Trp Table Mountain Plant
Metal/Non-Metal, Surface·Crushed, Broken Stone NEC·Butte, California·Mine ID 0404847
Operator Triangle Rock Products·Controller Vulcan Materials Company·MSHA status Active since Nov 14, 1986
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionNov 3 to Nov 4, 2026Inspectors 0 | Hours on site 0Began: Nov 3, 2026Ended: Nov 4, 2026Activity: Regular Safety and Health InspectionInspectors: 0Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 3, 2026
- Closed outINSPECTION_END_DT
- Nov 4, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F042235
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2027
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (16)
InspectorsNBR_INSPECTOR, Hours on siteSUM_TOTAL_ON_SITE_HOURS, Total inspection hoursSUM_TOTAL_INSP_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 27 to Apr 30, 2026Inspectors 1 | Hours on site 7.75Began: Apr 27, 2026Ended: Apr 30, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 27, 2026
- Closed outINSPECTION_END_DT
- Apr 30, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F039829
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 15 to Oct 22, 2025Inspectors 1 | Hours on site 9Began: Oct 15, 2025Ended: Oct 22, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 15, 2025
- Closed outINSPECTION_END_DT
- Oct 22, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F02C681
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 3, 2025Inspectors 1 | Hours on site 4.25Began: Sep 3, 2025Ended: Sep 3, 2025Activity: Spot InspectionInspectors: 1Hours on site: 4.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 3, 2025
- Closed outINSPECTION_END_DT
- Sep 3, 2025
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- F02C66D
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 19 to May 21, 2025Inspectors 1 | Hours on site 4.75Began: May 19, 2025Ended: May 21, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 19, 2025
- Closed outINSPECTION_END_DT
- May 21, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F01656D
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 7, 2024Inspectors 1 | Hours on site 3.5Began: Oct 7, 2024Ended: Oct 7, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 7, 2024
- Closed outINSPECTION_END_DT
- Oct 7, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F014E94
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 15, 2024Inspectors 1 | Hours on site 1.75Began: Apr 15, 2024Ended: Apr 15, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 15, 2024
- Closed outINSPECTION_END_DT
- Apr 15, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6966883
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 30 to Oct 31, 2023Inspectors 1 | Hours on site 12.5Began: Oct 30, 2023Ended: Oct 31, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 30, 2023
- Closed outINSPECTION_END_DT
- Oct 31, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6966838
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 17 to Aug 24, 2023Inspectors 1 | Hours on site 15Began: Jul 17, 2023Ended: Aug 24, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 15Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 17, 2023
- Closed outINSPECTION_END_DT
- Aug 24, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6963324
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 15
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 26.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsMay 17, 2023Inspectors 1 | Hours on site 0.75Began: May 17, 2023Ended: May 17, 2023Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2023
- Closed outINSPECTION_END_DT
- May 17, 2023
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6874400
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 17 to Oct 18, 2022Inspectors 1 | Hours on site 8.75Began: Oct 17, 2022Ended: Oct 18, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 17, 2022
- Closed outINSPECTION_END_DT
- Oct 18, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6874316
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 8, 2022Inspectors 1 | Hours on site 3.25Began: Aug 8, 2022Ended: Aug 8, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Closed outINSPECTION_END_DT
- Aug 8, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6491303
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 15 to Dec 16, 2021Inspectors 1 | Hours on site 6.5Began: Dec 15, 2021Ended: Dec 16, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 15, 2021
- Closed outINSPECTION_END_DT
- Dec 16, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6873792
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 5, 2021Inspectors 1 | Hours on site 4Began: May 5, 2021Ended: May 5, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 5, 2021
- Closed outINSPECTION_END_DT
- May 5, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6874820
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 18 to Mar 19, 2021Inspectors 1 | Hours on site 5.5Began: Mar 18, 2021Ended: Mar 19, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 18, 2021
- Closed outINSPECTION_END_DT
- Mar 19, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6829298
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 30, 2020Inspectors 1 | Hours on site 3.5Began: Apr 30, 2020Ended: Apr 30, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 30, 2020
- Closed outINSPECTION_END_DT
- Apr 30, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6829161
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 6, 2020Inspectors 1 | Hours on site 3.25Began: Jan 6, 2020Ended: Jan 6, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 6, 2020
- Closed outINSPECTION_END_DT
- Jan 6, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6829118
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 13 to Aug 14, 2019Inspectors 1 | Hours on site 9.25Began: Aug 13, 2019Ended: Aug 14, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 13, 2019
- Closed outINSPECTION_END_DT
- Aug 14, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6729196
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 5 to Mar 7, 2019Inspectors 1 | Hours on site 12Began: Mar 5, 2019Ended: Mar 7, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 5, 2019
- Closed outINSPECTION_END_DT
- Mar 7, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6729169
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 2 to Jul 3, 2018Inspectors 1 | Hours on site 9.5Began: Jul 2, 2018Ended: Jul 3, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 2, 2018
- Closed outINSPECTION_END_DT
- Jul 3, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6729030
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 3 to Oct 13, 2017Inspectors 1 | Hours on site 16.25Began: Oct 3, 2017Ended: Oct 13, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 3, 2017
- Closed outINSPECTION_END_DT
- Oct 13, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6728118
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 22 to Apr 3, 2017Inspectors 1 | Hours on site 9.75Began: Mar 22, 2017Ended: Apr 3, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 22, 2017
- Closed outINSPECTION_END_DT
- Apr 3, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6721621
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 13 to Oct 3, 2016Inspectors 1 | Hours on site 7.75Began: Sep 13, 2016Ended: Oct 3, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 13, 2016
- Closed outINSPECTION_END_DT
- Oct 3, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6663985
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionMay 9 to Jun 6, 2016Inspectors 1 | Hours on site 3Began: May 9, 2016Ended: Jun 6, 2016Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 9, 2016
- Closed outINSPECTION_END_DT
- Jun 6, 2016
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6663372
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionApr 18 to Apr 21, 2016Inspectors 1 | Hours on site 2Began: Apr 18, 2016Ended: Apr 21, 2016Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 2Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 18, 2016
- Closed outINSPECTION_END_DT
- Apr 21, 2016
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6663364
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 68 inspections and other MSHA visits since Aug 15, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Oct 15, 2025Type: CitationStandard: 56.12028S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5106061
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 15, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1311
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 15, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12028
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 17, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Oct 17, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Oct 22, 2025
- Terminated, timeTERMINATION_TIME
- 0836
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Dec 10, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 15, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 18, 2025
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- F02C681
- Inspection beganINSPECTION_BEGIN_DT
- Oct 15, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 22, 2025
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 8, 2022Type: CitationStandard: 56.15005S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $840.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9535624
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 8, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1025
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 8, 2022
- 30 CFR part and sectionPART_SECTION
- 56.15005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 8, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1330
- Latest dueLATEST_TERM_DUE_DT
- Aug 8, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1330
- TerminatedTERMINATION_DT
- Aug 8, 2022
- Terminated, timeTERMINATION_TIME
- 1255
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 840
- Current proposed assessmentAMOUNT_DUE
- 840
- Amount paidAMOUNT_PAID
- 840
- Bill first printedBILL_PRINT_DT
- Sep 8, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 12, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 4, 2022
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6491303
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 8, 2022
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 22, 2017Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $116.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9372022
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 22, 2017
- Time issuedVIOLATION_ISSUE_TIME
- 1200
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 22, 2017
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 22, 2017
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Mar 22, 2017
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Mar 22, 2017
- Terminated, timeTERMINATION_TIME
- 1230
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 116
- Current proposed assessmentAMOUNT_DUE
- 116
- Amount paidAMOUNT_PAID
- 116
- Bill first printedBILL_PRINT_DT
- May 11, 2017
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 25, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 19, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6721621
- Inspection beganINSPECTION_BEGIN_DT
- Mar 22, 2017
- Inspection closed outINSPECTION_END_DT
- Apr 3, 2017
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (3)
Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 22, 2017Type: CitationStandard: 56.9300(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $148.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9372023
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 22, 2017
- Time issuedVIOLATION_ISSUE_TIME
- 1430
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 22, 2017
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 27, 2017
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Mar 27, 2017
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Mar 23, 2017
- Terminated, timeTERMINATION_TIME
- 0851
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 148
- Current proposed assessmentAMOUNT_DUE
- 148
- Amount paidAMOUNT_PAID
- 148
- Bill first printedBILL_PRINT_DT
- May 11, 2017
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 25, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 19, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6721621
- Inspection beganINSPECTION_BEGIN_DT
- Mar 22, 2017
- Inspection closed outINSPECTION_END_DT
- Apr 3, 2017
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 22, 2017Type: CitationStandard: 56.15001S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $116.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9372021
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 22, 2017
- Time issuedVIOLATION_ISSUE_TIME
- 1045
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 22, 2017
- 30 CFR part and sectionPART_SECTION
- 56.15001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 22, 2017
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Mar 22, 2017
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Mar 22, 2017
- Terminated, timeTERMINATION_TIME
- 1415
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 116
- Current proposed assessmentAMOUNT_DUE
- 116
- Amount paidAMOUNT_PAID
- 116
- Bill first printedBILL_PRINT_DT
- May 11, 2017
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 25, 2017
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 19, 2017
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6721621
- Inspection beganINSPECTION_BEGIN_DT
- Mar 22, 2017
- Inspection closed outINSPECTION_END_DT
- Apr 3, 2017
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2016Type: CitationStandard: 56.16009S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8879349
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 1340
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2016
- 30 CFR part and sectionPART_SECTION
- 56.16009
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 18, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Apr 18, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Apr 21, 2016
- Terminated, timeTERMINATION_TIME
- 1337
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jun 9, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 24, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 29, 2016
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6663360
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2016
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2016
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (3)
Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2016Type: CitationStandard: 56.9300(a)S&S: YNegligence: LowNegligenceIssued to: OperatorProposed penalty: $285.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8879350
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 1700
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2016
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 8, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- May 12, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1530
- TerminatedTERMINATION_DT
- Jun 6, 2016
- Terminated, timeTERMINATION_TIME
- 1351
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 285
- Current proposed assessmentAMOUNT_DUE
- 285
- Amount paidAMOUNT_PAID
- 285
- Bill first printedBILL_PRINT_DT
- May 12, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 26, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 25, 2016
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6663360
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2016
- Inspection closed outINSPECTION_END_DT
- Apr 7, 2016
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 6, 2014Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8785895
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 6, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 0915
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 6, 2014
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 6, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Nov 6, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Nov 6, 2014
- Terminated, timeTERMINATION_TIME
- 1145
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 11, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 18, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 4, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6599090
- Inspection beganINSPECTION_BEGIN_DT
- Nov 5, 2014
- Inspection closed outINSPECTION_END_DT
- Nov 6, 2014
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 5, 2014Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8785893
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 5, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 1155
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 5, 2014
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 5, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 1210
- Latest dueLATEST_TERM_DUE_DT
- Nov 5, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 1210
- TerminatedTERMINATION_DT
- Nov 5, 2014
- Terminated, timeTERMINATION_TIME
- 1200
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 23, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 4, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 21, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- California Drilling & Blasting LLC
- Operator IDVIOLATOR_ID
- UD9
- Contractor IDCONTRACTOR_ID
- UD9
- Inspection eventEVENT_NO
- 6599090
- Inspection beganINSPECTION_BEGIN_DT
- Nov 5, 2014
- Inspection closed outINSPECTION_END_DT
- Nov 6, 2014
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (3)
Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Nov 5, 2014Type: CitationStandard: 56.12025S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8785894
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 5, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 1245
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 5, 2014
- 30 CFR part and sectionPART_SECTION
- 56.12025
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 5, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Nov 5, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Nov 5, 2014
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 11, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 18, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 4, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6599090
- Inspection beganINSPECTION_BEGIN_DT
- Nov 5, 2014
- Inspection closed outINSPECTION_END_DT
- Nov 6, 2014
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 16, 2014Type: CitationStandard: 56.4601S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $308.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6345568
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 16, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 1015
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 16, 2014
- 30 CFR part and sectionPART_SECTION
- 56.4601
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 16, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 1030
- Latest dueLATEST_TERM_DUE_DT
- Jan 16, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 1030
- TerminatedTERMINATION_DT
- Jan 16, 2014
- Terminated, timeTERMINATION_TIME
- 1020
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 308
- Current proposed assessmentAMOUNT_DUE
- 308
- Amount paidAMOUNT_PAID
- 308
- Bill first printedBILL_PRINT_DT
- Mar 6, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2014
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 31, 2014
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6592864
- Inspection beganINSPECTION_BEGIN_DT
- Jan 16, 2014
- Inspection closed outINSPECTION_END_DT
- Jan 16, 2014
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 16, 2014Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6345567
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 16, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 0950
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 16, 2014
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 16, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 1015
- Latest dueLATEST_TERM_DUE_DT
- Jan 16, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 1015
- TerminatedTERMINATION_DT
- Jan 16, 2014
- Terminated, timeTERMINATION_TIME
- 1000
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Mar 6, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2014
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 31, 2014
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6592864
- Inspection beganINSPECTION_BEGIN_DT
- Jan 16, 2014
- Inspection closed outINSPECTION_END_DT
- Jan 16, 2014
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jun 4, 2013Type: CitationStandard: 56.12004S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $634.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6345458
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 4, 2013
- Time issuedVIOLATION_ISSUE_TIME
- 1255
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 4, 2013
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 4, 2013
- Originally due, timeORIG_TERM_DUE_TIME
- 1315
- Latest dueLATEST_TERM_DUE_DT
- Jun 4, 2013
- Latest due, timeLATEST_TERM_DUE_TIME
- 1315
- TerminatedTERMINATION_DT
- Jun 4, 2013
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 634
- Current proposed assessmentAMOUNT_DUE
- 634
- Amount paidAMOUNT_PAID
- 634
- Bill first printedBILL_PRINT_DT
- Jul 11, 2013
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 16, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 13, 2013
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 6592817
- Inspection beganINSPECTION_BEGIN_DT
- Jun 4, 2013
- Inspection closed outINSPECTION_END_DT
- Jun 5, 2013
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2012Type: CitationStandard: 56.11027S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8695866
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 0950
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2012
- 30 CFR part and sectionPART_SECTION
- 56.11027
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Oct 4, 2012
- Terminated, timeTERMINATION_TIME
- 1002
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 15, 2012
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 11, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161788
- Inspection beganINSPECTION_BEGIN_DT
- Oct 2, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 4, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2012Type: CitationStandard: 56.11027S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8695869
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1113
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2012
- 30 CFR part and sectionPART_SECTION
- 56.11027
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Oct 4, 2012
- Terminated, timeTERMINATION_TIME
- 0915
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 15, 2012
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 11, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161788
- Inspection beganINSPECTION_BEGIN_DT
- Oct 2, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 4, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2012Type: CitationStandard: 56.9315S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $425.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8695864
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 0830
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2012
- 30 CFR part and sectionPART_SECTION
- 56.9315
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Oct 2, 2012
- Terminated, timeTERMINATION_TIME
- 0900
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 425
- Current proposed assessmentAMOUNT_DUE
- 375
- Amount paidAMOUNT_PAID
- 375
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- May 21, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 14, 2013
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161788
- Inspection beganINSPECTION_BEGIN_DT
- Oct 2, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 4, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2012Type: CitationStandard: 47.42(c)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8695867
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1035
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2012
- 30 CFR part and sectionPART_SECTION
- 47.42(c)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Oct 2, 2012
- Terminated, timeTERMINATION_TIME
- 1045
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- May 21, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 14, 2013
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161788
- Inspection beganINSPECTION_BEGIN_DT
- Oct 2, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 4, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2012Type: CitationStandard: 56.14110S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8695865
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 0845
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2012
- 30 CFR part and sectionPART_SECTION
- 56.14110
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Oct 4, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Oct 25, 2012
- Terminated, timeTERMINATION_TIME
- 1010
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- May 21, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 14, 2013
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161788
- Inspection beganINSPECTION_BEGIN_DT
- Oct 2, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 4, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 2, 2012Type: CitationStandard: 56.11012S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8695868
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 2, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1100
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 2, 2012
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 2, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Oct 2, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Oct 2, 2012
- Terminated, timeTERMINATION_TIME
- 1102
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- May 21, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 14, 2013
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161788
- Inspection beganINSPECTION_BEGIN_DT
- Oct 2, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 4, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 5, 2012Type: CitationStandard: 56.11027S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8609877
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 5, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1000
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 5, 2012
- 30 CFR part and sectionPART_SECTION
- 56.11027
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 5, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jan 5, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jan 5, 2012
- Terminated, timeTERMINATION_TIME
- 1215
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Feb 9, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 16, 2012
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 5, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1161166
- Inspection beganINSPECTION_BEGIN_DT
- Jan 5, 2012
- Inspection closed outINSPECTION_END_DT
- Jan 5, 2012
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 15, 2011Type: CitationStandard: 56.16005S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8603814
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 15, 2011
- Time issuedVIOLATION_ISSUE_TIME
- 1415
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 15, 2011
- 30 CFR part and sectionPART_SECTION
- 56.16005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 15, 2011
- Originally due, timeORIG_TERM_DUE_TIME
- 1515
- Latest dueLATEST_TERM_DUE_DT
- Mar 15, 2011
- Latest due, timeLATEST_TERM_DUE_TIME
- 1515
- TerminatedTERMINATION_DT
- Mar 15, 2011
- Terminated, timeTERMINATION_TIME
- 1430
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jun 9, 2011
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 15, 2011
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 1, 2011
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1155809
- Inspection beganINSPECTION_BEGIN_DT
- Mar 15, 2011
- Inspection closed outINSPECTION_END_DT
- Mar 16, 2011
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 15, 2011Type: CitationStandard: 56.20003(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $190.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8603815
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 15, 2011
- Time issuedVIOLATION_ISSUE_TIME
- 1545
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 15, 2011
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 15, 2011
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Mar 15, 2011
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Mar 16, 2011
- Terminated, timeTERMINATION_TIME
- 0800
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 190
- Current proposed assessmentAMOUNT_DUE
- 190
- Amount paidAMOUNT_PAID
- 190
- Bill first printedBILL_PRINT_DT
- Jun 9, 2011
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 15, 2011
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 1, 2011
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1155809
- Inspection beganINSPECTION_BEGIN_DT
- Mar 15, 2011
- Inspection closed outINSPECTION_END_DT
- Mar 16, 2011
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Mar 15, 2011Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8603813
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 15, 2011
- Time issuedVIOLATION_ISSUE_TIME
- 1210
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 15, 2011
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 15, 2011
- Originally due, timeORIG_TERM_DUE_TIME
- 1630
- Latest dueLATEST_TERM_DUE_DT
- Mar 15, 2011
- Latest due, timeLATEST_TERM_DUE_TIME
- 1630
- TerminatedTERMINATION_DT
- Mar 15, 2011
- Terminated, timeTERMINATION_TIME
- 1635
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- May 12, 2011
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 17, 2011
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 31, 2011
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1155809
- Inspection beganINSPECTION_BEGIN_DT
- Mar 15, 2011
- Inspection closed outINSPECTION_END_DT
- Mar 16, 2011
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 20, 2010Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $127.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6487086
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 20, 2010
- Time issuedVIOLATION_ISSUE_TIME
- 0800
- Date of occurrenceVIOLATION_OCCUR_DT
- May 20, 2010
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 20, 2010
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- May 20, 2010
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- May 20, 2010
- Terminated, timeTERMINATION_TIME
- 1035
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 127
- Current proposed assessmentAMOUNT_DUE
- 127
- Amount paidAMOUNT_PAID
- 127
- Bill first printedBILL_PRINT_DT
- Jul 8, 2010
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 14, 2010
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 19, 2010
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1155171
- Inspection beganINSPECTION_BEGIN_DT
- May 19, 2010
- Inspection closed outINSPECTION_END_DT
- May 20, 2010
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 20, 2010Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6487087
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 20, 2010
- Time issuedVIOLATION_ISSUE_TIME
- 0825
- Date of occurrenceVIOLATION_OCCUR_DT
- May 20, 2010
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 20, 2010
- Originally due, timeORIG_TERM_DUE_TIME
- 0840
- Latest dueLATEST_TERM_DUE_DT
- May 20, 2010
- Latest due, timeLATEST_TERM_DUE_TIME
- 0840
- TerminatedTERMINATION_DT
- May 20, 2010
- Terminated, timeTERMINATION_TIME
- 1028
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jul 8, 2010
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 14, 2010
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 19, 2010
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Triangle Rock Products
- Operator IDVIOLATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Inspection eventEVENT_NO
- 1155171
- Inspection beganINSPECTION_BEGIN_DT
- May 19, 2010
- Inspection closed outINSPECTION_END_DT
- May 20, 2010
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
65 citations and orders since Aug 15, 2000: 59 issued to the operator, 6 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Oct 15, 2025Citation number: 5106061Standard: 56.12028Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5106061
- Assessment control numberASSESS_CASE_NO
- 000632625
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 18, 2025
- Citation issuedISSUE_DT
- Oct 15, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 15, 2025
- Final order dateFINAL_ORDER_DT
- Jan 15, 2026
- Bill first printedBILL_PRINT_DT
- Dec 10, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 15, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12028
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 54
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 21490
- Size of mineSIZE_OF_MINE
- 21490
- Controller hours workedCONTROLLER_HRS
- 13171043
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13171043
- History period startHISTORY_START_DT
- Jul 15, 2024
- History period endHISTORY_END_DT
- Oct 14, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02C681
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 8, 2022Citation number: 9535624Standard: 56.15005Proposed penalty: $840.00Current assessment: $840.00Paid against proposed penalty: $840.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9535624
- Assessment control numberASSESS_CASE_NO
- 000562515
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 4, 2022
- Citation issuedISSUE_DT
- Aug 8, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 8, 2022
- Final order dateFINAL_ORDER_DT
- Oct 12, 2022
- Bill first printedBILL_PRINT_DT
- Sep 8, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 12, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.15005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 840.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 840.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 840.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 83
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 18715
- Size of mineSIZE_OF_MINE
- 18715
- Controller hours workedCONTROLLER_HRS
- 10981346
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10981346
- History period startHISTORY_START_DT
- May 8, 2021
- History period endHISTORY_END_DT
- Aug 7, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6491303
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 22, 2017Citation number: 9372022Standard: 56.14100(b)Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9372022
- Assessment control numberASSESS_CASE_NO
- 000438078
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 19, 2017
- Citation issuedISSUE_DT
- Mar 22, 2017
- Date of occurrenceOCCURRENCE_DT
- Mar 22, 2017
- Final order dateFINAL_ORDER_DT
- Jun 25, 2017
- Bill first printedBILL_PRINT_DT
- May 11, 2017
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 116.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 116.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 116.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.29
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 26142
- Size of mineSIZE_OF_MINE
- 26142
- Controller hours workedCONTROLLER_HRS
- 9432354
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9432354
- History period startHISTORY_START_DT
- Dec 22, 2015
- History period endHISTORY_END_DT
- Mar 21, 2017
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6721621
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 22, 2017Citation number: 9372021Standard: 56.15001Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9372021
- Assessment control numberASSESS_CASE_NO
- 000438078
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 19, 2017
- Citation issuedISSUE_DT
- Mar 22, 2017
- Date of occurrenceOCCURRENCE_DT
- Mar 22, 2017
- Final order dateFINAL_ORDER_DT
- Jun 25, 2017
- Bill first printedBILL_PRINT_DT
- May 11, 2017
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.15001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 116.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 116.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 116.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.29
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 26142
- Size of mineSIZE_OF_MINE
- 26142
- Controller hours workedCONTROLLER_HRS
- 9432354
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9432354
- History period startHISTORY_START_DT
- Dec 22, 2015
- History period endHISTORY_END_DT
- Mar 21, 2017
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6721621
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 22, 2017Citation number: 9372023Standard: 56.9300(a)Proposed penalty: $148.00Current assessment: $148.00Paid against proposed penalty: $148.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9372023
- Assessment control numberASSESS_CASE_NO
- 000438078
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 19, 2017
- Citation issuedISSUE_DT
- Mar 22, 2017
- Date of occurrenceOCCURRENCE_DT
- Mar 22, 2017
- Final order dateFINAL_ORDER_DT
- Jun 25, 2017
- Bill first printedBILL_PRINT_DT
- May 11, 2017
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2017
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 148.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 148.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 148.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 63
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.29
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.143
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 26142
- Size of mineSIZE_OF_MINE
- 26142
- Controller hours workedCONTROLLER_HRS
- 9432354
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9432354
- History period startHISTORY_START_DT
- Dec 22, 2015
- History period endHISTORY_END_DT
- Mar 21, 2017
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6721621
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2016Citation number: 8879350Standard: 56.9300(a)Proposed penalty: $285.00Current assessment: $285.00Paid against proposed penalty: $285.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8879350
- Assessment control numberASSESS_CASE_NO
- 000410062
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 23, 2016
- Citation issuedISSUE_DT
- Apr 6, 2016
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2016
- Final order dateFINAL_ORDER_DT
- Jun 26, 2016
- Bill first printedBILL_PRINT_DT
- May 12, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 285.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 285.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 285.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 73
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 29217
- Size of mineSIZE_OF_MINE
- 29217
- Controller hours workedCONTROLLER_HRS
- 8891026
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8891026
- History period startHISTORY_START_DT
- Jan 6, 2015
- History period endHISTORY_END_DT
- Apr 5, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6663360
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2016Citation number: 8879349Standard: 56.16009Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8879349
- Assessment control numberASSESS_CASE_NO
- 000412480
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 28, 2016
- Citation issuedISSUE_DT
- Apr 6, 2016
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2016
- Final order dateFINAL_ORDER_DT
- Jul 24, 2016
- Bill first printedBILL_PRINT_DT
- Jun 9, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16009
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 29217
- Size of mineSIZE_OF_MINE
- 29217
- Controller hours workedCONTROLLER_HRS
- 8891026
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8891026
- History period startHISTORY_START_DT
- Jan 6, 2015
- History period endHISTORY_END_DT
- Apr 5, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6663360
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 6, 2014Citation number: 8785895Standard: 56.12004Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8785895
- Assessment control numberASSESS_CASE_NO
- 000369088
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 2, 2015
- Citation issuedISSUE_DT
- Nov 6, 2014
- Date of occurrenceOCCURRENCE_DT
- Nov 6, 2014
- Final order dateFINAL_ORDER_DT
- Jan 18, 2015
- Bill first printedBILL_PRINT_DT
- Dec 11, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 18, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 34
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.5
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.333
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31382
- Size of mineSIZE_OF_MINE
- 31382
- Controller hours workedCONTROLLER_HRS
- 7421371
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7421371
- History period startHISTORY_START_DT
- Aug 6, 2013
- History period endHISTORY_END_DT
- Nov 5, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6599090
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 5, 2014Citation number: 8785893Standard: 56.14100(b)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8785893
- Assessment control numberASSESS_CASE_NO
- 000370257
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 20, 2015
- Citation issuedISSUE_DT
- Nov 5, 2014
- Date of occurrenceOCCURRENCE_DT
- Nov 5, 2014
- Final order dateFINAL_ORDER_DT
- Feb 4, 2015
- Bill first printedBILL_PRINT_DT
- Dec 23, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 4, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 19787
- Size of mineSIZE_OF_MINE
- 19787
- History period startHISTORY_START_DT
- Aug 5, 2013
- History period endHISTORY_END_DT
- Nov 4, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- California Drilling & Blasting
- IDVIOLATOR_ID
- UD9
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Nov 5, 2014
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6599090
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Nov 5, 2014Citation number: 8785894Standard: 56.12025Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8785894
- Assessment control numberASSESS_CASE_NO
- 000369088
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 2, 2015
- Citation issuedISSUE_DT
- Nov 5, 2014
- Date of occurrenceOCCURRENCE_DT
- Nov 5, 2014
- Final order dateFINAL_ORDER_DT
- Jan 18, 2015
- Bill first printedBILL_PRINT_DT
- Dec 11, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 18, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12025
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31382
- Size of mineSIZE_OF_MINE
- 31382
- Controller hours workedCONTROLLER_HRS
- 7421371
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7421371
- History period startHISTORY_START_DT
- Aug 5, 2013
- History period endHISTORY_END_DT
- Nov 4, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6599090
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 16, 2014Citation number: 6345568Standard: 56.4601Proposed penalty: $308.00Current assessment: $308.00Paid against proposed penalty: $308.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6345568
- Assessment control numberASSESS_CASE_NO
- 000344960
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 31, 2014
- Citation issuedISSUE_DT
- Jan 16, 2014
- Date of occurrenceOCCURRENCE_DT
- Jan 16, 2014
- Final order dateFINAL_ORDER_DT
- Apr 12, 2014
- Bill first printedBILL_PRINT_DT
- Mar 6, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2014
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2014
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4601
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 308.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 308.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 308.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 74
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31382
- Size of mineSIZE_OF_MINE
- 31382
- Controller hours workedCONTROLLER_HRS
- 7652863
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7652863
- History period startHISTORY_START_DT
- Oct 16, 2012
- History period endHISTORY_END_DT
- Jan 15, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6592864
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 16, 2014Citation number: 6345567Standard: 56.12004Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6345567
- Assessment control numberASSESS_CASE_NO
- 000344960
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 31, 2014
- Citation issuedISSUE_DT
- Jan 16, 2014
- Date of occurrenceOCCURRENCE_DT
- Jan 16, 2014
- Final order dateFINAL_ORDER_DT
- Apr 12, 2014
- Bill first printedBILL_PRINT_DT
- Mar 6, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2014
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2014
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.4
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31382
- Size of mineSIZE_OF_MINE
- 31382
- Controller hours workedCONTROLLER_HRS
- 7652863
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7652863
- History period startHISTORY_START_DT
- Oct 16, 2012
- History period endHISTORY_END_DT
- Jan 15, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6592864
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 4, 2013Citation number: 6345458Standard: 56.12004Proposed penalty: $634.00Current assessment: $634.00Paid against proposed penalty: $634.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6345458
- Assessment control numberASSESS_CASE_NO
- 000326818
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 13, 2013
- Citation issuedISSUE_DT
- Jun 4, 2013
- Date of occurrenceOCCURRENCE_DT
- Jun 4, 2013
- Final order dateFINAL_ORDER_DT
- Aug 16, 2013
- Bill first printedBILL_PRINT_DT
- Jul 11, 2013
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 16, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 634.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 634.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 634.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 83
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1.75
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 26313
- Size of mineSIZE_OF_MINE
- 26313
- Controller hours workedCONTROLLER_HRS
- 7644683
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7644683
- History period startHISTORY_START_DT
- Mar 4, 2012
- History period endHISTORY_END_DT
- Jun 3, 2013
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6592817
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2012Citation number: 8695869Standard: 56.11027Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8695869
- Assessment control numberASSESS_CASE_NO
- 000306182
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2013
- Citation issuedISSUE_DT
- Oct 2, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2012
- Final order dateFINAL_ORDER_DT
- Dec 15, 2012
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 15, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11027
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7848486
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7848486
- History period startHISTORY_START_DT
- Jul 2, 2011
- History period endHISTORY_END_DT
- Oct 1, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161788
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2012Citation number: 8695866Standard: 56.11027Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8695866
- Assessment control numberASSESS_CASE_NO
- 000306182
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2013
- Citation issuedISSUE_DT
- Oct 2, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2012
- Final order dateFINAL_ORDER_DT
- Dec 15, 2012
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 15, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11027
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7848486
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7848486
- History period startHISTORY_START_DT
- Jul 2, 2011
- History period endHISTORY_END_DT
- Oct 1, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161788
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2012Citation number: 8695868Standard: 56.11012Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8695868
- Assessment control numberASSESS_CASE_NO
- 000306182
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2013
- Citation issuedISSUE_DT
- Oct 2, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2012
- Final order dateFINAL_ORDER_DT
- May 21, 2013
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7851028
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7851028
- History period startHISTORY_START_DT
- Jul 2, 2011
- History period endHISTORY_END_DT
- Oct 1, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161788
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2012Citation number: 8695865Standard: 56.14110Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8695865
- Assessment control numberASSESS_CASE_NO
- 000306182
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2013
- Citation issuedISSUE_DT
- Oct 2, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2012
- Final order dateFINAL_ORDER_DT
- May 21, 2013
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14110
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7848486
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7848486
- History period startHISTORY_START_DT
- Jul 2, 2011
- History period endHISTORY_END_DT
- Oct 1, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161788
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2012Citation number: 8695867Standard: 47.42(c)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8695867
- Assessment control numberASSESS_CASE_NO
- 000306182
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2013
- Citation issuedISSUE_DT
- Oct 2, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2012
- Final order dateFINAL_ORDER_DT
- May 21, 2013
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.42(c)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 33
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7851028
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7851028
- History period startHISTORY_START_DT
- Jul 2, 2011
- History period endHISTORY_END_DT
- Oct 1, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161788
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 2, 2012Citation number: 8695864Standard: 56.9315Proposed penalty: $425.00Current assessment: $375.00Paid against proposed penalty: $375.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8695864
- Assessment control numberASSESS_CASE_NO
- 000306182
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2013
- Citation issuedISSUE_DT
- Oct 2, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 2, 2012
- Final order dateFINAL_ORDER_DT
- May 21, 2013
- Bill first printedBILL_PRINT_DT
- Nov 8, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9315
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 425.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 375.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 375.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7851028
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7851028
- History period startHISTORY_START_DT
- Jul 2, 2011
- History period endHISTORY_END_DT
- Oct 1, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161788
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 5, 2012Citation number: 8609877Standard: 56.11027Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8609877
- Assessment control numberASSESS_CASE_NO
- 000280321
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 5, 2012
- Citation issuedISSUE_DT
- Jan 5, 2012
- Date of occurrenceOCCURRENCE_DT
- Jan 5, 2012
- Final order dateFINAL_ORDER_DT
- Mar 16, 2012
- Bill first printedBILL_PRINT_DT
- Feb 9, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2012
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 16, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11027
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 24515
- Size of mineSIZE_OF_MINE
- 24515
- Controller hours workedCONTROLLER_HRS
- 7826108
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7826108
- History period startHISTORY_START_DT
- Oct 5, 2010
- History period endHISTORY_END_DT
- Jan 4, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1161166
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 15, 2011Citation number: 8603814Standard: 56.16005Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8603814
- Assessment control numberASSESS_CASE_NO
- 000257681
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 30, 2011
- Citation issuedISSUE_DT
- Mar 15, 2011
- Date of occurrenceOCCURRENCE_DT
- Mar 15, 2011
- Final order dateFINAL_ORDER_DT
- Jul 15, 2011
- Bill first printedBILL_PRINT_DT
- Jun 9, 2011
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2011
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 15, 2011
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 22860
- Size of mineSIZE_OF_MINE
- 22860
- Controller hours workedCONTROLLER_HRS
- 7966029
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7966029
- History period startHISTORY_START_DT
- Dec 15, 2009
- History period endHISTORY_END_DT
- Mar 14, 2011
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1155809
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 15, 2011Citation number: 8603813Standard: 56.12032Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8603813
- Assessment control numberASSESS_CASE_NO
- 000254552
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 27, 2011
- Citation issuedISSUE_DT
- Mar 15, 2011
- Date of occurrenceOCCURRENCE_DT
- Mar 15, 2011
- Final order dateFINAL_ORDER_DT
- Jun 17, 2011
- Bill first printedBILL_PRINT_DT
- May 12, 2011
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2011
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 17, 2011
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 22860
- Size of mineSIZE_OF_MINE
- 22860
- Controller hours workedCONTROLLER_HRS
- 7966029
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7966029
- History period startHISTORY_START_DT
- Dec 15, 2009
- History period endHISTORY_END_DT
- Mar 14, 2011
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1155809
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 15, 2011Citation number: 8603815Standard: 56.20003(a)Proposed penalty: $190.00Current assessment: $190.00Paid against proposed penalty: $190.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8603815
- Assessment control numberASSESS_CASE_NO
- 000257681
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 30, 2011
- Citation issuedISSUE_DT
- Mar 15, 2011
- Date of occurrenceOCCURRENCE_DT
- Mar 15, 2011
- Final order dateFINAL_ORDER_DT
- Jul 15, 2011
- Bill first printedBILL_PRINT_DT
- Jun 9, 2011
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2011
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 15, 2011
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 190.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 190.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 190.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 68
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 22860
- Size of mineSIZE_OF_MINE
- 22860
- Controller hours workedCONTROLLER_HRS
- 7966029
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7966029
- History period startHISTORY_START_DT
- Dec 15, 2009
- History period endHISTORY_END_DT
- Mar 14, 2011
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1155809
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 20, 2010Citation number: 6487086Standard: 56.12004Proposed penalty: $127.00Current assessment: $127.00Paid against proposed penalty: $127.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6487086
- Assessment control numberASSESS_CASE_NO
- 000225415
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 18, 2010
- Citation issuedISSUE_DT
- May 20, 2010
- Date of occurrenceOCCURRENCE_DT
- May 20, 2010
- Final order dateFINAL_ORDER_DT
- Aug 14, 2010
- Bill first printedBILL_PRINT_DT
- Jul 8, 2010
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2010
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 14, 2010
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 127.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 127.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 127.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 63
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 27699
- Size of mineSIZE_OF_MINE
- 27699
- Controller hours workedCONTROLLER_HRS
- 7973945
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7973945
- History period startHISTORY_START_DT
- Feb 20, 2009
- History period endHISTORY_END_DT
- May 19, 2010
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1155171
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 20, 2010Citation number: 6487087Standard: 56.12004Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6487087
- Assessment control numberASSESS_CASE_NO
- 000225415
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 18, 2010
- Citation issuedISSUE_DT
- May 20, 2010
- Date of occurrenceOCCURRENCE_DT
- May 20, 2010
- Final order dateFINAL_ORDER_DT
- Aug 14, 2010
- Bill first printedBILL_PRINT_DT
- Jul 8, 2010
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2010
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 14, 2010
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 3
- Controller size pointsCONTROLLER_SIZE_POINTS
- 9
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 27699
- Size of mineSIZE_OF_MINE
- 27699
- Controller hours workedCONTROLLER_HRS
- 7973945
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7973945
- History period startHISTORY_START_DT
- Feb 20, 2009
- History period endHISTORY_END_DT
- May 19, 2010
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Triangle Rock Products
- IDVIOLATOR_ID
- L13967
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 11, 2008
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1155171
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 65 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Dec 4, 2012Citation issued: Oct 2, 2012Docket: WEST 2013-258MStandard: 47.42(c)Proposed penalty: $100.00Penalty after decision: $100.00Decided: Apr 10, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8695867
- Citation issuedCITATION_ISSUE_DT
- Oct 2, 2012
- Hearing request receivedCONTEST_DT
- Dec 4, 2012
- Docket numberDOCKET_NO
- WEST 2013-258M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Richard
- Judge, last nameJUDGE_LAST_NAME
- Manning
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Apr 10, 2013
- Petition duePETITION_DUE_DT
- Jan 18, 2013
- Petition filedPETITION_FILED_DT
- Jan 9, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 47.42(c)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- NoLostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Dec 4, 2012Citation issued: Oct 2, 2012Docket: WEST 2013-258MStandard: 56.11012Proposed penalty: $100.00Penalty after decision: $100.00Decided: Apr 10, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8695868
- Citation issuedCITATION_ISSUE_DT
- Oct 2, 2012
- Hearing request receivedCONTEST_DT
- Dec 4, 2012
- Docket numberDOCKET_NO
- WEST 2013-258M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Richard
- Judge, last nameJUDGE_LAST_NAME
- Manning
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Apr 10, 2013
- Petition duePETITION_DUE_DT
- Jan 18, 2013
- Petition filedPETITION_FILED_DT
- Jan 9, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.11012
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Dec 4, 2012Citation issued: Oct 2, 2012Docket: WEST 2013-258MStandard: 56.9315Proposed penalty: $425.00Penalty after decision: $375.00Decided: Apr 10, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8695864
- Citation issuedCITATION_ISSUE_DT
- Oct 2, 2012
- Hearing request receivedCONTEST_DT
- Dec 4, 2012
- Docket numberDOCKET_NO
- WEST 2013-258M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Richard
- Judge, last nameJUDGE_LAST_NAME
- Manning
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Apr 10, 2013
- Petition duePETITION_DUE_DT
- Jan 18, 2013
- Petition filedPETITION_FILED_DT
- Jan 9, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 425.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 375.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.9315
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Dec 4, 2012Citation issued: Oct 2, 2012Docket: WEST 2013-258MStandard: 56.14110Proposed penalty: $100.00Penalty after decision: $100.00Decided: Apr 10, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8695865
- Citation issuedCITATION_ISSUE_DT
- Oct 2, 2012
- Hearing request receivedCONTEST_DT
- Dec 4, 2012
- Docket numberDOCKET_NO
- WEST 2013-258M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Richard
- Judge, last nameJUDGE_LAST_NAME
- Manning
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Apr 10, 2013
- Petition duePETITION_DUE_DT
- Jan 18, 2013
- Petition filedPETITION_FILED_DT
- Jan 9, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14110
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
4 contested citations and orders; decision types are MSHA's own text.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 3
- DAYS AWAY FROM WORK ONLY
- 3
- DAYS RESTRICTED ACTIVITY ONLY
- 2
- ACCIDENT ONLY
- 1
Date: Oct 8, 2019Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall from machineDays lost: 178Details
The report
- Document numberDOCUMENT_NO
- 220192880012
- DateACCIDENT_DT
- Oct 8, 2019
- TimeACCIDENT_TIME
- 1130
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from machine
- Accident type codeACCIDENT_TYPE_CD
- 12
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- Part of body codeINJ_BODY_PART_CD
- 700
- Days lostDAYS_LOST
- 178
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
- Equipment codeMINING_EQUIP_CD
- 60
- Equipment manufacturerEQUIP_MFR_NAME
- FMC
- Equipment manufacturer codeEQUIP_MFR_CD
- 040
- Equipment model numberEQUIP_MODEL_NO
- 245x4
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Returned to workRETURN_TO_WORK_DT, Contractor IDCONTRACTOR_ID
Date: Oct 8, 2017Degree of injury: ACCIDENT ONLYClassification: FIREAccident type: Accident type, without injuriesDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220172850027
- DateACCIDENT_DT
- Oct 8, 2017
- TimeACCIDENT_TIME
- 2200
- Shift beganSHIFT_BEGIN_TIME
- 0400
- Degree of injuryDEGREE_INJURY
- ACCIDENT ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 00
- ClassificationCLASSIFICATION
- FIRE
- Classification codeCLASSIFICATION_CD
- 08
- Accident typeACCIDENT_TYPE
- Accident type, without injuries
- Accident type codeACCIDENT_TYPE_CD
- 44
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- NO VALUE FOUND
- Activity codeACTIVITY_CD
- ?
- Source of injuryINJURY_SOURCE
- NO VALUE FOUND
- Source of injury codeINJURY_SOURCE_CD
- ?
- Nature of injuryNATURE_INJURY
- NO VALUE FOUND
- Nature of injury codeNATURE_INJURY_CD
- ?
- Part of bodyINJ_BODY_PART
- NO VALUE FOUND
- Part of body codeINJ_BODY_PART_CD
- ?
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Controller at the timeCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Reportable injuries or illnessesNO_INJURIES, Schedule charge, daysSCHEDULE_CHARGE
Not recorded by MSHA (8)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jul 20, 2007Degree of injury: DAYS AWAY FROM WORK ONLYClassification: MACHINERYAccident type: Caught in, under or between running or meshing objectsDays lost: 3Details
The report
- Document numberDOCUMENT_NO
- 220072040016
- DateACCIDENT_DT
- Jul 20, 2007
- TimeACCIDENT_TIME
- 0715
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Caught in, under or between running or meshing objects
- Accident type codeACCIDENT_TYPE_CD
- 20
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- CHAIN,ROPE,CABLE-NT CONVY
- Source of injury codeINJURY_SOURCE_CD
- 079
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Days lostDAYS_LOST
- 3
- Returned to workRETURN_TO_WORK_DT
- Jul 26, 2007
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Carriage-mounted drills, Rail, Rubber-tired, Jumbo, Air-track drill
- Equipment codeMINING_EQUIP_CD
- 09
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Martin Marietta Materials
- Operator IDOPERATOR_ID
- L16197
- Controller at the timeCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Contractor IDCONTRACTOR_ID
- YHN
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2007
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2007
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Jun 15, 2006Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220061710023
- DateACCIDENT_DT
- Jun 15, 2006
- TimeACCIDENT_TIME
- 1130
- Shift beganSHIFT_BEGIN_TIME
- 0530
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- WRENCH
- Source of injury codeINJURY_SOURCE_CD
- 050
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- MOUTH/LIP/TEETH/TONGUE/THROAT/TASTE
- Part of body codeINJ_BODY_PART_CD
- 142
- Returned to workRETURN_TO_WORK_DT
- Jun 15, 2006
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Martin Marietta Materials
- Operator IDOPERATOR_ID
- L16197
- Controller at the timeCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2006
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2006
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 30, 2003Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Struck by... NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220032870061
- DateACCIDENT_DT
- Sep 30, 2003
- TimeACCIDENT_TIME
- 1100
- Shift beganSHIFT_BEGIN_TIME
- 500
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Grinding
- Activity codeACTIVITY_CD
- 024
- Source of injuryINJURY_SOURCE
- PULVERIZED MINERAL (DUST)
- Source of injury codeINJURY_SOURCE_CD
- 092
- Nature of injuryNATURE_INJURY
- DUST IN EYES
- Nature of injury codeNATURE_INJURY_CD
- 320
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- Oct 1, 2003
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Meridian Aggregates Company Lp
- Operator IDOPERATOR_ID
- L18213
- Controller at the timeCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: Mar 19, 2003Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220031540003
- DateACCIDENT_DT
- Mar 19, 2003
- TimeACCIDENT_TIME
- 0600
- Shift beganSHIFT_BEGIN_TIME
- 500
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Handling coal, Rock, Ore
- Activity codeACTIVITY_CD
- 026
- Source of injuryINJURY_SOURCE
- BROKEN ROCK,COAL,ORE,WSTE
- Source of injury codeINJURY_SOURCE_CD
- 089
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 23
- Returned to workRETURN_TO_WORK_DT
- May 22, 2003
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Conveyor, Belt feeder, Stage loader, Hopper shaker, Belt structure
- Equipment codeMINING_EQUIP_CD
- 13
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Meridian Aggregates Company Lp
- Operator IDOPERATOR_ID
- L18213
- Controller at the timeCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: Aug 23, 2002Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 5Details
The report
- Document numberDOCUMENT_NO
- 220022600068
- DateACCIDENT_DT
- Aug 23, 2002
- TimeACCIDENT_TIME
- 1400
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
- Part of body codeINJ_BODY_PART_CD
- 440
- Days lostDAYS_LOST
- 5
- Returned to workRETURN_TO_WORK_DT
- Sep 3, 2002
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Crusher, Breaker, Mills (ball and rod), Feeder breaker
- Equipment codeMINING_EQUIP_CD
- 15
- Equipment manufacturerEQUIP_MFR_NAME
- Cedar Rapids
- Equipment manufacturer codeEQUIP_MFR_CD
- 0909
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Meridian Aggregates Company Lp
- Operator IDOPERATOR_ID
- L18213
- Controller at the timeCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2002
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2002
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Contractor IDCONTRACTOR_ID
Date: Jun 14, 2002Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall onto or against objectsDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220021890078
- DateACCIDENT_DT
- Jun 14, 2002
- TimeACCIDENT_TIME
- 0715
- Shift beganSHIFT_BEGIN_TIME
- 500
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall onto or against objects
- Accident type codeACCIDENT_TYPE_CD
- 18
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- CHUTE & SLIDE-CONVYR HOPR
- Source of injury codeINJURY_SOURCE_CD
- 034
- Nature of injuryNATURE_INJURY
- CONTUSN,BRUISE,INTAC SKIN
- Nature of injury codeNATURE_INJURY_CD
- 160
- Part of bodyINJ_BODY_PART
- CHEST (RIBS/BREAST BONE/CHEST ORGNS)
- Part of body codeINJ_BODY_PART_CD
- 430
- Days of restricted workDAYS_RESTRICT
- 1
- Returned to workRETURN_TO_WORK_DT
- Jun 17, 2002
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Chute
- Equipment codeMINING_EQUIP_CD
- 10
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Meridian Aggregates Company Lp
- Operator IDOPERATOR_ID
- L18213
- Controller at the timeCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2002
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2002
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
Date: May 18, 2000Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220001610025
- DateACCIDENT_DT
- May 18, 2000
- TimeACCIDENT_TIME
- 0815
- Shift beganSHIFT_BEGIN_TIME
- 600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- KNIFE
- Source of injury codeINJURY_SOURCE_CD
- 049
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- THIGH/FEMUR
- Part of body codeINJ_BODY_PART_CD
- 511
- Returned to workRETURN_TO_WORK_DT
- May 19, 2000
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Meridian Aggregates Company
- Operator IDOPERATOR_ID
- L13605
- Controller at the timeCONTROLLER_NAME
- Meridian Aggregates Company LP
- Controller IDCONTROLLER_ID
- M09944
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2000
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2000
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID
9 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 6,703Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 6703
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1676
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 12Hours worked: 16,669Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 12
- Hours workedANNUAL_HRS
- 16669
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1389
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 9,746Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 9746
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1949
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 12Hours worked: 21,312Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 12
- Hours workedANNUAL_HRS
- 21312
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1776
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 8,257Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 8257
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2064
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 12Hours worked: 21,490Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 12
- Hours workedANNUAL_HRS
- 21490
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1791
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 11,711Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 11711
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2342
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 17,682Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 17682
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1768
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 11,297Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 11297
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2259
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 17,564Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 17564
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1756
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 12,237Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 12237
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2447
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 18,715Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 18715
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1872
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 8,000Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 8000
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2667
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 13Hours worked: 21,640Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 13
- Hours workedANNUAL_HRS
- 21640
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1665
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 8,559Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 8559
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2140
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 13Hours worked: 23,704Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 13
- Hours workedANNUAL_HRS
- 23704
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1823
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileCURR_MINE_NM
- TRP Table Mountain Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Vacaville CA Field Office
- Nearest town
- colusa
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 1
- Employees, current record
- 19
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- Y
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- TRP Table Mountain Plant
- Mine IDMINE_ID
- 0404847
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Nov 14, 1986
- Legal entity typeCOMPANY_TYPE
- Other
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Triangle Rock Products
- Operator IDCURRENT_OPERATOR_ID
- L13967
- ControllerCURRENT_CONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCURRENT_CONTROLLER_ID
- 0071891
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Apr 11, 2008
Location and MSHA office
- StateSTATE
- CA
- Bureau of Mines state codeBOM_STATE_CD
- 04
- FIPS county codeFIPS_CNTY_CD
- 007
- FIPS county nameFIPS_CNTY_NM
- Butte
- Congressional districtCONG_DIST_CD
- 02
- Nearest townNEAREST_TOWN
- colusa
- MSHA districtDISTRICT
- M7
- MSHA office codeOFFICE_CD
- M7821
- MSHA officeOFFICE_NAME
- Vacaville CA Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 105
- Most recent assessment control numberASSESS_CTRL_NO
- 000632625
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Stone NEC
- Primary commodity codePRIMARY_SIC_CD
- 142900
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 19
- Safety committeeSAFETY_COMMITTEE_IND
- Y
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (1)
Tailing pondsNO_TAILING_PONDS
Recorded as N (4)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS
Not recorded by MSHA (13)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Triangle Rock ProductsFrom: Apr 11, 2008To: No end dateController: Vulcan Materials CompanyFrom : Nov 16, 2007To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Operator fromOPERATOR_START_DT
- Apr 11, 2008
Controller
- ControllerCONTROLLER_NAME
- Vulcan Materials Company
- Controller IDCONTROLLER_ID
- 0071891
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Nov 16, 2007
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: Triangle Rock ProductsFrom: Apr 11, 2008To: No end dateController: Legacy Vulcan Corp (Form:Vulcan Materials Co)From : Jan 6, 1999To : Nov 15, 2007Details
Operator
- OperatorOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Operator fromOPERATOR_START_DT
- Apr 11, 2008
Controller
- ControllerCONTROLLER_NAME
- Legacy Vulcan Corp (Form:Vulcan Materials Co)
- Controller IDCONTROLLER_ID
- M00024
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 6, 1999
- Controller toCONTROLLER_END_DT
- Nov 15, 2007
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Operator toOPERATOR_END_DT
Operator: Triangle Rock ProductsFrom: Apr 11, 2008To: No end dateController: Calmat CompanyFrom : Nov 9, 1987To : Jan 5, 1999Details
Operator
- OperatorOPERATOR_NAME
- Triangle Rock Products
- Operator IDOPERATOR_ID
- L13967
- Operator fromOPERATOR_START_DT
- Apr 11, 2008
Controller
- ControllerCONTROLLER_NAME
- Calmat Company
- Controller IDCONTROLLER_ID
- M00112
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Nov 9, 1987
- Controller toCONTROLLER_END_DT
- Jan 5, 1999
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Operator toOPERATOR_END_DT
Operator: Martin Marietta MaterialsFrom: Dec 5, 2005To: Apr 10, 2008Controller: Martin Marietta Materials IncFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Martin Marietta Materials
- Operator IDOPERATOR_ID
- L16197
- Operator fromOPERATOR_START_DT
- Dec 5, 2005
- Operator toOPERATOR_END_DT
- Apr 10, 2008
Controller
- ControllerCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
Operator: Meridian Aggregates Company LpFrom: Apr 3, 2001To: Dec 4, 2005Controller: Martin Marietta Materials IncFrom : Apr 3, 2001To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Meridian Aggregates Company Lp
- Operator IDOPERATOR_ID
- L18213
- Operator fromOPERATOR_START_DT
- Apr 3, 2001
- Operator toOPERATOR_END_DT
- Dec 4, 2005
Controller
- ControllerCONTROLLER_NAME
- Martin Marietta Materials Inc
- Controller IDCONTROLLER_ID
- M00174
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Apr 3, 2001
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
Operator: Meridian Aggregates CompanyFrom: Mar 20, 1996To: Apr 2, 2001Controller: Meridian Aggregates Company LPFrom : Mar 1, 1991To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Meridian Aggregates Company
- Operator IDOPERATOR_ID
- L13605
- Operator fromOPERATOR_START_DT
- Mar 20, 1996
- Operator toOPERATOR_END_DT
- Apr 2, 2001
Controller
- ControllerCONTROLLER_NAME
- Meridian Aggregates Company LP
- Controller IDCONTROLLER_ID
- M09944
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Mar 1, 1991
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
Operator: Green Rock QuarriesFrom: Sep 1, 1986To: Mar 19, 1996Controller: Not shownFrom : Sep 1, 1986To : Mar 19, 1996Details
Operator
- OperatorOPERATOR_NAME
- Green Rock Quarries
- Operator IDOPERATOR_ID
- L33842
- Operator fromOPERATOR_START_DT
- Sep 1, 1986
- Operator toOPERATOR_END_DT
- Mar 19, 1996
Controller
- Controller IDCONTROLLER_ID
- M33842
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Sep 1, 1986
- Controller toCONTROLLER_END_DT
- Mar 19, 1996
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
ControllerCONTROLLER_NAME
As MSHA records it, newest operator first.
Address of record
Triangle Rock Products·Contact title Director- Safety & Health·16013 E Foothill Blvd, Irwindale CA 91702
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Triangle Rock Products
- Contact titleCONTACT_TITLE
- Director- Safety & Health
- StreetSTREET
- 16013 E Foothill Blvd
- CityCITY
- Irwindale
- StateSTATE_ABBR
- CA
- State nameSTATE
- California
- ZIP codeZIP_CD
- 91702
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 06
Mine
- Mine IDMINE_ID
- 0404847
- Mine name in this fileMINE_NAME
- TRP Table Mountain Plant
- Nearest townNEAREST_TOWN
- colusa
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Nov 14, 1986
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Stone NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology