Citations and orders
105
since Mar 12, 2001 · 104 to the operator, 1 to contractors · 20 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
May 12 to May 14, 2026Inspectors 1 | Hours on site 15.25

The inspection

BeganINSPECTION_BEGIN_DT
May 12, 2026
Closed outINSPECTION_END_DT
May 14, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03A520
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
26

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Jan 8, 2026Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Jan 8, 2026
Closed outINSPECTION_END_DT
Jan 8, 2026
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
F03A50D
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Total inspection hoursSUM_TOTAL_INSP_HOURS
1

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 12 to Nov 14, 2025Inspectors 1 | Hours on site 17.5

The inspection

BeganINSPECTION_BEGIN_DT
Nov 12, 2025
Closed outINSPECTION_END_DT
Nov 14, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0207B1
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
28

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 15 to Sep 17, 2025Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Sep 15, 2025
Closed outINSPECTION_END_DT
Sep 17, 2025
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
F0207A4
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 23 to Apr 24, 2025Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 23, 2025
Closed outINSPECTION_END_DT
Apr 24, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0151F4
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 14 to Jan 15, 2025Inspectors 1 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Jan 14, 2025
Closed outINSPECTION_END_DT
Jan 15, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F00690C
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
17.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 3 to Jun 7, 2024Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Jun 3, 2024
Closed outINSPECTION_END_DT
Jun 7, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F005553
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
26

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 20 to Nov 22, 2023Inspectors 1 | Hours on site 23.5

The inspection

BeganINSPECTION_BEGIN_DT
Nov 20, 2023
Closed outINSPECTION_END_DT
Nov 22, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6932179
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
23.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
29

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 27 to Jun 30, 2023Inspectors 1 | Hours on site 26.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 27, 2023
Closed outINSPECTION_END_DT
Jun 30, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6934555
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
26.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
30

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
May 17, 2023Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2023
Closed outINSPECTION_END_DT
May 17, 2023
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6806026
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
1

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 14 to Feb 16, 2023Inspectors 1 | Hours on site 26

The inspection

BeganINSPECTION_BEGIN_DT
Feb 14, 2023
Closed outINSPECTION_END_DT
Feb 16, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6934509
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
26
Total inspection hoursSUM_TOTAL_INSP_HOURS
29

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 24 to Jun 2, 2022Inspectors 1 | Hours on site 23.5

The inspection

BeganINSPECTION_BEGIN_DT
May 24, 2022
Closed outINSPECTION_END_DT
Jun 2, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6888852
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
23.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
28

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 11 to Jan 13, 2022Inspectors 1 | Hours on site 20

The inspection

BeganINSPECTION_BEGIN_DT
Jan 11, 2022
Closed outINSPECTION_END_DT
Jan 13, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6888817
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
20
Total inspection hoursSUM_TOTAL_INSP_HOURS
24

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 1 to Jun 3, 2021Inspectors 1 | Hours on site 20

The inspection

BeganINSPECTION_BEGIN_DT
Jun 1, 2021
Closed outINSPECTION_END_DT
Jun 3, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6884977
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
20
Total inspection hoursSUM_TOTAL_INSP_HOURS
28

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 3 to Nov 5, 2020Inspectors 1 | Hours on site 27.25

The inspection

BeganINSPECTION_BEGIN_DT
Nov 3, 2020
Closed outINSPECTION_END_DT
Nov 5, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6884931
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
27.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
30

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 8 to Sep 9, 2020Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Sep 8, 2020
Closed outINSPECTION_END_DT
Sep 9, 2020
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6884325
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
15

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 16 to Jul 17, 2020Inspectors 1 | Hours on site 6.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 16, 2020
Closed outINSPECTION_END_DT
Jul 17, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6884313
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
16

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 7 to Jan 9, 2020Inspectors 1 | Hours on site 9.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 7, 2020
Closed outINSPECTION_END_DT
Jan 9, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6808178
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
18.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 24 to Jun 25, 2019Inspectors 1 | Hours on site 13.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 24, 2019
Closed outINSPECTION_END_DT
Jun 25, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6810702
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
13.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 13 to Feb 14, 2019Inspectors 1 | Hours on site 15.25

The inspection

BeganINSPECTION_BEGIN_DT
Feb 13, 2019
Closed outINSPECTION_END_DT
Feb 14, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804373
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 26, 2018Inspectors 1 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Sep 26, 2018
Closed outINSPECTION_END_DT
Sep 26, 2018
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6806002
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 8 to Aug 9, 2018Inspectors 1 | Hours on site 18.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 8, 2018
Closed outINSPECTION_END_DT
Aug 9, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6739097
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
18.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
24

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 10 to Jan 11, 2018Inspectors 1 | Hours on site 9.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 10, 2018
Closed outINSPECTION_END_DT
Jan 11, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6739058
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 19 to Apr 20, 2017Inspectors 1 | Hours on site 12.25

The inspection

BeganINSPECTION_BEGIN_DT
Apr 19, 2017
Closed outINSPECTION_END_DT
Apr 20, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6738636
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
22.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 7 to Nov 8, 2016Inspectors 1 | Hours on site 11.25

The inspection

BeganINSPECTION_BEGIN_DT
Nov 7, 2016
Closed outINSPECTION_END_DT
Nov 8, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6735940
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
11.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 64 inspections and other MSHA visits since Mar 12, 2001; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: May 13, 2026
Type: Citation
Standard: 56.11012
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170140
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 13, 2026
Time issuedVIOLATION_ISSUE_TIME
0752
Date of occurrenceVIOLATION_OCCUR_DT
May 13, 2026
30 CFR part and sectionPART_SECTION
56.11012
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 13, 2026
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
May 13, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
May 13, 2026
Terminated, timeTERMINATION_TIME
0904
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Aug 15, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 22, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F03A520
Inspection beganINSPECTION_BEGIN_DT
May 12, 2026
Inspection closed outINSPECTION_END_DT
May 14, 2026
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 12, 2026
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170138
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 12, 2026
Time issuedVIOLATION_ISSUE_TIME
0950
Date of occurrenceVIOLATION_OCCUR_DT
May 12, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 13, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 13, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 13, 2026
Terminated, timeTERMINATION_TIME
0718
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Aug 15, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 22, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F03A520
Inspection beganINSPECTION_BEGIN_DT
May 12, 2026
Inspection closed outINSPECTION_END_DT
May 14, 2026
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 12, 2026
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $642.00
Details

The citation

Citation or order numberVIOLATION_NO
5170139
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 12, 2026
Time issuedVIOLATION_ISSUE_TIME
1029
Date of occurrenceVIOLATION_OCCUR_DT
May 12, 2026
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 12, 2026
Originally due, timeORIG_TERM_DUE_TIME
1039
Latest dueLATEST_TERM_DUE_DT
May 12, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1039
TerminatedTERMINATION_DT
May 12, 2026
Terminated, timeTERMINATION_TIME
1256
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
642
Current proposed assessmentAMOUNT_DUE
642
Amount paidAMOUNT_PAID
642
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Aug 15, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 22, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F03A520
Inspection beganINSPECTION_BEGIN_DT
May 12, 2026
Inspection closed outINSPECTION_END_DT
May 14, 2026
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 12, 2026
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170137
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 12, 2026
Time issuedVIOLATION_ISSUE_TIME
0925
Date of occurrenceVIOLATION_OCCUR_DT
May 12, 2026
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 13, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 13, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 13, 2026
Terminated, timeTERMINATION_TIME
0720
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Aug 15, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 22, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F03A520
Inspection beganINSPECTION_BEGIN_DT
May 12, 2026
Inspection closed outINSPECTION_END_DT
May 14, 2026
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 8, 2026
Type: Citation
Standard: 50.20-1
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170045
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 8, 2026
Time issuedVIOLATION_ISSUE_TIME
0935
Date of occurrenceVIOLATION_OCCUR_DT
Jan 8, 2026
30 CFR part and sectionPART_SECTION
50.20-1
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 8, 2026
Originally due, timeORIG_TERM_DUE_TIME
0950
Latest dueLATEST_TERM_DUE_DT
Jan 8, 2026
Latest due, timeLATEST_TERM_DUE_TIME
0950
TerminatedTERMINATION_DT
Jan 8, 2026
Terminated, timeTERMINATION_TIME
0945
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Feb 11, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Mar 20, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 6, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F03A50D
Inspection beganINSPECTION_BEGIN_DT
Jan 8, 2026
Inspection closed outINSPECTION_END_DT
Jan 8, 2026
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 13, 2025
Type: Order
Standard: 46.7(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $168.00
Details

The citation

Citation or order numberVIOLATION_NO
5171017
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Nov 13, 2025
Time issuedVIOLATION_ISSUE_TIME
0954
Date of occurrenceVIOLATION_OCCUR_DT
Nov 13, 2025
30 CFR part and sectionPART_SECTION
46.7(a)
Section of the Act, primarySECTION_OF_ACT_1
104(g)(1)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

TerminatedTERMINATION_DT
Nov 13, 2025
Terminated, timeTERMINATION_TIME
1036
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
168
Current proposed assessmentAMOUNT_DUE
168
Amount paidAMOUNT_PAID
168
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 19, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0207B1
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2025
Inspection closed outINSPECTION_END_DT
Nov 14, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (17)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 12, 2025
Type: Citation
Standard: 56.12018
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
5171011
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2025
Time issuedVIOLATION_ISSUE_TIME
1131
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2025
30 CFR part and sectionPART_SECTION
56.12018
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 12, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 12, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 12, 2025
Terminated, timeTERMINATION_TIME
1156
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 19, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0207B1
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2025
Inspection closed outINSPECTION_END_DT
Nov 14, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 12, 2025
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5171012
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2025
Time issuedVIOLATION_ISSUE_TIME
1416
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2025
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 12, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 12, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 13, 2025
Terminated, timeTERMINATION_TIME
0906
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 19, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0207B1
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2025
Inspection closed outINSPECTION_END_DT
Nov 14, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 12, 2025
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5171013
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2025
Time issuedVIOLATION_ISSUE_TIME
1438
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2025
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 12, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 12, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 13, 2025
Terminated, timeTERMINATION_TIME
0856
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 19, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0207B1
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2025
Inspection closed outINSPECTION_END_DT
Nov 14, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 12, 2025
Type: Citation
Standard: 56.12018
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5171014
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2025
Time issuedVIOLATION_ISSUE_TIME
1443
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2025
30 CFR part and sectionPART_SECTION
56.12018
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 12, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 12, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 12, 2025
Terminated, timeTERMINATION_TIME
1448
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 19, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0207B1
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2025
Inspection closed outINSPECTION_END_DT
Nov 14, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 12, 2025
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5171010
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2025
Time issuedVIOLATION_ISSUE_TIME
1019
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2025
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 12, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 12, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 12, 2025
Terminated, timeTERMINATION_TIME
1158
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Feb 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 19, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0207B1
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2025
Inspection closed outINSPECTION_END_DT
Nov 14, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 23, 2025
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5000302
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 23, 2025
Time issuedVIOLATION_ISSUE_TIME
0953
Date of occurrenceVIOLATION_OCCUR_DT
Apr 23, 2025
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 23, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Apr 23, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Apr 24, 2025
Terminated, timeTERMINATION_TIME
0800
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jun 11, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jul 20, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 3, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F0151F4
Inspection beganINSPECTION_BEGIN_DT
Apr 23, 2025
Inspection closed outINSPECTION_END_DT
Apr 24, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 14, 2025
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5000236
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 14, 2025
Time issuedVIOLATION_ISSUE_TIME
1401
Date of occurrenceVIOLATION_OCCUR_DT
Jan 14, 2025
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 14, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jan 14, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jan 14, 2025
Terminated, timeTERMINATION_TIME
1430
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 11, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 31, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F00690C
Inspection beganINSPECTION_BEGIN_DT
Jan 14, 2025
Inspection closed outINSPECTION_END_DT
Jan 15, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 14, 2025
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
5000235
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 14, 2025
Time issuedVIOLATION_ISSUE_TIME
1303
Date of occurrenceVIOLATION_OCCUR_DT
Jan 14, 2025
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 14, 2025
Originally due, timeORIG_TERM_DUE_TIME
1348
Latest dueLATEST_TERM_DUE_DT
Jan 14, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1348
TerminatedTERMINATION_DT
Jan 15, 2025
Terminated, timeTERMINATION_TIME
0930
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 11, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 31, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F00690C
Inspection beganINSPECTION_BEGIN_DT
Jan 14, 2025
Inspection closed outINSPECTION_END_DT
Jan 15, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 14, 2025
Type: Citation
Standard: 56.11002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5000234
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 14, 2025
Time issuedVIOLATION_ISSUE_TIME
1256
Date of occurrenceVIOLATION_OCCUR_DT
Jan 14, 2025
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 14, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jan 14, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jan 15, 2025
Terminated, timeTERMINATION_TIME
0927
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 11, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 31, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F00690C
Inspection beganINSPECTION_BEGIN_DT
Jan 14, 2025
Inspection closed outINSPECTION_END_DT
Jan 15, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 14, 2025
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
5000233
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 14, 2025
Time issuedVIOLATION_ISSUE_TIME
1215
Date of occurrenceVIOLATION_OCCUR_DT
Jan 14, 2025
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 14, 2025
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Jan 14, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Jan 14, 2025
Terminated, timeTERMINATION_TIME
1416
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 11, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 31, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F00690C
Inspection beganINSPECTION_BEGIN_DT
Jan 14, 2025
Inspection closed outINSPECTION_END_DT
Jan 15, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 14, 2025
Type: Citation
Standard: 56.9300(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
5000237
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 14, 2025
Time issuedVIOLATION_ISSUE_TIME
1408
Date of occurrenceVIOLATION_OCCUR_DT
Jan 14, 2025
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 14, 2025
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jan 14, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jan 14, 2025
Terminated, timeTERMINATION_TIME
1709
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 11, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 31, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
F00690C
Inspection beganINSPECTION_BEGIN_DT
Jan 14, 2025
Inspection closed outINSPECTION_END_DT
Jan 15, 2025
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 21, 2023
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9742546
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 21, 2023
Time issuedVIOLATION_ISSUE_TIME
0845
Date of occurrenceVIOLATION_OCCUR_DT
Nov 21, 2023
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 21, 2023
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Nov 21, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Nov 21, 2023
Terminated, timeTERMINATION_TIME
0850
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jan 10, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6932179
Inspection beganINSPECTION_BEGIN_DT
Nov 20, 2023
Inspection closed outINSPECTION_END_DT
Nov 22, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 20, 2023
Type: Citation
Standard: 47.44(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9742545
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 20, 2023
Time issuedVIOLATION_ISSUE_TIME
1350
Date of occurrenceVIOLATION_OCCUR_DT
Nov 20, 2023
30 CFR part and sectionPART_SECTION
47.44(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 20, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 20, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 20, 2023
Terminated, timeTERMINATION_TIME
1352
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jan 10, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6932179
Inspection beganINSPECTION_BEGIN_DT
Nov 20, 2023
Inspection closed outINSPECTION_END_DT
Nov 22, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 27, 2023
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9744620
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 27, 2023
Time issuedVIOLATION_ISSUE_TIME
0923
Date of occurrenceVIOLATION_OCCUR_DT
Jun 27, 2023
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 27, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 27, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 27, 2023
Terminated, timeTERMINATION_TIME
1100
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 5, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6934555
Inspection beganINSPECTION_BEGIN_DT
Jun 27, 2023
Inspection closed outINSPECTION_END_DT
Jun 30, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 27, 2023
Type: Citation
Standard: 56.14132(a)
S&S: Y
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $2,014.00
Details

The citation

Citation or order numberVIOLATION_NO
9744621
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 27, 2023
Time issuedVIOLATION_ISSUE_TIME
1003
Date of occurrenceVIOLATION_OCCUR_DT
Jun 27, 2023
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 27, 2023
Originally due, timeORIG_TERM_DUE_TIME
1015
Latest dueLATEST_TERM_DUE_DT
Jun 28, 2023
Latest due, timeLATEST_TERM_DUE_TIME
0700
TerminatedTERMINATION_DT
Jun 29, 2023
Terminated, timeTERMINATION_TIME
0854
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2014
Current proposed assessmentAMOUNT_DUE
2014
Amount paidAMOUNT_PAID
2014
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 5, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6934555
Inspection beganINSPECTION_BEGIN_DT
Jun 27, 2023
Inspection closed outINSPECTION_END_DT
Jun 30, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 27, 2023
Type: Citation
Standard: 56.14103(b)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9744622
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 27, 2023
Time issuedVIOLATION_ISSUE_TIME
1018
Date of occurrenceVIOLATION_OCCUR_DT
Jun 27, 2023
30 CFR part and sectionPART_SECTION
56.14103(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 27, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 27, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 27, 2023
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 5, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6934555
Inspection beganINSPECTION_BEGIN_DT
Jun 27, 2023
Inspection closed outINSPECTION_END_DT
Jun 30, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 27, 2023
Type: Citation
Standard: 56.12019
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9744618
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 27, 2023
Time issuedVIOLATION_ISSUE_TIME
0733
Date of occurrenceVIOLATION_OCCUR_DT
Jun 27, 2023
30 CFR part and sectionPART_SECTION
56.12019
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 27, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 27, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 27, 2023
Terminated, timeTERMINATION_TIME
0745
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 5, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6934555
Inspection beganINSPECTION_BEGIN_DT
Jun 27, 2023
Inspection closed outINSPECTION_END_DT
Jun 30, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 15, 2023
Type: Citation
Standard: 56.11012
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9677106
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 15, 2023
Time issuedVIOLATION_ISSUE_TIME
0755
Date of occurrenceVIOLATION_OCCUR_DT
Feb 15, 2023
30 CFR part and sectionPART_SECTION
56.11012
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 15, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Feb 15, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Feb 15, 2023
Terminated, timeTERMINATION_TIME
0810
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Mar 30, 2023
Final order dateFINAL_ORDER_ISSUE_DT
May 14, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 13, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Inspection eventEVENT_NO
6934509
Inspection beganINSPECTION_BEGIN_DT
Feb 14, 2023
Inspection closed outINSPECTION_END_DT
Feb 16, 2023
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 24, 2022
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9646782
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 24, 2022
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
May 24, 2022
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 24, 2022
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
May 24, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 2, 2022
Terminated, timeTERMINATION_TIME
1038
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Jun 28, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Aug 12, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 25, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Ronnie Duffield Gravel Company
Operator IDVIOLATOR_ID
L03692
Controller IDCONTROLLER_ID
0164763
Inspection eventEVENT_NO
6888852
Inspection beganINSPECTION_BEGIN_DT
May 24, 2022
Inspection closed outINSPECTION_END_DT
Jun 2, 2022
Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

105 citations and orders since Mar 12, 2001: 104 issued to the operator, 1 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: May 13, 2026
Citation number: 5170140
Standard: 56.11012
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170140
Assessment control numberASSESS_CASE_NO
000644416
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 22, 2026
Citation issuedISSUE_DT
May 13, 2026
Date of occurrenceOCCURRENCE_DT
May 13, 2026
Final order dateFINAL_ORDER_DT
Aug 15, 2026
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 15, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11012
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
14
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1.44
Operator hours worked at the mineVIOLATOR_MINE_HRS
48317
Size of mineSIZE_OF_MINE
48317
Controller hours workedCONTROLLER_HRS
141057
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
141057
History period startHISTORY_START_DT
Feb 13, 2025
History period endHISTORY_END_DT
May 12, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A520
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 12, 2026
Citation number: 5170137
Standard: 56.14112(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170137
Assessment control numberASSESS_CASE_NO
000644416
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 22, 2026
Citation issuedISSUE_DT
May 12, 2026
Date of occurrenceOCCURRENCE_DT
May 12, 2026
Final order dateFINAL_ORDER_DT
Aug 15, 2026
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 15, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
1.63
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
3
Repeat violations per inspection dayRPID
0.375
Operator hours worked at the mineVIOLATOR_MINE_HRS
48317
Size of mineSIZE_OF_MINE
48317
Controller hours workedCONTROLLER_HRS
141057
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
141057
History period startHISTORY_START_DT
Feb 12, 2025
History period endHISTORY_END_DT
May 11, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A520
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 12, 2026
Citation number: 5170138
Standard: 56.20003(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170138
Assessment control numberASSESS_CASE_NO
000644416
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 22, 2026
Citation issuedISSUE_DT
May 12, 2026
Date of occurrenceOCCURRENCE_DT
May 12, 2026
Final order dateFINAL_ORDER_DT
Aug 15, 2026
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 15, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
1.63
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
48317
Size of mineSIZE_OF_MINE
48317
Controller hours workedCONTROLLER_HRS
141057
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
141057
History period startHISTORY_START_DT
Feb 12, 2025
History period endHISTORY_END_DT
May 11, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A520
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 12, 2026
Citation number: 5170139
Standard: 56.20003(a)
Proposed penalty: $642.00
Current assessment: $642.00
Paid against proposed penalty: $642.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170139
Assessment control numberASSESS_CASE_NO
000644416
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 22, 2026
Citation issuedISSUE_DT
May 12, 2026
Date of occurrenceOCCURRENCE_DT
May 12, 2026
Final order dateFINAL_ORDER_DT
Aug 15, 2026
Bill first printedBILL_PRINT_DT
Jul 8, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 15, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
642.00
Current assessmentCURRENT_ASSESSMENT_AMT
642.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
642.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
1.63
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
48317
Size of mineSIZE_OF_MINE
48317
Controller hours workedCONTROLLER_HRS
141057
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
141057
History period startHISTORY_START_DT
Feb 12, 2025
History period endHISTORY_END_DT
May 11, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A520
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 8, 2026
Citation number: 5170045
Standard: 50.20-1
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170045
Assessment control numberASSESS_CASE_NO
000635559
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 6, 2026
Citation issuedISSUE_DT
Jan 8, 2026
Date of occurrenceOCCURRENCE_DT
Jan 8, 2026
Final order dateFINAL_ORDER_DT
Mar 20, 2026
Bill first printedBILL_PRINT_DT
Feb 11, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 20, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.20-1
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
0.6
Operator hours worked at the mineVIOLATOR_MINE_HRS
48317
Size of mineSIZE_OF_MINE
48317
Controller hours workedCONTROLLER_HRS
141057
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
141057
History period startHISTORY_START_DT
Oct 8, 2024
History period endHISTORY_END_DT
Jan 7, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A50D
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 13, 2025
Citation number: 5171017
Standard: 46.7(a)
Proposed penalty: $168.00
Current assessment: $168.00
Paid against proposed penalty: $168.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5171017
Assessment control numberASSESS_CASE_NO
000634261
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Nov 13, 2025
Date of occurrenceOCCURRENCE_DT
Nov 13, 2025
Final order dateFINAL_ORDER_DT
Feb 19, 2026
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 19, 2026
Citation typeCITATION_TYPE_CD
Order
30 CFR standardCFR_STANDARD_CD
46.7(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(g)(1)

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
168.00
Current assessmentCURRENT_ASSESSMENT_AMT
168.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
168.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
0.75
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Aug 13, 2024
History period endHISTORY_END_DT
Nov 12, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0207B1
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (3)

Significant and substantialSIG_SUB_IND, Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2025
Citation number: 5171012
Standard: 56.14112(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5171012
Assessment control numberASSESS_CASE_NO
000634261
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Nov 12, 2025
Date of occurrenceOCCURRENCE_DT
Nov 12, 2025
Final order dateFINAL_ORDER_DT
Feb 19, 2026
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 19, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Aug 12, 2024
History period endHISTORY_END_DT
Nov 11, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0207B1
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2025
Citation number: 5171014
Standard: 56.12018
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5171014
Assessment control numberASSESS_CASE_NO
000634261
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Nov 12, 2025
Date of occurrenceOCCURRENCE_DT
Nov 12, 2025
Final order dateFINAL_ORDER_DT
Feb 19, 2026
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 19, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12018
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Aug 12, 2024
History period endHISTORY_END_DT
Nov 11, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0207B1
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2025
Citation number: 5171010
Standard: 56.14112(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5171010
Assessment control numberASSESS_CASE_NO
000634261
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Nov 12, 2025
Date of occurrenceOCCURRENCE_DT
Nov 12, 2025
Final order dateFINAL_ORDER_DT
Feb 19, 2026
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 19, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Aug 12, 2024
History period endHISTORY_END_DT
Nov 11, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0207B1
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2025
Citation number: 5171011
Standard: 56.12018
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5171011
Assessment control numberASSESS_CASE_NO
000634261
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Nov 12, 2025
Date of occurrenceOCCURRENCE_DT
Nov 12, 2025
Final order dateFINAL_ORDER_DT
Feb 19, 2026
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 19, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12018
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Aug 12, 2024
History period endHISTORY_END_DT
Nov 11, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0207B1
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2025
Citation number: 5171013
Standard: 56.14112(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5171013
Assessment control numberASSESS_CASE_NO
000634261
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Nov 12, 2025
Date of occurrenceOCCURRENCE_DT
Nov 12, 2025
Final order dateFINAL_ORDER_DT
Feb 19, 2026
Bill first printedBILL_PRINT_DT
Jan 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 19, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Aug 12, 2024
History period endHISTORY_END_DT
Nov 11, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0207B1
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 23, 2025
Citation number: 5000302
Standard: 56.14107(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000302
Assessment control numberASSESS_CASE_NO
000622035
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 3, 2025
Citation issuedISSUE_DT
Apr 23, 2025
Date of occurrenceOCCURRENCE_DT
Apr 23, 2025
Final order dateFINAL_ORDER_DT
Jul 20, 2025
Bill first printedBILL_PRINT_DT
Jun 11, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 20, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1.75
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Jan 23, 2024
History period endHISTORY_END_DT
Apr 22, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0151F4
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 14, 2025
Citation number: 5000236
Standard: 56.14207
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000236
Assessment control numberASSESS_CASE_NO
000615891
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2025
Citation issuedISSUE_DT
Jan 14, 2025
Date of occurrenceOCCURRENCE_DT
Jan 14, 2025
Final order dateFINAL_ORDER_DT
Apr 11, 2025
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 11, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.29
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Oct 14, 2023
History period endHISTORY_END_DT
Jan 13, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00690C
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 14, 2025
Citation number: 5000235
Standard: 56.20003(a)
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000235
Assessment control numberASSESS_CASE_NO
000615891
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2025
Citation issuedISSUE_DT
Jan 14, 2025
Date of occurrenceOCCURRENCE_DT
Jan 14, 2025
Final order dateFINAL_ORDER_DT
Apr 11, 2025
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 11, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.29
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Oct 14, 2023
History period endHISTORY_END_DT
Jan 13, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00690C
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 14, 2025
Citation number: 5000237
Standard: 56.9300(a)
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000237
Assessment control numberASSESS_CASE_NO
000615891
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2025
Citation issuedISSUE_DT
Jan 14, 2025
Date of occurrenceOCCURRENCE_DT
Jan 14, 2025
Final order dateFINAL_ORDER_DT
Apr 11, 2025
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 11, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.29
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Oct 14, 2023
History period endHISTORY_END_DT
Jan 13, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00690C
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 14, 2025
Citation number: 5000233
Standard: 56.20003(a)
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000233
Assessment control numberASSESS_CASE_NO
000615891
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2025
Citation issuedISSUE_DT
Jan 14, 2025
Date of occurrenceOCCURRENCE_DT
Jan 14, 2025
Final order dateFINAL_ORDER_DT
Apr 11, 2025
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 11, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.29
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Oct 14, 2023
History period endHISTORY_END_DT
Jan 13, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00690C
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 14, 2025
Citation number: 5000234
Standard: 56.11002
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000234
Assessment control numberASSESS_CASE_NO
000615891
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2025
Citation issuedISSUE_DT
Jan 14, 2025
Date of occurrenceOCCURRENCE_DT
Jan 14, 2025
Final order dateFINAL_ORDER_DT
Apr 11, 2025
Bill first printedBILL_PRINT_DT
Mar 5, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 11, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.29
Operator hours worked at the mineVIOLATOR_MINE_HRS
53579
Size of mineSIZE_OF_MINE
53579
Controller hours workedCONTROLLER_HRS
148527
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
148527
History period startHISTORY_START_DT
Oct 14, 2023
History period endHISTORY_END_DT
Jan 13, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00690C
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 21, 2023
Citation number: 9742546
Standard: 56.14112(a)(1)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9742546
Assessment control numberASSESS_CASE_NO
000592055
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2024
Citation issuedISSUE_DT
Nov 21, 2023
Date of occurrenceOCCURRENCE_DT
Nov 21, 2023
Final order dateFINAL_ORDER_DT
Feb 16, 2024
Bill first printedBILL_PRINT_DT
Jan 10, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 16, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.38
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Aug 21, 2022
History period endHISTORY_END_DT
Nov 20, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6932179
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 20, 2023
Citation number: 9742545
Standard: 47.44(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9742545
Assessment control numberASSESS_CASE_NO
000592055
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2024
Citation issuedISSUE_DT
Nov 20, 2023
Date of occurrenceOCCURRENCE_DT
Nov 20, 2023
Final order dateFINAL_ORDER_DT
Feb 16, 2024
Bill first printedBILL_PRINT_DT
Jan 10, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 16, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.44(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
0.45
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Aug 20, 2022
History period endHISTORY_END_DT
Nov 19, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6932179
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 27, 2023
Citation number: 9744618
Standard: 56.12019
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744618
Assessment control numberASSESS_CASE_NO
000584420
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 5, 2023
Citation issuedISSUE_DT
Jun 27, 2023
Date of occurrenceOCCURRENCE_DT
Jun 27, 2023
Final order dateFINAL_ORDER_DT
Oct 11, 2023
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12019
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
0.3
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Mar 27, 2022
History period endHISTORY_END_DT
Jun 26, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934555
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 27, 2023
Citation number: 9744622
Standard: 56.14103(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744622
Assessment control numberASSESS_CASE_NO
000584420
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 5, 2023
Citation issuedISSUE_DT
Jun 27, 2023
Date of occurrenceOCCURRENCE_DT
Jun 27, 2023
Final order dateFINAL_ORDER_DT
Oct 11, 2023
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14103(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
0.3
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Mar 27, 2022
History period endHISTORY_END_DT
Jun 26, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934555
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 27, 2023
Citation number: 9744620
Standard: 56.14107(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744620
Assessment control numberASSESS_CASE_NO
000584420
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 5, 2023
Citation issuedISSUE_DT
Jun 27, 2023
Date of occurrenceOCCURRENCE_DT
Jun 27, 2023
Final order dateFINAL_ORDER_DT
Oct 11, 2023
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
0.3
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Mar 27, 2022
History period endHISTORY_END_DT
Jun 26, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934555
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 27, 2023
Citation number: 9744621
Standard: 56.14132(a)
Proposed penalty: $2,014.00
Current assessment: $2,014.00
Paid against proposed penalty: $2,014.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744621
Assessment control numberASSESS_CASE_NO
000584420
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 5, 2023
Citation issuedISSUE_DT
Jun 27, 2023
Date of occurrenceOCCURRENCE_DT
Jun 27, 2023
Final order dateFINAL_ORDER_DT
Oct 11, 2023
Bill first printedBILL_PRINT_DT
Sep 6, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2014.00
Current assessmentCURRENT_ASSESSMENT_AMT
2014.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2014.00

Penalty points

Violation history pointsPENALTY_POINTS
93
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
0.3
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Mar 27, 2022
History period endHISTORY_END_DT
Jun 26, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934555
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 15, 2023
Citation number: 9677106
Standard: 56.11012
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9677106
Assessment control numberASSESS_CASE_NO
000573873
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 13, 2023
Citation issuedISSUE_DT
Feb 15, 2023
Date of occurrenceOCCURRENCE_DT
Feb 15, 2023
Final order dateFINAL_ORDER_DT
May 14, 2023
Bill first printedBILL_PRINT_DT
Mar 30, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11012
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
0.18
Operator hours worked at the mineVIOLATOR_MINE_HRS
55953
Size of mineSIZE_OF_MINE
55953
Controller hours workedCONTROLLER_HRS
139354
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
139354
History period startHISTORY_START_DT
Nov 15, 2021
History period endHISTORY_END_DT
Feb 14, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934509
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 24, 2022
Citation number: 9646782
Standard: 56.14100(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9646782
Assessment control numberASSESS_CASE_NO
000557629
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 25, 2022
Citation issuedISSUE_DT
May 24, 2022
Date of occurrenceOCCURRENCE_DT
May 24, 2022
Final order dateFINAL_ORDER_DT
Aug 12, 2022
Bill first printedBILL_PRINT_DT
Jun 28, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
33
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
53846
Size of mineSIZE_OF_MINE
53846
Controller hours workedCONTROLLER_HRS
130070
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
130070
History period startHISTORY_START_DT
Feb 24, 2021
History period endHISTORY_END_DT
May 23, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Ronnie Duffield Gravel Company
IDVIOLATOR_ID
L03692
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6888852
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 104 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

DAYS AWAY FROM WORK ONLY
3
DYS AWY FRM WRK & RESTRCTD ACT
2
Date: Jan 13, 2025
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 363
Details

The report

Document numberDOCUMENT_NO
220250240013
DateACCIDENT_DT
Jan 13, 2025
TimeACCIDENT_TIME
0530
Shift beganSHIFT_BEGIN_TIME
0530
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Days lostDAYS_LOST
363
Returned to workRETURN_TO_WORK_DT
Jun 25, 2026

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
0169560
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 11, 2010
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: POWERED HAULAGE
Accident type: Over-exertion NEC
Days lost: 7
Details

The report

Document numberDOCUMENT_NO
220100280040
DateACCIDENT_DT
Jan 11, 2010
TimeACCIDENT_TIME
1600
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320100400019

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
LOWER LEG/TIBIA/FIBULA
Part of body codeINJ_BODY_PART_CD
513
Days of restricted workDAYS_RESTRICT
13
Days lostDAYS_LOST
7
Returned to workRETURN_TO_WORK_DT
Feb 24, 2010

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
Equipment model numberEQUIP_MODEL_NO
345B
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Oct 7, 2008
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion NEC
Days lost: 3
Details

The report

Document numberDOCUMENT_NO
220083010075
DateACCIDENT_DT
Oct 7, 2008
TimeACCIDENT_TIME
1330
Shift beganSHIFT_BEGIN_TIME
0709
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320082980010

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days lostDAYS_LOST
3
Returned to workRETURN_TO_WORK_DT
Oct 13, 2008

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 13, 2007
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 50
Details

The report

Document numberDOCUMENT_NO
220072420047
DateACCIDENT_DT
Aug 13, 2007
TimeACCIDENT_TIME
0730
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320073270011

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
HERNIA;RUPTURE
Nature of injury codeNATURE_INJURY_CD
260
Part of bodyINJ_BODY_PART
HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
Part of body codeINJ_BODY_PART_CD
440
Days lostDAYS_LOST
50
Returned to workRETURN_TO_WORK_DT
Nov 12, 2007

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2007
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 29, 2005
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220052900092
DateACCIDENT_DT
Sep 29, 2005
TimeACCIDENT_TIME
0815
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
RBR,GLS,PLSTC,FIBRGLS,FAB
Source of injury codeINJURY_SOURCE_CD
007
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
2
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Oct 3, 2005

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Controller IDCONTROLLER_ID
M02961
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2005
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2005
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

5 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 2,324
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
2324
Average hours per employeeAVG_EMPLOYEE_HOURS
775

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 21
Hours worked: 37,977
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
21
Hours workedANNUAL_HRS
37977
Average hours per employeeAVG_EMPLOYEE_HOURS
1808

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 780
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
780
Average hours per employeeAVG_EMPLOYEE_HOURS
390

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 22
Hours worked: 48,317
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
22
Hours workedANNUAL_HRS
48317
Average hours per employeeAVG_EMPLOYEE_HOURS
2196

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 780
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
780
Average hours per employeeAVG_EMPLOYEE_HOURS
390

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 24
Hours worked: 53,579
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
53579
Average hours per employeeAVG_EMPLOYEE_HOURS
2232

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 660
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
660
Average hours per employeeAVG_EMPLOYEE_HOURS
330

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 23
Hours worked: 59,363
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
23
Hours workedANNUAL_HRS
59363
Average hours per employeeAVG_EMPLOYEE_HOURS
2581

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 810
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
810
Average hours per employeeAVG_EMPLOYEE_HOURS
405

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 22
Hours worked: 55,953
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
22
Hours workedANNUAL_HRS
55953
Average hours per employeeAVG_EMPLOYEE_HOURS
2543

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 780
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
780
Average hours per employeeAVG_EMPLOYEE_HOURS
390

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 20
Hours worked: 53,846
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
20
Hours workedANNUAL_HRS
53846
Average hours per employeeAVG_EMPLOYEE_HOURS
2692

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 780
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
780
Average hours per employeeAVG_EMPLOYEE_HOURS
390

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 17
Hours worked: 46,430
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
46430
Average hours per employeeAVG_EMPLOYEE_HOURS
2731

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 780
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
780
Average hours per employeeAVG_EMPLOYEE_HOURS
390

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 13
Hours worked: 32,577
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
13
Hours workedANNUAL_HRS
32577
Average hours per employeeAVG_EMPLOYEE_HOURS
2506

Mine

Mine IDMINE_ID
0301618
Mine name in this fileCURR_MINE_NM
Gum Log Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Little Rock AR Field Office
Nearest town
Russellville
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
17
Tailing ponds
0
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Gum Log Quarry
Mine IDMINE_ID
0301618
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Apr 23, 2004
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDCURRENT_OPERATOR_ID
L03692
Controller IDCURRENT_CONTROLLER_ID
0169560
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jan 1, 1987

Location and MSHA office

StateSTATE
AR
Bureau of Mines state codeBOM_STATE_CD
03
FIPS county codeFIPS_CNTY_CD
115
FIPS county nameFIPS_CNTY_NM
Pope
Congressional districtCONG_DIST_CD
03
Nearest townNEAREST_TOWN
Russellville
MSHA districtDISTRICT
M5
MSHA office codeOFFICE_CD
M5871
MSHA officeOFFICE_NAME
Little Rock AR Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
100
Most recent assessment control numberASSESS_CTRL_NO
000644416

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Sandstone
Primary commodity codePRIMARY_SIC_CD
142902
Primary SIC codePRIMARY_SIC_CD_1
1429
Primary SIC suffixPRIMARY_SIC_CD_SFX
02
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
17
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (15)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jun 3, 2022
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
0169560
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 3, 2022

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jun 3, 2022
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
0169560
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 3, 2022

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jun 3, 2022
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
0169560
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 3, 2022

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jun 8, 2020
To : Jun 2, 2022
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
0164763
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 8, 2020
Controller toCONTROLLER_END_DT
Jun 2, 2022

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jun 8, 2020
To : Jun 2, 2022
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
0164763
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 8, 2020
Controller toCONTROLLER_END_DT
Jun 2, 2022

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jun 8, 2020
To : Jun 2, 2022
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
0164763
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 8, 2020
Controller toCONTROLLER_END_DT
Jun 2, 2022

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Ronnie Duffield Gravel Company
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jan 1, 1950
To : Jun 7, 2020
Details

Operator

OperatorOPERATOR_NAME
Ronnie Duffield Gravel Company
Operator IDOPERATOR_ID
L03692
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
M02961
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Jun 7, 2020

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

Ronnie Duffield Gravel Company·Contact title President·Street not recorded, Russellville AR 72802

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Ronnie Duffield Gravel Company
Contact titleCONTACT_TITLE
President
CityCITY
Russellville
StateSTATE_ABBR
AR
State nameSTATE
Arkansas
ZIP codeZIP_CD
72802
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
05

Mine

Mine IDMINE_ID
0301618
Mine name in this fileMINE_NAME
Gum Log Quarry
Nearest townNEAREST_TOWN
Russellville
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Apr 23, 2004
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Sandstone
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology