Glenwood Quarry
Metal/Non-Metal, Surface·Crushed, Broken Slate·Montgomery, Arkansas·Mine ID 0300466
Operator CertainTeed·Controller Saint-Gobain·MSHA status Active since Jul 4, 1976
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionMay 4 to May 6, 2026Inspectors 1 | Hours on site 17.5Began: May 4, 2026Ended: May 6, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 17.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 4, 2026
- Closed outINSPECTION_END_DT
- May 6, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03A7DE
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 17.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 37.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 24 to Nov 26, 2025Inspectors 1 | Hours on site 11.75Began: Nov 24, 2025Ended: Nov 26, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 24, 2025
- Closed outINSPECTION_END_DT
- Nov 26, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F022A24
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 26.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 28 to Jul 30, 2025Inspectors 2 | Hours on site 16.25Began: Jul 28, 2025Ended: Jul 30, 2025Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 16.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Closed outINSPECTION_END_DT
- Jul 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F01421E
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29.25
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 3.5
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 7
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Regular Safety and Health InspectionJan 14 to Jan 17, 2025Inspectors 1 | Hours on site 22.5Began: Jan 14, 2025Ended: Jan 17, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 22.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 14, 2025
- Closed outINSPECTION_END_DT
- Jan 17, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F003533
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 22.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 30
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 24 to Sep 26, 2024Inspectors 1 | Hours on site 9.5Began: Sep 24, 2024Ended: Sep 26, 2024Activity: Spot InspectionInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 24, 2024
- Closed outINSPECTION_END_DT
- Sep 26, 2024
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- F0068F4
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 16 to Sep 19, 2024Inspectors 1 | Hours on site 14Began: Sep 16, 2024Ended: Sep 19, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Closed outINSPECTION_END_DT
- Sep 19, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F0068F3
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 29 to May 2, 2024Inspectors 1 | Hours on site 23.75Began: Apr 29, 2024Ended: May 2, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 23.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Closed outINSPECTION_END_DT
- May 2, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6935974
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 23.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 27 to Oct 1, 2023Inspectors 1 | Hours on site 18.5Began: Sep 27, 2023Ended: Oct 1, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 18.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 27, 2023
- Closed outINSPECTION_END_DT
- Oct 1, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6935938
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 18.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 24 to Jul 25, 2023Inspectors 1 | Hours on site 13Began: Jul 24, 2023Ended: Jul 25, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 13Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 24, 2023
- Closed outINSPECTION_END_DT
- Jul 25, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6935714
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 13
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 21.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionFeb 6 to Feb 10, 2023Inspectors 1 | Hours on site 32.5Began: Feb 6, 2023Ended: Feb 10, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 32.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 6, 2023
- Closed outINSPECTION_END_DT
- Feb 10, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6932110
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 32.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 13 to Apr 14, 2022Inspectors 1 | Hours on site 16Began: Apr 13, 2022Ended: Apr 14, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 13, 2022
- Closed outINSPECTION_END_DT
- Apr 14, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6890220
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 7 to Dec 8, 2021Inspectors 1 | Hours on site 14.5Began: Dec 7, 2021Ended: Dec 8, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 7, 2021
- Closed outINSPECTION_END_DT
- Dec 8, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6886491
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 10 to May 13, 2021Inspectors 1 | Hours on site 23.5Began: May 10, 2021Ended: May 13, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 23.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 10, 2021
- Closed outINSPECTION_END_DT
- May 13, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884372
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 23.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 36.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 13 to Jan 15, 2021Inspectors 1 | Hours on site 8Began: Jan 13, 2021Ended: Jan 15, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 13, 2021
- Closed outINSPECTION_END_DT
- Jan 15, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884349
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 14 to Apr 15, 2020Inspectors 1 | Hours on site 13.25Began: Apr 14, 2020Ended: Apr 15, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 13.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 14, 2020
- Closed outINSPECTION_END_DT
- Apr 15, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6810755
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 13.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 22
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 16 to Mar 19, 2020Inspectors 1 | Hours on site 28.5Began: Mar 16, 2020Ended: Mar 19, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 28.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 16, 2020
- Closed outINSPECTION_END_DT
- Mar 19, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6807681
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 28.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 38
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 14 to May 15, 2019Inspectors 1 | Hours on site 19Began: May 14, 2019Ended: May 15, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 14, 2019
- Closed outINSPECTION_END_DT
- May 15, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6807629
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 25.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 10 to Dec 13, 2018Inspectors 1 | Hours on site 28.25Began: Dec 10, 2018Ended: Dec 13, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 28.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 10, 2018
- Closed outINSPECTION_END_DT
- Dec 13, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802772
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 28.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 36.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 10 to Jul 11, 2018Inspectors 1 | Hours on site 8.25Began: Jul 10, 2018Ended: Jul 11, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 10, 2018
- Closed outINSPECTION_END_DT
- Jul 11, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802667
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 19 to Mar 22, 2018Inspectors 1 | Hours on site 24Began: Mar 19, 2018Ended: Mar 22, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 24Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 19, 2018
- Closed outINSPECTION_END_DT
- Mar 22, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802638
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 24
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 34.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 6 to Jun 7, 2017Inspectors 1 | Hours on site 14Began: Jun 6, 2017Ended: Jun 7, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 6, 2017
- Closed outINSPECTION_END_DT
- Jun 7, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6739022
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 24 to Jan 26, 2017Inspectors 1 | Hours on site 19.25Began: Jan 24, 2017Ended: Jan 26, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 24, 2017
- Closed outINSPECTION_END_DT
- Jan 26, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6660599
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 30
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 2 to May 5, 2016Inspectors 1 | Hours on site 22.75Began: May 2, 2016Ended: May 5, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 22.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 2, 2016
- Closed outINSPECTION_END_DT
- May 5, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6735904
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 22.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 3 to Nov 4, 2015Inspectors 1 | Hours on site 18Began: Nov 3, 2015Ended: Nov 4, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 18Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 3, 2015
- Closed outINSPECTION_END_DT
- Nov 4, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6660521
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 18
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 9 to Jun 10, 2015Inspectors 1 | Hours on site 19Began: Jun 9, 2015Ended: Jun 10, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 9, 2015
- Closed outINSPECTION_END_DT
- Jun 10, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6656999
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 78 inspections and other MSHA visits since Mar 27, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: May 6, 2026Type: CitationStandard: 62.120S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $209.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5175801
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1438
- Date of occurrenceVIOLATION_OCCUR_DT
- May 6, 2026
- 30 CFR part and sectionPART_SECTION
- 62.120
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 20, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- May 20, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- May 11, 2026
- Terminated, timeTERMINATION_TIME
- 1821
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 209
- Current proposed assessmentAMOUNT_DUE
- 209
- Amount paidAMOUNT_PAID
- 209
- Bill first printedBILL_PRINT_DT
- Jun 11, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F03A7DE
- Inspection beganINSPECTION_BEGIN_DT
- May 4, 2026
- Inspection closed outINSPECTION_END_DT
- May 6, 2026
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 5, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $177.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009200
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 5, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0835
- Date of occurrenceVIOLATION_OCCUR_DT
- May 5, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 5, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 5, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 5, 2026
- Terminated, timeTERMINATION_TIME
- 0927
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 177
- Current proposed assessmentAMOUNT_DUE
- 177
- Amount paidAMOUNT_PAID
- 177
- Bill first printedBILL_PRINT_DT
- Jun 11, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F03A7DE
- Inspection beganINSPECTION_BEGIN_DT
- May 4, 2026
- Inspection closed outINSPECTION_END_DT
- May 6, 2026
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 25, 2025Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009093
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 25, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0859
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 25, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 25, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Nov 25, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Nov 25, 2025
- Terminated, timeTERMINATION_TIME
- 0910
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 14, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F022A24
- Inspection beganINSPECTION_BEGIN_DT
- Nov 24, 2025
- Inspection closed outINSPECTION_END_DT
- Nov 26, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 25, 2025Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009094
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 25, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0917
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 25, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 25, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Nov 25, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Nov 25, 2025
- Terminated, timeTERMINATION_TIME
- 1016
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 14, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F022A24
- Inspection beganINSPECTION_BEGIN_DT
- Nov 24, 2025
- Inspection closed outINSPECTION_END_DT
- Nov 26, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 24, 2025Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009092
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 24, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1225
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 24, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 25, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 25, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 25, 2025
- Terminated, timeTERMINATION_TIME
- 1315
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 14, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 12
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F022A24
- Inspection beganINSPECTION_BEGIN_DT
- Nov 24, 2025
- Inspection closed outINSPECTION_END_DT
- Nov 26, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007609
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0918
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Jul 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 29, 2025
- Terminated, timeTERMINATION_TIME
- 1207
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007606
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0541
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 29, 2025
- Terminated, timeTERMINATION_TIME
- 0739
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007611
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1031
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 29, 2025
- Terminated, timeTERMINATION_TIME
- 1052
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.12008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007607
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0709
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 29, 2025
- Terminated, timeTERMINATION_TIME
- 0733
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.11002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007608
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0911
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Jul 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 29, 2025
- Terminated, timeTERMINATION_TIME
- 1208
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.11012S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007612
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1110
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jul 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jul 30, 2025
- Terminated, timeTERMINATION_TIME
- 0732
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007610
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0935
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jul 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jul 30, 2025
- Terminated, timeTERMINATION_TIME
- 0729
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 29, 2025Type: CitationStandard: 50.30(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007613
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1300
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 29, 2025
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jul 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jul 29, 2025
- Terminated, timeTERMINATION_TIME
- 1305
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 2, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F01421E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 30, 2025
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2024Type: CitationStandard: 56.23002(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9793544
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1517
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.23002(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 30, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Sep 30, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Sep 23, 2024
- Terminated, timeTERMINATION_TIME
- 0839
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Nov 7, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 14, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 29, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 12
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- F0068F3
- Inspection beganINSPECTION_BEGIN_DT
- Sep 16, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 19, 2024
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 30, 2024Type: CitationStandard: 56.12002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749103
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1335
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1345
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1345
- TerminatedTERMINATION_DT
- Apr 30, 2024
- Terminated, timeTERMINATION_TIME
- 1445
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 11, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 7, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6935974
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 2, 2024
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 30, 2024Type: CitationStandard: 56.14211(c)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749101
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1230
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14211(c)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1245
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1245
- TerminatedTERMINATION_DT
- Apr 30, 2024
- Terminated, timeTERMINATION_TIME
- 1245
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 11, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 7, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6935974
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 2, 2024
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 30, 2024Type: CitationStandard: 56.12008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749102
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1310
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 30, 2024
- Terminated, timeTERMINATION_TIME
- 1405
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 11, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 7, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6935974
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 2, 2024
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 30, 2024Type: CitationStandard: 56.16001S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9749104
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1450
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2024
- 30 CFR part and sectionPART_SECTION
- 56.16001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 30, 2024
- Terminated, timeTERMINATION_TIME
- 1505
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 11, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 7, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6935974
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 2, 2024
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 27, 2023Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9678978
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 27, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0930
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 27, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 27, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0945
- Latest dueLATEST_TERM_DUE_DT
- Sep 27, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0945
- TerminatedTERMINATION_DT
- Sep 27, 2023
- Terminated, timeTERMINATION_TIME
- 0945
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Nov 9, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 17, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 21, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6935938
- Inspection beganINSPECTION_BEGIN_DT
- Sep 27, 2023
- Inspection closed outINSPECTION_END_DT
- Oct 1, 2023
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 24, 2023Type: CitationStandard: 47.41(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9743640
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 24, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1020
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 24, 2023
- 30 CFR part and sectionPART_SECTION
- 47.41(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 24, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 24, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 24, 2023
- Terminated, timeTERMINATION_TIME
- 1022
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Sep 7, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 16, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 22, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6935714
- Inspection beganINSPECTION_BEGIN_DT
- Jul 24, 2023
- Inspection closed outINSPECTION_END_DT
- Jul 25, 2023
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Feb 6, 2023Type: CitationStandard: 56.9300(d)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9674124
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 6, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1420
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 6, 2023
- 30 CFR part and sectionPART_SECTION
- 56.9300(d)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 7, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Feb 7, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Feb 7, 2023
- Terminated, timeTERMINATION_TIME
- 1545
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Mar 9, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 26, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6932110
- Inspection beganINSPECTION_BEGIN_DT
- Feb 6, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 10, 2023
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 13, 2022Type: CitationStandard: 56.12002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9670650
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 13, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1155
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 13, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 13, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 13, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 13, 2022
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Jun 9, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 1, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 16, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6890220
- Inspection beganINSPECTION_BEGIN_DT
- Apr 13, 2022
- Inspection closed outINSPECTION_END_DT
- Apr 14, 2022
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Dec 7, 2021Type: CitationStandard: 56.11010S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642372
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 7, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1130
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 7, 2021
- 30 CFR part and sectionPART_SECTION
- 56.11010
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 7, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Dec 7, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Dec 7, 2021
- Terminated, timeTERMINATION_TIME
- 1200
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Feb 10, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 19, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 23, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6886491
- Inspection beganINSPECTION_BEGIN_DT
- Dec 7, 2021
- Inspection closed outINSPECTION_END_DT
- Dec 8, 2021
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Dec 7, 2021Type: CitationStandard: 56.4200(b)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642373
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 7, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1245
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 7, 2021
- 30 CFR part and sectionPART_SECTION
- 56.4200(b)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 7, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Dec 7, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Dec 7, 2021
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Feb 10, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 19, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 23, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6886491
- Inspection beganINSPECTION_BEGIN_DT
- Dec 7, 2021
- Inspection closed outINSPECTION_END_DT
- Dec 8, 2021
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 12, 2021Type: CitationStandard: 56.11001S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9518941
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 12, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1028
- Date of occurrenceVIOLATION_OCCUR_DT
- May 12, 2021
- 30 CFR part and sectionPART_SECTION
- 56.11001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 12, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 12, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 12, 2021
- Terminated, timeTERMINATION_TIME
- 1117
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Jul 8, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 22, 2021
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 24, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- CertainTeed
- Operator IDVIOLATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Inspection eventEVENT_NO
- 6884372
- Inspection beganINSPECTION_BEGIN_DT
- May 10, 2021
- Inspection closed outINSPECTION_END_DT
- May 13, 2021
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
128 citations and orders since Mar 27, 2000: 127 issued to the operator, 1 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: May 6, 2026Citation number: 5175801Standard: 62.120Proposed penalty: $209.00Current assessment: $209.00Paid against proposed penalty: $209.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5175801
- Assessment control numberASSESS_CASE_NO
- 000642722
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 18, 2026
- Citation issuedISSUE_DT
- May 6, 2026
- Date of occurrenceOCCURRENCE_DT
- May 6, 2026
- Final order dateFINAL_ORDER_DT
- Jul 20, 2026
- Bill first printedBILL_PRINT_DT
- Jun 11, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 62.120
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 209.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 209.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 209.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 64
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 1.57
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30470
- Size of mineSIZE_OF_MINE
- 30470
- Controller hours workedCONTROLLER_HRS
- 279628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 279628
- History period startHISTORY_START_DT
- Feb 6, 2025
- History period endHISTORY_END_DT
- May 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A7DE
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 5, 2026Citation number: 5009200Standard: 56.20003(a)Proposed penalty: $177.00Current assessment: $177.00Paid against proposed penalty: $177.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009200
- Assessment control numberASSESS_CASE_NO
- 000642722
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 18, 2026
- Citation issuedISSUE_DT
- May 5, 2026
- Date of occurrenceOCCURRENCE_DT
- May 5, 2026
- Final order dateFINAL_ORDER_DT
- Jul 20, 2026
- Bill first printedBILL_PRINT_DT
- Jun 11, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 177.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 177.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 177.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 62
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.83
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.333
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30470
- Size of mineSIZE_OF_MINE
- 30470
- Controller hours workedCONTROLLER_HRS
- 279628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 279628
- History period startHISTORY_START_DT
- Feb 5, 2025
- History period endHISTORY_END_DT
- May 4, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A7DE
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 25, 2025Citation number: 5009094Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009094
- Assessment control numberASSESS_CASE_NO
- 000634384
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 5, 2026
- Citation issuedISSUE_DT
- Nov 25, 2025
- Date of occurrenceOCCURRENCE_DT
- Nov 25, 2025
- Final order dateFINAL_ORDER_DT
- Feb 14, 2026
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 14, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.69
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.077
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Aug 25, 2024
- History period endHISTORY_END_DT
- Nov 24, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F022A24
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 25, 2025Citation number: 5009093Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009093
- Assessment control numberASSESS_CASE_NO
- 000634384
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 5, 2026
- Citation issuedISSUE_DT
- Nov 25, 2025
- Date of occurrenceOCCURRENCE_DT
- Nov 25, 2025
- Final order dateFINAL_ORDER_DT
- Feb 14, 2026
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 14, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.69
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Aug 25, 2024
- History period endHISTORY_END_DT
- Nov 24, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F022A24
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 24, 2025Citation number: 5009092Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009092
- Assessment control numberASSESS_CASE_NO
- 000634384
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 5, 2026
- Citation issuedISSUE_DT
- Nov 24, 2025
- Date of occurrenceOCCURRENCE_DT
- Nov 24, 2025
- Final order dateFINAL_ORDER_DT
- Feb 14, 2026
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 14, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 12
- Violations per inspection dayVPID
- 0.75
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 288528
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 288528
- History period startHISTORY_START_DT
- Aug 24, 2024
- History period endHISTORY_END_DT
- Nov 23, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F022A24
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007608Standard: 56.11002Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007608
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007611Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007611
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007612Standard: 56.11012Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007612
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007613Standard: 50.30(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007613
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007607Standard: 56.12008Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007607
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.067
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007609Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007609
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007610Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007610
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 33
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 29, 2025Citation number: 5007606Standard: 56.12032Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007606
- Assessment control numberASSESS_CASE_NO
- 000628241
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2025
- Citation issuedISSUE_DT
- Jul 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 29, 2025
- Final order dateFINAL_ORDER_DT
- Oct 18, 2025
- Bill first printedBILL_PRINT_DT
- Sep 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32052
- Size of mineSIZE_OF_MINE
- 32052
- Controller hours workedCONTROLLER_HRS
- 287182
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 287182
- History period startHISTORY_START_DT
- Apr 29, 2024
- History period endHISTORY_END_DT
- Jul 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01421E
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2024Citation number: 9793544Standard: 56.23002(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9793544
- Assessment control numberASSESS_CASE_NO
- 000609708
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 29, 2024
- Citation issuedISSUE_DT
- Sep 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2024
- Final order dateFINAL_ORDER_DT
- Dec 14, 2024
- Bill first printedBILL_PRINT_DT
- Nov 7, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.23002(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 17
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 12
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31690
- Size of mineSIZE_OF_MINE
- 31690
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jun 17, 2023
- History period endHISTORY_END_DT
- Sep 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0068F3
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 30, 2024Citation number: 9749104Standard: 56.16001Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749104
- Assessment control numberASSESS_CASE_NO
- 000600916
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 7, 2024
- Citation issuedISSUE_DT
- Apr 30, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2024
- Final order dateFINAL_ORDER_DT
- Jul 11, 2024
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 11, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31690
- Size of mineSIZE_OF_MINE
- 31690
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jan 30, 2023
- History period endHISTORY_END_DT
- Apr 29, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935974
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 30, 2024Citation number: 9749103Standard: 56.12002Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749103
- Assessment control numberASSESS_CASE_NO
- 000600916
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 7, 2024
- Citation issuedISSUE_DT
- Apr 30, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2024
- Final order dateFINAL_ORDER_DT
- Jul 11, 2024
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 11, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31690
- Size of mineSIZE_OF_MINE
- 31690
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jan 30, 2023
- History period endHISTORY_END_DT
- Apr 29, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935974
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 30, 2024Citation number: 9749101Standard: 56.14211(c)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749101
- Assessment control numberASSESS_CASE_NO
- 000600916
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 7, 2024
- Citation issuedISSUE_DT
- Apr 30, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2024
- Final order dateFINAL_ORDER_DT
- Jul 11, 2024
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 11, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14211(c)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31690
- Size of mineSIZE_OF_MINE
- 31690
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jan 30, 2023
- History period endHISTORY_END_DT
- Apr 29, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935974
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 30, 2024Citation number: 9749102Standard: 56.12008Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9749102
- Assessment control numberASSESS_CASE_NO
- 000600916
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 7, 2024
- Citation issuedISSUE_DT
- Apr 30, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2024
- Final order dateFINAL_ORDER_DT
- Jul 11, 2024
- Bill first printedBILL_PRINT_DT
- Jun 6, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 11, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31690
- Size of mineSIZE_OF_MINE
- 31690
- Controller hours workedCONTROLLER_HRS
- 278569
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 278569
- History period startHISTORY_START_DT
- Jan 30, 2023
- History period endHISTORY_END_DT
- Apr 29, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935974
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 27, 2023Citation number: 9678978Standard: 56.12004Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9678978
- Assessment control numberASSESS_CASE_NO
- 000589006
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 21, 2023
- Citation issuedISSUE_DT
- Sep 27, 2023
- Date of occurrenceOCCURRENCE_DT
- Sep 27, 2023
- Final order dateFINAL_ORDER_DT
- Dec 17, 2023
- Bill first printedBILL_PRINT_DT
- Nov 9, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 17, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30217
- Size of mineSIZE_OF_MINE
- 30217
- Controller hours workedCONTROLLER_HRS
- 256726
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 256726
- History period startHISTORY_START_DT
- Jun 27, 2022
- History period endHISTORY_END_DT
- Sep 26, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935938
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 24, 2023Citation number: 9743640Standard: 47.41(a)(1)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9743640
- Assessment control numberASSESS_CASE_NO
- 000584611
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 22, 2023
- Citation issuedISSUE_DT
- Jul 24, 2023
- Date of occurrenceOCCURRENCE_DT
- Jul 24, 2023
- Final order dateFINAL_ORDER_DT
- Oct 16, 2023
- Bill first printedBILL_PRINT_DT
- Sep 7, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 16, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.29
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30217
- Size of mineSIZE_OF_MINE
- 30217
- Controller hours workedCONTROLLER_HRS
- 256726
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 256726
- History period startHISTORY_START_DT
- Apr 24, 2022
- History period endHISTORY_END_DT
- Jul 23, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935714
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 6, 2023Citation number: 9674124Standard: 56.9300(d)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9674124
- Assessment control numberASSESS_CASE_NO
- 000572657
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 26, 2023
- Citation issuedISSUE_DT
- Feb 6, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 6, 2023
- Final order dateFINAL_ORDER_DT
- Apr 12, 2023
- Bill first printedBILL_PRINT_DT
- Mar 9, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(d)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30217
- Size of mineSIZE_OF_MINE
- 30217
- Controller hours workedCONTROLLER_HRS
- 256726
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 256726
- History period startHISTORY_START_DT
- Nov 6, 2021
- History period endHISTORY_END_DT
- Feb 5, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6932110
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 13, 2022Citation number: 9670650Standard: 56.12002Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9670650
- Assessment control numberASSESS_CASE_NO
- 000556650
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 16, 2022
- Citation issuedISSUE_DT
- Apr 13, 2022
- Date of occurrenceOCCURRENCE_DT
- Apr 13, 2022
- Final order dateFINAL_ORDER_DT
- Aug 1, 2022
- Bill first printedBILL_PRINT_DT
- Jun 9, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 1, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 28530
- Size of mineSIZE_OF_MINE
- 28530
- Controller hours workedCONTROLLER_HRS
- 249499
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 249499
- History period startHISTORY_START_DT
- Jan 13, 2021
- History period endHISTORY_END_DT
- Apr 12, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6890220
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 7, 2021Citation number: 9642372Standard: 56.11010Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642372
- Assessment control numberASSESS_CASE_NO
- 000549652
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 23, 2022
- Citation issuedISSUE_DT
- Dec 7, 2021
- Date of occurrenceOCCURRENCE_DT
- Dec 7, 2021
- Final order dateFINAL_ORDER_DT
- Mar 19, 2022
- Bill first printedBILL_PRINT_DT
- Feb 10, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 19, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11010
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.14
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 28617
- Size of mineSIZE_OF_MINE
- 28617
- Controller hours workedCONTROLLER_HRS
- 221803
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 221803
- History period startHISTORY_START_DT
- Sep 7, 2020
- History period endHISTORY_END_DT
- Dec 6, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6886491
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 7, 2021Citation number: 9642373Standard: 56.4200(b)(2)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642373
- Assessment control numberASSESS_CASE_NO
- 000549652
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 23, 2022
- Citation issuedISSUE_DT
- Dec 7, 2021
- Date of occurrenceOCCURRENCE_DT
- Dec 7, 2021
- Final order dateFINAL_ORDER_DT
- Mar 19, 2022
- Bill first printedBILL_PRINT_DT
- Feb 10, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 19, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4200(b)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.14
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 28617
- Size of mineSIZE_OF_MINE
- 28617
- Controller hours workedCONTROLLER_HRS
- 221803
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 221803
- History period startHISTORY_START_DT
- Sep 7, 2020
- History period endHISTORY_END_DT
- Dec 6, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6886491
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 12, 2021Citation number: 9518941Standard: 56.11001Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9518941
- Assessment control numberASSESS_CASE_NO
- 000538292
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 24, 2021
- Citation issuedISSUE_DT
- May 12, 2021
- Date of occurrenceOCCURRENCE_DT
- May 12, 2021
- Final order dateFINAL_ORDER_DT
- Aug 22, 2021
- Bill first printedBILL_PRINT_DT
- Jul 8, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.08
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 28617
- Size of mineSIZE_OF_MINE
- 28617
- Controller hours workedCONTROLLER_HRS
- 257543
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 257543
- History period startHISTORY_START_DT
- Feb 12, 2020
- History period endHISTORY_END_DT
- May 11, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- CertainTeed
- IDVIOLATOR_ID
- L16898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 22, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6884372
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 126 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Mar 1, 2011Citation issued: Jan 4, 2011Docket: CENT 2011-504MStandard: 56.11012Proposed penalty: $687.00Penalty after decision: $687.00Decided: Sep 19, 2011Decision type: DismissalDetails
The contest
- Citation or order numberCITATION_NO
- 6568989
- Citation issuedCITATION_ISSUE_DT
- Jan 4, 2011
- Hearing request receivedCONTEST_DT
- Mar 1, 2011
- Docket numberDOCKET_NO
- CENT 2011-504M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Barbour
- Decision typeDOCKET_DECISION_TYPE_CODE
- Dismissal
- DecidedDECISION_DT
- Sep 19, 2011
- Petition duePETITION_DUE_DT
- Apr 15, 2011
- Petition filedPETITION_FILED_DT
- Apr 13, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 687.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 687.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.11012
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Mar 1, 2011Citation issued: Jan 4, 2011Docket: CENT 2011-504MStandard: 56.11002Proposed penalty: $207.00Penalty after decision: $100.00Decided: Sep 19, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6568988
- Citation issuedCITATION_ISSUE_DT
- Jan 4, 2011
- Hearing request receivedCONTEST_DT
- Mar 1, 2011
- Docket numberDOCKET_NO
- CENT 2011-504M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Barbour
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 19, 2011
- Petition duePETITION_DUE_DT
- Apr 15, 2011
- Petition filedPETITION_FILED_DT
- Apr 13, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 207.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.11002
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jun 30, 2010Citation issued: Apr 13, 2010Docket: CENT 2010-948MStandard: 56.12032Proposed penalty: $150.00Penalty after decision: $100.00Decided: Jun 7, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6572887
- Citation issuedCITATION_ISSUE_DT
- Apr 13, 2010
- Hearing request receivedCONTEST_DT
- Jun 30, 2010
- Docket numberDOCKET_NO
- CENT 2010-948M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jun 7, 2011
- Petition duePETITION_DUE_DT
- Aug 14, 2010
- Petition filedPETITION_FILED_DT
- Oct 20, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 150.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12032
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jun 30, 2010Citation issued: Apr 13, 2010Docket: CENT 2010-948MStandard: 56.12004Proposed penalty: $100.00Penalty after decision: $100.00Decided: Jun 7, 2011Decision type: DismissalDetails
The contest
- Citation or order numberCITATION_NO
- 6572889
- Citation issuedCITATION_ISSUE_DT
- Apr 13, 2010
- Hearing request receivedCONTEST_DT
- Jun 30, 2010
- Docket numberDOCKET_NO
- CENT 2010-948M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Dismissal
- DecidedDECISION_DT
- Jun 7, 2011
- Petition duePETITION_DUE_DT
- Aug 14, 2010
- Petition filedPETITION_FILED_DT
- Oct 20, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12004
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 30, 2010Citation issued: Apr 13, 2010Docket: CENT 2010-948MStandard: 56.12032Proposed penalty: $100.00Penalty after decision: $100.00Decided: Jun 7, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6572890
- Citation issuedCITATION_ISSUE_DT
- Apr 13, 2010
- Hearing request receivedCONTEST_DT
- Jun 30, 2010
- Docket numberDOCKET_NO
- CENT 2010-948M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jun 7, 2011
- Petition duePETITION_DUE_DT
- Aug 14, 2010
- Petition filedPETITION_FILED_DT
- Oct 20, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12032
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jun 30, 2010Citation issued: Apr 13, 2010Docket: CENT 2010-948MStandard: 56.20003(a)Proposed penalty: $150.00Penalty after decision: $100.00Decided: Jun 7, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6572888
- Citation issuedCITATION_ISSUE_DT
- Apr 13, 2010
- Hearing request receivedCONTEST_DT
- Jun 30, 2010
- Docket numberDOCKET_NO
- CENT 2010-948M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jun 7, 2011
- Petition duePETITION_DUE_DT
- Aug 14, 2010
- Petition filedPETITION_FILED_DT
- Oct 20, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 150.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 15, 2009Docket: CENT 2009-548MStandard: 62.120Proposed penalty: $100.00Penalty after decision: $100.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896354
- Citation issuedCITATION_ISSUE_DT
- Apr 15, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 62.120
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 15, 2009Docket: CENT 2009-548MStandard: 56.13015(a)Proposed penalty: $190.00Penalty after decision: $100.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896355
- Citation issuedCITATION_ISSUE_DT
- Apr 15, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 190.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.13015(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 15, 2009Docket: CENT 2009-548MStandard: 56.12023Proposed penalty: $127.00Penalty after decision: $100.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896353
- Citation issuedCITATION_ISSUE_DT
- Apr 15, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 127.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12023
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.20003(a)Proposed penalty: $100.00Penalty after decision: $100.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896348
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.14112(b)Proposed penalty: $425.00Penalty after decision: $191.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896346
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 425.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 191.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14112(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.12032Proposed penalty: $285.00Penalty after decision: $100.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896344
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 285.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12032
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.20003(a)Proposed penalty: $285.00Penalty after decision: $285.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896347
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 285.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 285.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.9200(d)Proposed penalty: $2,341.00Penalty after decision: $947.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896352
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 2341.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 947.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.9200(d)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Highly
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Highly
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.14205Proposed penalty: $946.00Penalty after decision: $191.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896343
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 946.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 191.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14205
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 6, 2009Citation issued: Apr 14, 2009Docket: CENT 2009-548MStandard: 56.20003(a)Proposed penalty: $285.00Penalty after decision: $100.00Decided: Oct 13, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 7896345
- Citation issuedCITATION_ISSUE_DT
- Apr 14, 2009
- Hearing request receivedCONTEST_DT
- Jul 6, 2009
- Docket numberDOCKET_NO
- CENT 2009-548M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 13, 2010
- Petition duePETITION_DUE_DT
- Aug 20, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 285.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
16 contested citations and orders; decision types are MSHA's own text.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 4
- INJURIES DUE TO NATURAL CAUSES
- 1
Date: Oct 5, 2017Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: STEPPING OR KNEELING ON OBJECTAccident type: Struck against stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220172920004
- DateACCIDENT_DT
- Oct 5, 2017
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 9999
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- STEPPING OR KNEELING ON OBJECT
- Classification codeCLASSIFICATION_CD
- 19
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- MSHA investigation beganINVEST_BEGIN_DT
- Oct 8, 2017
- Returned to Duty document numberCLOSED_DOC_NO
- 320180790010
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- BROKEN ROCK,COAL,ORE,WSTE
- Source of injury codeINJURY_SOURCE_CD
- 089
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- ANKLE
- Part of body codeINJ_BODY_PART_CD
- 520
- Returned to workRETURN_TO_WORK_DT
- Oct 6, 2017
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Mack
- Equipment manufacturer codeEQUIP_MFR_CD
- 068
- Equipment model numberEQUIP_MODEL_NO
- 700
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (1)
Contractor IDCONTRACTOR_ID
Date: Dec 27, 2012Degree of injury: INJURIES DUE TO NATURAL CAUSESClassification: OTHERAccident type: NECDays lost: 1Details
The report
- Document numberDOCUMENT_NO
- 220123660010
- DateACCIDENT_DT
- Dec 27, 2012
- TimeACCIDENT_TIME
- 0905
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- INJURIES DUE TO NATURAL CAUSES
- Degree of injury codeDEGREE_INJURY_CD
- 08
- ClassificationCLASSIFICATION
- OTHER
- Classification codeCLASSIFICATION_CD
- 21
- Accident typeACCIDENT_TYPE
- NEC
- Accident type codeACCIDENT_TYPE_CD
- 42
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320130030026
Injury
- Activity at the timeACTIVITY
- Idle
- Activity codeACTIVITY_CD
- 034
- Source of injuryINJURY_SOURCE
- MISCELLANEOUS,NEC
- Source of injury codeINJURY_SOURCE_CD
- 127
- Nature of injuryNATURE_INJURY
- CEREBRAL HEMORAGE-NT CCUS
- Nature of injury codeNATURE_INJURY_CD
- 350
- Part of bodyINJ_BODY_PART
- BRAIN
- Part of body codeINJ_BODY_PART_CD
- 110
- Days lostDAYS_LOST
- 1
- Returned to workRETURN_TO_WORK_DT
- Jan 2, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Aug 25, 2009Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220092390013
- DateACCIDENT_DT
- Aug 25, 2009
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 1430
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Aug 26, 2009
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jun 4, 2008Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220081700027
- DateACCIDENT_DT
- Jun 4, 2008
- TimeACCIDENT_TIME
- 1630
- Shift beganSHIFT_BEGIN_TIME
- 1430
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Returned to workRETURN_TO_WORK_DT
- Jun 5, 2008
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Dec 4, 2000Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: FIREAccident type: Contact with hot objects or substancesDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220003480014
- DateACCIDENT_DT
- Dec 4, 2000
- TimeACCIDENT_TIME
- 1400
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- FIRE
- Classification codeCLASSIFICATION_CD
- 08
- Accident typeACCIDENT_TYPE
- Contact with hot objects or substances
- Accident type codeACCIDENT_TYPE_CD
- 33
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Bulldozer
- Activity codeACTIVITY_CD
- 047
- Source of injuryINJURY_SOURCE
- AXE,HAMMER,SLEDGE
- Source of injury codeINJURY_SOURCE_CD
- 046
- Nature of injuryNATURE_INJURY
- BURN OR SCALD (HEAT)
- Nature of injury codeNATURE_INJURY_CD
- 120
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Returned to workRETURN_TO_WORK_DT
- Dec 4, 2000
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
- Equipment codeMINING_EQUIP_CD
- 60
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 0310
- Equipment model numberEQUIP_MODEL_NO
- 235
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- GS Roofing Products Incorporated
- Operator IDOPERATOR_ID
- L16990
- Controller at the timeCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2000
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2001
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
5 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 12,903Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 12903
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1290
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 7,870Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 7870
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1312
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 9,505Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 9505
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1358
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 17,595Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 17595
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1760
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 11,136Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 11136
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1856
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 12,875Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 12875
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1839
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 18,998Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 18998
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1900
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 10,478Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 10478
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1746
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 13,054Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 13054
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1865
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 17,172Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 17172
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1717
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 11,631Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 11631
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1939
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 14,518Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 14518
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2074
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 17,575Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 17575
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1758
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 12,079Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 12079
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2013
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 12,642Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 12642
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1806
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 8Hours worked: 14,904Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 14904
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1863
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 10,381Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 10381
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1730
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 13,626Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 13626
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1703
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 9Hours worked: 15,453Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 15453
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1717
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 7,702Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 7702
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1926
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 13,164Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 13164
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1881
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 9Hours worked: 17,256Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 17256
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1917
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 7,802Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 7802
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1951
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 12,767Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 12767
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1824
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileCURR_MINE_NM
- Glenwood Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Glenwood
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 20
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Glenwood Quarry
- Mine IDMINE_ID
- 0300466
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Jul 4, 1976
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- CertainTeed
- Operator IDCURRENT_OPERATOR_ID
- L16898
- ControllerCURRENT_CONTROLLER_NAME
- Saint-Gobain
- Controller IDCURRENT_CONTROLLER_ID
- M08468
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Apr 22, 2005
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 097
- FIPS county nameFIPS_CNTY_NM
- Montgomery
- Nearest townNEAREST_TOWN
- Glenwood
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 67
- Most recent assessment control numberASSESS_CTRL_NO
- 000642722
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Slate
- Primary commodity codePRIMARY_SIC_CD
- 142903
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 03
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 20
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: CertainTeedFrom: Apr 22, 2005To: No end dateController: Saint-GobainFrom : Jun 9, 1999To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- CertainTeed
- Operator IDOPERATOR_ID
- L16898
- Operator fromOPERATOR_START_DT
- Apr 22, 2005
Controller
- ControllerCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jun 9, 1999
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: GS Roofing Products IncorporatedFrom: Aug 5, 1999To: Apr 21, 2005Controller: Saint-GobainFrom : Aug 5, 1999To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- GS Roofing Products Incorporated
- Operator IDOPERATOR_ID
- L16990
- Operator fromOPERATOR_START_DT
- Aug 5, 1999
- Operator toOPERATOR_END_DT
- Apr 21, 2005
Controller
- ControllerCONTROLLER_NAME
- Saint-Gobain
- Controller IDCONTROLLER_ID
- M08468
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Aug 5, 1999
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
Operator: Gs Roofing Products Company IncFrom: Nov 30, 1988To: Aug 4, 1999Controller: Newgen Holding IncFrom : Nov 30, 1988To : Aug 4, 1999Details
Operator
- OperatorOPERATOR_NAME
- Gs Roofing Products Company Inc
- Operator IDOPERATOR_ID
- L10669
- Operator fromOPERATOR_START_DT
- Nov 30, 1988
- Operator toOPERATOR_END_DT
- Aug 4, 1999
Controller
- ControllerCONTROLLER_NAME
- Newgen Holding Inc
- Controller IDCONTROLLER_ID
- M08285
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Nov 30, 1988
- Controller toCONTROLLER_END_DT
- Aug 4, 1999
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Operator: Gs Roofing Products Company IncFrom: May 8, 1987To: Nov 29, 1988Controller: Not shownFrom : May 8, 1987To : Nov 29, 1988Details
Operator
- OperatorOPERATOR_NAME
- Gs Roofing Products Company Inc
- Operator IDOPERATOR_ID
- L09576
- Operator fromOPERATOR_START_DT
- May 8, 1987
- Operator toOPERATOR_END_DT
- Nov 29, 1988
Controller
- Controller IDCONTROLLER_ID
- M07511
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- May 8, 1987
- Controller toCONTROLLER_END_DT
- Nov 29, 1988
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
ControllerCONTROLLER_NAME
Operator: Genstar Roofing Products CompanyFrom: Aug 6, 1985To: May 7, 1987Controller: Cimenteries Cbr CementbedrijvenFrom : Feb 16, 1985To : May 7, 1987Details
Operator
- OperatorOPERATOR_NAME
- Genstar Roofing Products Company
- Operator IDOPERATOR_ID
- L08024
- Operator fromOPERATOR_START_DT
- Aug 6, 1985
- Operator toOPERATOR_END_DT
- May 7, 1987
Controller
- ControllerCONTROLLER_NAME
- Cimenteries Cbr Cementbedrijven
- Controller IDCONTROLLER_ID
- M03174
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Feb 16, 1985
- Controller toCONTROLLER_END_DT
- May 7, 1987
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Operator: Bird & Son IncFrom: Jan 1, 1950To: Aug 5, 1985Controller: Not shownFrom : Jan 1, 1950To : Aug 5, 1985Details
Operator
- OperatorOPERATOR_NAME
- Bird & Son Inc
- Operator IDOPERATOR_ID
- L08023
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
- Operator toOPERATOR_END_DT
- Aug 5, 1985
Controller
- Controller IDCONTROLLER_ID
- M06380
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
- Controller toCONTROLLER_END_DT
- Aug 5, 1985
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
ControllerCONTROLLER_NAME
As MSHA records it, newest operator first.
Address of record
CertainTeed·Contact title EHS Coordinator·3657 Hwy 8 East, Glenwood AR 71943
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- CertainTeed
- Contact titleCONTACT_TITLE
- EHS Coordinator
- StreetSTREET
- 3657 Hwy 8 East
- CityCITY
- Glenwood
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 71943
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0300466
- Mine name in this fileMINE_NAME
- Glenwood Quarry
- Nearest townNEAREST_TOWN
- Glenwood
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Jul 4, 1976
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Slate
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology