Skip to content
SafetyRecord logoSafetyRecord

Kellog Creek Aggregates Inc

Metal/Non-Metal, SurfaceConstruction Sand and GravelContra Costa, CaliforniaMine ID 0403622

Operator Kellog Creek Aggregates IncController not shownMSHA status Active since Jan 12, 2014

What MSHA has on file for this mine

Citations and orders
36
since Jul 20, 2000 · 36 to the operator, 0 to contractors · 8 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
1
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Jul 29 to Jul 30, 2026Inspectors 1 | Hours on site 13.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 29, 2026
Closed outINSPECTION_END_DT
Jul 30, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F012E4B
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
13.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
26.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 9 to Oct 14, 2025Inspectors 2 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 9, 2025
Closed outINSPECTION_END_DT
Oct 14, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6874023
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 24, 2025Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jun 24, 2025
Closed outINSPECTION_END_DT
Jun 24, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F016575
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 18, 2025Inspectors 1 | Hours on site 1.75

The inspection

BeganINSPECTION_BEGIN_DT
Feb 18, 2025
Closed outINSPECTION_END_DT
Feb 18, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F011110
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
4

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 29 to Aug 31, 2024Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Aug 29, 2024
Closed outINSPECTION_END_DT
Aug 31, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6880697
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 19 to Mar 20, 2024Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Mar 19, 2024
Closed outINSPECTION_END_DT
Mar 20, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6880687
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 25, 2023Inspectors 1 | Hours on site 8.5

The inspection

BeganINSPECTION_BEGIN_DT
May 25, 2023
Closed outINSPECTION_END_DT
May 25, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6874491
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 29 to Nov 30, 2022Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Nov 29, 2022
Closed outINSPECTION_END_DT
Nov 30, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6874423
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 10, 2022Inspectors 1 | Hours on site 2.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 10, 2022
Closed outINSPECTION_END_DT
Aug 10, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6875711
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 21, 2022Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 21, 2022
Closed outINSPECTION_END_DT
Mar 21, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6873944
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 23, 2021Inspectors 1 | Hours on site 8.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 23, 2021
Closed outINSPECTION_END_DT
Sep 23, 2021
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6873765
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 9, 2021Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Jun 9, 2021
Closed outINSPECTION_END_DT
Jun 9, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6873733
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 1, 2021Inspectors 1 | Hours on site 2.25

The inspection

BeganINSPECTION_BEGIN_DT
Feb 1, 2021
Closed outINSPECTION_END_DT
Feb 1, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6829494
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 30 to Apr 1, 2020Inspectors 1 | Hours on site 2.75

The inspection

BeganINSPECTION_BEGIN_DT
Mar 30, 2020
Closed outINSPECTION_END_DT
Apr 1, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6828899
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Jan 13 to Jan 14, 2020Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Jan 13, 2020
Closed outINSPECTION_END_DT
Jan 14, 2020
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6828974
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Dec 17 to Dec 19, 2019Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Dec 17, 2019
Closed outINSPECTION_END_DT
Dec 19, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6828968
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 18, 2019Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Apr 18, 2019
Closed outINSPECTION_END_DT
Apr 18, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6728513
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 1, 2018Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Nov 1, 2018
Closed outINSPECTION_END_DT
Nov 1, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6728468
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 24, 2018Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Aug 24, 2018
Closed outINSPECTION_END_DT
Aug 24, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6728454
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 20 to Nov 21, 2017Inspectors 1 | Hours on site 10.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 20, 2017
Closed outINSPECTION_END_DT
Nov 21, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6721483
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
17.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 17, 2017Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2017
Closed outINSPECTION_END_DT
May 17, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6728033
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 24, 2017Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Jan 24, 2017
Closed outINSPECTION_END_DT
Jan 24, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6663784
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 26, 2016Inspectors 1 | Hours on site 2.75

The inspection

BeganINSPECTION_BEGIN_DT
Jul 26, 2016
Closed outINSPECTION_END_DT
Jul 26, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6599185
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 12, 2016Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Jan 12, 2016
Closed outINSPECTION_END_DT
Jan 12, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6663665
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 15 to Jun 17, 2015Inspectors 1 | Hours on site 6.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 15, 2015
Closed outINSPECTION_END_DT
Jun 17, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6663547
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Mine IDMINE_ID
0403622
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 35 inspections and other MSHA visits since Jul 20, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 9, 2025
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890340
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1100
Date of occurrenceVIOLATION_OCCUR_DT
Oct 9, 2025
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 10, 2025
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 10, 2025
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 9, 2025
Terminated, timeTERMINATION_TIME
1140
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 13, 2025
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6874023
Inspection beganINSPECTION_BEGIN_DT
Oct 9, 2025
Inspection closed outINSPECTION_END_DT
Oct 14, 2025
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 9, 2025
Type: Citation
Standard: 56.12028
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890341
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1105
Date of occurrenceVIOLATION_OCCUR_DT
Oct 9, 2025
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 10, 2025
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 10, 2025
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 14, 2025
Terminated, timeTERMINATION_TIME
0634
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 13, 2025
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6874023
Inspection beganINSPECTION_BEGIN_DT
Oct 9, 2025
Inspection closed outINSPECTION_END_DT
Oct 14, 2025
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 9, 2025
Type: Citation
Standard: 56.18002(d)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890342
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1115
Date of occurrenceVIOLATION_OCCUR_DT
Oct 9, 2025
30 CFR part and sectionPART_SECTION
56.18002(d)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 9, 2025
Originally due, timeORIG_TERM_DUE_TIME
1120
Latest dueLATEST_TERM_DUE_DT
Oct 9, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1120
TerminatedTERMINATION_DT
Oct 9, 2025
Terminated, timeTERMINATION_TIME
1120
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 13, 2025
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6874023
Inspection beganINSPECTION_BEGIN_DT
Oct 9, 2025
Inspection closed outINSPECTION_END_DT
Oct 14, 2025
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 21, 2022
Type: Citation
Standard: 50.0(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9507391
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 21, 2022
Time issuedVIOLATION_ISSUE_TIME
1450
Date of occurrenceVIOLATION_OCCUR_DT
Oct 16, 2021
30 CFR part and sectionPART_SECTION
50.0(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 21, 2022
Originally due, timeORIG_TERM_DUE_TIME
1451
Latest dueLATEST_TERM_DUE_DT
Mar 21, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1451
TerminatedTERMINATION_DT
Mar 21, 2022
Terminated, timeTERMINATION_TIME
1531
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 3, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jun 15, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 25, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6873944
Inspection beganINSPECTION_BEGIN_DT
Mar 21, 2022
Inspection closed outINSPECTION_END_DT
Mar 21, 2022
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 1, 2021
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9507062
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 1, 2021
Time issuedVIOLATION_ISSUE_TIME
1354
Date of occurrenceVIOLATION_OCCUR_DT
Jul 16, 2020
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 1, 2021
Originally due, timeORIG_TERM_DUE_TIME
1415
Latest dueLATEST_TERM_DUE_DT
Feb 1, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1415
TerminatedTERMINATION_DT
Feb 1, 2021
Terminated, timeTERMINATION_TIME
1410
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Mar 30, 2021
Final order dateFINAL_ORDER_ISSUE_DT
May 14, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 22, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6829494
Inspection beganINSPECTION_BEGIN_DT
Feb 1, 2021
Inspection closed outINSPECTION_END_DT
Feb 1, 2021
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 18, 2019
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9502635
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 18, 2019
Time issuedVIOLATION_ISSUE_TIME
1130
Date of occurrenceVIOLATION_OCCUR_DT
Dec 18, 2019
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 26, 2019
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Dec 26, 2019
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Jan 14, 2020
Terminated, timeTERMINATION_TIME
0830
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Jan 28, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Mar 4, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 18, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6828968
Inspection beganINSPECTION_BEGIN_DT
Dec 17, 2019
Inspection closed outINSPECTION_END_DT
Dec 19, 2019
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 18, 2019
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9502633
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 18, 2019
Time issuedVIOLATION_ISSUE_TIME
0930
Date of occurrenceVIOLATION_OCCUR_DT
Dec 18, 2019
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 26, 2019
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Dec 26, 2019
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Jan 14, 2020
Terminated, timeTERMINATION_TIME
0845
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Jan 28, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Mar 4, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 18, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6828968
Inspection beganINSPECTION_BEGIN_DT
Dec 17, 2019
Inspection closed outINSPECTION_END_DT
Dec 19, 2019
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 18, 2019
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $324.00
Details

The citation

Citation or order numberVIOLATION_NO
9502613
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 18, 2019
Time issuedVIOLATION_ISSUE_TIME
0915
Date of occurrenceVIOLATION_OCCUR_DT
Dec 18, 2019
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 18, 2019
Originally due, timeORIG_TERM_DUE_TIME
0945
Latest dueLATEST_TERM_DUE_DT
Dec 18, 2019
Latest due, timeLATEST_TERM_DUE_TIME
0945
TerminatedTERMINATION_DT
Dec 18, 2019
Terminated, timeTERMINATION_TIME
0930
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
324
Current proposed assessmentAMOUNT_DUE
324
Amount paidAMOUNT_PAID
324
Bill first printedBILL_PRINT_DT
Jan 28, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Mar 4, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 18, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6828968
Inspection beganINSPECTION_BEGIN_DT
Dec 17, 2019
Inspection closed outINSPECTION_END_DT
Dec 19, 2019
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 1, 2018
Type: Citation
Standard: 56.4200(b)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
9377649
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2018
Time issuedVIOLATION_ISSUE_TIME
1055
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2018
30 CFR part and sectionPART_SECTION
56.4200(b)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2018
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Nov 1, 2018
Terminated, timeTERMINATION_TIME
1110
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Jan 2, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Feb 7, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 16, 2019
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6728468
Inspection beganINSPECTION_BEGIN_DT
Nov 1, 2018
Inspection closed outINSPECTION_END_DT
Nov 1, 2018
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 1, 2018
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
9377650
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2018
Time issuedVIOLATION_ISSUE_TIME
1215
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2018
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2018
Originally due, timeORIG_TERM_DUE_TIME
1330
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1330
TerminatedTERMINATION_DT
Nov 1, 2018
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Jan 2, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Feb 7, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 16, 2019
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6728468
Inspection beganINSPECTION_BEGIN_DT
Nov 1, 2018
Inspection closed outINSPECTION_END_DT
Nov 1, 2018
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 24, 2017
Type: Citation
Standard: 56.4203
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8991125
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 24, 2017
Time issuedVIOLATION_ISSUE_TIME
0850
Date of occurrenceVIOLATION_OCCUR_DT
Jan 24, 2017
30 CFR part and sectionPART_SECTION
56.4203
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 24, 2017
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jan 24, 2017
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jan 24, 2017
Terminated, timeTERMINATION_TIME
0855
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Feb 28, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Apr 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 13, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6663784
Inspection beganINSPECTION_BEGIN_DT
Jan 24, 2017
Inspection closed outINSPECTION_END_DT
Jan 24, 2017
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 12, 2016
Type: Citation
Standard: 41.12
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8793372
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 12, 2016
Time issuedVIOLATION_ISSUE_TIME
0900
Date of occurrenceVIOLATION_OCCUR_DT
Jan 12, 2016
30 CFR part and sectionPART_SECTION
41.12
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 12, 2016
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jan 12, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jan 12, 2016
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Mar 1, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Apr 30, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 11, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6663665
Inspection beganINSPECTION_BEGIN_DT
Jan 12, 2016
Inspection closed outINSPECTION_END_DT
Jan 12, 2016
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2015
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8873618
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2015
Time issuedVIOLATION_ISSUE_TIME
0928
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2015
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2015
Originally due, timeORIG_TERM_DUE_TIME
1230
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1230
TerminatedTERMINATION_DT
Jun 17, 2015
Terminated, timeTERMINATION_TIME
1150
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Sep 4, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 11, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6663547
Inspection beganINSPECTION_BEGIN_DT
Jun 15, 2015
Inspection closed outINSPECTION_END_DT
Jun 17, 2015
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8873617
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2015
Time issuedVIOLATION_ISSUE_TIME
0850
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 17, 2015
Terminated, timeTERMINATION_TIME
1145
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Sep 4, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 11, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6663547
Inspection beganINSPECTION_BEGIN_DT
Jun 15, 2015
Inspection closed outINSPECTION_END_DT
Jun 17, 2015
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 23, 2014
Type: Citation
Standard: 56.12004
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8703046
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 23, 2014
Time issuedVIOLATION_ISSUE_TIME
0910
Date of occurrenceVIOLATION_OCCUR_DT
Oct 23, 2014
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 23, 2014
Originally due, timeORIG_TERM_DUE_TIME
0915
Latest dueLATEST_TERM_DUE_DT
Oct 23, 2014
Latest due, timeLATEST_TERM_DUE_TIME
0915
TerminatedTERMINATION_DT
Oct 23, 2014
Terminated, timeTERMINATION_TIME
0915
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 2, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Jan 16, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 18, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6663601
Inspection beganINSPECTION_BEGIN_DT
Oct 23, 2014
Inspection closed outINSPECTION_END_DT
Oct 23, 2014
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 29, 2014
Type: Citation
Standard: 56.4130(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8702658
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 29, 2014
Time issuedVIOLATION_ISSUE_TIME
1000
Date of occurrenceVIOLATION_OCCUR_DT
May 29, 2014
30 CFR part and sectionPART_SECTION
56.4130(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 29, 2014
Originally due, timeORIG_TERM_DUE_TIME
1230
Latest dueLATEST_TERM_DUE_DT
May 29, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1230
TerminatedTERMINATION_DT
May 29, 2014
Terminated, timeTERMINATION_TIME
1145
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Aug 13, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 22, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6599058
Inspection beganINSPECTION_BEGIN_DT
May 29, 2014
Inspection closed outINSPECTION_END_DT
May 29, 2014
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 24, 2014
Type: Citation
Standard: 56.14132(b)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8785618
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 24, 2014
Time issuedVIOLATION_ISSUE_TIME
1500
Date of occurrenceVIOLATION_OCCUR_DT
Feb 24, 2014
30 CFR part and sectionPART_SECTION
56.14132(b)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 25, 2014
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Feb 25, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Feb 25, 2014
Terminated, timeTERMINATION_TIME
0900
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Apr 1, 2014
Final order dateFINAL_ORDER_ISSUE_DT
May 7, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 15, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6592494
Inspection beganINSPECTION_BEGIN_DT
Feb 24, 2014
Inspection closed outINSPECTION_END_DT
Feb 26, 2014
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 24, 2014
Type: Citation
Standard: 56.12002
S&S: Y
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8785619
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 24, 2014
Time issuedVIOLATION_ISSUE_TIME
1535
Date of occurrenceVIOLATION_OCCUR_DT
Feb 24, 2014
30 CFR part and sectionPART_SECTION
56.12002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 24, 2014
Originally due, timeORIG_TERM_DUE_TIME
1615
Latest dueLATEST_TERM_DUE_DT
Feb 24, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1615
TerminatedTERMINATION_DT
Feb 26, 2014
Terminated, timeTERMINATION_TIME
1515
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Apr 1, 2014
Final order dateFINAL_ORDER_ISSUE_DT
May 7, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 15, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6592494
Inspection beganINSPECTION_BEGIN_DT
Feb 24, 2014
Inspection closed outINSPECTION_END_DT
Feb 26, 2014
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 30, 2013
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8698129
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 30, 2013
Time issuedVIOLATION_ISSUE_TIME
1805
Date of occurrenceVIOLATION_OCCUR_DT
Apr 16, 2012
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 30, 2013
Originally due, timeORIG_TERM_DUE_TIME
1810
Latest dueLATEST_TERM_DUE_DT
Apr 30, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1810
TerminatedTERMINATION_DT
Apr 30, 2013
Terminated, timeTERMINATION_TIME
1810
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 2, 2013
Final order dateFINAL_ORDER_ISSUE_DT
Aug 10, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 17, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6595110
Inspection beganINSPECTION_BEGIN_DT
Apr 30, 2013
Inspection closed outINSPECTION_END_DT
Apr 30, 2013
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 30, 2013
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8698128
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 30, 2013
Time issuedVIOLATION_ISSUE_TIME
1700
Date of occurrenceVIOLATION_OCCUR_DT
Apr 30, 2013
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 30, 2013
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Apr 30, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Apr 30, 2013
Terminated, timeTERMINATION_TIME
1730
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 2, 2013
Final order dateFINAL_ORDER_ISSUE_DT
Aug 10, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 17, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6595110
Inspection beganINSPECTION_BEGIN_DT
Apr 30, 2013
Inspection closed outINSPECTION_END_DT
Apr 30, 2013
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 30, 2013
Type: Citation
Standard: 56.4104(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8698127
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 30, 2013
Time issuedVIOLATION_ISSUE_TIME
1440
Date of occurrenceVIOLATION_OCCUR_DT
Apr 30, 2013
30 CFR part and sectionPART_SECTION
56.4104(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 30, 2013
Originally due, timeORIG_TERM_DUE_TIME
1530
Latest dueLATEST_TERM_DUE_DT
Apr 30, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1530
TerminatedTERMINATION_DT
Apr 30, 2013
Terminated, timeTERMINATION_TIME
1500
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 2, 2013
Final order dateFINAL_ORDER_ISSUE_DT
Aug 10, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 17, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
6595110
Inspection beganINSPECTION_BEGIN_DT
Apr 30, 2013
Inspection closed outINSPECTION_END_DT
Apr 30, 2013
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 19, 2011
Type: Citation
Standard: 56.14130(g)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $263.00
Details

The citation

Citation or order numberVIOLATION_NO
8611134
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 19, 2011
Time issuedVIOLATION_ISSUE_TIME
1155
Date of occurrenceVIOLATION_OCCUR_DT
Oct 19, 2011
30 CFR part and sectionPART_SECTION
56.14130(g)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 19, 2011
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Oct 19, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Oct 19, 2011
Terminated, timeTERMINATION_TIME
1158
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
263
Current proposed assessmentAMOUNT_DUE
263
Amount paidAMOUNT_PAID
263
Bill first printedBILL_PRINT_DT
Jan 3, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Feb 9, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 6, 2012
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
1155270
Inspection beganINSPECTION_BEGIN_DT
Oct 18, 2011
Inspection closed outINSPECTION_END_DT
Oct 19, 2011
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (2)

Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 19, 2011
Type: Citation
Standard: 56.12023
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8611132
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 19, 2011
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Oct 19, 2011
30 CFR part and sectionPART_SECTION
56.12023
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 19, 2011
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Oct 19, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Oct 19, 2011
Terminated, timeTERMINATION_TIME
1120
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Nov 29, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Jan 7, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 4, 2012
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
1155270
Inspection beganINSPECTION_BEGIN_DT
Oct 18, 2011
Inspection closed outINSPECTION_END_DT
Oct 19, 2011
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 19, 2011
Type: Citation
Standard: 56.9300(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $117.00
Details

The citation

Citation or order numberVIOLATION_NO
8611133
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 19, 2011
Time issuedVIOLATION_ISSUE_TIME
1135
Date of occurrenceVIOLATION_OCCUR_DT
Oct 19, 2011
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 19, 2011
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Oct 19, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Oct 19, 2011
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
117
Current proposed assessmentAMOUNT_DUE
117
Amount paidAMOUNT_PAID
117
Bill first printedBILL_PRINT_DT
Nov 29, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Jan 7, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 4, 2012
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
1155270
Inspection beganINSPECTION_BEGIN_DT
Oct 18, 2011
Inspection closed outINSPECTION_END_DT
Oct 19, 2011
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 19, 2011
Type: Citation
Standard: 56.14130(e)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8611135
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 19, 2011
Time issuedVIOLATION_ISSUE_TIME
1200
Date of occurrenceVIOLATION_OCCUR_DT
Oct 19, 2011
30 CFR part and sectionPART_SECTION
56.14130(e)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 19, 2011
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Oct 19, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Oct 19, 2011
Terminated, timeTERMINATION_TIME
1220
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Nov 29, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Jan 7, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 4, 2012
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Kellog Creek Aggregates Inc
Operator IDVIOLATOR_ID
0108185
Controller IDCONTROLLER_ID
0091553
Inspection eventEVENT_NO
1155270
Inspection beganINSPECTION_BEGIN_DT
Oct 18, 2011
Inspection closed outINSPECTION_END_DT
Oct 19, 2011
Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

36 citations and orders since Jul 20, 2000: 36 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Oct 9, 2025
Citation number: 9890340
Standard: 56.14132(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890340
Assessment control numberASSESS_CASE_NO
000631719
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 13, 2025
Citation issuedISSUE_DT
Oct 9, 2025
Date of occurrenceOCCURRENCE_DT
Oct 9, 2025
Final order dateFINAL_ORDER_DT
Jan 9, 2026
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
2284
Size of mineSIZE_OF_MINE
2284
Controller hours workedCONTROLLER_HRS
2760
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
2760
History period startHISTORY_START_DT
Jul 9, 2024
History period endHISTORY_END_DT
Oct 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6874023
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 9, 2025
Citation number: 9890342
Standard: 56.18002(d)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890342
Assessment control numberASSESS_CASE_NO
000631719
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 13, 2025
Citation issuedISSUE_DT
Oct 9, 2025
Date of occurrenceOCCURRENCE_DT
Oct 9, 2025
Final order dateFINAL_ORDER_DT
Jan 9, 2026
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(d)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
2284
Size of mineSIZE_OF_MINE
2284
Controller hours workedCONTROLLER_HRS
2760
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
2760
History period startHISTORY_START_DT
Jul 9, 2024
History period endHISTORY_END_DT
Oct 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6874023
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 9, 2025
Citation number: 9890341
Standard: 56.12028
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890341
Assessment control numberASSESS_CASE_NO
000631719
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 13, 2025
Citation issuedISSUE_DT
Oct 9, 2025
Date of occurrenceOCCURRENCE_DT
Oct 9, 2025
Final order dateFINAL_ORDER_DT
Jan 9, 2026
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
2284
Size of mineSIZE_OF_MINE
2284
Controller hours workedCONTROLLER_HRS
2760
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
2760
History period startHISTORY_START_DT
Jul 9, 2024
History period endHISTORY_END_DT
Oct 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6874023
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 21, 2022
Citation number: 9507391
Standard: 50.0(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9507391
Assessment control numberASSESS_CASE_NO
000553717
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 24, 2022
Citation issuedISSUE_DT
Mar 21, 2022
Date of occurrenceOCCURRENCE_DT
Oct 16, 2021
Final order dateFINAL_ORDER_DT
Jun 15, 2022
Bill first printedBILL_PRINT_DT
May 3, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 15, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.0(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
2640
Size of mineSIZE_OF_MINE
2640
Controller hours workedCONTROLLER_HRS
2640
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
2640
History period startHISTORY_START_DT
Jul 16, 2020
History period endHISTORY_END_DT
Oct 15, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6873944
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 1, 2021
Citation number: 9507062
Standard: 50.30(a)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9507062
Assessment control numberASSESS_CASE_NO
000532099
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 22, 2021
Citation issuedISSUE_DT
Feb 1, 2021
Date of occurrenceOCCURRENCE_DT
Jul 16, 2020
Final order dateFINAL_ORDER_DT
May 14, 2021
Bill first printedBILL_PRINT_DT
Mar 30, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 14, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3781
Size of mineSIZE_OF_MINE
3781
Controller hours workedCONTROLLER_HRS
3781
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
3781
History period startHISTORY_START_DT
Apr 16, 2019
History period endHISTORY_END_DT
Jul 15, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6829494
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 18, 2019
Citation number: 9502633
Standard: 56.14107(a)
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9502633
Assessment control numberASSESS_CASE_NO
000508219
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
Dec 18, 2019
Date of occurrenceOCCURRENCE_DT
Dec 18, 2019
Final order dateFINAL_ORDER_DT
Mar 4, 2020
Bill first printedBILL_PRINT_DT
Jan 28, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 4, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7332
Size of mineSIZE_OF_MINE
7332
Controller hours workedCONTROLLER_HRS
7332
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7332
History period startHISTORY_START_DT
Sep 18, 2018
History period endHISTORY_END_DT
Dec 17, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6828968
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 18, 2019
Citation number: 9502635
Standard: 56.14100(b)
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9502635
Assessment control numberASSESS_CASE_NO
000508219
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
Dec 18, 2019
Date of occurrenceOCCURRENCE_DT
Dec 18, 2019
Final order dateFINAL_ORDER_DT
Mar 4, 2020
Bill first printedBILL_PRINT_DT
Jan 28, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 4, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7332
Size of mineSIZE_OF_MINE
7332
Controller hours workedCONTROLLER_HRS
7332
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7332
History period startHISTORY_START_DT
Sep 18, 2018
History period endHISTORY_END_DT
Dec 17, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6828968
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 18, 2019
Citation number: 9502613
Standard: 56.14107(a)
Proposed penalty: $324.00
Current assessment: $324.00
Paid against proposed penalty: $324.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9502613
Assessment control numberASSESS_CASE_NO
000508219
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
Dec 18, 2019
Date of occurrenceOCCURRENCE_DT
Dec 18, 2019
Final order dateFINAL_ORDER_DT
Mar 4, 2020
Bill first printedBILL_PRINT_DT
Jan 28, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 4, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
324.00
Current assessmentCURRENT_ASSESSMENT_AMT
324.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
324.00

Penalty points

Violation history pointsPENALTY_POINTS
72
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7332
Size of mineSIZE_OF_MINE
7332
Controller hours workedCONTROLLER_HRS
7332
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7332
History period startHISTORY_START_DT
Sep 18, 2018
History period endHISTORY_END_DT
Dec 17, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6828968
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2018
Citation number: 9377650
Standard: 50.30(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9377650
Assessment control numberASSESS_CASE_NO
000480181
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 16, 2019
Citation issuedISSUE_DT
Nov 1, 2018
Date of occurrenceOCCURRENCE_DT
Nov 1, 2018
Final order dateFINAL_ORDER_DT
Feb 7, 2019
Bill first printedBILL_PRINT_DT
Jan 2, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 7, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
11
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
4741
Size of mineSIZE_OF_MINE
4741
Controller hours workedCONTROLLER_HRS
4741
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4741
History period startHISTORY_START_DT
Aug 1, 2017
History period endHISTORY_END_DT
Oct 31, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6728468
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2018
Citation number: 9377649
Standard: 56.4200(b)(2)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9377649
Assessment control numberASSESS_CASE_NO
000480181
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 16, 2019
Citation issuedISSUE_DT
Nov 1, 2018
Date of occurrenceOCCURRENCE_DT
Nov 1, 2018
Final order dateFINAL_ORDER_DT
Feb 7, 2019
Bill first printedBILL_PRINT_DT
Jan 2, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 7, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4200(b)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
4741
Size of mineSIZE_OF_MINE
4741
Controller hours workedCONTROLLER_HRS
4741
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4741
History period startHISTORY_START_DT
Aug 1, 2017
History period endHISTORY_END_DT
Oct 31, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6728468
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 24, 2017
Citation number: 8991125
Standard: 56.4203
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8991125
Assessment control numberASSESS_CASE_NO
000432698
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 13, 2017
Citation issuedISSUE_DT
Jan 24, 2017
Date of occurrenceOCCURRENCE_DT
Jan 24, 2017
Final order dateFINAL_ORDER_DT
Apr 14, 2017
Bill first printedBILL_PRINT_DT
Feb 28, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4203
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
4149
Size of mineSIZE_OF_MINE
4149
Controller hours workedCONTROLLER_HRS
4149
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4149
History period startHISTORY_START_DT
Oct 24, 2015
History period endHISTORY_END_DT
Jan 23, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663784
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 12, 2016
Citation number: 8793372
Standard: 41.12
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8793372
Assessment control numberASSESS_CASE_NO
000404059
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 11, 2016
Citation issuedISSUE_DT
Jan 12, 2016
Date of occurrenceOCCURRENCE_DT
Jan 12, 2016
Final order dateFINAL_ORDER_DT
Apr 30, 2016
Bill first printedBILL_PRINT_DT
Mar 1, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 30, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
41.12
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.75
Operator hours worked at the mineVIOLATOR_MINE_HRS
3925
Size of mineSIZE_OF_MINE
3925
Controller hours workedCONTROLLER_HRS
3925
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
3925
History period startHISTORY_START_DT
Oct 12, 2014
History period endHISTORY_END_DT
Jan 11, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663665
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2015
Citation number: 8873617
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8873617
Assessment control numberASSESS_CASE_NO
000387681
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 11, 2015
Citation issuedISSUE_DT
Jun 17, 2015
Date of occurrenceOCCURRENCE_DT
Jun 17, 2015
Final order dateFINAL_ORDER_DT
Sep 4, 2015
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 4, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
5247
Size of mineSIZE_OF_MINE
5247
Controller hours workedCONTROLLER_HRS
5247
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5247
History period startHISTORY_START_DT
Mar 17, 2014
History period endHISTORY_END_DT
Jun 16, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663547
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2015
Citation number: 8873618
Standard: 56.14100(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8873618
Assessment control numberASSESS_CASE_NO
000387681
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 11, 2015
Citation issuedISSUE_DT
Jun 17, 2015
Date of occurrenceOCCURRENCE_DT
Jun 17, 2015
Final order dateFINAL_ORDER_DT
Sep 4, 2015
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 4, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
5247
Size of mineSIZE_OF_MINE
5247
Controller hours workedCONTROLLER_HRS
5247
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5247
History period startHISTORY_START_DT
Mar 17, 2014
History period endHISTORY_END_DT
Jun 16, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663547
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 23, 2014
Citation number: 8703046
Standard: 56.12004
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8703046
Assessment control numberASSESS_CASE_NO
000367739
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 17, 2014
Citation issuedISSUE_DT
Oct 23, 2014
Date of occurrenceOCCURRENCE_DT
Oct 23, 2014
Final order dateFINAL_ORDER_DT
Jan 16, 2015
Bill first printedBILL_PRINT_DT
Dec 2, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
6560
Size of mineSIZE_OF_MINE
6560
Controller hours workedCONTROLLER_HRS
6560
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6560
History period startHISTORY_START_DT
Jul 23, 2013
History period endHISTORY_END_DT
Oct 22, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663601
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 29, 2014
Citation number: 8702658
Standard: 56.4130(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8702658
Assessment control numberASSESS_CASE_NO
000354916
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 22, 2014
Citation issuedISSUE_DT
May 29, 2014
Date of occurrenceOCCURRENCE_DT
May 29, 2014
Final order dateFINAL_ORDER_DT
Aug 13, 2014
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 13, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4130(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
6560
Size of mineSIZE_OF_MINE
6560
Controller hours workedCONTROLLER_HRS
6560
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6560
History period startHISTORY_START_DT
Feb 28, 2013
History period endHISTORY_END_DT
May 28, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6599058
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 24, 2014
Citation number: 8785618
Standard: 56.14132(b)(1)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8785618
Assessment control numberASSESS_CASE_NO
000346325
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 15, 2014
Citation issuedISSUE_DT
Feb 24, 2014
Date of occurrenceOCCURRENCE_DT
Feb 24, 2014
Final order dateFINAL_ORDER_DT
May 7, 2014
Bill first printedBILL_PRINT_DT
Apr 1, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 7, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(b)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
6560
Size of mineSIZE_OF_MINE
6560
Controller hours workedCONTROLLER_HRS
6560
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6560
History period startHISTORY_START_DT
Nov 24, 2012
History period endHISTORY_END_DT
Feb 23, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6592494
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 24, 2014
Citation number: 8785619
Standard: 56.12002
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8785619
Assessment control numberASSESS_CASE_NO
000346325
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 15, 2014
Citation issuedISSUE_DT
Feb 24, 2014
Date of occurrenceOCCURRENCE_DT
Feb 24, 2014
Final order dateFINAL_ORDER_DT
May 7, 2014
Bill first printedBILL_PRINT_DT
Apr 1, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 7, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
6560
Size of mineSIZE_OF_MINE
6560
Controller hours workedCONTROLLER_HRS
6560
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6560
History period startHISTORY_START_DT
Nov 24, 2012
History period endHISTORY_END_DT
Feb 23, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6592494
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 30, 2013
Citation number: 8698127
Standard: 56.4104(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8698127
Assessment control numberASSESS_CASE_NO
000325543
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 17, 2013
Citation issuedISSUE_DT
Apr 30, 2013
Date of occurrenceOCCURRENCE_DT
Apr 30, 2013
Final order dateFINAL_ORDER_DT
Aug 10, 2013
Bill first printedBILL_PRINT_DT
Jul 2, 2013
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 10, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4104(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7723
Size of mineSIZE_OF_MINE
7723
Controller hours workedCONTROLLER_HRS
7723
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7723
History period startHISTORY_START_DT
Jan 30, 2012
History period endHISTORY_END_DT
Apr 29, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595110
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 30, 2013
Citation number: 8698128
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8698128
Assessment control numberASSESS_CASE_NO
000325543
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 17, 2013
Citation issuedISSUE_DT
Apr 30, 2013
Date of occurrenceOCCURRENCE_DT
Apr 30, 2013
Final order dateFINAL_ORDER_DT
Aug 10, 2013
Bill first printedBILL_PRINT_DT
Jul 2, 2013
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 10, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7723
Size of mineSIZE_OF_MINE
7723
Controller hours workedCONTROLLER_HRS
7723
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7723
History period startHISTORY_START_DT
Jan 30, 2012
History period endHISTORY_END_DT
Apr 29, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595110
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 30, 2013
Citation number: 8698129
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8698129
Assessment control numberASSESS_CASE_NO
000325543
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 17, 2013
Citation issuedISSUE_DT
Apr 30, 2013
Date of occurrenceOCCURRENCE_DT
Apr 16, 2012
Final order dateFINAL_ORDER_DT
Aug 10, 2013
Bill first printedBILL_PRINT_DT
Jul 2, 2013
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 10, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
3.5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
8313
Size of mineSIZE_OF_MINE
8313
Controller hours workedCONTROLLER_HRS
8313
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8313
History period startHISTORY_START_DT
Jan 16, 2011
History period endHISTORY_END_DT
Apr 15, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6595110
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 19, 2011
Citation number: 8611132
Standard: 56.12023
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8611132
Assessment control numberASSESS_CASE_NO
000273400
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 4, 2012
Citation issuedISSUE_DT
Oct 19, 2011
Date of occurrenceOCCURRENCE_DT
Oct 19, 2011
Final order dateFINAL_ORDER_DT
Jan 7, 2012
Bill first printedBILL_PRINT_DT
Nov 29, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 7, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12023
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
7666
Size of mineSIZE_OF_MINE
7666
Controller hours workedCONTROLLER_HRS
7666
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7666
History period startHISTORY_START_DT
Jul 19, 2010
History period endHISTORY_END_DT
Oct 18, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1155270
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 19, 2011
Citation number: 8611135
Standard: 56.14130(e)(1)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8611135
Assessment control numberASSESS_CASE_NO
000273400
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 4, 2012
Citation issuedISSUE_DT
Oct 19, 2011
Date of occurrenceOCCURRENCE_DT
Oct 19, 2011
Final order dateFINAL_ORDER_DT
Jan 7, 2012
Bill first printedBILL_PRINT_DT
Nov 29, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 7, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14130(e)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
7666
Size of mineSIZE_OF_MINE
7666
Controller hours workedCONTROLLER_HRS
7666
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7666
History period startHISTORY_START_DT
Jul 19, 2010
History period endHISTORY_END_DT
Oct 18, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1155270
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 19, 2011
Citation number: 8611134
Standard: 56.14130(g)
Proposed penalty: $263.00
Current assessment: $263.00
Paid against proposed penalty: $263.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8611134
Assessment control numberASSESS_CASE_NO
000276301
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 6, 2012
Citation issuedISSUE_DT
Oct 19, 2011
Date of occurrenceOCCURRENCE_DT
Oct 19, 2011
Final order dateFINAL_ORDER_DT
Feb 9, 2012
Bill first printedBILL_PRINT_DT
Jan 3, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 9, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14130(g)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
263.00
Current assessmentCURRENT_ASSESSMENT_AMT
263.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
263.00

Penalty points

Violation history pointsPENALTY_POINTS
72
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
7666
Size of mineSIZE_OF_MINE
7666
Controller hours workedCONTROLLER_HRS
7666
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7666
History period startHISTORY_START_DT
Jul 19, 2010
History period endHISTORY_END_DT
Oct 18, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1155270
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 19, 2011
Citation number: 8611133
Standard: 56.9300(b)
Proposed penalty: $117.00
Current assessment: $117.00
Paid against proposed penalty: $117.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8611133
Assessment control numberASSESS_CASE_NO
000273400
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 4, 2012
Citation issuedISSUE_DT
Oct 19, 2011
Date of occurrenceOCCURRENCE_DT
Oct 19, 2011
Final order dateFINAL_ORDER_DT
Jan 7, 2012
Bill first printedBILL_PRINT_DT
Nov 29, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 7, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
117.00
Current assessmentCURRENT_ASSESSMENT_AMT
117.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
117.00

Penalty points

Violation history pointsPENALTY_POINTS
62
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
7666
Size of mineSIZE_OF_MINE
7666
Controller hours workedCONTROLLER_HRS
7666
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7666
History period startHISTORY_START_DT
Jul 19, 2010
History period endHISTORY_END_DT
Oct 18, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Kellog Creek Aggregates Inc
IDVIOLATOR_ID
0108185
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 2010
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1155270
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 35 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Imminent danger orders, section 107(a)

Issued: Oct 28, 2010
Order number: 8568705
Terminated: Oct 28, 2010
Issued to: Operator
Details

The order

Order numberVIOLATION_NO
8568705
IssuedVIOLATION_DATE_ISSUED
Oct 28, 2010
TerminatedTERMINATION_DATE
Oct 28, 2010
Issued toVIOLATOR_TYPE
Operator

Who

Operator at the timeOPERATOR_NAME_VIOLATIONS
Kellog Creek Aggregates Inc
Controller IDCONTROLLER_ID_VIOLATIONS
0091553

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
StateSTATE_ABBREVIATION
CA
Coal or Metal/Non-MetalCOAL_OR_METAL
M

Not recorded by MSHA (3)

Controller at the timeCONTROLLER_NAME_VIOLATIONS, ContractorCONTRACTOR_NAME, Contractor IDCONTRACTOR_ID

1 imminent danger order in MSHA's list, which starts July 1, 2010.

Employment and hours worked

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 1,780
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1780
Average hours per employeeAVG_EMPLOYEE_HOURS
1780

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 2,499
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2499
Average hours per employeeAVG_EMPLOYEE_HOURS
2499

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 2,284
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2284
Average hours per employeeAVG_EMPLOYEE_HOURS
2284

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 2,036
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2036
Average hours per employeeAVG_EMPLOYEE_HOURS
2036

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 2,157
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2157
Average hours per employeeAVG_EMPLOYEE_HOURS
2157

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 2,376
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2376
Average hours per employeeAVG_EMPLOYEE_HOURS
2376

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 2,640
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2640
Average hours per employeeAVG_EMPLOYEE_HOURS
2640

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 3,781
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3781
Average hours per employeeAVG_EMPLOYEE_HOURS
1891

Mine

Mine IDMINE_ID
0403622
Mine name in this fileCURR_MINE_NM
Kellog Creek Aggregates Inc
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Vacaville CA Field Office
Nearest town
BYRON
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
5
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Kellog Creek Aggregates Inc
Mine IDMINE_ID
0403622
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Jan 12, 2014
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDCURRENT_OPERATOR_ID
0108185
Controller IDCURRENT_CONTROLLER_ID
0091553
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jan 1, 2010

Location and MSHA office

StateSTATE
CA
Bureau of Mines state codeBOM_STATE_CD
04
FIPS county codeFIPS_CNTY_CD
013
FIPS county nameFIPS_CNTY_NM
Contra Costa
Congressional districtCONG_DIST_CD
07
Nearest townNEAREST_TOWN
BYRON
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7821
MSHA officeOFFICE_NAME
Vacaville CA Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
53
Most recent assessment control numberASSESS_CTRL_NO
000631719

Commodity

Primary commodity (SIC)PRIMARY_SIC
Construction Sand and Gravel
Primary commodity codePRIMARY_SIC_CD
144200
Primary SIC codePRIMARY_SIC_CD_1
1442
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
SandAndGravel
Primary industry group codePRIMARY_CANVASS_CD
5

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
5
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Kellog Creek Aggregates Inc
From: Jan 1, 2010
To: No end date
Controller: Not shown
From : Jan 1, 2010
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Kellog Creek Aggregates Inc
Operator IDOPERATOR_ID
0108185
Operator fromOPERATOR_START_DT
Jan 1, 2010

Controller

Controller IDCONTROLLER_ID
0091553
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 2010

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Von Euw & Nunes Trucking
From: May 21, 1999
To: Dec 31, 2009
Controller: Not shown
From : May 21, 1999
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Von Euw & Nunes Trucking
Operator IDOPERATOR_ID
L16982
Operator fromOPERATOR_START_DT
May 21, 1999
Operator toOPERATOR_END_DT
Dec 31, 2009

Controller

Controller IDCONTROLLER_ID
M12962
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 21, 1999

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Kellogg Creek Sand Company Inc
From: May 9, 1989
To: May 20, 1999
Controller: Not shown
From : May 9, 1989
To : May 20, 1999
Details

Operator

OperatorOPERATOR_NAME
Kellogg Creek Sand Company Inc
Operator IDOPERATOR_ID
L10945
Operator fromOPERATOR_START_DT
May 9, 1989
Operator toOPERATOR_END_DT
May 20, 1999

Controller

Controller IDCONTROLLER_ID
M08475
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 9, 1989
Controller toCONTROLLER_END_DT
May 20, 1999

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

Operator: Silico Inc
From: May 14, 1985
To: May 8, 1989
Controller: Not shown
From : May 14, 1985
To : May 8, 1989
Details

Operator

OperatorOPERATOR_NAME
Silico Inc
Operator IDOPERATOR_ID
L08144
Operator fromOPERATOR_START_DT
May 14, 1985
Operator toOPERATOR_END_DT
May 8, 1989

Controller

Controller IDCONTROLLER_ID
M06475
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 14, 1985
Controller toCONTROLLER_END_DT
May 8, 1989

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

Operator: Ridgemoor Development Corp
From: Jan 1, 1950
To: May 13, 1985
Controller: Not shown
From : Jan 1, 1950
To : May 13, 1985
Details

Operator

OperatorOPERATOR_NAME
Ridgemoor Development Corp
Operator IDOPERATOR_ID
L08143
Operator fromOPERATOR_START_DT
Jan 1, 1950
Operator toOPERATOR_END_DT
May 13, 1985

Controller

Controller IDCONTROLLER_ID
M06474
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
May 13, 1985

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

Kellog Creek Aggregates Inc·Contact title Owner·Street not recorded, Linden CA 95236

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Kellog Creek Aggregates Inc
Contact titleCONTACT_TITLE
Owner
CityCITY
Linden
StateSTATE_ABBR
CA
State nameSTATE
California
ZIP codeZIP_CD
95236
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
06

Mine

Mine IDMINE_ID
0403622
Mine name in this fileMINE_NAME
Kellog Creek Aggregates Inc
Nearest townNEAREST_TOWN
BYRON
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Jan 12, 2014
Primary commodity (SIC)PRIMARY_SIC_CD
Construction Sand and Gravel
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology