Searcy Quarry
Metal/Non-Metal, Surface·Crushed, Broken Sandstone·White, Arkansas·Mine ID 0301140
Operator Vulcan Construction Materials, LLC·Controller Vulcan Materials Company·MSHA status Active since Oct 10, 2006
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionOct 6 to Oct 8, 2026Inspectors 1 | Hours on site 14.5Began: Oct 6, 2026Ended: Oct 8, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 6, 2026
- Closed outINSPECTION_END_DT
- Oct 8, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03A539
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 26.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2027
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 20 to Jul 21, 2026Inspectors 1 | Hours on site 7Began: Jul 20, 2026Ended: Jul 21, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 20, 2026
- Closed outINSPECTION_END_DT
- Jul 21, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F038650
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 21 to Oct 23, 2025Inspectors 1 | Hours on site 8.5Began: Oct 21, 2025Ended: Oct 23, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 21, 2025
- Closed outINSPECTION_END_DT
- Oct 23, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6938293
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.75
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 8.5
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 18.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Spot InspectionSep 8 to Sep 11, 2025Inspectors 2 | Hours on site 15.5Began: Sep 8, 2025Ended: Sep 11, 2025Activity: Spot InspectionInspectors: 2Hours on site: 15.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 8, 2025
- Closed outINSPECTION_END_DT
- Sep 11, 2025
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- F02586D
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 15.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 26.5
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 2.5
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Regular Safety and Health InspectionAug 11 to Aug 12, 2025Inspectors 1 | Hours on site 6.25Began: Aug 11, 2025Ended: Aug 12, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 11, 2025
- Closed outINSPECTION_END_DT
- Aug 12, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F014D8F
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsJul 10, 2025Inspectors 1 | Hours on site 0Began: Jul 10, 2025Ended: Jul 10, 2025Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 10, 2025
- Closed outINSPECTION_END_DT
- Jul 10, 2025
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- F013D68
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 3 to Dec 5, 2024Inspectors 1 | Hours on site 11.25Began: Dec 3, 2024Ended: Dec 5, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 3, 2024
- Closed outINSPECTION_END_DT
- Dec 5, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F00557A
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 29 to May 1, 2024Inspectors 1 | Hours on site 14Began: Apr 29, 2024Ended: May 1, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Closed outINSPECTION_END_DT
- May 1, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6935095
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 24
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 22 to Jan 26, 2024Inspectors 1 | Hours on site 20.25Began: Jan 22, 2024Ended: Jan 26, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 22, 2024
- Closed outINSPECTION_END_DT
- Jan 26, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6932187
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 20 to Jun 22, 2023Inspectors 1 | Hours on site 27.5Began: Jun 20, 2023Ended: Jun 22, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 27.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 20, 2023
- Closed outINSPECTION_END_DT
- Jun 22, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6934553
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 27.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsMay 17 to May 18, 2023Inspectors 1 | Hours on site 1Began: May 17, 2023Ended: May 18, 2023Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2023
- Closed outINSPECTION_END_DT
- May 18, 2023
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6934528
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 3 to Jan 9, 2023Inspectors 1 | Hours on site 23.5Began: Jan 3, 2023Ended: Jan 9, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 23.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 3, 2023
- Closed outINSPECTION_END_DT
- Jan 9, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6889699
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 23.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 9 to May 12, 2022Inspectors 1 | Hours on site 24Began: May 9, 2022Ended: May 12, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 24Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 9, 2022
- Closed outINSPECTION_END_DT
- May 12, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6888846
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 24
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 30
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 18 to Jan 21, 2022Inspectors 1 | Hours on site 25Began: Jan 18, 2022Ended: Jan 21, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 18, 2022
- Closed outINSPECTION_END_DT
- Jan 21, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6888818
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 30
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 6 to Jul 8, 2021Inspectors 1 | Hours on site 26.75Began: Jul 6, 2021Ended: Jul 8, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 26.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 6, 2021
- Closed outINSPECTION_END_DT
- Jul 8, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884985
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 20 to Jan 22, 2021Inspectors 1 | Hours on site 14Began: Jan 20, 2021Ended: Jan 22, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 20, 2021
- Closed outINSPECTION_END_DT
- Jan 22, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884043
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 3 to Jun 4, 2020Inspectors 1 | Hours on site 11Began: Jun 3, 2020Ended: Jun 4, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 3, 2020
- Closed outINSPECTION_END_DT
- Jun 4, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6809696
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 8 to Jan 10, 2020Inspectors 1 | Hours on site 11Began: Jan 8, 2020Ended: Jan 10, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 8, 2020
- Closed outINSPECTION_END_DT
- Jan 10, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6809659
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 23 to Sep 25, 2019Inspectors 1 | Hours on site 16Began: Sep 23, 2019Ended: Sep 25, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 23, 2019
- Closed outINSPECTION_END_DT
- Sep 25, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6810419
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 22 to Jan 23, 2019Inspectors 1 | Hours on site 18Began: Jan 22, 2019Ended: Jan 23, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 18Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 22, 2019
- Closed outINSPECTION_END_DT
- Jan 23, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6802499
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 18
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 13, 2018Inspectors 1 | Hours on site 8Began: Jun 13, 2018Ended: Jun 13, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 13, 2018
- Closed outINSPECTION_END_DT
- Jun 13, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6805406
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 15 to Nov 16, 2017Inspectors 1 | Hours on site 6Began: Nov 15, 2017Ended: Nov 16, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 15, 2017
- Closed outINSPECTION_END_DT
- Nov 16, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6738669
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 20, 2017Inspectors 1 | Hours on site 12.5Began: Sep 20, 2017Ended: Sep 20, 2017Activity: Spot InspectionInspectors: 1Hours on site: 12.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 20, 2017
- Closed outINSPECTION_END_DT
- Sep 20, 2017
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6739037
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 7 to Aug 8, 2017Inspectors 1 | Hours on site 13.25Began: Aug 7, 2017Ended: Aug 8, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 13.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 7, 2017
- Closed outINSPECTION_END_DT
- Aug 8, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6739032
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 13.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 15 to Mar 16, 2017Inspectors 1 | Hours on site 10.25Began: Mar 15, 2017Ended: Mar 16, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 15, 2017
- Closed outINSPECTION_END_DT
- Mar 16, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6737556
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 74 inspections and other MSHA visits since Jan 12, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Oct 6, 2026Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5250236
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0845
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Oct 6, 2026
- Terminated, timeTERMINATION_TIME
- 0854
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- J A Riggs Tractor Co
- Operator IDVIOLATOR_ID
- FLC
- Contractor IDCONTRACTOR_ID
- FLC
- Inspection eventEVENT_NO
- F03A539
- Inspection beganINSPECTION_BEGIN_DT
- Oct 6, 2026
- Inspection closed outINSPECTION_END_DT
- Oct 8, 2026
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2027
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (22)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Oct 6, 2026Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5250235
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0844
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 6, 2026
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Oct 6, 2026
- Terminated, timeTERMINATION_TIME
- 0854
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- J A Riggs Tractor Co
- Operator IDVIOLATOR_ID
- FLC
- Contractor IDCONTRACTOR_ID
- FLC
- Inspection eventEVENT_NO
- F03A539
- Inspection beganINSPECTION_BEGIN_DT
- Oct 6, 2026
- Inspection closed outINSPECTION_END_DT
- Oct 8, 2026
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2027
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (22)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jul 21, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5176233
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 21, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0908
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 21, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 21, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 21, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 21, 2026
- Terminated, timeTERMINATION_TIME
- 0918
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 17, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 23, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 4, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- F038650
- Inspection beganINSPECTION_BEGIN_DT
- Jul 20, 2026
- Inspection closed outINSPECTION_END_DT
- Jul 21, 2026
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 21, 2025Type: CitationStandard: 56.14132(b)(1)(i)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9792878
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 21, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1451
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 21, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14132(b)(1)(i)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 22, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Oct 22, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Oct 22, 2025
- Terminated, timeTERMINATION_TIME
- 0832
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Dec 23, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 1, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 8, 2026
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Ace Welding
- Operator IDVIOLATOR_ID
- B3143
- Contractor IDCONTRACTOR_ID
- B3143
- Inspection eventEVENT_NO
- 6938293
- Inspection beganINSPECTION_BEGIN_DT
- Oct 21, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 23, 2025
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Oct 21, 2025Type: CitationStandard: 46.9(a)S&S: NNegligence: LowNegligenceIssued to: ContractorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9792877
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 21, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1400
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 21, 2025
- 30 CFR part and sectionPART_SECTION
- 46.9(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 24, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Oct 24, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Oct 22, 2025
- Terminated, timeTERMINATION_TIME
- 0822
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 24, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 30, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Two Eight Drilling Incorporated
- Operator IDVIOLATOR_ID
- KM9
- Contractor IDCONTRACTOR_ID
- KM9
- Inspection eventEVENT_NO
- 6938293
- Inspection beganINSPECTION_BEGIN_DT
- Oct 21, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 23, 2025
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Oct 21, 2025Type: CitationStandard: 56.12021S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9792879
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 21, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1521
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 21, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12021
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 22, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Oct 22, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Oct 21, 2025
- Terminated, timeTERMINATION_TIME
- 1957
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Dec 2, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 16, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 1, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6938293
- Inspection beganINSPECTION_BEGIN_DT
- Oct 21, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 23, 2025
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 12, 2025Type: CitationStandard: 56.20013S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9768922
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 12, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1235
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 12, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20013
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 12, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Aug 12, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Aug 12, 2025
- Terminated, timeTERMINATION_TIME
- 1250
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 30, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 10, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- F014D8F
- Inspection beganINSPECTION_BEGIN_DT
- Aug 11, 2025
- Inspection closed outINSPECTION_END_DT
- Aug 12, 2025
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 1, 2024Type: OrderStandard: Not recordedS&S: Not recordedNegligence: Not recordedIssued to: ContractorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 9795232
- TypeCIT_ORD_SAFE
- Order
- IssuedVIOLATION_ISSUE_DT
- May 1, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1056
- Date of occurrenceVIOLATION_OCCUR_DT
- May 1, 2024
- Section of the Act, primarySECTION_OF_ACT_1
- 107(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Abatement
- TerminatedTERMINATION_DT
- May 1, 2024
- Terminated, timeTERMINATION_TIME
- 1338
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Vulcan Drill Services
- Operator IDVIOLATOR_ID
- K5K
- Contractor IDCONTRACTOR_ID
- K5K
- Inspection eventEVENT_NO
- 6935095
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 1, 2024
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (31)
30 CFR part and sectionPART_SECTION, Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: May 1, 2024Type: CitationStandard: 56.15005S&S: YNegligence: ModNegligenceIssued to: ContractorProposed penalty: $1,039.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795233
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 1, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1057
- Date of occurrenceVIOLATION_OCCUR_DT
- May 1, 2024
- 30 CFR part and sectionPART_SECTION
- 56.15005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Highly
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- TerminatedTERMINATION_DT
- May 1, 2024
- Terminated, timeTERMINATION_TIME
- 1059
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1039
- Current proposed assessmentAMOUNT_DUE
- 1039
- Amount paidAMOUNT_PAID
- 1039
- Bill first printedBILL_PRINT_DT
- Jun 20, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 14, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 19, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Vulcan Drill Services
- Operator IDVIOLATOR_ID
- K5K
- Contractor IDCONTRACTOR_ID
- K5K
- Inspection eventEVENT_NO
- 6935095
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 1, 2024
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (17)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Apr 30, 2024Type: CitationStandard: 56.11008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795231
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1339
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2024
- 30 CFR part and sectionPART_SECTION
- 56.11008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 1, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 1, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 1, 2024
- Terminated, timeTERMINATION_TIME
- 0729
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jun 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 12, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 19, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6935095
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2024
- Inspection closed outINSPECTION_END_DT
- May 1, 2024
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 23, 2024Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9742578
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 23, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1030
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 23, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 23, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1530
- Latest dueLATEST_TERM_DUE_DT
- Jan 23, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1530
- TerminatedTERMINATION_DT
- Jan 23, 2024
- Terminated, timeTERMINATION_TIME
- 1032
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Mar 20, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- May 4, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 10, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Vulcan Drill Services
- Operator IDVIOLATOR_ID
- K5K
- Contractor IDCONTRACTOR_ID
- K5K
- Inspection eventEVENT_NO
- 6932187
- Inspection beganINSPECTION_BEGIN_DT
- Jan 22, 2024
- Inspection closed outINSPECTION_END_DT
- Jan 26, 2024
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jun 21, 2023Type: CitationStandard: 56.11001S&S: YNegligence: LowNegligenceIssued to: ContractorProposed penalty: $2,065.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744617
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 21, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0721
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 21, 2023
- 30 CFR part and sectionPART_SECTION
- 56.11001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Highly
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- TerminatedTERMINATION_DT
- Jun 21, 2023
- Terminated, timeTERMINATION_TIME
- 0722
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 2065
- Current proposed assessmentAMOUNT_DUE
- 2065
- Amount paidAMOUNT_PAID
- 2065
- Bill first printedBILL_PRINT_DT
- Aug 22, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 27, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 14, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Two Eight Drilling Incorporated
- Operator IDVIOLATOR_ID
- KM9
- Contractor IDCONTRACTOR_ID
- KM9
- Inspection eventEVENT_NO
- 6934553
- Inspection beganINSPECTION_BEGIN_DT
- Jun 20, 2023
- Inspection closed outINSPECTION_END_DT
- Jun 22, 2023
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (17)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jun 21, 2023Type: OrderStandard: Not recordedS&S: Not recordedNegligence: Not recordedIssued to: ContractorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 9744616
- TypeCIT_ORD_SAFE
- Order
- IssuedVIOLATION_ISSUE_DT
- Jun 21, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0720
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 21, 2023
- Section of the Act, primarySECTION_OF_ACT_1
- 107(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Abatement
- TerminatedTERMINATION_DT
- Jun 21, 2023
- Terminated, timeTERMINATION_TIME
- 0721
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Two Eight Drilling Incorporated
- Operator IDVIOLATOR_ID
- KM9
- Contractor IDCONTRACTOR_ID
- KM9
- Inspection eventEVENT_NO
- 6934553
- Inspection beganINSPECTION_BEGIN_DT
- Jun 20, 2023
- Inspection closed outINSPECTION_END_DT
- Jun 22, 2023
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (31)
30 CFR part and sectionPART_SECTION, Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jun 20, 2023Type: CitationStandard: 56.12002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744615
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 20, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0949
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 20, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 20, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jun 20, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jun 20, 2023
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Aug 10, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 18, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 25, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6934553
- Inspection beganINSPECTION_BEGIN_DT
- Jun 20, 2023
- Inspection closed outINSPECTION_END_DT
- Jun 22, 2023
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 9, 2022Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9646772
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1250
- Date of occurrenceVIOLATION_OCCUR_DT
- May 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- May 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- May 9, 2022
- Terminated, timeTERMINATION_TIME
- 1251
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Jun 14, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 29, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 20, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6888846
- Inspection beganINSPECTION_BEGIN_DT
- May 9, 2022
- Inspection closed outINSPECTION_END_DT
- May 12, 2022
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 6, 2021Type: CitationStandard: 56.14206(b)S&S: NNegligence: LowNegligenceIssued to: ContractorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642131
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 6, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1007
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 6, 2021
- 30 CFR part and sectionPART_SECTION
- 56.14206(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 6, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 6, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 6, 2021
- Terminated, timeTERMINATION_TIME
- 1100
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Aug 26, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 11, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 12, 2022
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Capital Paving & Construction, LLC.
- Operator IDVIOLATOR_ID
- C0619
- Contractor IDCONTRACTOR_ID
- C0619
- Inspection eventEVENT_NO
- 6884985
- Inspection beganINSPECTION_BEGIN_DT
- Jul 6, 2021
- Inspection closed outINSPECTION_END_DT
- Jul 8, 2021
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jul 6, 2021Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9642132
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 6, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1055
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 6, 2021
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 6, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 6, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 6, 2021
- Terminated, timeTERMINATION_TIME
- 1200
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 124.29
- Bill first printedBILL_PRINT_DT
- Aug 26, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 30, 2021
- Last actionLAST_ACTION_CD
- 1stDemandPrinted
- Last action dateLAST_ACTION_DT
- Nov 16, 2021
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Capital Paving & Construction, LLC.
- Operator IDVIOLATOR_ID
- C0619
- Contractor IDCONTRACTOR_ID
- C0619
- Inspection eventEVENT_NO
- 6884985
- Inspection beganINSPECTION_BEGIN_DT
- Jul 6, 2021
- Inspection closed outINSPECTION_END_DT
- Jul 8, 2021
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Jan 20, 2021Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9516057
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 20, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1215
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 20, 2021
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 20, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Feb 15, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Feb 9, 2021
- Terminated, timeTERMINATION_TIME
- 0800
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Mar 11, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 21, 2021
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 28, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6884043
- Inspection beganINSPECTION_BEGIN_DT
- Jan 20, 2021
- Inspection closed outINSPECTION_END_DT
- Jan 22, 2021
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jun 3, 2020Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9513316
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 3, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1252
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 3, 2020
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 3, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jun 3, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jun 4, 2020
- Terminated, timeTERMINATION_TIME
- 0843
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 9, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 23, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 31, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6809696
- Inspection beganINSPECTION_BEGIN_DT
- Jun 3, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 4, 2020
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jun 3, 2020Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9513317
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 3, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1311
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 3, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 3, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Jun 4, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jun 4, 2020
- Terminated, timeTERMINATION_TIME
- 0846
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 9, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 23, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 31, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6809696
- Inspection beganINSPECTION_BEGIN_DT
- Jun 3, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 4, 2020
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 24, 2019Type: CitationStandard: 46.9(c)(3)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9455688
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 24, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1121
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 24, 2019
- 30 CFR part and sectionPART_SECTION
- 46.9(c)(3)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 24, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Sep 24, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Sep 24, 2019
- Terminated, timeTERMINATION_TIME
- 1142
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Oct 30, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 5, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 14, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6810419
- Inspection beganINSPECTION_BEGIN_DT
- Sep 23, 2019
- Inspection closed outINSPECTION_END_DT
- Sep 25, 2019
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 24, 2019Type: CitationStandard: 56.4203S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9455687
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 24, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0850
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 24, 2019
- 30 CFR part and sectionPART_SECTION
- 56.4203
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 24, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 0930
- Latest dueLATEST_TERM_DUE_DT
- Sep 24, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 0930
- TerminatedTERMINATION_DT
- Sep 24, 2019
- Terminated, timeTERMINATION_TIME
- 0906
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Oct 30, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 5, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 14, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6810419
- Inspection beganINSPECTION_BEGIN_DT
- Sep 23, 2019
- Inspection closed outINSPECTION_END_DT
- Sep 25, 2019
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 22, 2019Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9405569
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1034
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2019
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 22, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Jan 22, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Jan 22, 2019
- Terminated, timeTERMINATION_TIME
- 1040
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Mar 5, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 7, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2019
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6802499
- Inspection beganINSPECTION_BEGIN_DT
- Jan 22, 2019
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2019
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 22, 2019Type: CitationStandard: 56.14132(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9405568
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0925
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 22, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Jan 22, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Jan 22, 2019
- Terminated, timeTERMINATION_TIME
- 0940
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Mar 5, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 7, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2019
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDVIOLATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6802499
- Inspection beganINSPECTION_BEGIN_DT
- Jan 22, 2019
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2019
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 8, 2017Type: CitationStandard: 47.44(b)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $116.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9354448
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 8, 2017
- Time issuedVIOLATION_ISSUE_TIME
- 1050
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 8, 2017
- 30 CFR part and sectionPART_SECTION
- 47.44(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 8, 2017
- Originally due, timeORIG_TERM_DUE_TIME
- 1120
- Latest dueLATEST_TERM_DUE_DT
- Aug 8, 2017
- Latest due, timeLATEST_TERM_DUE_TIME
- 1120
- TerminatedTERMINATION_DT
- Aug 8, 2017
- Terminated, timeTERMINATION_TIME
- 1053
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 116
- Current proposed assessmentAMOUNT_DUE
- 116
- Amount paidAMOUNT_PAID
- 116
- Bill first printedBILL_PRINT_DT
- Sep 20, 2017
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 23, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 28, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Vulcan Drill Services
- Operator IDVIOLATOR_ID
- K5K
- Contractor IDCONTRACTOR_ID
- K5K
- Inspection eventEVENT_NO
- 6739032
- Inspection beganINSPECTION_BEGIN_DT
- Aug 7, 2017
- Inspection closed outINSPECTION_END_DT
- Aug 8, 2017
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
86 citations and orders since Jan 12, 2000: 73 issued to the operator, 13 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Jul 21, 2026Citation number: 5176233Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5176233
- Assessment control numberASSESS_CASE_NO
- 000648881
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 4, 2026
- Citation issuedISSUE_DT
- Jul 21, 2026
- Date of occurrenceOCCURRENCE_DT
- Jul 21, 2026
- Final order dateFINAL_ORDER_DT
- Oct 23, 2026
- Bill first printedBILL_PRINT_DT
- Sep 17, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 23, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 37445
- Size of mineSIZE_OF_MINE
- 37445
- Controller hours workedCONTROLLER_HRS
- 12859117
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 12859117
- History period startHISTORY_START_DT
- Apr 21, 2025
- History period endHISTORY_END_DT
- Jul 20, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038650
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 21, 2025Citation number: 9792878Standard: 56.14132(b)(1)(i)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9792878
- Assessment control numberASSESS_CASE_NO
- 000633424
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 8, 2026
- Citation issuedISSUE_DT
- Oct 21, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 21, 2025
- Final order dateFINAL_ORDER_DT
- Feb 1, 2026
- Bill first printedBILL_PRINT_DT
- Dec 23, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 1, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(b)(1)(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 40
- Size of mineSIZE_OF_MINE
- 40
- History period startHISTORY_START_DT
- Jul 21, 2024
- History period endHISTORY_END_DT
- Oct 20, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Ace Welding
- IDVIOLATOR_ID
- B3143
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Oct 21, 2025
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938293
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (18)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Oct 21, 2025Citation number: 9792879Standard: 56.12021Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9792879
- Assessment control numberASSESS_CASE_NO
- 000632118
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 1, 2026
- Citation issuedISSUE_DT
- Oct 21, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 21, 2025
- Final order dateFINAL_ORDER_DT
- Jan 16, 2026
- Bill first printedBILL_PRINT_DT
- Dec 2, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12021
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32727
- Size of mineSIZE_OF_MINE
- 32727
- Controller hours workedCONTROLLER_HRS
- 13171043
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13171043
- History period startHISTORY_START_DT
- Jul 21, 2024
- History period endHISTORY_END_DT
- Oct 20, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938293
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 21, 2025Citation number: 9792877Standard: 46.9(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9792877
- Assessment control numberASSESS_CASE_NO
- 000637867
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 5, 2026
- Citation issuedISSUE_DT
- Oct 21, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 21, 2025
- Final order dateFINAL_ORDER_DT
- Apr 30, 2026
- Bill first printedBILL_PRINT_DT
- Mar 24, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 30, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.9(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 29
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 16
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 3
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 131006
- Size of mineSIZE_OF_MINE
- 131006
- History period startHISTORY_START_DT
- Jul 21, 2024
- History period endHISTORY_END_DT
- Oct 20, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Two Eight Drilling Incorporated
- IDVIOLATOR_ID
- KM9
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jun 21, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938293
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (18)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Aug 12, 2025Citation number: 9768922Standard: 56.20013Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9768922
- Assessment control numberASSESS_CASE_NO
- 000629408
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 10, 2025
- Citation issuedISSUE_DT
- Aug 12, 2025
- Date of occurrenceOCCURRENCE_DT
- Aug 12, 2025
- Final order dateFINAL_ORDER_DT
- Nov 14, 2025
- Bill first printedBILL_PRINT_DT
- Sep 30, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20013
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32727
- Size of mineSIZE_OF_MINE
- 32727
- Controller hours workedCONTROLLER_HRS
- 13171043
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13171043
- History period startHISTORY_START_DT
- May 12, 2024
- History period endHISTORY_END_DT
- Aug 11, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F014D8F
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 1, 2024Citation number: 9795233Standard: 56.15005Proposed penalty: $1,039.00Current assessment: $1,039.00Paid against proposed penalty: $1,039.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795233
- Assessment control numberASSESS_CASE_NO
- 000601650
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 19, 2024
- Citation issuedISSUE_DT
- May 1, 2024
- Date of occurrenceOCCURRENCE_DT
- May 1, 2024
- Final order dateFINAL_ORDER_DT
- Aug 14, 2024
- Bill first printedBILL_PRINT_DT
- Jun 20, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.15005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1039.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1039.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 1039.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 83
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 40
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 12
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 55131
- Size of mineSIZE_OF_MINE
- 55131
- History period startHISTORY_START_DT
- Feb 1, 2023
- History period endHISTORY_END_DT
- Apr 30, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Drill Services
- IDVIOLATOR_ID
- K5K
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 8, 2017
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935095
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Apr 30, 2024Citation number: 9795231Standard: 56.11008Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795231
- Assessment control numberASSESS_CASE_NO
- 000600593
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 19, 2024
- Citation issuedISSUE_DT
- Apr 30, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2024
- Final order dateFINAL_ORDER_DT
- Jul 12, 2024
- Bill first printedBILL_PRINT_DT
- Jun 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 12, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32732
- Size of mineSIZE_OF_MINE
- 32732
- Controller hours workedCONTROLLER_HRS
- 11991064
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11991064
- History period startHISTORY_START_DT
- Jan 30, 2023
- History period endHISTORY_END_DT
- Apr 29, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6935095
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 23, 2024Citation number: 9742578Standard: 56.14207Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9742578
- Assessment control numberASSESS_CASE_NO
- 000595934
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 10, 2024
- Citation issuedISSUE_DT
- Jan 23, 2024
- Date of occurrenceOCCURRENCE_DT
- Jan 23, 2024
- Final order dateFINAL_ORDER_DT
- May 4, 2024
- Bill first printedBILL_PRINT_DT
- Mar 20, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 12
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 55131
- Size of mineSIZE_OF_MINE
- 55131
- History period startHISTORY_START_DT
- Oct 23, 2022
- History period endHISTORY_END_DT
- Jan 22, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Drill Services
- IDVIOLATOR_ID
- K5K
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 8, 2017
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6932187
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jun 21, 2023Citation number: 9744617Standard: 56.11001Proposed penalty: $2,065.00Current assessment: $2,065.00Paid against proposed penalty: $2,065.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744617
- Assessment control numberASSESS_CASE_NO
- 000583368
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 14, 2023
- Citation issuedISSUE_DT
- Jun 21, 2023
- Date of occurrenceOCCURRENCE_DT
- Jun 21, 2023
- Final order dateFINAL_ORDER_DT
- Sep 27, 2023
- Bill first printedBILL_PRINT_DT
- Aug 22, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 27, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 2065.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 2065.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 2065.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 92
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 40
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 16
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 10
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 103582
- Size of mineSIZE_OF_MINE
- 103582
- History period startHISTORY_START_DT
- Mar 21, 2022
- History period endHISTORY_END_DT
- Jun 20, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Two Eight Drilling Incorporated
- IDVIOLATOR_ID
- KM9
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jun 21, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934553
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jun 20, 2023Citation number: 9744615Standard: 56.12002Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744615
- Assessment control numberASSESS_CASE_NO
- 000582456
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 25, 2023
- Citation issuedISSUE_DT
- Jun 20, 2023
- Date of occurrenceOCCURRENCE_DT
- Jun 20, 2023
- Final order dateFINAL_ORDER_DT
- Sep 18, 2023
- Bill first printedBILL_PRINT_DT
- Aug 10, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 18, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31307
- Size of mineSIZE_OF_MINE
- 31307
- Controller hours workedCONTROLLER_HRS
- 11749278
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11749278
- History period startHISTORY_START_DT
- Mar 20, 2022
- History period endHISTORY_END_DT
- Jun 19, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934553
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 9, 2022Citation number: 9646772Standard: 56.14207Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9646772
- Assessment control numberASSESS_CASE_NO
- 000556809
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 20, 2022
- Citation issuedISSUE_DT
- May 9, 2022
- Date of occurrenceOCCURRENCE_DT
- May 9, 2022
- Final order dateFINAL_ORDER_DT
- Jul 29, 2022
- Bill first printedBILL_PRINT_DT
- Jun 14, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.09
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 34894
- Size of mineSIZE_OF_MINE
- 34894
- Controller hours workedCONTROLLER_HRS
- 10981346
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10981346
- History period startHISTORY_START_DT
- Feb 9, 2021
- History period endHISTORY_END_DT
- May 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6888846
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 6, 2021Citation number: 9642131Standard: 56.14206(b)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642131
- Assessment control numberASSESS_CASE_NO
- 000541035
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Sep 24, 2021
- Citation issuedISSUE_DT
- Jul 6, 2021
- Date of occurrenceOCCURRENCE_DT
- Jul 6, 2021
- Final order dateFINAL_ORDER_DT
- Apr 11, 2022
- Bill first printedBILL_PRINT_DT
- Aug 26, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 1, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14206(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4000
- Size of mineSIZE_OF_MINE
- 4000
- History period startHISTORY_START_DT
- Apr 6, 2020
- History period endHISTORY_END_DT
- Jul 5, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Capital Paving & Construction, LLC.
- IDVIOLATOR_ID
- C0619
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jul 6, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6884985
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (18)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 6, 2021Citation number: 9642132Standard: 56.4201(a)(2)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $124.29Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9642132
- Assessment control numberASSESS_CASE_NO
- 000541035
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Sep 24, 2021
- Citation issuedISSUE_DT
- Jul 6, 2021
- Date of occurrenceOCCURRENCE_DT
- Jul 6, 2021
- Final order dateFINAL_ORDER_DT
- Sep 30, 2021
- Bill first printedBILL_PRINT_DT
- Aug 26, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 30, 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 124.29
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 0.71
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4000
- Size of mineSIZE_OF_MINE
- 4000
- History period startHISTORY_START_DT
- Apr 6, 2020
- History period endHISTORY_END_DT
- Jul 5, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Capital Paving & Construction, LLC.
- IDVIOLATOR_ID
- C0619
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jul 6, 2021
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6884985
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jan 20, 2021Citation number: 9516057Standard: 56.14100(b)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9516057
- Assessment control numberASSESS_CASE_NO
- 000531231
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 28, 2021
- Citation issuedISSUE_DT
- Jan 20, 2021
- Date of occurrenceOCCURRENCE_DT
- Jan 20, 2021
- Final order dateFINAL_ORDER_DT
- Apr 21, 2021
- Bill first printedBILL_PRINT_DT
- Mar 11, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 21, 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.8
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 28095
- Size of mineSIZE_OF_MINE
- 28095
- Controller hours workedCONTROLLER_HRS
- 10393491
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10393491
- History period startHISTORY_START_DT
- Oct 20, 2019
- History period endHISTORY_END_DT
- Jan 19, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6884043
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 3, 2020Citation number: 9513317Standard: 56.14100(b)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9513317
- Assessment control numberASSESS_CASE_NO
- 000518071
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 31, 2020
- Citation issuedISSUE_DT
- Jun 3, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 3, 2020
- Final order dateFINAL_ORDER_DT
- Aug 23, 2020
- Bill first printedBILL_PRINT_DT
- Jul 9, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30761
- Size of mineSIZE_OF_MINE
- 30761
- Controller hours workedCONTROLLER_HRS
- 10919986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10919986
- History period startHISTORY_START_DT
- Mar 3, 2019
- History period endHISTORY_END_DT
- Jun 2, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6809696
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 3, 2020Citation number: 9513316Standard: 56.20003(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9513316
- Assessment control numberASSESS_CASE_NO
- 000518071
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 31, 2020
- Citation issuedISSUE_DT
- Jun 3, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 3, 2020
- Final order dateFINAL_ORDER_DT
- Aug 23, 2020
- Bill first printedBILL_PRINT_DT
- Jul 9, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 30761
- Size of mineSIZE_OF_MINE
- 30761
- Controller hours workedCONTROLLER_HRS
- 10919986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10919986
- History period startHISTORY_START_DT
- Mar 3, 2019
- History period endHISTORY_END_DT
- Jun 2, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6809696
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 24, 2019Citation number: 9455687Standard: 56.4203Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9455687
- Assessment control numberASSESS_CASE_NO
- 000502813
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 14, 2019
- Citation issuedISSUE_DT
- Sep 24, 2019
- Date of occurrenceOCCURRENCE_DT
- Sep 24, 2019
- Final order dateFINAL_ORDER_DT
- Dec 5, 2019
- Bill first printedBILL_PRINT_DT
- Oct 30, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 5, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4203
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31150
- Size of mineSIZE_OF_MINE
- 31150
- Controller hours workedCONTROLLER_HRS
- 10359796
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10359796
- History period startHISTORY_START_DT
- Jun 24, 2018
- History period endHISTORY_END_DT
- Sep 23, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810419
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 24, 2019Citation number: 9455688Standard: 46.9(c)(3)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9455688
- Assessment control numberASSESS_CASE_NO
- 000502813
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 14, 2019
- Citation issuedISSUE_DT
- Sep 24, 2019
- Date of occurrenceOCCURRENCE_DT
- Sep 24, 2019
- Final order dateFINAL_ORDER_DT
- Dec 5, 2019
- Bill first printedBILL_PRINT_DT
- Oct 30, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 5, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.9(c)(3)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31150
- Size of mineSIZE_OF_MINE
- 31150
- Controller hours workedCONTROLLER_HRS
- 10359796
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10359796
- History period startHISTORY_START_DT
- Jun 24, 2018
- History period endHISTORY_END_DT
- Sep 23, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810419
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2019Citation number: 9405568Standard: 56.14132(a)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9405568
- Assessment control numberASSESS_CASE_NO
- 000484414
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 24, 2019
- Citation issuedISSUE_DT
- Jan 22, 2019
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2019
- Final order dateFINAL_ORDER_DT
- Apr 7, 2019
- Bill first printedBILL_PRINT_DT
- Mar 5, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 7, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31150
- Size of mineSIZE_OF_MINE
- 31150
- Controller hours workedCONTROLLER_HRS
- 10367816
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10367816
- History period startHISTORY_START_DT
- Oct 22, 2017
- History period endHISTORY_END_DT
- Jan 21, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6802499
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2019Citation number: 9405569Standard: 47.41(a)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9405569
- Assessment control numberASSESS_CASE_NO
- 000484414
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 24, 2019
- Citation issuedISSUE_DT
- Jan 22, 2019
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2019
- Final order dateFINAL_ORDER_DT
- Apr 7, 2019
- Bill first printedBILL_PRINT_DT
- Mar 5, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 7, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31150
- Size of mineSIZE_OF_MINE
- 31150
- Controller hours workedCONTROLLER_HRS
- 10367816
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10367816
- History period startHISTORY_START_DT
- Oct 22, 2017
- History period endHISTORY_END_DT
- Jan 21, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6802499
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 8, 2017Citation number: 9354448Standard: 47.44(b)Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9354448
- Assessment control numberASSESS_CASE_NO
- 000448897
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 28, 2017
- Citation issuedISSUE_DT
- Aug 8, 2017
- Date of occurrenceOCCURRENCE_DT
- Aug 8, 2017
- Final order dateFINAL_ORDER_DT
- Oct 23, 2017
- Bill first printedBILL_PRINT_DT
- Sep 20, 2017
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 23, 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.44(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 116.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 116.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 116.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 38021
- Size of mineSIZE_OF_MINE
- 38021
- History period startHISTORY_START_DT
- May 8, 2016
- History period endHISTORY_END_DT
- Aug 7, 2017
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Drill Services
- IDVIOLATOR_ID
- K5K
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 8, 2017
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6739032
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Mar 29, 2016Citation number: 8962875Standard: 56.16005Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8962875
- Assessment control numberASSESS_CASE_NO
- 000409631
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 1, 2016
- Citation issuedISSUE_DT
- Mar 29, 2016
- Date of occurrenceOCCURRENCE_DT
- Mar 29, 2016
- Final order dateFINAL_ORDER_DT
- Jun 24, 2016
- Bill first printedBILL_PRINT_DT
- May 10, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 20011
- Size of mineSIZE_OF_MINE
- 20011
- Controller hours workedCONTROLLER_HRS
- 8891026
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8891026
- History period startHISTORY_START_DT
- Dec 29, 2014
- History period endHISTORY_END_DT
- Mar 28, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6660954
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 11, 2015Citation number: 8859145Standard: 56.14105Proposed penalty: $138.00Current assessment: $138.00Paid against proposed penalty: $138.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8859145
- Assessment control numberASSESS_CASE_NO
- 000403495
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 4, 2016
- Citation issuedISSUE_DT
- Aug 11, 2015
- Date of occurrenceOCCURRENCE_DT
- Aug 11, 2015
- Final order dateFINAL_ORDER_DT
- Mar 25, 2016
- Bill first printedBILL_PRINT_DT
- Feb 18, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 25, 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14105
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 138.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 138.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 138.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 64
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31050
- Size of mineSIZE_OF_MINE
- 31050
- Controller hours workedCONTROLLER_HRS
- 8200924
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8200924
- History period startHISTORY_START_DT
- May 11, 2014
- History period endHISTORY_END_DT
- Aug 10, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Construction Materials, LLC
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6660421
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2013Citation number: 8688660Standard: 56.14132(b)(1)(i)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8688660
- Assessment control numberASSESS_CASE_NO
- 000325121
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 2, 2013
- Citation issuedISSUE_DT
- Apr 9, 2013
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2013
- Final order dateFINAL_ORDER_DT
- Jul 25, 2013
- Bill first printedBILL_PRINT_DT
- Jun 19, 2013
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(b)(1)(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- History period startHISTORY_START_DT
- Jan 9, 2012
- History period endHISTORY_END_DT
- Apr 8, 2013
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- H & E Equipment
- IDVIOLATOR_ID
- Q471
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 9, 2013
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6606048
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (19)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Dec 20, 2011Citation number: 8619922Standard: 56.4201(a)(2)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8619922
- Assessment control numberASSESS_CASE_NO
- 000279398
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 14, 2012
- Citation issuedISSUE_DT
- Dec 20, 2011
- Date of occurrenceOCCURRENCE_DT
- Dec 20, 2011
- Final order dateFINAL_ORDER_DT
- Mar 8, 2012
- Bill first printedBILL_PRINT_DT
- Feb 1, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2012
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 8, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 59
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.83
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 38525
- Size of mineSIZE_OF_MINE
- 38525
- Controller hours workedCONTROLLER_HRS
- 7876041
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7876041
- History period startHISTORY_START_DT
- Sep 20, 2010
- History period endHISTORY_END_DT
- Dec 19, 2011
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Vulcan Constr. Materials, L.P.
- IDVIOLATOR_ID
- L16168
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 8, 1999
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6602230
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 82 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Sep 26, 2021Citation issued: Jul 6, 2021Docket: CENT 2021-0212Standard: 56.14206(b)Proposed penalty: $125.00Penalty after decision: $125.00Decided: Mar 1, 2022Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 9642131
- Citation issuedCITATION_ISSUE_DT
- Jul 6, 2021
- Hearing request receivedCONTEST_DT
- Sep 26, 2021
- Docket numberDOCKET_NO
- CENT 2021-0212
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Richard
- Judge, last nameJUDGE_LAST_NAME
- Manning
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Mar 1, 2022
- Petition duePETITION_DUE_DT
- Nov 10, 2021
- Petition filedPETITION_FILED_DT
- Oct 19, 2021
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 125.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 125.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14206(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Aug 21, 2009Citation issued: Jun 23, 2009Docket: CENT 2009-770MStandard: 56.9300(a)Proposed penalty: $334.00Penalty after decision: $100.00Decided: Jul 19, 2010Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6470340
- Citation issuedCITATION_ISSUE_DT
- Jun 23, 2009
- Hearing request receivedCONTEST_DT
- Aug 21, 2009
- Docket numberDOCKET_NO
- CENT 2009-770M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jul 19, 2010
- Petition duePETITION_DUE_DT
- Oct 5, 2009
- Petition filedPETITION_FILED_DT
- Oct 16, 2009
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 334.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.9300(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Apr 5, 2004Citation issued: Dec 30, 2003Docket: CENT 2004-114-MStandard: 46.5(a)Proposed penalty: $327.00Penalty after decision: $0.00Decided: Oct 7, 2004Decision type: DismissalDetails
The contest
- Citation or order numberCITATION_NO
- 6232774
- Citation issuedCITATION_ISSUE_DT
- Dec 30, 2003
- Hearing request receivedCONTEST_DT
- Apr 5, 2004
- Docket numberDOCKET_NO
- CENT 2004-114-M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- T
- Judge, last nameJUDGE_LAST_NAME
- Hodgdon
- Decision typeDOCKET_DECISION_TYPE_CODE
- Dismissal
- DecidedDECISION_DT
- Oct 7, 2004
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 327.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 46.5(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Order
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(g)(1)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (1)
Penalty after the decisionDECISION_PENALTY_AMT
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (11)
Petition duePETITION_DUE_DT, Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
3 contested citations and orders; decision types are MSHA's own text.
Imminent danger orders, section 107(a)
Issued: May 1, 2024Order number: 9795232Terminated: May 1, 2024Issued to: ContractorDetails
The order
- Order numberVIOLATION_NO
- 9795232
- IssuedVIOLATION_DATE_ISSUED
- May 1, 2024
- TerminatedTERMINATION_DATE
- May 1, 2024
- Issued toVIOLATOR_TYPE
- Contractor
Who
- Operator at the timeOPERATOR_NAME_VIOLATIONS
- Vulcan Construction Materials, LLC
- ContractorCONTRACTOR_NAME
- Vulcan Drill Services
- Contractor IDCONTRACTOR_ID
- K5K
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- StateSTATE_ABBREVIATION
- AR
- Coal or Metal/Non-MetalCOAL_OR_METAL
- M
Not recorded by MSHA (2)
Controller at the timeCONTROLLER_NAME_VIOLATIONS, Controller IDCONTROLLER_ID_VIOLATIONS
Issued: Jun 21, 2023Order number: 9744616Terminated: Jun 21, 2023Issued to: ContractorDetails
The order
- Order numberVIOLATION_NO
- 9744616
- IssuedVIOLATION_DATE_ISSUED
- Jun 21, 2023
- TerminatedTERMINATION_DATE
- Jun 21, 2023
- Issued toVIOLATOR_TYPE
- Contractor
Who
- Operator at the timeOPERATOR_NAME_VIOLATIONS
- Vulcan Construction Materials, LLC
- ContractorCONTRACTOR_NAME
- Two Eight Drilling Incorporated
- Contractor IDCONTRACTOR_ID
- KM9
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- StateSTATE_ABBREVIATION
- AR
- Coal or Metal/Non-MetalCOAL_OR_METAL
- M
Not recorded by MSHA (2)
Controller at the timeCONTROLLER_NAME_VIOLATIONS, Controller IDCONTROLLER_ID_VIOLATIONS
2 imminent danger orders in MSHA's list, which starts July 1, 2010.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS RESTRICTED ACTIVITY ONLY
- 9
- NO DYS AWY FRM WRK,NO RSTR ACT
- 5
- DAYS AWAY FROM WORK ONLY
- 2
- DYS AWY FRM WRK & RESTRCTD ACT
- 1
Date: Jan 23, 2019Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220190300089
- DateACCIDENT_DT
- Jan 23, 2019
- TimeACCIDENT_TIME
- 1020
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- MINE RESCUE EQUIPMENT
- Source of injury codeINJURY_SOURCE_CD
- 025
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- Jan 24, 2019
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jun 1, 2017Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220171560020
- DateACCIDENT_DT
- Jun 1, 2017
- TimeACCIDENT_TIME
- 0700
- Shift beganSHIFT_BEGIN_TIME
- 0500
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- KNIFE
- Source of injury codeINJURY_SOURCE_CD
- 049
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FOREARM/ULNAR/RADIUS
- Part of body codeINJ_BODY_PART_CD
- 313
- Returned to workRETURN_TO_WORK_DT
- Jun 1, 2017
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Contractor IDCONTRACTOR_ID
- B5233
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Feb 17, 2016Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 21Details
The report
- Document numberDOCUMENT_NO
- 220160500011
- DateACCIDENT_DT
- Feb 17, 2016
- TimeACCIDENT_TIME
- 1123
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320160920006
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- ANKLE
- Part of body codeINJ_BODY_PART_CD
- 520
- Days lostDAYS_LOST
- 21
- Returned to workRETURN_TO_WORK_DT
- Mar 18, 2016
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
- Equipment codeMINING_EQUIP_CD
- 60
- Equipment manufacturerEQUIP_MFR_NAME
- Komatsu
- Equipment manufacturer codeEQUIP_MFR_CD
- 063
- Equipment model numberEQUIP_MODEL_NO
- PC400
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Jun 24, 2015Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between running or meshing objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220151810053
- DateACCIDENT_DT
- Jun 24, 2015
- TimeACCIDENT_TIME
- 1120
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between running or meshing objects
- Accident type codeACCIDENT_TYPE_CD
- 20
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320152150010
Injury
- Activity at the timeACTIVITY
- Mill equipment
- Activity codeACTIVITY_CD
- 063
- Source of injuryINJURY_SOURCE
- BELTS (NOT CONVEYOR)
- Source of injury codeINJURY_SOURCE_CD
- 078
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 6
- Permanently transferred or terminatedTRANS_TERM
- Y
- Returned to workRETURN_TO_WORK_DT
- Jul 3, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Conveyor, Belt feeder, Stage loader, Hopper shaker, Belt structure
- Equipment codeMINING_EQUIP_CD
- 13
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- Equipment model numberEQUIP_MODEL_NO
- N/A
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: May 4, 2015Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220151250034
- DateACCIDENT_DT
- May 4, 2015
- TimeACCIDENT_TIME
- 0800
- Shift beganSHIFT_BEGIN_TIME
- 0730
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320151690005
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 25
- Returned to workRETURN_TO_WORK_DT
- Jun 10, 2015
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Kenworth
- Equipment manufacturer codeEQUIP_MFR_CD
- 059
- Equipment model numberEQUIP_MODEL_NO
- T300
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Contractor IDCONTRACTOR_ID
- FLC
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (1)
MSHA investigation beganINVEST_BEGIN_DT
Date: Aug 14, 2014Degree of injury: DAYS AWAY FROM WORK ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220142520027
- DateACCIDENT_DT
- Aug 14, 2014
- TimeACCIDENT_TIME
- 1100
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Haulage or Dump truck
- Activity codeACTIVITY_CD
- 055
- Source of injuryINJURY_SOURCE
- HGHWY ORE CARIER,LRGE TRK
- Source of injury codeINJURY_SOURCE_CD
- 104
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days lostDAYS_LOST
- 2
- Returned to workRETURN_TO_WORK_DT
- Aug 20, 2014
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Volvo
- Equipment manufacturer codeEQUIP_MFR_CD
- 155
- Equipment model numberEQUIP_MODEL_NO
- A40
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Contractor IDCONTRACTOR_ID
- A6490
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO
Date: Feb 5, 2009Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall from machineDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220090430024
- DateACCIDENT_DT
- Feb 5, 2009
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from machine
- Accident type codeACCIDENT_TYPE_CD
- 12
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- WRIST
- Part of body codeINJ_BODY_PART_CD
- 320
- Days of restricted workDAYS_RESTRICT
- 4
- Returned to workRETURN_TO_WORK_DT
- Feb 11, 2009
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Komatsu
- Equipment manufacturer codeEQUIP_MFR_CD
- 063
- Equipment model numberEQUIP_MODEL_NO
- HD605
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Sep 16, 2008Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Caught in, under or between NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220082750032
- DateACCIDENT_DT
- Sep 16, 2008
- TimeACCIDENT_TIME
- 1041
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Caught in, under or between NEC
- Accident type codeACCIDENT_TYPE_CD
- 24
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320082810013
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- CRANES,DERRICKS
- Source of injury codeINJURY_SOURCE_CD
- 062
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 14
- Returned to workRETURN_TO_WORK_DT
- Oct 3, 2008
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Crane, Cherry picker, Lift basket, Scissor truck, Boom truck
- Equipment codeMINING_EQUIP_CD
- 14
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- RT528
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Aug 1, 2007Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220072200003
- DateACCIDENT_DT
- Aug 1, 2007
- TimeACCIDENT_TIME
- 1645
- Shift beganSHIFT_BEGIN_TIME
- 1650
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between NEC
- Accident type codeACCIDENT_TYPE_CD
- 24
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320072480008
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- DRILL STEEL (ALL SIZES)
- Source of injury codeINJURY_SOURCE_CD
- 082
- Nature of injuryNATURE_INJURY
- MULTIPLE INJURIES
- Nature of injury codeNATURE_INJURY_CD
- 370
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 25
- Returned to workRETURN_TO_WORK_DT
- Aug 31, 2007
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Carriage-mounted drills, Rail, Rubber-tired, Jumbo, Air-track drill
- Equipment codeMINING_EQUIP_CD
- 09
- Equipment manufacturerEQUIP_MFR_NAME
- Ingersol-Rand
- Equipment manufacturer codeEQUIP_MFR_CD
- 053
- Equipment model numberEQUIP_MODEL_NO
- T4BH
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2007
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2007
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Jan 26, 2006Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220060520016
- DateACCIDENT_DT
- Jan 26, 2006
- TimeACCIDENT_TIME
- 1130
- Shift beganSHIFT_BEGIN_TIME
- 1030
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320061880001
Injury
- Activity at the timeACTIVITY
- Front-end loader
- Activity codeACTIVITY_CD
- 053
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- NECK
- Part of body codeINJ_BODY_PART_CD
- 200
- Days of restricted workDAYS_RESTRICT
- 113
- Returned to workRETURN_TO_WORK_DT
- Jul 5, 2006
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 970F
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2006
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2006
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: May 25, 2005Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall from machineDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220051470011
- DateACCIDENT_DT
- May 25, 2005
- TimeACCIDENT_TIME
- 0630
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from machine
- Accident type codeACCIDENT_TYPE_CD
- 12
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320053110002
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- WRIST
- Part of body codeINJ_BODY_PART_CD
- 320
- Days of restricted workDAYS_RESTRICT
- 115
- Returned to workRETURN_TO_WORK_DT
- Nov 3, 2005
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Crusher, Breaker, Mills (ball and rod), Feeder breaker
- Equipment codeMINING_EQUIP_CD
- 15
- Equipment manufacturerEQUIP_MFR_NAME
- Telsmith
- Equipment manufacturer codeEQUIP_MFR_CD
- 104
- Equipment model numberEQUIP_MODEL_NO
- 66145
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Sep 22, 2004Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall from machineDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220042710017
- DateACCIDENT_DT
- Sep 22, 2004
- TimeACCIDENT_TIME
- 1000
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from machine
- Accident type codeACCIDENT_TYPE_CD
- 12
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- UPPER ARM/HUMERUS
- Part of body codeINJ_BODY_PART_CD
- 311
- Days of restricted workDAYS_RESTRICT
- 1
- Permanently transferred or terminatedTRANS_TERM
- Y
- Returned to workRETURN_TO_WORK_DT
- Sep 24, 2004
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Carriage-mounted drills, Rail, Rubber-tired, Jumbo, Air-track drill
- Equipment codeMINING_EQUIP_CD
- 09
- Equipment manufacturerEQUIP_MFR_NAME
- Ingersol-Rand
- Equipment manufacturer codeEQUIP_MFR_CD
- 053
- Equipment model numberEQUIP_MODEL_NO
- T4BH
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Jun 30, 2003Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: MACHINERYAccident type: Struck by... NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220032030004
- DateACCIDENT_DT
- Jun 30, 2003
- TimeACCIDENT_TIME
- 1000
- Shift beganSHIFT_BEGIN_TIME
- 600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Hand tools (powered)
- Activity codeACTIVITY_CD
- 031
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 15
- Returned to workRETURN_TO_WORK_DT
- Jul 23, 2003
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: Mar 25, 2002Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Caught in, under or between NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220020940005
- DateACCIDENT_DT
- Mar 25, 2002
- TimeACCIDENT_TIME
- 2130
- Shift beganSHIFT_BEGIN_TIME
- 1800
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Caught in, under or between NEC
- Accident type codeACCIDENT_TYPE_CD
- 24
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320020980034
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Mar 26, 2002
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2002
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2002
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: Dec 4, 2001Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: FIREAccident type: Contact with hot objects or substancesDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220013510124
- DateACCIDENT_DT
- Dec 4, 2001
- TimeACCIDENT_TIME
- 2115
- Shift beganSHIFT_BEGIN_TIME
- 1800
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- FIRE
- Classification codeCLASSIFICATION_CD
- 08
- Accident typeACCIDENT_TYPE
- Contact with hot objects or substances
- Accident type codeACCIDENT_TYPE_CD
- 33
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320013510034
Injury
- Activity at the timeACTIVITY
- Welding or cutting
- Activity codeACTIVITY_CD
- 093
- Source of injuryINJURY_SOURCE
- FLAME,FIRE,SMOKE,NEC
- Source of injury codeINJURY_SOURCE_CD
- 045
- Nature of injuryNATURE_INJURY
- BURN OR SCALD (HEAT)
- Nature of injury codeNATURE_INJURY_CD
- 120
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Returned to workRETURN_TO_WORK_DT
- Dec 5, 2001
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Machine, NEC - Wheelbarrow, Well drilling Rig, Post hole auger
- Equipment codeMINING_EQUIP_CD
- 71
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2001
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2002
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: Sep 14, 2001Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: MACHINERYAccident type: Contact with hot objects or substancesDays lost: 19Details
The report
- Document numberDOCUMENT_NO
- 220012680046
- DateACCIDENT_DT
- Sep 14, 2001
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 2330
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Contact with hot objects or substances
- Accident type codeACCIDENT_TYPE_CD
- 33
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320013040004
Injury
- Activity at the timeACTIVITY
- Welding or cutting
- Activity codeACTIVITY_CD
- 093
- Source of injuryINJURY_SOURCE
- MOLTEN METAL
- Source of injury codeINJURY_SOURCE_CD
- 085
- Nature of injuryNATURE_INJURY
- BURN OR SCALD (HEAT)
- Nature of injury codeNATURE_INJURY_CD
- 120
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 5
- Days lostDAYS_LOST
- 19
- Returned to workRETURN_TO_WORK_DT
- Oct 23, 2001
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Welding machine, Torch, Cutting torch, Arc welder, Air arc
- Equipment codeMINING_EQUIP_CD
- 70
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2001
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2001
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Contractor IDCONTRACTOR_ID
Date: Mar 28, 2000Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck against stationary objectDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220001080172
- DateACCIDENT_DT
- Mar 28, 2000
- TimeACCIDENT_TIME
- 1145
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320001080008
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Mar 28, 2000
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Controller at the timeCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2000
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2000
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
17 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 5Hours worked: 12,131Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 12131
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2426
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 3,764Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 3764
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1882
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 12,515Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 12515
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1391
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 16,692Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 16692
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 4173
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 5,119Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 5119
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2560
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 11Hours worked: 20,753Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 11
- Hours workedANNUAL_HRS
- 20753
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1887
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 14,425Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 14425
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3606
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 4,950Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 4950
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2475
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 18,302Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 18302
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1830
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 14,129Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 14129
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3532
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 5,835Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 5835
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2918
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 18,603Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 18603
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1860
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 5Hours worked: 14,140Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 14140
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2828
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 5,098Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 5098
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2549
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 17,167Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 17167
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1717
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 5Hours worked: 16,733Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 16733
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3347
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 5,158Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 5158
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2579
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 18,161Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 18161
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2018
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 3Hours worked: 10,782Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 10782
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3594
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 10,329Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 10329
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2582
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 17,313Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 17313
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1924
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 11,943Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 11943
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2986
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 12,547Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 12547
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2509
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 18,818Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 18818
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1882
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileCURR_MINE_NM
- Searcy Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Judsonia
- Days worked per week
- 5
- Hours per shift
- 12
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 14
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Searcy Quarry
- Mine IDMINE_ID
- 0301140
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Oct 10, 2006
- Legal entity typeCOMPANY_TYPE
- Other
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDCURRENT_OPERATOR_ID
- L16168
- ControllerCURRENT_CONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCURRENT_CONTROLLER_ID
- 0071891
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Feb 8, 1999
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 145
- FIPS county nameFIPS_CNTY_NM
- White
- Congressional districtCONG_DIST_CD
- 02
- Nearest townNEAREST_TOWN
- Judsonia
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 85
- Most recent assessment control numberASSESS_CTRL_NO
- 000648881
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Sandstone
- Primary commodity codePRIMARY_SIC_CD
- 142902
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 02
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 12
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 14
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (13)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Vulcan Construction Materials, LLCFrom: Feb 8, 1999To: No end dateController: Vulcan Materials CompanyFrom : Nov 16, 2007To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Operator fromOPERATOR_START_DT
- Feb 8, 1999
Controller
- ControllerCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Nov 16, 2007
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: Vulcan Construction Materials, LLCFrom: Feb 8, 1999To: No end dateController: Legacy Vulcan Corp (Form:Vulcan Materials Co)From : Jan 1, 1950To : Nov 15, 2007Details
Operator
- OperatorOPERATOR_NAME
- Vulcan Construction Materials, LLC
- Operator IDOPERATOR_ID
- L16168
- Operator fromOPERATOR_START_DT
- Feb 8, 1999
Controller
- ControllerCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
- Controller toCONTROLLER_END_DT
- Nov 15, 2007
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Operator toOPERATOR_END_DT
Operator: Rock Products IncFrom: May 1, 1998To: Feb 7, 1999Controller: Not shownFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Rock Products Inc
- Operator IDOPERATOR_ID
- L01228
- Operator fromOPERATOR_START_DT
- May 1, 1998
- Operator toOPERATOR_END_DT
- Feb 7, 1999
Controller
- Controller IDCONTROLLER_ID
- M01074
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Searcy Asphalt & Materials IncFrom: Mar 27, 1985To: Apr 30, 1998Controller: Not shownFrom : Mar 27, 1985To : Apr 30, 1998Details
Operator
- OperatorOPERATOR_NAME
- Searcy Asphalt & Materials Inc
- Operator IDOPERATOR_ID
- L07756
- Operator fromOPERATOR_START_DT
- Mar 27, 1985
- Operator toOPERATOR_END_DT
- Apr 30, 1998
Controller
- Controller IDCONTROLLER_ID
- M06164
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Mar 27, 1985
- Controller toCONTROLLER_END_DT
- Apr 30, 1998
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
ControllerCONTROLLER_NAME
Operator: St Francis Material CompanyFrom: Jan 1, 1950To: Mar 26, 1985Controller: Ben M Hogan Company IncFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- St Francis Material Company
- Operator IDOPERATOR_ID
- L00257
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
- Operator toOPERATOR_END_DT
- Mar 26, 1985
Controller
- ControllerCONTROLLER_NAME
- Ben M Hogan Company Inc
- Controller IDCONTROLLER_ID
- M00306
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
Vulcan Construction Materials, LLC·Contact title Safety and Health Director·10101 Reunion Place, Ste. 500, San Antonio TX 78216
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Vulcan Construction Materials, LLC
- Contact titleCONTACT_TITLE
- Safety and Health Director
- StreetSTREET
- 10101 Reunion Place, Ste. 500
- CityCITY
- San Antonio
- StateSTATE_ABBR
- TX
- State nameSTATE
- Texas
- ZIP codeZIP_CD
- 78216
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 48
Mine
- Mine IDMINE_ID
- 0301140
- Mine name in this fileMINE_NAME
- Searcy Quarry
- Nearest townNEAREST_TOWN
- Judsonia
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Oct 10, 2006
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Sandstone
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology