Painted Hills Quarry

Metal/Non-Metal, SurfaceConstruction Sand and GravelRiverside, CaliforniaMine ID 0400351

Operator Painted Hills Mining CompanyController not shownMSHA status Active since May 25, 1989

What MSHA has on file for this mine

Citations and orders
115
since Jul 5, 2000 · 115 to the operator, 0 to contractors · 16 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Nov 4, 2026Inspectors 0 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Nov 4, 2026
Closed outINSPECTION_END_DT
Nov 4, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0177EE
Inspector's office codeINSPECT_OFFICE_CD
M7831

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (16)

InspectorsNBR_INSPECTOR, Hours on siteSUM_TOTAL_ON_SITE_HOURS, Total inspection hoursSUM_TOTAL_INSP_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 28 to Apr 29, 2026Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Apr 28, 2026
Closed outINSPECTION_END_DT
Apr 29, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0177D0
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
3
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 22, 2025Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Oct 22, 2025
Closed outINSPECTION_END_DT
Oct 22, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F014E69
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 9, 2025Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 9, 2025
Closed outINSPECTION_END_DT
Apr 9, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6967199
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 3, 2024Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Oct 3, 2024
Closed outINSPECTION_END_DT
Oct 3, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6878874
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
May 21, 2024Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
May 21, 2024
Closed outINSPECTION_END_DT
May 21, 2024
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6878784
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 20 to May 21, 2024Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
May 20, 2024
Closed outINSPECTION_END_DT
May 21, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6878783
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Dec 20, 2023Inspectors 1 | Hours on site 3.25

The inspection

BeganINSPECTION_BEGIN_DT
Dec 20, 2023
Closed outINSPECTION_END_DT
Dec 20, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6878485
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
8

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 23, 2023Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
May 23, 2023
Closed outINSPECTION_END_DT
May 23, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6878619
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 9, 2022Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Nov 9, 2022
Closed outINSPECTION_END_DT
Nov 9, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6872382
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 8 to Aug 9, 2022Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 8, 2022
Closed outINSPECTION_END_DT
Aug 9, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6878066
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 23, 2021Inspectors 1 | Hours on site 5.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 23, 2021
Closed outINSPECTION_END_DT
Nov 23, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6878018
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 4 to May 5, 2021Inspectors 1 | Hours on site 12.25

The inspection

BeganINSPECTION_BEGIN_DT
May 4, 2021
Closed outINSPECTION_END_DT
May 5, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6871755
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
22.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Dec 1, 2020Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Dec 1, 2020
Closed outINSPECTION_END_DT
Dec 1, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6871740
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 1, 2020Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 1, 2020
Closed outINSPECTION_END_DT
Jul 1, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6727965
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 23, 2020Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Jan 23, 2020
Closed outINSPECTION_END_DT
Jan 23, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6821498
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
11

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
May 2 to May 4, 2019Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
May 2, 2019
Closed outINSPECTION_END_DT
May 4, 2019
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6825633
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 2 to Apr 3, 2019Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Apr 2, 2019
Closed outINSPECTION_END_DT
Apr 3, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6821443
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
16

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 27 to Dec 3, 2018Inspectors 1 | Hours on site 14

The inspection

BeganINSPECTION_BEGIN_DT
Nov 27, 2018
Closed outINSPECTION_END_DT
Dec 3, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6821150
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14
Total inspection hoursSUM_TOTAL_INSP_HOURS
33

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 4 to Apr 5, 2018Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Apr 4, 2018
Closed outINSPECTION_END_DT
Apr 5, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6727102
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
24.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 10, 2018Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 10, 2018
Closed outINSPECTION_END_DT
Jan 10, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6727085
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
21.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 18, 2017Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Apr 18, 2017
Closed outINSPECTION_END_DT
Apr 18, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6669363
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 21 to Nov 22, 2016Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Nov 21, 2016
Closed outINSPECTION_END_DT
Nov 22, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6669342
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 28 to Apr 1, 2016Inspectors 1 | Hours on site 8.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 28, 2016
Closed outINSPECTION_END_DT
Apr 1, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6669011
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Dec 3, 2015Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Dec 3, 2015
Closed outINSPECTION_END_DT
Dec 3, 2015
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6663289
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7831
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Mine IDMINE_ID
0400351
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 66 inspections and other MSHA visits since Jul 5, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Apr 9, 2025
Type: Citation
Standard: 56.14207
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890671
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1058
Date of occurrenceVIOLATION_OCCUR_DT
Apr 9, 2025
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 9, 2025
Originally due, timeORIG_TERM_DUE_TIME
1115
Latest dueLATEST_TERM_DUE_DT
Apr 9, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1115
TerminatedTERMINATION_DT
Apr 9, 2025
Terminated, timeTERMINATION_TIME
1305
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jun 3, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jul 16, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 26, 2025
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6967199
Inspection beganINSPECTION_BEGIN_DT
Apr 9, 2025
Inspection closed outINSPECTION_END_DT
Apr 9, 2025
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 9, 2025
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890673
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1115
Date of occurrenceVIOLATION_OCCUR_DT
Apr 9, 2025
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 9, 2025
Originally due, timeORIG_TERM_DUE_TIME
1251
Latest dueLATEST_TERM_DUE_DT
Apr 9, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1251
TerminatedTERMINATION_DT
Apr 9, 2025
Terminated, timeTERMINATION_TIME
1327
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jun 3, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jul 16, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 26, 2025
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6967199
Inspection beganINSPECTION_BEGIN_DT
Apr 9, 2025
Inspection closed outINSPECTION_END_DT
Apr 9, 2025
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 9, 2025
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890672
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1114
Date of occurrenceVIOLATION_OCCUR_DT
Apr 9, 2025
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 9, 2025
Originally due, timeORIG_TERM_DUE_TIME
1234
Latest dueLATEST_TERM_DUE_DT
Apr 9, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1234
TerminatedTERMINATION_DT
Apr 9, 2025
Terminated, timeTERMINATION_TIME
1420
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jun 3, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jul 16, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 26, 2025
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6967199
Inspection beganINSPECTION_BEGIN_DT
Apr 9, 2025
Inspection closed outINSPECTION_END_DT
Apr 9, 2025
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 23, 2021
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9506685
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 23, 2021
Time issuedVIOLATION_ISSUE_TIME
1015
Date of occurrenceVIOLATION_OCCUR_DT
Nov 23, 2021
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 23, 2021
Originally due, timeORIG_TERM_DUE_TIME
1115
Latest dueLATEST_TERM_DUE_DT
Nov 23, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1115
TerminatedTERMINATION_DT
Nov 23, 2021
Terminated, timeTERMINATION_TIME
1220
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Dec 28, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Feb 7, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 20, 2022
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6878018
Inspection beganINSPECTION_BEGIN_DT
Nov 23, 2021
Inspection closed outINSPECTION_END_DT
Nov 23, 2021
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 2, 2019
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9432868
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 2, 2019
Time issuedVIOLATION_ISSUE_TIME
1335
Date of occurrenceVIOLATION_OCCUR_DT
Apr 16, 2019
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 2, 2019
Originally due, timeORIG_TERM_DUE_TIME
1445
Latest dueLATEST_TERM_DUE_DT
May 2, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1445
TerminatedTERMINATION_DT
May 2, 2019
Terminated, timeTERMINATION_TIME
1345
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Jul 2, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Aug 7, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 16, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6825633
Inspection beganINSPECTION_BEGIN_DT
May 2, 2019
Inspection closed outINSPECTION_END_DT
May 4, 2019
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 4, 2018
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8995167
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 4, 2018
Time issuedVIOLATION_ISSUE_TIME
1035
Date of occurrenceVIOLATION_OCCUR_DT
Apr 4, 2018
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2018
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Apr 5, 2018
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
May 29, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Jul 13, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 14, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6727102
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2018
Inspection closed outINSPECTION_END_DT
Apr 5, 2018
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 10, 2018
Type: Citation
Standard: 56.9300(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8995130
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 10, 2018
Time issuedVIOLATION_ISSUE_TIME
0905
Date of occurrenceVIOLATION_OCCUR_DT
Jan 10, 2018
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 10, 2018
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Jan 10, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Jan 10, 2018
Terminated, timeTERMINATION_TIME
0915
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Feb 27, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Apr 13, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 20, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6727085
Inspection beganINSPECTION_BEGIN_DT
Jan 10, 2018
Inspection closed outINSPECTION_END_DT
Jan 10, 2018
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 30, 2016
Type: Citation
Standard: 56.11001
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8874442
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 30, 2016
Time issuedVIOLATION_ISSUE_TIME
0930
Date of occurrenceVIOLATION_OCCUR_DT
Mar 30, 2016
30 CFR part and sectionPART_SECTION
56.11001
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 30, 2016
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Mar 30, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Mar 30, 2016
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
May 3, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Jun 8, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 16, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6669011
Inspection beganINSPECTION_BEGIN_DT
Mar 28, 2016
Inspection closed outINSPECTION_END_DT
Apr 1, 2016
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 12, 2015
Type: Citation
Standard: 56.3130
S&S: Y
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $117.00
Details

The citation

Citation or order numberVIOLATION_NO
8793777
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 12, 2015
Time issuedVIOLATION_ISSUE_TIME
1500
Date of occurrenceVIOLATION_OCCUR_DT
Nov 12, 2015
30 CFR part and sectionPART_SECTION
56.3130
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 27, 2015
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Nov 27, 2015
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Dec 3, 2015
Terminated, timeTERMINATION_TIME
1210
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
117
Current proposed assessmentAMOUNT_DUE
117
Amount paidAMOUNT_PAID
117
Bill first printedBILL_PRINT_DT
Feb 2, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Mar 9, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 22, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6663281
Inspection beganINSPECTION_BEGIN_DT
Oct 19, 2015
Inspection closed outINSPECTION_END_DT
Nov 12, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (2)

Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 7, 2015
Type: Order
Standard: 46.8(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $112.00
Details

The citation

Citation or order numberVIOLATION_NO
8788437
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
May 7, 2015
Time issuedVIOLATION_ISSUE_TIME
0710
Date of occurrenceVIOLATION_OCCUR_DT
May 7, 2015
30 CFR part and sectionPART_SECTION
46.8(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(g)(1)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
7
NegligenceNEGLIGENCE
ModNegligence

Abatement

TerminatedTERMINATION_DT
May 8, 2015
Terminated, timeTERMINATION_TIME
0911
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
112
Current proposed assessmentAMOUNT_DUE
112
Amount paidAMOUNT_PAID
112
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 2, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 14, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6668609
Inspection beganINSPECTION_BEGIN_DT
May 5, 2015
Inspection closed outINSPECTION_END_DT
May 7, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (18)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 6, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8788435
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 6, 2015
Time issuedVIOLATION_ISSUE_TIME
1020
Date of occurrenceVIOLATION_OCCUR_DT
May 6, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 6, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 6, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 6, 2015
Terminated, timeTERMINATION_TIME
1133
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 2, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 14, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6668609
Inspection beganINSPECTION_BEGIN_DT
May 5, 2015
Inspection closed outINSPECTION_END_DT
May 7, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 6, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8788436
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 6, 2015
Time issuedVIOLATION_ISSUE_TIME
1118
Date of occurrenceVIOLATION_OCCUR_DT
May 6, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 6, 2015
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
May 6, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
May 7, 2015
Terminated, timeTERMINATION_TIME
0820
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 2, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 14, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6668609
Inspection beganINSPECTION_BEGIN_DT
May 5, 2015
Inspection closed outINSPECTION_END_DT
May 7, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 6, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8788434
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 6, 2015
Time issuedVIOLATION_ISSUE_TIME
0950
Date of occurrenceVIOLATION_OCCUR_DT
May 6, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 6, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 6, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 7, 2015
Terminated, timeTERMINATION_TIME
0827
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 2, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 14, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6668609
Inspection beganINSPECTION_BEGIN_DT
May 5, 2015
Inspection closed outINSPECTION_END_DT
May 7, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 5, 2015
Type: Citation
Standard: 56.14130(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8788433
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 5, 2015
Time issuedVIOLATION_ISSUE_TIME
1245
Date of occurrenceVIOLATION_OCCUR_DT
May 5, 2015
30 CFR part and sectionPART_SECTION
56.14130(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 20, 2015
Terminated, timeTERMINATION_TIME
1230
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 2, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 14, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6668609
Inspection beganINSPECTION_BEGIN_DT
May 5, 2015
Inspection closed outINSPECTION_END_DT
May 7, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 5, 2015
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8788432
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 5, 2015
Time issuedVIOLATION_ISSUE_TIME
1005
Date of occurrenceVIOLATION_OCCUR_DT
May 5, 2015
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
May 5, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 5, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 5, 2015
Terminated, timeTERMINATION_TIME
1043
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 30, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 18, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6668609
Inspection beganINSPECTION_BEGIN_DT
May 5, 2015
Inspection closed outINSPECTION_END_DT
May 7, 2015
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 19, 2013
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8781012
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 19, 2013
Time issuedVIOLATION_ISSUE_TIME
1334
Date of occurrenceVIOLATION_OCCUR_DT
Dec 19, 2013
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 20, 2013
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Jan 2, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jan 22, 2014
Terminated, timeTERMINATION_TIME
1453
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Mar 14, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 12, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6595414
Inspection beganINSPECTION_BEGIN_DT
Dec 19, 2013
Inspection closed outINSPECTION_END_DT
Dec 23, 2013
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 19, 2013
Type: Citation
Standard: 56.14101(a)(3)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8781010
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 19, 2013
Time issuedVIOLATION_ISSUE_TIME
1312
Date of occurrenceVIOLATION_OCCUR_DT
Dec 19, 2013
30 CFR part and sectionPART_SECTION
56.14101(a)(3)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 20, 2013
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Dec 20, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Dec 23, 2013
Terminated, timeTERMINATION_TIME
1213
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Mar 14, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 12, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6595414
Inspection beganINSPECTION_BEGIN_DT
Dec 19, 2013
Inspection closed outINSPECTION_END_DT
Dec 23, 2013
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 19, 2013
Type: Citation
Standard: 56.14101(a)(3)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8781011
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 19, 2013
Time issuedVIOLATION_ISSUE_TIME
1330
Date of occurrenceVIOLATION_OCCUR_DT
Dec 19, 2013
30 CFR part and sectionPART_SECTION
56.14101(a)(3)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 20, 2013
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Dec 20, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Dec 23, 2013
Terminated, timeTERMINATION_TIME
1212
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Mar 14, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 12, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6595414
Inspection beganINSPECTION_BEGIN_DT
Dec 19, 2013
Inspection closed outINSPECTION_END_DT
Dec 23, 2013
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 19, 2013
Type: Citation
Standard: 56.14101(a)(3)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8781013
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 19, 2013
Time issuedVIOLATION_ISSUE_TIME
1339
Date of occurrenceVIOLATION_OCCUR_DT
Dec 19, 2013
30 CFR part and sectionPART_SECTION
56.14101(a)(3)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 20, 2013
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Dec 20, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Dec 23, 2013
Terminated, timeTERMINATION_TIME
1225
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Mar 14, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 12, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
6595414
Inspection beganINSPECTION_BEGIN_DT
Dec 19, 2013
Inspection closed outINSPECTION_END_DT
Dec 23, 2013
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 24, 2012
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8697518
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 24, 2012
Time issuedVIOLATION_ISSUE_TIME
0941
Date of occurrenceVIOLATION_OCCUR_DT
Oct 24, 2012
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 24, 2012
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Oct 24, 2012
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Oct 25, 2012
Terminated, timeTERMINATION_TIME
0843
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Nov 27, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Jan 2, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 11, 2012
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Painted Hills Mining Company
Operator IDVIOLATOR_ID
0119070
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
1160368
Inspection beganINSPECTION_BEGIN_DT
Oct 24, 2012
Inspection closed outINSPECTION_END_DT
Oct 25, 2012
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 25, 2011
Type: Citation
Standard: 56.9300(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $127.00
Details

The citation

Citation or order numberVIOLATION_NO
8567966
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 25, 2011
Time issuedVIOLATION_ISSUE_TIME
1355
Date of occurrenceVIOLATION_OCCUR_DT
Apr 25, 2011
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 25, 2011
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Apr 25, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Apr 26, 2011
Terminated, timeTERMINATION_TIME
1055
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
127
Current proposed assessmentAMOUNT_DUE
127
Amount paidAMOUNT_PAID
127
Bill first printedBILL_PRINT_DT
May 31, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Jul 6, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 30, 2011
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Whitewater Rock & Supply Co
Operator IDVIOLATOR_ID
L40205
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
1160019
Inspection beganINSPECTION_BEGIN_DT
Apr 25, 2011
Inspection closed outINSPECTION_END_DT
Apr 26, 2011
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 25, 2011
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8567965
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 25, 2011
Time issuedVIOLATION_ISSUE_TIME
1145
Date of occurrenceVIOLATION_OCCUR_DT
Apr 25, 2011
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 25, 2011
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Apr 25, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Apr 26, 2011
Terminated, timeTERMINATION_TIME
1050
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
May 31, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Jul 6, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 30, 2011
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Whitewater Rock & Supply Co
Operator IDVIOLATOR_ID
L40205
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
1160019
Inspection beganINSPECTION_BEGIN_DT
Apr 25, 2011
Inspection closed outINSPECTION_END_DT
Apr 26, 2011
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 28, 2010
Type: Citation
Standard: 56.9300(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $127.00
Details

The citation

Citation or order numberVIOLATION_NO
8560567
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 28, 2010
Time issuedVIOLATION_ISSUE_TIME
1049
Date of occurrenceVIOLATION_OCCUR_DT
Dec 28, 2010
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 28, 2010
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Dec 28, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Dec 28, 2010
Terminated, timeTERMINATION_TIME
1140
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
127
Current proposed assessmentAMOUNT_DUE
127
Amount paidAMOUNT_PAID
127
Bill first printedBILL_PRINT_DT
Feb 1, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Mar 10, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 16, 2011
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Whitewater Rock & Supply Co
Operator IDVIOLATOR_ID
L40205
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
1152297
Inspection beganINSPECTION_BEGIN_DT
Dec 28, 2010
Inspection closed outINSPECTION_END_DT
Dec 28, 2010
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 21, 2010
Type: Citation
Standard: 56.14100(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8555777
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 21, 2010
Time issuedVIOLATION_ISSUE_TIME
1010
Date of occurrenceVIOLATION_OCCUR_DT
Jul 21, 2010
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 21, 2010
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Jul 21, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Jul 21, 2010
Terminated, timeTERMINATION_TIME
1055
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 31, 2010
Final order dateFINAL_ORDER_ISSUE_DT
Oct 8, 2010
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 15, 2010
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Whitewater Rock & Supply Co
Operator IDVIOLATOR_ID
L40205
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
1152514
Inspection beganINSPECTION_BEGIN_DT
Jul 21, 2010
Inspection closed outINSPECTION_END_DT
Jul 21, 2010
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 21, 2010
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8555776
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 21, 2010
Time issuedVIOLATION_ISSUE_TIME
0953
Date of occurrenceVIOLATION_OCCUR_DT
Jul 21, 2010
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 21, 2010
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Jul 21, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Jul 21, 2010
Terminated, timeTERMINATION_TIME
1030
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 31, 2010
Final order dateFINAL_ORDER_ISSUE_DT
Oct 8, 2010
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 15, 2010
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Whitewater Rock & Supply Co
Operator IDVIOLATOR_ID
L40205
Controller IDCONTROLLER_ID
M40205
Inspection eventEVENT_NO
1152514
Inspection beganINSPECTION_BEGIN_DT
Jul 21, 2010
Inspection closed outINSPECTION_END_DT
Jul 21, 2010
Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

115 citations and orders since Jul 5, 2000: 115 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Apr 9, 2025
Citation number: 9890672
Standard: 56.14100(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890672
Assessment control numberASSESS_CASE_NO
000621295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 26, 2025
Citation issuedISSUE_DT
Apr 9, 2025
Date of occurrenceOCCURRENCE_DT
Apr 9, 2025
Final order dateFINAL_ORDER_DT
Jul 16, 2025
Bill first printedBILL_PRINT_DT
Jun 3, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 16, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
3304
Size of mineSIZE_OF_MINE
3304
Controller hours workedCONTROLLER_HRS
3304
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
3304
History period startHISTORY_START_DT
Jan 9, 2024
History period endHISTORY_END_DT
Apr 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6967199
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 9, 2025
Citation number: 9890673
Standard: 56.14100(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890673
Assessment control numberASSESS_CASE_NO
000621295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 26, 2025
Citation issuedISSUE_DT
Apr 9, 2025
Date of occurrenceOCCURRENCE_DT
Apr 9, 2025
Final order dateFINAL_ORDER_DT
Jul 16, 2025
Bill first printedBILL_PRINT_DT
Jun 3, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 16, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
3304
Size of mineSIZE_OF_MINE
3304
Controller hours workedCONTROLLER_HRS
3304
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
3304
History period startHISTORY_START_DT
Jan 9, 2024
History period endHISTORY_END_DT
Apr 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6967199
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 9, 2025
Citation number: 9890671
Standard: 56.14207
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890671
Assessment control numberASSESS_CASE_NO
000621295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 26, 2025
Citation issuedISSUE_DT
Apr 9, 2025
Date of occurrenceOCCURRENCE_DT
Apr 9, 2025
Final order dateFINAL_ORDER_DT
Jul 16, 2025
Bill first printedBILL_PRINT_DT
Jun 3, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 16, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
3304
Size of mineSIZE_OF_MINE
3304
Controller hours workedCONTROLLER_HRS
3304
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
3304
History period startHISTORY_START_DT
Jan 9, 2024
History period endHISTORY_END_DT
Apr 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6967199
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 23, 2021
Citation number: 9506685
Standard: 56.14112(b)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9506685
Assessment control numberASSESS_CASE_NO
000547656
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 20, 2022
Citation issuedISSUE_DT
Nov 23, 2021
Date of occurrenceOCCURRENCE_DT
Nov 23, 2021
Final order dateFINAL_ORDER_DT
Feb 7, 2022
Bill first printedBILL_PRINT_DT
Dec 28, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 7, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
6557
Size of mineSIZE_OF_MINE
6557
Controller hours workedCONTROLLER_HRS
6557
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6557
History period startHISTORY_START_DT
Aug 23, 2020
History period endHISTORY_END_DT
Nov 22, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6878018
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 2, 2019
Citation number: 9432868
Standard: 50.30(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9432868
Assessment control numberASSESS_CASE_NO
000493759
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 16, 2019
Citation issuedISSUE_DT
May 2, 2019
Date of occurrenceOCCURRENCE_DT
Apr 16, 2019
Final order dateFINAL_ORDER_DT
Aug 7, 2019
Bill first printedBILL_PRINT_DT
Jul 2, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 7, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
7545
Size of mineSIZE_OF_MINE
7545
Controller hours workedCONTROLLER_HRS
7545
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7545
History period startHISTORY_START_DT
Jan 16, 2018
History period endHISTORY_END_DT
Apr 15, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6825633
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 4, 2018
Citation number: 8995167
Standard: 56.14100(b)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8995167
Assessment control numberASSESS_CASE_NO
000465698
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 12, 2018
Citation issuedISSUE_DT
Apr 4, 2018
Date of occurrenceOCCURRENCE_DT
Apr 4, 2018
Final order dateFINAL_ORDER_DT
Jul 13, 2018
Bill first printedBILL_PRINT_DT
May 29, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
7848
Size of mineSIZE_OF_MINE
7848
Controller hours workedCONTROLLER_HRS
7848
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7848
History period startHISTORY_START_DT
Jan 4, 2017
History period endHISTORY_END_DT
Apr 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6727102
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 10, 2018
Citation number: 8995130
Standard: 56.9300(b)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8995130
Assessment control numberASSESS_CASE_NO
000459296
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 20, 2018
Citation issuedISSUE_DT
Jan 10, 2018
Date of occurrenceOCCURRENCE_DT
Jan 10, 2018
Final order dateFINAL_ORDER_DT
Apr 13, 2018
Bill first printedBILL_PRINT_DT
Feb 27, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
32
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
7848
Size of mineSIZE_OF_MINE
7848
Controller hours workedCONTROLLER_HRS
7848
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7848
History period startHISTORY_START_DT
Oct 10, 2016
History period endHISTORY_END_DT
Jan 9, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6727085
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 30, 2016
Citation number: 8874442
Standard: 56.11001
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8874442
Assessment control numberASSESS_CASE_NO
000408859
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 16, 2016
Citation issuedISSUE_DT
Mar 30, 2016
Date of occurrenceOCCURRENCE_DT
Mar 30, 2016
Final order dateFINAL_ORDER_DT
Jun 8, 2016
Bill first printedBILL_PRINT_DT
May 3, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 8, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
8300
Size of mineSIZE_OF_MINE
8300
Controller hours workedCONTROLLER_HRS
8300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8300
History period startHISTORY_START_DT
Dec 30, 2014
History period endHISTORY_END_DT
Mar 29, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6669011
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 12, 2015
Citation number: 8793777
Standard: 56.3130
Proposed penalty: $117.00
Current assessment: $117.00
Paid against proposed penalty: $117.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8793777
Assessment control numberASSESS_CASE_NO
000401936
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 22, 2016
Citation issuedISSUE_DT
Nov 12, 2015
Date of occurrenceOCCURRENCE_DT
Nov 12, 2015
Final order dateFINAL_ORDER_DT
Mar 9, 2016
Bill first printedBILL_PRINT_DT
Feb 2, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 9, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.3130
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
117.00
Current assessmentCURRENT_ASSESSMENT_AMT
117.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
117.00

Penalty points

Violation history pointsPENALTY_POINTS
62
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
0.75
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Aug 12, 2014
History period endHISTORY_END_DT
Nov 11, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663281
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 7, 2015
Citation number: 8788437
Standard: 46.8(a)(2)
Proposed penalty: $112.00
Current assessment: $112.00
Paid against proposed penalty: $112.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8788437
Assessment control numberASSESS_CASE_NO
000385295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2015
Citation issuedISSUE_DT
May 7, 2015
Date of occurrenceOCCURRENCE_DT
May 7, 2015
Final order dateFINAL_ORDER_DT
Aug 2, 2015
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 2, 2015
Citation typeCITATION_TYPE_CD
Order
30 CFR standardCFR_STANDARD_CD
46.8(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(g)(1)

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
112.00
Current assessmentCURRENT_ASSESSMENT_AMT
112.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
112.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
12
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Feb 7, 2014
History period endHISTORY_END_DT
May 6, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6668609
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (3)

Significant and substantialSIG_SUB_IND, Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 6, 2015
Citation number: 8788434
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8788434
Assessment control numberASSESS_CASE_NO
000385295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2015
Citation issuedISSUE_DT
May 6, 2015
Date of occurrenceOCCURRENCE_DT
May 6, 2015
Final order dateFINAL_ORDER_DT
Aug 2, 2015
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 2, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Feb 6, 2014
History period endHISTORY_END_DT
May 5, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6668609
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 6, 2015
Citation number: 8788436
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8788436
Assessment control numberASSESS_CASE_NO
000385295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2015
Citation issuedISSUE_DT
May 6, 2015
Date of occurrenceOCCURRENCE_DT
May 6, 2015
Final order dateFINAL_ORDER_DT
Aug 2, 2015
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 2, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Feb 6, 2014
History period endHISTORY_END_DT
May 5, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6668609
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 6, 2015
Citation number: 8788435
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8788435
Assessment control numberASSESS_CASE_NO
000385295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2015
Citation issuedISSUE_DT
May 6, 2015
Date of occurrenceOCCURRENCE_DT
May 6, 2015
Final order dateFINAL_ORDER_DT
Aug 2, 2015
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 2, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Feb 6, 2014
History period endHISTORY_END_DT
May 5, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6668609
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 5, 2015
Citation number: 8788433
Standard: 56.14130(c)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8788433
Assessment control numberASSESS_CASE_NO
000385295
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2015
Citation issuedISSUE_DT
May 5, 2015
Date of occurrenceOCCURRENCE_DT
May 5, 2015
Final order dateFINAL_ORDER_DT
Aug 2, 2015
Bill first printedBILL_PRINT_DT
Jun 30, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 2, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14130(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
22
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Feb 5, 2014
History period endHISTORY_END_DT
May 4, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6668609
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 5, 2015
Citation number: 8788432
Standard: 56.14207
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8788432
Assessment control numberASSESS_CASE_NO
000387678
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 18, 2015
Citation issuedISSUE_DT
May 5, 2015
Date of occurrenceOCCURRENCE_DT
May 5, 2015
Final order dateFINAL_ORDER_DT
Aug 30, 2015
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 30, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
6892
Size of mineSIZE_OF_MINE
6892
Controller hours workedCONTROLLER_HRS
6892
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6892
History period startHISTORY_START_DT
Feb 5, 2014
History period endHISTORY_END_DT
May 4, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6668609
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 19, 2013
Citation number: 8781011
Standard: 56.14101(a)(3)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8781011
Assessment control numberASSESS_CASE_NO
000342096
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 11, 2014
Citation issuedISSUE_DT
Dec 19, 2013
Date of occurrenceOCCURRENCE_DT
Dec 19, 2013
Final order dateFINAL_ORDER_DT
Mar 14, 2014
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(3)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
7867
Size of mineSIZE_OF_MINE
7867
Controller hours workedCONTROLLER_HRS
7867
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7867
History period startHISTORY_START_DT
Sep 19, 2012
History period endHISTORY_END_DT
Dec 18, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595414
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 19, 2013
Citation number: 8781013
Standard: 56.14101(a)(3)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8781013
Assessment control numberASSESS_CASE_NO
000342096
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 11, 2014
Citation issuedISSUE_DT
Dec 19, 2013
Date of occurrenceOCCURRENCE_DT
Dec 19, 2013
Final order dateFINAL_ORDER_DT
Mar 14, 2014
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(3)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
7867
Size of mineSIZE_OF_MINE
7867
Controller hours workedCONTROLLER_HRS
7867
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7867
History period startHISTORY_START_DT
Sep 19, 2012
History period endHISTORY_END_DT
Dec 18, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595414
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 19, 2013
Citation number: 8781010
Standard: 56.14101(a)(3)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8781010
Assessment control numberASSESS_CASE_NO
000342096
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 11, 2014
Citation issuedISSUE_DT
Dec 19, 2013
Date of occurrenceOCCURRENCE_DT
Dec 19, 2013
Final order dateFINAL_ORDER_DT
Mar 14, 2014
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(3)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
7867
Size of mineSIZE_OF_MINE
7867
Controller hours workedCONTROLLER_HRS
7867
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7867
History period startHISTORY_START_DT
Sep 19, 2012
History period endHISTORY_END_DT
Dec 18, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595414
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 19, 2013
Citation number: 8781012
Standard: 56.14100(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8781012
Assessment control numberASSESS_CASE_NO
000342096
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 11, 2014
Citation issuedISSUE_DT
Dec 19, 2013
Date of occurrenceOCCURRENCE_DT
Dec 19, 2013
Final order dateFINAL_ORDER_DT
Mar 14, 2014
Bill first printedBILL_PRINT_DT
Jan 28, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
7867
Size of mineSIZE_OF_MINE
7867
Controller hours workedCONTROLLER_HRS
7867
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7867
History period startHISTORY_START_DT
Sep 19, 2012
History period endHISTORY_END_DT
Dec 18, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595414
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 24, 2012
Citation number: 8697518
Standard: 56.12004
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8697518
Assessment control numberASSESS_CASE_NO
000307384
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 11, 2012
Citation issuedISSUE_DT
Oct 24, 2012
Date of occurrenceOCCURRENCE_DT
Oct 24, 2012
Final order dateFINAL_ORDER_DT
Jan 2, 2013
Bill first printedBILL_PRINT_DT
Nov 27, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 2, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
8710
Size of mineSIZE_OF_MINE
8710
Controller hours workedCONTROLLER_HRS
8710
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8710
History period startHISTORY_START_DT
Jul 24, 2011
History period endHISTORY_END_DT
Oct 23, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Painted Hills Mining Company
IDVIOLATOR_ID
0119070
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1160368
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 25, 2011
Citation number: 8567965
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8567965
Assessment control numberASSESS_CASE_NO
000256413
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 29, 2011
Citation issuedISSUE_DT
Apr 25, 2011
Date of occurrenceOCCURRENCE_DT
Apr 25, 2011
Final order dateFINAL_ORDER_DT
Jul 6, 2011
Bill first printedBILL_PRINT_DT
May 31, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2011
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 6, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
11321
Size of mineSIZE_OF_MINE
11321
Controller hours workedCONTROLLER_HRS
11321
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
11321
History period startHISTORY_START_DT
Jan 25, 2010
History period endHISTORY_END_DT
Apr 24, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Whitewater Rock & Supply Co
IDVIOLATOR_ID
L40205
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1160019
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 25, 2011
Citation number: 8567966
Standard: 56.9300(b)
Proposed penalty: $127.00
Current assessment: $127.00
Paid against proposed penalty: $127.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8567966
Assessment control numberASSESS_CASE_NO
000256413
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 29, 2011
Citation issuedISSUE_DT
Apr 25, 2011
Date of occurrenceOCCURRENCE_DT
Apr 25, 2011
Final order dateFINAL_ORDER_DT
Jul 6, 2011
Bill first printedBILL_PRINT_DT
May 31, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2011
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 6, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
127.00
Current assessmentCURRENT_ASSESSMENT_AMT
127.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
127.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
11321
Size of mineSIZE_OF_MINE
11321
Controller hours workedCONTROLLER_HRS
11321
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
11321
History period startHISTORY_START_DT
Jan 25, 2010
History period endHISTORY_END_DT
Apr 24, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Whitewater Rock & Supply Co
IDVIOLATOR_ID
L40205
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1160019
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 28, 2010
Citation number: 8560567
Standard: 56.9300(a)
Proposed penalty: $127.00
Current assessment: $127.00
Paid against proposed penalty: $127.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8560567
Assessment control numberASSESS_CASE_NO
000245036
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 15, 2011
Citation issuedISSUE_DT
Dec 28, 2010
Date of occurrenceOCCURRENCE_DT
Dec 28, 2010
Final order dateFINAL_ORDER_DT
Mar 10, 2011
Bill first printedBILL_PRINT_DT
Feb 1, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2011
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 10, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
127.00
Current assessmentCURRENT_ASSESSMENT_AMT
127.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
127.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
10889
Size of mineSIZE_OF_MINE
10889
Controller hours workedCONTROLLER_HRS
10889
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10889
History period startHISTORY_START_DT
Sep 28, 2009
History period endHISTORY_END_DT
Dec 27, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Whitewater Rock & Supply Co
IDVIOLATOR_ID
L40205
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1152297
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 21, 2010
Citation number: 8555776
Standard: 56.14132(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8555776
Assessment control numberASSESS_CASE_NO
000230178
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 14, 2010
Citation issuedISSUE_DT
Jul 21, 2010
Date of occurrenceOCCURRENCE_DT
Jul 21, 2010
Final order dateFINAL_ORDER_DT
Oct 8, 2010
Bill first printedBILL_PRINT_DT
Aug 31, 2010
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2010
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 8, 2010
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
10889
Size of mineSIZE_OF_MINE
10889
Controller hours workedCONTROLLER_HRS
10889
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10889
History period startHISTORY_START_DT
Apr 21, 2009
History period endHISTORY_END_DT
Jul 20, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Whitewater Rock & Supply Co
IDVIOLATOR_ID
L40205
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1152514
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 21, 2010
Citation number: 8555777
Standard: 56.14100(c)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8555777
Assessment control numberASSESS_CASE_NO
000230178
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 14, 2010
Citation issuedISSUE_DT
Jul 21, 2010
Date of occurrenceOCCURRENCE_DT
Jul 21, 2010
Final order dateFINAL_ORDER_DT
Oct 8, 2010
Bill first printedBILL_PRINT_DT
Aug 31, 2010
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2010
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 8, 2010
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
10889
Size of mineSIZE_OF_MINE
10889
Controller hours workedCONTROLLER_HRS
10889
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10889
History period startHISTORY_START_DT
Apr 21, 2009
History period endHISTORY_END_DT
Jul 20, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Whitewater Rock & Supply Co
IDVIOLATOR_ID
L40205
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1152514
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7831

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 114 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Feb 2, 2010
Citation issued: Nov 24, 2009
Docket: WEST 2010-633M
Standard: 56.14100(c)
Proposed penalty: $946.00
Penalty after decision: $250.00
Decided: Jul 19, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
7980979
Citation issuedCITATION_ISSUE_DT
Nov 24, 2009
Hearing request receivedCONTEST_DT
Feb 2, 2010
Docket numberDOCKET_NO
WEST 2010-633M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Jacqueline
Judge, last nameJUDGE_LAST_NAME
Bulluck
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 19, 2011
Petition duePETITION_DUE_DT
Mar 19, 2010
Petition filedPETITION_FILED_DT
Mar 19, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
946.00
Penalty after the decisionDECISION_PENALTY_AMT
250.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14100(c)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR701
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver

Mine

Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry

Other fields

ISSUING_FIELD_OFFICE
M7831

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Feb 2, 2010
Citation issued: Nov 24, 2009
Docket: WEST 2010-633M
Standard: 56.14103(b)
Proposed penalty: $634.00
Penalty after decision: $250.00
Decided: Jul 19, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
7980981
Citation issuedCITATION_ISSUE_DT
Nov 24, 2009
Hearing request receivedCONTEST_DT
Feb 2, 2010
Docket numberDOCKET_NO
WEST 2010-633M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Jacqueline
Judge, last nameJUDGE_LAST_NAME
Bulluck
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 19, 2011
Petition duePETITION_DUE_DT
Mar 19, 2010
Petition filedPETITION_FILED_DT
Mar 19, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
634.00
Penalty after the decisionDECISION_PENALTY_AMT
250.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14103(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR701
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver

Mine

Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry

Other fields

ISSUING_FIELD_OFFICE
M7831

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

2 contested citations and orders; decision types are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 2,723
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2723
Average hours per employeeAVG_EMPLOYEE_HOURS
1362

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 3,663
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3663
Average hours per employeeAVG_EMPLOYEE_HOURS
1832

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 3,304
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3304
Average hours per employeeAVG_EMPLOYEE_HOURS
1652

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 3,647
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3647
Average hours per employeeAVG_EMPLOYEE_HOURS
1824

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 3,967
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3967
Average hours per employeeAVG_EMPLOYEE_HOURS
1984

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 5,439
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
5439
Average hours per employeeAVG_EMPLOYEE_HOURS
1360

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 6,557
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
6557
Average hours per employeeAVG_EMPLOYEE_HOURS
1639

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 7,612
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
7612
Average hours per employeeAVG_EMPLOYEE_HOURS
1522

Mine

Mine IDMINE_ID
0400351
Mine name in this fileCURR_MINE_NM
Painted Hills Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
San Bernardino CA Field Office
Nearest town
Whitewater
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
6
Tailing ponds
0
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Painted Hills Quarry
Mine IDMINE_ID
0400351
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
May 25, 1989
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Painted Hills Mining Company
Operator IDCURRENT_OPERATOR_ID
0119070
Controller IDCURRENT_CONTROLLER_ID
M40205
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jul 1, 2011

Location and MSHA office

StateSTATE
CA
Bureau of Mines state codeBOM_STATE_CD
04
FIPS county codeFIPS_CNTY_CD
065
FIPS county nameFIPS_CNTY_NM
Riverside
Nearest townNEAREST_TOWN
Whitewater
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7831
MSHA officeOFFICE_NAME
San Bernardino CA Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
40
Most recent assessment control numberASSESS_CTRL_NO
000621295

Commodity

Primary commodity (SIC)PRIMARY_SIC
Construction Sand and Gravel
Primary commodity codePRIMARY_SIC_CD
144200
Primary SIC codePRIMARY_SIC_CD_1
1442
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
SandAndGravel
Primary industry group codePRIMARY_CANVASS_CD
5

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
6
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (16)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Painted Hills Mining Company
From: Jul 1, 2011
To: No end date
Controller: Not shown
From : Jul 1, 2011
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Painted Hills Mining Company
Operator IDOPERATOR_ID
0119070
Operator fromOPERATOR_START_DT
Jul 1, 2011

Controller

Controller IDCONTROLLER_ID
M40205
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2011

Mine

Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Whitewater Rock & Supply Co
From: Jan 1, 1950
To: Jun 30, 2011
Controller: Not shown
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Whitewater Rock & Supply Co
Operator IDOPERATOR_ID
L40205
Operator fromOPERATOR_START_DT
Jan 1, 1950
Operator toOPERATOR_END_DT
Jun 30, 2011

Controller

Controller IDCONTROLLER_ID
M40205
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

Painted Hills Mining Company·Contact title President·Street not recorded, Whitewater CA 92282

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Painted Hills Mining Company
Contact titleCONTACT_TITLE
President
CityCITY
Whitewater
StateSTATE_ABBR
CA
State nameSTATE
California
ZIP codeZIP_CD
92282
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
06

Mine

Mine IDMINE_ID
0400351
Mine name in this fileMINE_NAME
Painted Hills Quarry
Nearest townNEAREST_TOWN
Whitewater
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
May 25, 1989
Primary commodity (SIC)PRIMARY_SIC_CD
Construction Sand and Gravel
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology