, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.23002(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 17
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 1.21
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106351
- Size of mineSIZE_OF_MINE
- 106351
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 19, 2023
- History period endHISTORY_END_DT
- Sep 18, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003523
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 19, 2024Citation number: 9749167Standard: 50.30(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749167
- Assessment control numberASSESS_CASE_NO
- 000609224
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 21, 2024
- Citation issuedISSUE_DT
- Sep 19, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 19, 2024
- Final order dateFINAL_ORDER_DT
- Dec 19, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 17
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 1.21
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106351
- Size of mineSIZE_OF_MINE
- 106351
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 19, 2023
- History period endHISTORY_END_DT
- Sep 18, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003523
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2024Citation number: 9749164Standard: 56.12040Proposed penalty: $861.00Current assessment: $861.00Paid against proposed penalty: $861.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749164
- Assessment control numberASSESS_CASE_NO
- 000609224
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 21, 2024
- Citation issuedISSUE_DT
- Sep 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2024
- Final order dateFINAL_ORDER_DT
- Dec 19, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12040
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 861.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 861.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 861.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 82
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 22
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106351
- Size of mineSIZE_OF_MINE
- 106351
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 17, 2023
- History period endHISTORY_END_DT
- Sep 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003523
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2024Citation number: 9749165Standard: 56.12018Proposed penalty: $861.00Current assessment: $861.00Paid against proposed penalty: $861.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749165
- Assessment control numberASSESS_CASE_NO
- 000609224
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 21, 2024
- Citation issuedISSUE_DT
- Sep 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2024
- Final order dateFINAL_ORDER_DT
- Dec 19, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 861.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 861.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 861.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 82
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 22
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106351
- Size of mineSIZE_OF_MINE
- 106351
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 17, 2023
- History period endHISTORY_END_DT
- Sep 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003523
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2024Citation number: 9749166Standard: 56.14207Proposed penalty: $861.00Current assessment: $861.00Paid against proposed penalty: $861.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749166
- Assessment control numberASSESS_CASE_NO
- 000609224
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 21, 2024
- Citation issuedISSUE_DT
- Sep 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2024
- Final order dateFINAL_ORDER_DT
- Dec 19, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 861.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 861.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 861.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 82
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 22
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106351
- Size of mineSIZE_OF_MINE
- 106351
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 17, 2023
- History period endHISTORY_END_DT
- Sep 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003523
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2024Citation number: 9749163Standard: 56.4200(b)(2)Proposed penalty: $260.00Current assessment: $260.00Paid against proposed penalty: $260.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749163
- Assessment control numberASSESS_CASE_NO
- 000609224
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 21, 2024
- Citation issuedISSUE_DT
- Sep 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2024
- Final order dateFINAL_ORDER_DT
- Dec 19, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4200(b)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 260.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 260.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 260.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 67
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 22
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 2
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 106351
- Size of mineSIZE_OF_MINE
- 106351
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 17, 2023
- History period endHISTORY_END_DT
- Sep 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003523
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 1, 2023Citation number: 9742540Standard: 56.11002Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9742540
- Assessment control numberASSESS_CASE_NO
- 000591676
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 31, 2024
- Citation issuedISSUE_DT
- Nov 1, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 1, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 5
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 1.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 99397
- Size of mineSIZE_OF_MINE
- 99397
- Controller hours workedCONTROLLER_HRS
- 256726
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 256726
- History period startHISTORY_START_DT
- Aug 1, 2022
- History period endHISTORY_END_DT
- Oct 31, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6932177
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 1, 2023Citation number: 9742542Standard: 56.12032Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9742542
- Assessment control numberASSESS_CASE_NO
- 000591676
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 31, 2024
- Citation issuedISSUE_DT
- Nov 1, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 1, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 5
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 20
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 1.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 99397
- Size of mineSIZE_OF_MINE
- 99397
- Controller hours workedCONTROLLER_HRS
- 256726
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 256726
- History period startHISTORY_START_DT
- Aug 1, 2022
- History period endHISTORY_END_DT
- Oct 31, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- IDVIOLATOR_ID
- 0050860
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 26, 2002
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6932177
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 322 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 7
- DAYS RESTRICTED ACTIVITY ONLY
- 3
- DYS AWY FRM WRK & RESTRCTD ACT
- 1
- INJURIES DUE TO NATURAL CAUSES
- 1
Date: Mar 7, 2024Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220240730015
- DateACCIDENT_DT
- Mar 7, 2024
- TimeACCIDENT_TIME
- 1030
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (powered)
- Activity codeACTIVITY_CD
- 031
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CONTUSN,BRUISE,INTAC SKIN
- Nature of injury codeNATURE_INJURY_CD
- 160
- Part of bodyINJ_BODY_PART
- FACE,NEC
- Part of body codeINJ_BODY_PART_CD
- 140
- Returned to workRETURN_TO_WORK_DT
- Mar 7, 2024
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- 4355H
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: May 8, 2023Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220231320012
- DateACCIDENT_DT
- May 8, 2023
- TimeACCIDENT_TIME
- 0130
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between NEC
- Accident type codeACCIDENT_TYPE_CD
- 24
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- May 9, 2023
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Bulldozer, Dozer, Crawler tractor, Push cat
- Equipment codeMINING_EQUIP_CD
- 08
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- D8T AW454
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: May 7, 2021Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220211380008
- DateACCIDENT_DT
- May 7, 2021
- TimeACCIDENT_TIME
- 0910
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Grinding
- Activity codeACTIVITY_CD
- 024
- Source of injuryINJURY_SOURCE
- ABRAS STONE,WHEEL GRINDER
- Source of injury codeINJURY_SOURCE_CD
- 052
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FOREARM/ULNAR/RADIUS
- Part of body codeINJ_BODY_PART_CD
- 313
- Returned to workRETURN_TO_WORK_DT
- May 7, 2021
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Makita
- Equipment manufacturer codeEQUIP_MFR_CD
- 141
- Equipment model numberEQUIP_MODEL_NO
- 4.5 inch grinder
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Aug 24, 2020Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220202470014
- DateACCIDENT_DT
- Aug 24, 2020
- TimeACCIDENT_TIME
- 1645
- Shift beganSHIFT_BEGIN_TIME
- 1500
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320211040017
Injury
- Activity at the timeACTIVITY
- Idle
- Activity codeACTIVITY_CD
- 034
- Source of injuryINJURY_SOURCE
- HGHWY ORE CARIER,LRGE TRK
- Source of injury codeINJURY_SOURCE_CD
- 104
- Nature of injuryNATURE_INJURY
- UNCLASSIFIED,NOT DETERMED
- Nature of injury codeNATURE_INJURY_CD
- 400
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 63
- Returned to workRETURN_TO_WORK_DT
- Mar 31, 2021
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 992G
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Nov 3, 2016Degree of injury: INJURIES DUE TO NATURAL CAUSESClassification: OTHERAccident type: NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220163210004
- DateACCIDENT_DT
- Nov 3, 2016
- TimeACCIDENT_TIME
- 1300
- Shift beganSHIFT_BEGIN_TIME
- 0730
- Degree of injuryDEGREE_INJURY
- INJURIES DUE TO NATURAL CAUSES
- Degree of injury codeDEGREE_INJURY_CD
- 08
- ClassificationCLASSIFICATION
- OTHER
- Classification codeCLASSIFICATION_CD
- 21
- Accident typeACCIDENT_TYPE
- NEC
- Accident type codeACCIDENT_TYPE_CD
- 42
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320163330013
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- MISCELLANEOUS,NEC
- Source of injury codeINJURY_SOURCE_CD
- 127
- Nature of injuryNATURE_INJURY
- OTHER INJURY,NEC
- Nature of injury codeNATURE_INJURY_CD
- 390
- Part of bodyINJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- Part of body codeINJ_BODY_PART_CD
- 700
- Days of restricted workDAYS_RESTRICT
- 6
- Returned to workRETURN_TO_WORK_DT
- Nov 22, 2016
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Bulldozer, Dozer, Crawler tractor, Push cat
- Equipment codeMINING_EQUIP_CD
- 08
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- D10T
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Contractor IDCONTRACTOR_ID
- FLC
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (1)
MSHA investigation beganINVEST_BEGIN_DT
Date: Jul 28, 2012Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: HANDLING OF MATERIALSAccident type: Struck by... NECDays lost: 80Details
The report
- Document numberDOCUMENT_NO
- 220122200001
- DateACCIDENT_DT
- Jul 28, 2012
- TimeACCIDENT_TIME
- 1400
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- MSHA investigation beganINVEST_BEGIN_DT
- Jul 28, 2012
- Returned to Duty document numberCLOSED_DOC_NO
- 320130500001
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- COAL & PETROL PRODUCT,NEC
- Source of injury codeINJURY_SOURCE_CD
- 033
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Days of restricted workDAYS_RESTRICT
- 46
- Days lostDAYS_LOST
- 80
- Returned to workRETURN_TO_WORK_DT
- Jan 29, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Bulldozer, Dozer, Crawler tractor, Push cat
- Equipment codeMINING_EQUIP_CD
- 08
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- D-10
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (1)
Contractor IDCONTRACTOR_ID
Date: Oct 21, 2010Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall from machineDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220103050053
- DateACCIDENT_DT
- Oct 21, 2010
- TimeACCIDENT_TIME
- 1000
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from machine
- Accident type codeACCIDENT_TYPE_CD
- 12
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- MSHA investigation beganINVEST_BEGIN_DT
- Oct 21, 2010
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
- Part of body codeINJ_BODY_PART_CD
- 530
- Returned to workRETURN_TO_WORK_DT
- Oct 21, 2010
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 777
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: May 30, 2007Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall onto or against objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220071620078
- DateACCIDENT_DT
- May 30, 2007
- TimeACCIDENT_TIME
- 1530
- Shift beganSHIFT_BEGIN_TIME
- 0500
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall onto or against objects
- Accident type codeACCIDENT_TYPE_CD
- 18
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320071870016
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- LEG, NEC
- Part of body codeINJ_BODY_PART_CD
- 510
- Days of restricted workDAYS_RESTRICT
- 13
- Returned to workRETURN_TO_WORK_DT
- Jun 25, 2007
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2007
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2007
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Aug 25, 2006Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by falling objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220062540090
- DateACCIDENT_DT
- Aug 25, 2006
- TimeACCIDENT_TIME
- 1115
- Shift beganSHIFT_BEGIN_TIME
- 0500
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by falling object
- Accident type codeACCIDENT_TYPE_CD
- 04
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- CHAIN HOIST, CHAIN BLOCK
- Source of injury codeINJURY_SOURCE_CD
- 065
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- MOUTH/LIP/TEETH/TONGUE/THROAT/TASTE
- Part of body codeINJ_BODY_PART_CD
- 142
- Returned to workRETURN_TO_WORK_DT
- Aug 25, 2006
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- LB015
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- BPB Plc
- Controller IDCONTROLLER_ID
- M13649
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2006
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2006
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Feb 2, 2004Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220050190019
- DateACCIDENT_DT
- Feb 2, 2004
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- RAILROAD TIES
- Source of injury codeINJURY_SOURCE_CD
- 115
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 10
- Returned to workRETURN_TO_WORK_DT
- Feb 16, 2004
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- BPB Plc
- Controller IDCONTROLLER_ID
- M13649
- Contractor IDCONTRACTOR_ID
- FLC
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Dec 23, 2002Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall onto or against objectsDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220023650002
- DateACCIDENT_DT
- Dec 23, 2002
- TimeACCIDENT_TIME
- 1300
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall onto or against objects
- Accident type codeACCIDENT_TYPE_CD
- 18
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- STEEL RAIL (ALL KINDS)
- Source of injury codeINJURY_SOURCE_CD
- 084
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- SCALP
- Part of body codeINJ_BODY_PART_CD
- 150
- Returned to workRETURN_TO_WORK_DT
- Dec 23, 2002
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Crusher, Breaker, Mills (ball and rod), Feeder breaker
- Equipment codeMINING_EQUIP_CD
- 15
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Controller at the timeCONTROLLER_NAME
- BPB Plc
- Controller IDCONTROLLER_ID
- M13649
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2002
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: Feb 22, 2002Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Caught in, under or between NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220020630008
- DateACCIDENT_DT
- Feb 22, 2002
- TimeACCIDENT_TIME
- 1215
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Caught in, under or between NEC
- Accident type codeACCIDENT_TYPE_CD
- 24
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- CHAIN HOIST, CHAIN BLOCK
- Source of injury codeINJURY_SOURCE_CD
- 065
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Returned to workRETURN_TO_WORK_DT
- Feb 22, 2002
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- James Hardie Gypsum Inc Nevada
- Operator IDOPERATOR_ID
- L15009
- Controller at the timeCONTROLLER_NAME
- James Hardie Industries Ltd
- Controller IDCONTROLLER_ID
- M07846
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2002
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2002
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
12 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 12Hours worked: 15,530Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 12
- Hours workedANNUAL_HRS
- 15530
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1294
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 7Hours worked: 10,080Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 10080
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1440
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 44Hours worked: 57,479Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 44
- Hours workedANNUAL_HRS
- 57479
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1306
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 13Hours worked: 21,070Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 13
- Hours workedANNUAL_HRS
- 21070
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1621
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 7Hours worked: 13,488Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 13488
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1927
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 44Hours worked: 78,685Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 44
- Hours workedANNUAL_HRS
- 78685
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1788
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 14Hours worked: 25,931Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 14
- Hours workedANNUAL_HRS
- 25931
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1852
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 7Hours worked: 12,160Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 12160
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1737
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 46Hours worked: 80,844Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 46
- Hours workedANNUAL_HRS
- 80844
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1757
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 7Hours worked: 12,333Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 12333
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1762
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 10,080Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 10080
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2016
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 53Hours worked: 94,018Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 53
- Hours workedANNUAL_HRS
- 94018
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1774
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 5Hours worked: 8,836Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 8836
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1767
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 8,240Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 8240
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1648
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 56Hours worked: 90,561Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 56
- Hours workedANNUAL_HRS
- 90561
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1617
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 7,965Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 7965
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1991
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 7,704Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 7704
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1926
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 49Hours worked: 95,308Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 49
- Hours workedANNUAL_HRS
- 95308
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1945
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 7,901Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 7901
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1975
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 4,632Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4632
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1544
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 43Hours worked: 84,100Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 43
- Hours workedANNUAL_HRS
- 84100
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1956
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 2,475Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 2475
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 619
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 4,623Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 4623
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2312
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 45Hours worked: 96,178Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 45
- Hours workedANNUAL_HRS
- 96178
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2137
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileCURR_MINE_NM
- CertainTeed Gypsum Manufacturing Inc
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Nashville
- Days worked per week
- 7
- Hours per shift
- 8
- Production shifts per day
- 2
- Maintenance shifts per day
- 2
- Employees, current record
- 55
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine IDMINE_ID
- 0300276
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Apr 27, 1972
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDCURRENT_OPERATOR_ID
- 0050860
- ControllerCURRENT_CONTROLLER_NAME
- Saint-Gobain
- Controller IDCURRENT_CONTROLLER_ID
- M08468
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Apr 26, 2002
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 061
- FIPS county nameFIPS_CNTY_NM
- Howard
- Nearest townNEAREST_TOWN
- Nashville
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 105
- Most recent assessment control numberASSESS_CTRL_NO
- 000644091
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Gypsum
- Primary commodity codePRIMARY_SIC_CD
- 149907
- Primary SIC codePRIMARY_SIC_CD_1
- 1499
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 07
- Primary industry groupPRIMARY_CANVASS
- Nonmetal
- Primary industry group codePRIMARY_CANVASS_CD
- 7
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 7
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 2
- Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY
- 2
- Workers employedNO_EMPLOYEES
- 55
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (1)
Tailing pondsNO_TAILING_PONDS
Recorded as N (6)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND, MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: CertainTeed Gypsum Manufacturing IncFrom: Apr 26, 2002To: No end dateController: Saint-GobainFrom : Jan 1, 2007To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Operator fromOPERATOR_START_DT
- Apr 26, 2002
Controller
- ControllerCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 2007
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: CertainTeed Gypsum Manufacturing IncFrom: Apr 26, 2002To: No end dateController: BPB PlcFrom : Apr 25, 2002To : Dec 31, 2006Details
Operator
- OperatorOPERATOR_NAME
- CertainTeed Gypsum Manufacturing Inc
- Operator IDOPERATOR_ID
- 0050860
- Operator fromOPERATOR_START_DT
- Apr 26, 2002
Controller
- ControllerCONTROLLER_NAME
- BPB Plc
- Controller IDCONTROLLER_ID
- M13649
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Apr 25, 2002
- Controller toCONTROLLER_END_DT
- Dec 31, 2006
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Operator toOPERATOR_END_DT
Operator: James Hardie Gypsum Inc NevadaFrom: Feb 1, 1997To: Apr 25, 2002Controller: James Hardie Industries LtdFrom : Sep 1, 1987To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- James Hardie Gypsum Inc Nevada
- Operator IDOPERATOR_ID
- L15009
- Operator fromOPERATOR_START_DT
- Feb 1, 1997
- Operator toOPERATOR_END_DT
- Apr 25, 2002
Controller
- ControllerCONTROLLER_NAME
- James Hardie Industries Ltd
- Controller IDCONTROLLER_ID
- M07846
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Sep 1, 1987
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
Operator: Boral Gypsum IncFrom: Nov 2, 1989To: Jan 31, 1997Controller: Boral LimitedFrom : Nov 2, 1989To : Jan 31, 1997Details
Operator
- OperatorOPERATOR_NAME
- Boral Gypsum Inc
- Operator IDOPERATOR_ID
- L11322
- Operator fromOPERATOR_START_DT
- Nov 2, 1989
- Operator toOPERATOR_END_DT
- Jan 31, 1997
Controller
- ControllerCONTROLLER_NAME
- Boral Limited
- Controller IDCONTROLLER_ID
- M00202
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Nov 2, 1989
- Controller toCONTROLLER_END_DT
- Jan 31, 1997
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Operator: Weyerhaeuser CompanyFrom: Jan 1, 1950To: Nov 1, 1989Controller: Not shownFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Weyerhaeuser Company
- Operator IDOPERATOR_ID
- L00796
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
- Operator toOPERATOR_END_DT
- Nov 1, 1989
Controller
- Controller IDCONTROLLER_ID
- M00658
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
CertainTeed Gypsum Manufacturing Inc·Contact title Mine EHS Specialist·615 Hwy 369 N, Nashville AR 71852
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- CertainTeed Gypsum Manufacturing Inc
- Contact titleCONTACT_TITLE
- Mine EHS Specialist
- StreetSTREET
- 615 Hwy 369 N
- CityCITY
- Nashville
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 71852
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0300276
- Mine name in this fileMINE_NAME
- CertainTeed Gypsum Manufacturing Inc
- Nearest townNEAREST_TOWN
- Nashville
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Apr 27, 1972
- Primary commodity (SIC)PRIMARY_SIC_CD
- Gypsum
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology