Choctaw Quarry

Metal/Non-Metal, SurfaceCrushed, Broken SandstoneVan Buren, ArkansasMine ID 0301894

Operator Rogers Group Inc.Controller Rogers Group IncMSHA status Intermittent since Feb 3, 2025

What MSHA has on file for this mine

Citations and orders
107
since Jan 11, 2005 · 104 to the operator, 3 to contractors · 27 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Oct 29 to Oct 30, 2025Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Oct 29, 2025
Closed outINSPECTION_END_DT
Oct 30, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804567
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Rogers Group Inc.
Operator IDOPERATOR_ID
L06514
Controller at the timeCONTROLLER_NAME
Rogers Group Inc
Controller IDCONTROLLER_ID
M00452
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 28 to Oct 30, 2025Inspectors 1 | Hours on site 5.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 28, 2025
Closed outINSPECTION_END_DT
Oct 30, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804566
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
21

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Rogers Group Inc.
Operator IDOPERATOR_ID
L06514
Controller at the timeCONTROLLER_NAME
Rogers Group Inc
Controller IDCONTROLLER_ID
M00452
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Feb 3, 2025Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Feb 3, 2025
Closed outINSPECTION_END_DT
Feb 3, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0151DC
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
10

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Rogers Group Inc.
Operator IDOPERATOR_ID
L06514
Controller at the timeCONTROLLER_NAME
Rogers Group Inc
Controller IDCONTROLLER_ID
M00452
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Mar 19 to Mar 21, 2024Inspectors 1 | Hours on site 17.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 19, 2024
Closed outINSPECTION_END_DT
Mar 21, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6935083
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
30

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 19 to Jul 20, 2023Inspectors 1 | Hours on site 15

The inspection

BeganINSPECTION_BEGIN_DT
Jul 19, 2023
Closed outINSPECTION_END_DT
Jul 20, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6934561
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 18, 2022Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Apr 18, 2022
Closed outINSPECTION_END_DT
Apr 18, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6888840
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
11

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 9 to Aug 13, 2021Inspectors 1 | Hours on site 28

The inspection

BeganINSPECTION_BEGIN_DT
Aug 9, 2021
Closed outINSPECTION_END_DT
Aug 13, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6886468
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
28
Total inspection hoursSUM_TOTAL_INSP_HOURS
38

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 21 to Apr 22, 2020Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Apr 21, 2020
Closed outINSPECTION_END_DT
Apr 22, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6808200
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
21

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 2 to Oct 3, 2019Inspectors 1 | Hours on site 9.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 2, 2019
Closed outINSPECTION_END_DT
Oct 3, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6805489
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 18 to Jun 19, 2019Inspectors 1 | Hours on site 10.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 18, 2019
Closed outINSPECTION_END_DT
Jun 19, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6804400
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Verbal Hazard Complaint Inspections
Oct 31, 2018Inspectors 0 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Oct 31, 2018
Closed outINSPECTION_END_DT
Oct 31, 2018
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
6806011
Inspector's office codeINSPECT_OFFICE_CD
M5871

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (16)

InspectorsNBR_INSPECTOR, Hours on siteSUM_TOTAL_ON_SITE_HOURS, Total inspection hoursSUM_TOTAL_INSP_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 15 to Aug 16, 2018Inspectors 1 | Hours on site 14

The inspection

BeganINSPECTION_BEGIN_DT
Aug 15, 2018
Closed outINSPECTION_END_DT
Aug 16, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6739098
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14
Total inspection hoursSUM_TOTAL_INSP_HOURS
22

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 17, 2017Inspectors 1 | Hours on site 9.25

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2017
Closed outINSPECTION_END_DT
May 17, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6737573
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 25, 2016Inspectors 1 | Hours on site 8.25

The inspection

BeganINSPECTION_BEGIN_DT
May 25, 2016
Closed outINSPECTION_END_DT
May 25, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6660486
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 14 to Oct 16, 2014Inspectors 1 | Hours on site 17

The inspection

BeganINSPECTION_BEGIN_DT
Oct 14, 2014
Closed outINSPECTION_END_DT
Oct 16, 2014
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6655260
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17
Total inspection hoursSUM_TOTAL_INSP_HOURS
26.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Nov 12 to Nov 13, 2013Inspectors 1 | Hours on site 11.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 12, 2013
Closed outINSPECTION_END_DT
Nov 13, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6609969
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
11.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
21.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 23, 2013Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Apr 23, 2013
Closed outINSPECTION_END_DT
Apr 23, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6606054
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
10

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Feb 19, 2013Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 19, 2013
Closed outINSPECTION_END_DT
Feb 19, 2013
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6606033
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Feb 6 to Feb 7, 2013Inspectors 1 | Hours on site 13

The inspection

BeganINSPECTION_BEGIN_DT
Feb 6, 2013
Closed outINSPECTION_END_DT
Feb 7, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6606031
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
13
Total inspection hoursSUM_TOTAL_INSP_HOURS
26

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 31 to Aug 1, 2012Inspectors 1 | Hours on site 11

The inspection

BeganINSPECTION_BEGIN_DT
Jul 31, 2012
Closed outINSPECTION_END_DT
Aug 1, 2012
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6602680
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
11
Total inspection hoursSUM_TOTAL_INSP_HOURS
24.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Nov 16 to Nov 17, 2011Inspectors 1 | Hours on site 15.5

The inspection

BeganINSPECTION_BEGIN_DT
Nov 16, 2011
Closed outINSPECTION_END_DT
Nov 17, 2011
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6549266
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 7 to Jun 9, 2011Inspectors 1 | Hours on site 19.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 7, 2011
Closed outINSPECTION_END_DT
Jun 9, 2011
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6543996
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
19.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
27

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Feb 1 to Feb 2, 2011Inspectors 1 | Hours on site 15

The inspection

BeganINSPECTION_BEGIN_DT
Feb 1, 2011
Closed outINSPECTION_END_DT
Feb 2, 2011
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6543974
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15
Total inspection hoursSUM_TOTAL_INSP_HOURS
25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 20, 2010Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Jul 20, 2010
Closed outINSPECTION_END_DT
Jul 20, 2010
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6543930
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Mar 8, 2010Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 8, 2010
Closed outINSPECTION_END_DT
Mar 8, 2010
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
1060190
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

25 most recent of 48 inspections and other MSHA visits since Jan 11, 2005; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 30, 2025
Type: Citation
Standard: 56.12032
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170426
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 30, 2025
Time issuedVIOLATION_ISSUE_TIME
0800
Date of occurrenceVIOLATION_OCCUR_DT
Oct 30, 2025
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 30, 2025
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Oct 30, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Nov 5, 2025
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Dec 16, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 22, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 31, 2026
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Rogers Group Inc.
Operator IDVIOLATOR_ID
L06514
Controller at the timeCONTROLLER_NAME
Rogers Group Inc
Controller IDCONTROLLER_ID
M00452
Inspection eventEVENT_NO
6804566
Inspection beganINSPECTION_BEGIN_DT
Oct 28, 2025
Inspection closed outINSPECTION_END_DT
Oct 30, 2025
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 29, 2025
Type: Citation
Standard: 56.18002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5170425
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 29, 2025
Time issuedVIOLATION_ISSUE_TIME
1305
Date of occurrenceVIOLATION_OCCUR_DT
Oct 29, 2025
30 CFR part and sectionPART_SECTION
56.18002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 29, 2025
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 29, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 30, 2025
Terminated, timeTERMINATION_TIME
0912
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Dec 16, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 22, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 31, 2026
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Rogers Group Inc.
Operator IDVIOLATOR_ID
L06514
Controller at the timeCONTROLLER_NAME
Rogers Group Inc
Controller IDCONTROLLER_ID
M00452
Inspection eventEVENT_NO
6804566
Inspection beganINSPECTION_BEGIN_DT
Oct 28, 2025
Inspection closed outINSPECTION_END_DT
Oct 30, 2025
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Mar 19, 2024
Type: Citation
Standard: 56.14107(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9748558
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 19, 2024
Time issuedVIOLATION_ISSUE_TIME
1023
Date of occurrenceVIOLATION_OCCUR_DT
Mar 19, 2024
30 CFR part and sectionPART_SECTION
56.14107(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 19, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Mar 19, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Mar 19, 2024
Terminated, timeTERMINATION_TIME
1523
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
May 9, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Jun 13, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 30, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6935083
Inspection beganINSPECTION_BEGIN_DT
Mar 19, 2024
Inspection closed outINSPECTION_END_DT
Mar 21, 2024
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 19, 2023
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9744633
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2023
Time issuedVIOLATION_ISSUE_TIME
0903
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2023
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 21, 2023
Originally due, timeORIG_TERM_DUE_TIME
0700
Latest dueLATEST_TERM_DUE_DT
Jul 21, 2023
Latest due, timeLATEST_TERM_DUE_TIME
0700
TerminatedTERMINATION_DT
Jul 24, 2023
Terminated, timeTERMINATION_TIME
0730
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Sep 7, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 21, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 16, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6934561
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2023
Inspection closed outINSPECTION_END_DT
Jul 20, 2023
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 18, 2022
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9646764
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 18, 2022
Time issuedVIOLATION_ISSUE_TIME
0900
Date of occurrenceVIOLATION_OCCUR_DT
Apr 18, 2022
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 18, 2022
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Apr 18, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Apr 18, 2022
Terminated, timeTERMINATION_TIME
0920
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Jun 9, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Aug 7, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 21, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6888840
Inspection beganINSPECTION_BEGIN_DT
Apr 18, 2022
Inspection closed outINSPECTION_END_DT
Apr 18, 2022
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 18, 2022
Type: Citation
Standard: 47.44(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9646765
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 18, 2022
Time issuedVIOLATION_ISSUE_TIME
1015
Date of occurrenceVIOLATION_OCCUR_DT
Apr 18, 2022
30 CFR part and sectionPART_SECTION
47.44(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 18, 2022
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Apr 18, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Apr 18, 2022
Terminated, timeTERMINATION_TIME
1045
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Jun 9, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Aug 7, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 21, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6888840
Inspection beganINSPECTION_BEGIN_DT
Apr 18, 2022
Inspection closed outINSPECTION_END_DT
Apr 18, 2022
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 9, 2021
Type: Citation
Standard: 56.14207
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9642319
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 9, 2021
Time issuedVIOLATION_ISSUE_TIME
1015
Date of occurrenceVIOLATION_OCCUR_DT
Aug 9, 2021
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 9, 2021
Originally due, timeORIG_TERM_DUE_TIME
1030
Latest dueLATEST_TERM_DUE_DT
Aug 9, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1030
TerminatedTERMINATION_DT
Aug 9, 2021
Terminated, timeTERMINATION_TIME
1020
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Sep 9, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 6, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6886468
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2021
Inspection closed outINSPECTION_END_DT
Aug 13, 2021
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 9, 2021
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9642320
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 9, 2021
Time issuedVIOLATION_ISSUE_TIME
1345
Date of occurrenceVIOLATION_OCCUR_DT
Aug 9, 2021
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 9, 2021
Originally due, timeORIG_TERM_DUE_TIME
1350
Latest dueLATEST_TERM_DUE_DT
Aug 9, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1350
TerminatedTERMINATION_DT
Aug 9, 2021
Terminated, timeTERMINATION_TIME
1350
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Sep 9, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 6, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6886468
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2021
Inspection closed outINSPECTION_END_DT
Aug 13, 2021
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 22, 2020
Type: Citation
Standard: 56.12018
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9458953
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 22, 2020
Time issuedVIOLATION_ISSUE_TIME
1410
Date of occurrenceVIOLATION_OCCUR_DT
Apr 22, 2020
30 CFR part and sectionPART_SECTION
56.12018
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 22, 2020
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Apr 22, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Apr 22, 2020
Terminated, timeTERMINATION_TIME
1412
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Jun 15, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Jul 23, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 12, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6808200
Inspection beganINSPECTION_BEGIN_DT
Apr 21, 2020
Inspection closed outINSPECTION_END_DT
Apr 22, 2020
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 2, 2019
Type: Citation
Standard: 56.14101(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9458866
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 2, 2019
Time issuedVIOLATION_ISSUE_TIME
1123
Date of occurrenceVIOLATION_OCCUR_DT
Oct 2, 2019
30 CFR part and sectionPART_SECTION
56.14101(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 2, 2019
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Oct 29, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 8, 2019
Terminated, timeTERMINATION_TIME
1348
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Nov 7, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Dec 12, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 24, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6805489
Inspection beganINSPECTION_BEGIN_DT
Oct 2, 2019
Inspection closed outINSPECTION_END_DT
Oct 3, 2019
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 2, 2019
Type: Citation
Standard: 56.14101(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9458868
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 2, 2019
Time issuedVIOLATION_ISSUE_TIME
1151
Date of occurrenceVIOLATION_OCCUR_DT
Oct 2, 2019
30 CFR part and sectionPART_SECTION
56.14101(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Oct 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Oct 8, 2019
Terminated, timeTERMINATION_TIME
1243
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Nov 7, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Dec 12, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 24, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6805489
Inspection beganINSPECTION_BEGIN_DT
Oct 2, 2019
Inspection closed outINSPECTION_END_DT
Oct 3, 2019
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 2, 2019
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9458867
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 2, 2019
Time issuedVIOLATION_ISSUE_TIME
1131
Date of occurrenceVIOLATION_OCCUR_DT
Oct 2, 2019
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Oct 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Oct 8, 2019
Terminated, timeTERMINATION_TIME
1230
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Nov 7, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Dec 12, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 24, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6805489
Inspection beganINSPECTION_BEGIN_DT
Oct 2, 2019
Inspection closed outINSPECTION_END_DT
Oct 3, 2019
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 18, 2019
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9406594
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 18, 2019
Time issuedVIOLATION_ISSUE_TIME
1045
Date of occurrenceVIOLATION_OCCUR_DT
Jun 18, 2019
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 18, 2019
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 18, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 18, 2019
Terminated, timeTERMINATION_TIME
1115
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Aug 8, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Sep 11, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 20, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6804400
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2019
Inspection closed outINSPECTION_END_DT
Jun 19, 2019
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 15, 2018
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
9354572
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 15, 2018
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Aug 15, 2018
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2018
Originally due, timeORIG_TERM_DUE_TIME
1310
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1310
TerminatedTERMINATION_DT
Aug 15, 2018
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Oct 11, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6739098
Inspection beganINSPECTION_BEGIN_DT
Aug 15, 2018
Inspection closed outINSPECTION_END_DT
Aug 16, 2018
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 17, 2017
Type: Citation
Standard: 56.11003
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9352866
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 17, 2017
Time issuedVIOLATION_ISSUE_TIME
0825
Date of occurrenceVIOLATION_OCCUR_DT
May 17, 2017
30 CFR part and sectionPART_SECTION
56.11003
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 17, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 17, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 17, 2017
Terminated, timeTERMINATION_TIME
0847
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Jul 6, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Aug 20, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 2, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6737573
Inspection beganINSPECTION_BEGIN_DT
May 17, 2017
Inspection closed outINSPECTION_END_DT
May 17, 2017
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 17, 2017
Type: Citation
Standard: 50.20(b)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9352868
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 17, 2017
Time issuedVIOLATION_ISSUE_TIME
1155
Date of occurrenceVIOLATION_OCCUR_DT
May 17, 2017
30 CFR part and sectionPART_SECTION
50.20(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 18, 2017
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
May 18, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
May 18, 2017
Terminated, timeTERMINATION_TIME
0717
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Jul 6, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Aug 20, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 2, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6737573
Inspection beganINSPECTION_BEGIN_DT
May 17, 2017
Inspection closed outINSPECTION_END_DT
May 17, 2017
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 17, 2017
Type: Citation
Standard: 56.4201(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9352867
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 17, 2017
Time issuedVIOLATION_ISSUE_TIME
0940
Date of occurrenceVIOLATION_OCCUR_DT
May 17, 2017
30 CFR part and sectionPART_SECTION
56.4201(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 17, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 17, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 17, 2017
Terminated, timeTERMINATION_TIME
0945
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Jul 6, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Aug 20, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 2, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6737573
Inspection beganINSPECTION_BEGIN_DT
May 17, 2017
Inspection closed outINSPECTION_END_DT
May 17, 2017
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 25, 2016
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8960530
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 25, 2016
Time issuedVIOLATION_ISSUE_TIME
0845
Date of occurrenceVIOLATION_OCCUR_DT
May 25, 2016
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 25, 2016
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
May 25, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
May 25, 2016
Terminated, timeTERMINATION_TIME
0915
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 7, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 27, 2016

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6660486
Inspection beganINSPECTION_BEGIN_DT
May 25, 2016
Inspection closed outINSPECTION_END_DT
May 25, 2016
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 14, 2014
Type: Citation
Standard: 56.20013
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8773477
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 14, 2014
Time issuedVIOLATION_ISSUE_TIME
1445
Date of occurrenceVIOLATION_OCCUR_DT
Oct 14, 2014
30 CFR part and sectionPART_SECTION
56.20013
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 14, 2014
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 14, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 14, 2014
Terminated, timeTERMINATION_TIME
1500
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 13, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6655260
Inspection beganINSPECTION_BEGIN_DT
Oct 14, 2014
Inspection closed outINSPECTION_END_DT
Oct 16, 2014
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 14, 2014
Type: Citation
Standard: 56.12040
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8773479
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 14, 2014
Time issuedVIOLATION_ISSUE_TIME
1555
Date of occurrenceVIOLATION_OCCUR_DT
Oct 14, 2014
30 CFR part and sectionPART_SECTION
56.12040
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 15, 2014
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Oct 15, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Oct 15, 2014
Terminated, timeTERMINATION_TIME
0900
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 13, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6655260
Inspection beganINSPECTION_BEGIN_DT
Oct 14, 2014
Inspection closed outINSPECTION_END_DT
Oct 16, 2014
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 14, 2014
Type: Citation
Standard: 56.12023
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8773480
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 14, 2014
Time issuedVIOLATION_ISSUE_TIME
1615
Date of occurrenceVIOLATION_OCCUR_DT
Oct 14, 2014
30 CFR part and sectionPART_SECTION
56.12023
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 14, 2014
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 14, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 14, 2014
Terminated, timeTERMINATION_TIME
1645
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 13, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6655260
Inspection beganINSPECTION_BEGIN_DT
Oct 14, 2014
Inspection closed outINSPECTION_END_DT
Oct 16, 2014
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Oct 14, 2014
Type: Citation
Standard: 56.4200(b)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8773478
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 14, 2014
Time issuedVIOLATION_ISSUE_TIME
1530
Date of occurrenceVIOLATION_OCCUR_DT
Oct 14, 2014
30 CFR part and sectionPART_SECTION
56.4200(b)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 14, 2014
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 14, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 14, 2014
Terminated, timeTERMINATION_TIME
1630
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 13, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6655260
Inspection beganINSPECTION_BEGIN_DT
Oct 14, 2014
Inspection closed outINSPECTION_END_DT
Oct 16, 2014
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 12, 2013
Type: Citation
Standard: 56.20003(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $1,026.00
Details

The citation

Citation or order numberVIOLATION_NO
8769319
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2013
Time issuedVIOLATION_ISSUE_TIME
1622
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2013
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 12, 2013
Originally due, timeORIG_TERM_DUE_TIME
1637
Latest dueLATEST_TERM_DUE_DT
Nov 12, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1637
TerminatedTERMINATION_DT
Nov 13, 2013
Terminated, timeTERMINATION_TIME
1423
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1026
Current proposed assessmentAMOUNT_DUE
1026
Amount paidAMOUNT_PAID
1026
Bill first printedBILL_PRINT_DT
Jan 9, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Feb 14, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 4, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
12
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6609969
Inspection beganINSPECTION_BEGIN_DT
Nov 12, 2013
Inspection closed outINSPECTION_END_DT
Nov 13, 2013
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 23, 2013
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $150.00
Details

The citation

Citation or order numberVIOLATION_NO
8688672
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 23, 2013
Time issuedVIOLATION_ISSUE_TIME
1047
Date of occurrenceVIOLATION_OCCUR_DT
Apr 23, 2013
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 23, 2013
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Apr 23, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Apr 23, 2013
Terminated, timeTERMINATION_TIME
1049
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
150
Current proposed assessmentAMOUNT_DUE
150
Amount paidAMOUNT_PAID
150
Bill first printedBILL_PRINT_DT
Jun 6, 2013
Final order dateFINAL_ORDER_ISSUE_DT
Jul 12, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 8, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6606054
Inspection beganINSPECTION_BEGIN_DT
Apr 23, 2013
Inspection closed outINSPECTION_END_DT
Apr 23, 2013
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 23, 2013
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8688671
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 23, 2013
Time issuedVIOLATION_ISSUE_TIME
1016
Date of occurrenceVIOLATION_OCCUR_DT
Apr 23, 2013
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 23, 2013
Originally due, timeORIG_TERM_DUE_TIME
1046
Latest dueLATEST_TERM_DUE_DT
Apr 23, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1046
TerminatedTERMINATION_DT
Apr 23, 2013
Terminated, timeTERMINATION_TIME
1022
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 6, 2013
Final order dateFINAL_ORDER_ISSUE_DT
Jul 12, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 8, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDVIOLATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6606054
Inspection beganINSPECTION_BEGIN_DT
Apr 23, 2013
Inspection closed outINSPECTION_END_DT
Apr 23, 2013
Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

107 citations and orders since Jan 11, 2005: 104 issued to the operator, 3 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Oct 30, 2025
Citation number: 5170426
Standard: 56.12032
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170426
Assessment control numberASSESS_CASE_NO
000632931
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 31, 2026
Citation issuedISSUE_DT
Oct 30, 2025
Date of occurrenceOCCURRENCE_DT
Oct 30, 2025
Final order dateFINAL_ORDER_DT
Jan 22, 2026
Bill first printedBILL_PRINT_DT
Dec 16, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 22, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
7

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Controller hours workedCONTROLLER_HRS
2456372
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
2456372
History period startHISTORY_START_DT
Aug 30, 2024
History period endHISTORY_END_DT
Oct 29, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Rogers Group Inc.
IDVIOLATOR_ID
L06514
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 30, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6804566
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 29, 2025
Citation number: 5170425
Standard: 56.18002
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5170425
Assessment control numberASSESS_CASE_NO
000632931
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 31, 2026
Citation issuedISSUE_DT
Oct 29, 2025
Date of occurrenceOCCURRENCE_DT
Oct 29, 2025
Final order dateFINAL_ORDER_DT
Jan 22, 2026
Bill first printedBILL_PRINT_DT
Dec 16, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 22, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
7

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Controller hours workedCONTROLLER_HRS
2456372
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
2456372
History period startHISTORY_START_DT
Aug 30, 2024
History period endHISTORY_END_DT
Oct 28, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Rogers Group Inc.
IDVIOLATOR_ID
L06514
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 30, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6804566
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 19, 2024
Citation number: 9748558
Standard: 56.14107(b)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9748558
Assessment control numberASSESS_CASE_NO
000599212
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 30, 2024
Citation issuedISSUE_DT
Mar 19, 2024
Date of occurrenceOCCURRENCE_DT
Mar 19, 2024
Final order dateFINAL_ORDER_DT
Jun 13, 2024
Bill first printedBILL_PRINT_DT
May 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 13, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
8733
Size of mineSIZE_OF_MINE
8733
Controller hours workedCONTROLLER_HRS
810607
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
810607
History period startHISTORY_START_DT
Dec 19, 2022
History period endHISTORY_END_DT
Mar 18, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6935083
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2023
Citation number: 9744633
Standard: 56.14100(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744633
Assessment control numberASSESS_CASE_NO
000584614
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 16, 2023
Citation issuedISSUE_DT
Jul 19, 2023
Date of occurrenceOCCURRENCE_DT
Jul 19, 2023
Final order dateFINAL_ORDER_DT
Oct 21, 2023
Bill first printedBILL_PRINT_DT
Sep 7, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 21, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
9133
Size of mineSIZE_OF_MINE
9133
Controller hours workedCONTROLLER_HRS
782045
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
782045
History period startHISTORY_START_DT
Apr 19, 2022
History period endHISTORY_END_DT
Jul 18, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934561
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 18, 2022
Citation number: 9646764
Standard: 56.14100(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9646764
Assessment control numberASSESS_CASE_NO
000556653
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 21, 2022
Citation issuedISSUE_DT
Apr 18, 2022
Date of occurrenceOCCURRENCE_DT
Apr 18, 2022
Final order dateFINAL_ORDER_DT
Aug 7, 2022
Bill first printedBILL_PRINT_DT
Jun 9, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 7, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10790
Size of mineSIZE_OF_MINE
10790
Controller hours workedCONTROLLER_HRS
836391
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
836391
History period startHISTORY_START_DT
Jan 18, 2021
History period endHISTORY_END_DT
Apr 17, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6888840
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 18, 2022
Citation number: 9646765
Standard: 47.44(b)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9646765
Assessment control numberASSESS_CASE_NO
000556653
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 21, 2022
Citation issuedISSUE_DT
Apr 18, 2022
Date of occurrenceOCCURRENCE_DT
Apr 18, 2022
Final order dateFINAL_ORDER_DT
Aug 7, 2022
Bill first printedBILL_PRINT_DT
Jun 9, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 7, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.44(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10790
Size of mineSIZE_OF_MINE
10790
Controller hours workedCONTROLLER_HRS
836391
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
836391
History period startHISTORY_START_DT
Jan 18, 2021
History period endHISTORY_END_DT
Apr 17, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6888840
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 9, 2021
Citation number: 9642319
Standard: 56.14207
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9642319
Assessment control numberASSESS_CASE_NO
000541871
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 6, 2021
Citation issuedISSUE_DT
Aug 9, 2021
Date of occurrenceOCCURRENCE_DT
Aug 9, 2021
Final order dateFINAL_ORDER_DT
Oct 24, 2021
Bill first printedBILL_PRINT_DT
Sep 9, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
5742
Size of mineSIZE_OF_MINE
5742
Controller hours workedCONTROLLER_HRS
841985
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
841985
History period startHISTORY_START_DT
May 9, 2020
History period endHISTORY_END_DT
Aug 8, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6886468
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 9, 2021
Citation number: 9642320
Standard: 50.30(a)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9642320
Assessment control numberASSESS_CASE_NO
000541871
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 6, 2021
Citation issuedISSUE_DT
Aug 9, 2021
Date of occurrenceOCCURRENCE_DT
Aug 9, 2021
Final order dateFINAL_ORDER_DT
Oct 24, 2021
Bill first printedBILL_PRINT_DT
Sep 9, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
16
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
5742
Size of mineSIZE_OF_MINE
5742
Controller hours workedCONTROLLER_HRS
841985
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
841985
History period startHISTORY_START_DT
May 9, 2020
History period endHISTORY_END_DT
Aug 8, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6886468
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 22, 2020
Citation number: 9458953
Standard: 56.12018
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9458953
Assessment control numberASSESS_CASE_NO
000516114
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 10, 2020
Citation issuedISSUE_DT
Apr 22, 2020
Date of occurrenceOCCURRENCE_DT
Apr 22, 2020
Final order dateFINAL_ORDER_DT
Jul 23, 2020
Bill first printedBILL_PRINT_DT
Jun 15, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 23, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12018
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
33
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
13477
Size of mineSIZE_OF_MINE
13477
Controller hours workedCONTROLLER_HRS
858641
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
858641
History period startHISTORY_START_DT
Jan 22, 2019
History period endHISTORY_END_DT
Apr 21, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6808200
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 2, 2019
Citation number: 9458867
Standard: 56.14100(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9458867
Assessment control numberASSESS_CASE_NO
000503427
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 22, 2019
Citation issuedISSUE_DT
Oct 2, 2019
Date of occurrenceOCCURRENCE_DT
Oct 2, 2019
Final order dateFINAL_ORDER_DT
Dec 12, 2019
Bill first printedBILL_PRINT_DT
Nov 7, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 12, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
33
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
18664
Size of mineSIZE_OF_MINE
18664
Controller hours workedCONTROLLER_HRS
832928
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
832928
History period startHISTORY_START_DT
Jul 2, 2018
History period endHISTORY_END_DT
Oct 1, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6805489
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 2, 2019
Citation number: 9458868
Standard: 56.14101(a)(1)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9458868
Assessment control numberASSESS_CASE_NO
000503427
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 22, 2019
Citation issuedISSUE_DT
Oct 2, 2019
Date of occurrenceOCCURRENCE_DT
Oct 2, 2019
Final order dateFINAL_ORDER_DT
Dec 12, 2019
Bill first printedBILL_PRINT_DT
Nov 7, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 12, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
18664
Size of mineSIZE_OF_MINE
18664
Controller hours workedCONTROLLER_HRS
832928
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
832928
History period startHISTORY_START_DT
Jul 2, 2018
History period endHISTORY_END_DT
Oct 1, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6805489
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 2, 2019
Citation number: 9458866
Standard: 56.14101(a)(1)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9458866
Assessment control numberASSESS_CASE_NO
000503427
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 22, 2019
Citation issuedISSUE_DT
Oct 2, 2019
Date of occurrenceOCCURRENCE_DT
Oct 2, 2019
Final order dateFINAL_ORDER_DT
Dec 12, 2019
Bill first printedBILL_PRINT_DT
Nov 7, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 12, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
18664
Size of mineSIZE_OF_MINE
18664
Controller hours workedCONTROLLER_HRS
832928
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
832928
History period startHISTORY_START_DT
Jul 2, 2018
History period endHISTORY_END_DT
Oct 1, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6805489
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 18, 2019
Citation number: 9406594
Standard: 56.4201(a)(2)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9406594
Assessment control numberASSESS_CASE_NO
000497059
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 20, 2019
Citation issuedISSUE_DT
Jun 18, 2019
Date of occurrenceOCCURRENCE_DT
Jun 18, 2019
Final order dateFINAL_ORDER_DT
Sep 11, 2019
Bill first printedBILL_PRINT_DT
Aug 8, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 11, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
18664
Size of mineSIZE_OF_MINE
18664
Controller hours workedCONTROLLER_HRS
832928
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
832928
History period startHISTORY_START_DT
Mar 18, 2018
History period endHISTORY_END_DT
Jun 17, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6804400
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 15, 2018
Citation number: 9354572
Standard: 56.20003(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9354572
Assessment control numberASSESS_CASE_NO
000475142
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2018
Citation issuedISSUE_DT
Aug 15, 2018
Date of occurrenceOCCURRENCE_DT
Aug 15, 2018
Final order dateFINAL_ORDER_DT
Nov 14, 2018
Bill first printedBILL_PRINT_DT
Oct 11, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
13004
Size of mineSIZE_OF_MINE
13004
Controller hours workedCONTROLLER_HRS
827222
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
827222
History period startHISTORY_START_DT
May 15, 2017
History period endHISTORY_END_DT
Aug 14, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6739098
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 17, 2017
Citation number: 9352867
Standard: 56.4201(a)(1)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9352867
Assessment control numberASSESS_CASE_NO
000443055
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 2, 2017
Citation issuedISSUE_DT
May 17, 2017
Date of occurrenceOCCURRENCE_DT
May 17, 2017
Final order dateFINAL_ORDER_DT
Aug 20, 2017
Bill first printedBILL_PRINT_DT
Jul 6, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
12742
Size of mineSIZE_OF_MINE
12742
Controller hours workedCONTROLLER_HRS
739877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
739877
History period startHISTORY_START_DT
Feb 17, 2016
History period endHISTORY_END_DT
May 16, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6737573
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 17, 2017
Citation number: 9352868
Standard: 50.20(b)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9352868
Assessment control numberASSESS_CASE_NO
000443055
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 2, 2017
Citation issuedISSUE_DT
May 17, 2017
Date of occurrenceOCCURRENCE_DT
May 17, 2017
Final order dateFINAL_ORDER_DT
Aug 20, 2017
Bill first printedBILL_PRINT_DT
Jul 6, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.20(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
12742
Size of mineSIZE_OF_MINE
12742
Controller hours workedCONTROLLER_HRS
739877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
739877
History period startHISTORY_START_DT
Feb 17, 2016
History period endHISTORY_END_DT
May 16, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6737573
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 17, 2017
Citation number: 9352866
Standard: 56.11003
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9352866
Assessment control numberASSESS_CASE_NO
000443055
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 2, 2017
Citation issuedISSUE_DT
May 17, 2017
Date of occurrenceOCCURRENCE_DT
May 17, 2017
Final order dateFINAL_ORDER_DT
Aug 20, 2017
Bill first printedBILL_PRINT_DT
Jul 6, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11003
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
12742
Size of mineSIZE_OF_MINE
12742
Controller hours workedCONTROLLER_HRS
739877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
739877
History period startHISTORY_START_DT
Feb 17, 2016
History period endHISTORY_END_DT
May 16, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6737573
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 25, 2016
Citation number: 8960530
Standard: 56.4201(a)(2)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8960530
Assessment control numberASSESS_CASE_NO
000414877
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2016
Citation issuedISSUE_DT
May 25, 2016
Date of occurrenceOCCURRENCE_DT
May 25, 2016
Final order dateFINAL_ORDER_DT
Aug 21, 2016
Bill first printedBILL_PRINT_DT
Jul 7, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10554
Size of mineSIZE_OF_MINE
10554
Controller hours workedCONTROLLER_HRS
720782
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
720782
History period startHISTORY_START_DT
Feb 25, 2015
History period endHISTORY_END_DT
May 24, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6660486
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 14, 2014
Citation number: 8773478
Standard: 56.4200(b)(2)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8773478
Assessment control numberASSESS_CASE_NO
000369085
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 13, 2015
Citation issuedISSUE_DT
Oct 14, 2014
Date of occurrenceOCCURRENCE_DT
Oct 14, 2014
Final order dateFINAL_ORDER_DT
Jan 21, 2015
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4200(b)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
14907
Size of mineSIZE_OF_MINE
14907
Controller hours workedCONTROLLER_HRS
619198
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
619198
History period startHISTORY_START_DT
Jul 14, 2013
History period endHISTORY_END_DT
Oct 13, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6655260
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 14, 2014
Citation number: 8773477
Standard: 56.20013
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8773477
Assessment control numberASSESS_CASE_NO
000369085
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 13, 2015
Citation issuedISSUE_DT
Oct 14, 2014
Date of occurrenceOCCURRENCE_DT
Oct 14, 2014
Final order dateFINAL_ORDER_DT
Jan 21, 2015
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20013
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
14907
Size of mineSIZE_OF_MINE
14907
Controller hours workedCONTROLLER_HRS
619198
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
619198
History period startHISTORY_START_DT
Jul 14, 2013
History period endHISTORY_END_DT
Oct 13, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6655260
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 14, 2014
Citation number: 8773479
Standard: 56.12040
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8773479
Assessment control numberASSESS_CASE_NO
000369085
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 13, 2015
Citation issuedISSUE_DT
Oct 14, 2014
Date of occurrenceOCCURRENCE_DT
Oct 14, 2014
Final order dateFINAL_ORDER_DT
Jan 21, 2015
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12040
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
33
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
14907
Size of mineSIZE_OF_MINE
14907
Controller hours workedCONTROLLER_HRS
619198
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
619198
History period startHISTORY_START_DT
Jul 14, 2013
History period endHISTORY_END_DT
Oct 13, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6655260
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 14, 2014
Citation number: 8773480
Standard: 56.12023
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8773480
Assessment control numberASSESS_CASE_NO
000369085
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 13, 2015
Citation issuedISSUE_DT
Oct 14, 2014
Date of occurrenceOCCURRENCE_DT
Oct 14, 2014
Final order dateFINAL_ORDER_DT
Jan 21, 2015
Bill first printedBILL_PRINT_DT
Dec 11, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12023
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
14907
Size of mineSIZE_OF_MINE
14907
Controller hours workedCONTROLLER_HRS
619198
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
619198
History period startHISTORY_START_DT
Jul 14, 2013
History period endHISTORY_END_DT
Oct 13, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6655260
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2013
Citation number: 8769319
Standard: 56.20003(a)
Proposed penalty: $1,026.00
Current assessment: $1,026.00
Paid against proposed penalty: $1,026.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8769319
Assessment control numberASSESS_CASE_NO
000340995
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2014
Citation issuedISSUE_DT
Nov 12, 2013
Date of occurrenceOCCURRENCE_DT
Nov 12, 2013
Final order dateFINAL_ORDER_DT
Feb 14, 2014
Bill first printedBILL_PRINT_DT
Jan 9, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 14, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1026.00
Current assessmentCURRENT_ASSESSMENT_AMT
1026.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1026.00

Penalty points

Violation history pointsPENALTY_POINTS
89
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
12
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
2.4
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
21459
Size of mineSIZE_OF_MINE
21459
Controller hours workedCONTROLLER_HRS
656247
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
656247
History period startHISTORY_START_DT
Aug 12, 2012
History period endHISTORY_END_DT
Nov 11, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6609969
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 23, 2013
Citation number: 8688671
Standard: 56.20003(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8688671
Assessment control numberASSESS_CASE_NO
000323984
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 8, 2013
Citation issuedISSUE_DT
Apr 23, 2013
Date of occurrenceOCCURRENCE_DT
Apr 23, 2013
Final order dateFINAL_ORDER_DT
Jul 12, 2013
Bill first printedBILL_PRINT_DT
Jun 6, 2013
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 12, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
50
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.67
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.167
Operator hours worked at the mineVIOLATOR_MINE_HRS
21459
Size of mineSIZE_OF_MINE
21459
Controller hours workedCONTROLLER_HRS
654048
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
654048
History period startHISTORY_START_DT
Jan 23, 2012
History period endHISTORY_END_DT
Apr 22, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606054
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 23, 2013
Citation number: 8688672
Standard: 56.14132(a)
Proposed penalty: $150.00
Current assessment: $150.00
Paid against proposed penalty: $150.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8688672
Assessment control numberASSESS_CASE_NO
000323984
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 8, 2013
Citation issuedISSUE_DT
Apr 23, 2013
Date of occurrenceOCCURRENCE_DT
Apr 23, 2013
Final order dateFINAL_ORDER_DT
Jul 12, 2013
Bill first printedBILL_PRINT_DT
Jun 6, 2013
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 12, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
150.00
Current assessmentCURRENT_ASSESSMENT_AMT
150.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
150.00

Penalty points

Violation history pointsPENALTY_POINTS
65
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.67
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.167
Operator hours worked at the mineVIOLATOR_MINE_HRS
21459
Size of mineSIZE_OF_MINE
21459
Controller hours workedCONTROLLER_HRS
654048
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
654048
History period startHISTORY_START_DT
Jan 23, 2012
History period endHISTORY_END_DT
Apr 22, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Delta Asphalt of Arkansas Inc
IDVIOLATOR_ID
L03796
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 13, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6606054
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 106 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Sep 23, 2006
Citation issued: Feb 27, 2006
Docket: CENT 2007-27
Standard: 56.5001(a)/.5005
Proposed penalty: $99.00
Penalty after decision: $99.00
Decided: Feb 7, 2007
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6258411
Citation issuedCITATION_ISSUE_DT
Feb 27, 2006
Hearing request receivedCONTEST_DT
Sep 23, 2006
Docket numberDOCKET_NO
CENT 2007-27
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Feb 7, 2007
Petition filedPETITION_FILED_DT
Dec 5, 2006

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
99.00
Penalty after the decisionDECISION_PENALTY_AMT
99.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.5001(a)/.5005
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR600
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas

Mine

Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (3)

Petition duePETITION_DUE_DT, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

1 contested citation or order; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

DAYS RESTRICTED ACTIVITY ONLY
7
NO DYS AWY FRM WRK,NO RSTR ACT
3
DAYS AWAY FROM WORK ONLY
3
DYS AWY FRM WRK & RESTRCTD ACT
1
Date: Mar 3, 2021
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Struck by flying object
Days lost: 2
Details

The report

Document numberDOCUMENT_NO
220210780003
DateACCIDENT_DT
Mar 3, 2021
TimeACCIDENT_TIME
1000
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Grinding
Activity codeACTIVITY_CD
024
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
THIGH/FEMUR
Part of body codeINJ_BODY_PART_CD
511
Days lostDAYS_LOST
2
Returned to workRETURN_TO_WORK_DT
Mar 11, 2021

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Oct 7, 2016
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220162940023
DateACCIDENT_DT
Oct 7, 2016
TimeACCIDENT_TIME
1030
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320171380010

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
5
Returned to workRETURN_TO_WORK_DT
Oct 15, 2016

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
988G
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID

Date: Sep 30, 2016
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220162850017
DateACCIDENT_DT
Sep 30, 2016
TimeACCIDENT_TIME
1330
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
WOOD ITEMS,NEC
Source of injury codeINJURY_SOURCE_CD
116
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Returned to workRETURN_TO_WORK_DT
Oct 3, 2016

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jul 10, 2014
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: STEPPING OR KNEELING ON OBJECT
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220141920030
DateACCIDENT_DT
Jul 10, 2014
TimeACCIDENT_TIME
1515
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
STEPPING OR KNEELING ON OBJECT
Classification codeCLASSIFICATION_CD
19
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320142830014

Injury

Activity at the timeACTIVITY
Cross over (conveyor)
Activity codeACTIVITY_CD
017
Source of injuryINJURY_SOURCE
ELECTRICAL APPARATUS,NEC
Source of injury codeINJURY_SOURCE_CD
043
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520
Days of restricted workDAYS_RESTRICT
65
Returned to workRETURN_TO_WORK_DT
Oct 9, 2014

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Nov 5, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220133100021
DateACCIDENT_DT
Nov 5, 2013
TimeACCIDENT_TIME
0945
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Unknown
Activity codeACTIVITY_CD
099
Source of injuryINJURY_SOURCE
COAL (PROCESSED)
Source of injury codeINJURY_SOURCE_CD
030
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Returned to workRETURN_TO_WORK_DT
Nov 5, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Sep 11, 2012
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220122610026
DateACCIDENT_DT
Sep 11, 2012
TimeACCIDENT_TIME
1430
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320123070014

Injury

Activity at the timeACTIVITY
Hand load, Hand shoveling
Activity codeACTIVITY_CD
025
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
34
Returned to workRETURN_TO_WORK_DT
Nov 1, 2012

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Aug 2, 2011
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Caught in, under or between NEC
Days lost: 59
Details

The report

Document numberDOCUMENT_NO
220112220038
DateACCIDENT_DT
Aug 2, 2011
TimeACCIDENT_TIME
1110
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Caught in, under or between NEC
Accident type codeACCIDENT_TYPE_CD
24
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320113220004

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
PASS CARS,PICKUP TRUCKS
Source of injury codeINJURY_SOURCE_CD
103
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
LEG, NEC
Part of body codeINJ_BODY_PART_CD
510
Days lostDAYS_LOST
59
Returned to workRETURN_TO_WORK_DT
Oct 3, 2011

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Trucks, Service truck, Utility truck, Pickup, Water truck, Fuel truck
Equipment codeMINING_EQUIP_CD
67
Equipment manufacturerEQUIP_MFR_NAME
Euclid
Equipment manufacturer codeEQUIP_MFR_CD
037
Equipment model numberEQUIP_MODEL_NO
304TD
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID

Date: Jun 18, 2011
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220111800017
DateACCIDENT_DT
Jun 18, 2011
TimeACCIDENT_TIME
1630
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
OTHER INJURY,NEC
Nature of injury codeNATURE_INJURY_CD
390
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
4
Returned to workRETURN_TO_WORK_DT
Jun 27, 2011

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Screen, Vibrator, Shaker, Rock screener, Scalper
Equipment codeMINING_EQUIP_CD
58
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
BHM-3820
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID

Date: Jan 26, 2009
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220090410031
DateACCIDENT_DT
Jan 26, 2009
TimeACCIDENT_TIME
1500
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
HGHWY ORE CARIER,LRGE TRK
Source of injury codeINJURY_SOURCE_CD
104
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Ore haulage trucks - off highway trucks
Equipment codeMINING_EQUIP_CD
44
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
769D
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Contractor IDCONTRACTOR_ID

Date: Aug 27, 2008
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: STRIKING OR BUMPING
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220082560001
DateACCIDENT_DT
Aug 27, 2008
TimeACCIDENT_TIME
1100
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
STRIKING OR BUMPING
Classification codeCLASSIFICATION_CD
20
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Days of restricted workDAYS_RESTRICT
9
Returned to workRETURN_TO_WORK_DT
Sep 11, 2008

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
966E
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID

Date: Jul 7, 2008
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Struck by falling object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220081980030
DateACCIDENT_DT
Jul 7, 2008
TimeACCIDENT_TIME
1400
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by falling object
Accident type codeACCIDENT_TYPE_CD
04
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
MULTIPLE INJURIES
Nature of injury codeNATURE_INJURY_CD
370
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Days of restricted workDAYS_RESTRICT
3
Returned to workRETURN_TO_WORK_DT
Jul 10, 2008

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
1400
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID

Date: Oct 22, 2007
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220072970011
DateACCIDENT_DT
Oct 22, 2007
TimeACCIDENT_TIME
1300
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
AXE,HAMMER,SLEDGE
Source of injury codeINJURY_SOURCE_CD
046
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Oct 23, 2007

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jan 27, 2006
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 23
Details

The report

Document numberDOCUMENT_NO
220070360049
DateACCIDENT_DT
Jan 27, 2006
TimeACCIDENT_TIME
0930
Shift beganSHIFT_BEGIN_TIME
0800
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320070740012

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
14
Days lostDAYS_LOST
23
Returned to workRETURN_TO_WORK_DT
Mar 6, 2007

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2006
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2006
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: May 23, 2005
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220051570051
DateACCIDENT_DT
May 23, 2005
TimeACCIDENT_TIME
1200
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320052130012

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
CROWBAR,PRY BAR
Source of injury codeINJURY_SOURCE_CD
048
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
48
Returned to workRETURN_TO_WORK_DT
Jul 29, 2005

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2005
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2005
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

14 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 614
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
614
Average hours per employeeAVG_EMPLOYEE_HOURS
614

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,109
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1109
Average hours per employeeAVG_EMPLOYEE_HOURS
1109

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 4,227
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
4227
Average hours per employeeAVG_EMPLOYEE_HOURS
1057

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2,119
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2119
Average hours per employeeAVG_EMPLOYEE_HOURS
2119

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 8,733
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
8733
Average hours per employeeAVG_EMPLOYEE_HOURS
2183

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2,369
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2369
Average hours per employeeAVG_EMPLOYEE_HOURS
2369

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 9,133
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
9133
Average hours per employeeAVG_EMPLOYEE_HOURS
2283

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2,228
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2228
Average hours per employeeAVG_EMPLOYEE_HOURS
2228

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 10,790
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
10790
Average hours per employeeAVG_EMPLOYEE_HOURS
2158

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,613
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1613
Average hours per employeeAVG_EMPLOYEE_HOURS
1613

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 5,742
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
5742
Average hours per employeeAVG_EMPLOYEE_HOURS
1914

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2,152
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2152
Average hours per employeeAVG_EMPLOYEE_HOURS
2152

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 13,477
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
13477
Average hours per employeeAVG_EMPLOYEE_HOURS
2246

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2018
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,792
Details

The report

YearCALENDAR_YR
2018
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1792
Average hours per employeeAVG_EMPLOYEE_HOURS
1792

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2018
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 13,998
Details

The report

YearCALENDAR_YR
2018
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
13998
Average hours per employeeAVG_EMPLOYEE_HOURS
2000

Mine

Mine IDMINE_ID
0301894
Mine name in this fileCURR_MINE_NM
Choctaw Quarry
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Little Rock AR Field Office
Nearest town
Choctaw
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
5
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Choctaw Quarry
Mine IDMINE_ID
0301894
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Feb 3, 2025
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Rogers Group Inc.
Operator IDCURRENT_OPERATOR_ID
L06514
ControllerCURRENT_CONTROLLER_NAME
Rogers Group Inc
Controller IDCURRENT_CONTROLLER_ID
M00452
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Aug 30, 2024

Location and MSHA office

StateSTATE
AR
Bureau of Mines state codeBOM_STATE_CD
03
FIPS county codeFIPS_CNTY_CD
141
FIPS county nameFIPS_CNTY_NM
Van Buren
Nearest townNEAREST_TOWN
Choctaw
MSHA districtDISTRICT
M5
MSHA office codeOFFICE_CD
M5871
MSHA officeOFFICE_NAME
Little Rock AR Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
70
Most recent assessment control numberASSESS_CTRL_NO
000632931

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Sandstone
Primary commodity codePRIMARY_SIC_CD
142902
Primary SIC codePRIMARY_SIC_CD_1
1429
Primary SIC suffixPRIMARY_SIC_CD_SFX
02
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
5
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Rogers Group Inc.
From: Aug 30, 2024
To: No end date
Controller: Rogers Group Inc
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Rogers Group Inc.
Operator IDOPERATOR_ID
L06514
Operator fromOPERATOR_START_DT
Aug 30, 2024

Controller

ControllerCONTROLLER_NAME
Rogers Group Inc
Controller IDCONTROLLER_ID
M00452
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT

Operator: Delta Asphalt of Arkansas Inc
From: Aug 13, 2004
To: Aug 29, 2024
Controller: Colas S A
From : Aug 13, 2004
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Operator fromOPERATOR_START_DT
Aug 13, 2004
Operator toOPERATOR_END_DT
Aug 29, 2024

Controller

ControllerCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Aug 13, 2004

Mine

Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: Delta Asphalt of Arkansas Inc
From: Aug 13, 2004
To: Aug 29, 2024
Controller: Delta Asphalt Inc
From : Nov 1, 1979
To : Aug 12, 2004
Details

Operator

OperatorOPERATOR_NAME
Delta Asphalt of Arkansas Inc
Operator IDOPERATOR_ID
L03796
Operator fromOPERATOR_START_DT
Aug 13, 2004
Operator toOPERATOR_END_DT
Aug 29, 2024

Controller

ControllerCONTROLLER_NAME
Delta Asphalt Inc
Controller IDCONTROLLER_ID
M03040
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Nov 1, 1979
Controller toCONTROLLER_END_DT
Aug 12, 2004

Mine

Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

As MSHA records it, newest operator first.

Address of record

Rogers Group Inc.·Contact title Director Safety and Health·421 Great Circle Road, Nashville TN 37228

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Rogers Group Inc.
Contact titleCONTACT_TITLE
Director Safety and Health
StreetSTREET
421 Great Circle Road
CityCITY
Nashville
StateSTATE_ABBR
TN
State nameSTATE
Tennessee
ZIP codeZIP_CD
37228
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
47

Mine

Mine IDMINE_ID
0301894
Mine name in this fileMINE_NAME
Choctaw Quarry
Nearest townNEAREST_TOWN
Choctaw
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Feb 3, 2025
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Sandstone
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology