Vernalis Plant
Metal/Non-Metal, Surface·Sand, Industrial NEC·San Joaquin, California·Mine ID 0405783
Operator Granite Construction Company·Controller Granite Construction Inc·MSHA status Active since Sep 30, 2010
What MSHA has on file for this mine
MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionOct 27 to Oct 31, 2026Inspectors 1 | Hours on site 12.5Began: Oct 27, 2026Ended: Oct 31, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 27, 2026
- Closed outINSPECTION_END_DT
- Oct 31, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F005BF2
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 22.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2027
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 13 to Apr 16, 2026Inspectors 1 | Hours on site 24Began: Apr 13, 2026Ended: Apr 16, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 24Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 13, 2026
- Closed outINSPECTION_END_DT
- Apr 16, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F029BCA
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 24
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 37.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 12 to Nov 13, 2025Inspectors 1 | Hours on site 9Began: Nov 12, 2025Ended: Nov 13, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 12, 2025
- Closed outINSPECTION_END_DT
- Nov 13, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F029BA7
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 22 to Sep 23, 2025Inspectors 1 | Hours on site 9Began: Sep 22, 2025Ended: Sep 23, 2025Activity: Spot InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 22, 2025
- Closed outINSPECTION_END_DT
- Sep 23, 2025
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- F027892
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionMay 12, 2025Inspectors 1 | Hours on site 0.75Began: May 12, 2025Ended: May 12, 2025Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 12, 2025
- Closed outINSPECTION_END_DT
- May 12, 2025
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- F011132
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 28 to Apr 30, 2025Inspectors 1 | Hours on site 19Began: Apr 28, 2025Ended: Apr 30, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Closed outINSPECTION_END_DT
- Apr 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F01112E
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 22 to Jan 23, 2025Inspectors 1 | Hours on site 5.5Began: Jan 22, 2025Ended: Jan 23, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 22, 2025
- Closed outINSPECTION_END_DT
- Jan 23, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F014EB0
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 12 to Sep 16, 2024Inspectors 1 | Hours on site 20Began: Sep 12, 2024Ended: Sep 16, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 12, 2024
- Closed outINSPECTION_END_DT
- Sep 16, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F002AB7
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionFeb 10 to Mar 6, 2024Inspectors 2 | Hours on site 8.25Began: Feb 10, 2024Ended: Mar 6, 2024Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 8.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 10, 2024
- Closed outINSPECTION_END_DT
- Mar 6, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6232818
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 11 to Jul 13, 2023Inspectors 1 | Hours on site 5.5Began: Jul 11, 2023Ended: Jul 13, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 11, 2023
- Closed outINSPECTION_END_DT
- Jul 13, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6880665
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsMay 17, 2023Inspectors 1 | Hours on site 0.75Began: May 17, 2023Ended: May 17, 2023Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2023
- Closed outINSPECTION_END_DT
- May 17, 2023
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6875899
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Impoundment Spot InspectionJan 11 to Jan 12, 2023Inspectors 1 | Hours on site 1Began: Jan 11, 2023Ended: Jan 12, 2023Activity: Impoundment Spot InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 11, 2023
- Closed outINSPECTION_END_DT
- Jan 12, 2023
- ActivityACTIVITY
- Impoundment Spot Inspection
- Activity codeACTIVITY_CODE
- E23
- Program areaPROGRAM_AREA
- M/NM--Impoundment Spot Inspection
- Event numberEVENT_NO
- 6873528
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 5 to Jan 15, 2023Inspectors 1 | Hours on site 17.5Began: Jan 5, 2023Ended: Jan 15, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 17.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 5, 2023
- Closed outINSPECTION_END_DT
- Jan 15, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6873527
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 17.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 8 to Aug 10, 2022Inspectors 1 | Hours on site 8Began: Aug 8, 2022Ended: Aug 10, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Closed outINSPECTION_END_DT
- Aug 10, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6874270
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 7 to Mar 9, 2022Inspectors 1 | Hours on site 10.25Began: Mar 7, 2022Ended: Mar 9, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 7, 2022
- Closed outINSPECTION_END_DT
- Mar 9, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6874216
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionFeb 9, 2022Inspectors 1 | Hours on site 1.25Began: Feb 9, 2022Ended: Feb 9, 2022Activity: Spot InspectionInspectors: 1Hours on site: 1.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 9, 2022
- Closed outINSPECTION_END_DT
- Feb 9, 2022
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6874210
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionNov 16, 2021Inspectors 1 | Hours on site 1.5Began: Nov 16, 2021Ended: Nov 16, 2021Activity: Spot InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 16, 2021
- Closed outINSPECTION_END_DT
- Nov 16, 2021
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6875806
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 7 to Apr 9, 2021Inspectors 1 | Hours on site 6.5Began: Apr 7, 2021Ended: Apr 9, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 7, 2021
- Closed outINSPECTION_END_DT
- Apr 9, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6873678
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
103 (g) Written Notification Hazard Complaint InspectioApr 4 to Apr 6, 2021Inspectors 1 | Hours on site 6.5Began: Apr 4, 2021Ended: Apr 6, 2021Activity: 103 (g) Written Notification Hazard Complaint InspectioInspectors: 1Hours on site: 6.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 4, 2021
- Closed outINSPECTION_END_DT
- Apr 6, 2021
- ActivityACTIVITY
- 103 (g) Written Notification Hazard Complaint Inspectio
- Activity codeACTIVITY_CODE
- E03
- Program areaPROGRAM_AREA
- M/NM--103 (g) Written Notification Hazard Complaint Inspecti
- Event numberEVENT_NO
- 6873675
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 19 to Jan 20, 2021Inspectors 1 | Hours on site 12.5Began: Jan 19, 2021Ended: Jan 20, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 19, 2021
- Closed outINSPECTION_END_DT
- Jan 20, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6829489
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 31 to Sep 2, 2020Inspectors 1 | Hours on site 5.75Began: Aug 31, 2020Ended: Sep 2, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 31, 2020
- Closed outINSPECTION_END_DT
- Sep 2, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6873615
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 14 to Jan 15, 2020Inspectors 1 | Hours on site 7.75Began: Jan 14, 2020Ended: Jan 15, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 14, 2020
- Closed outINSPECTION_END_DT
- Jan 15, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6828877
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 29 to Apr 30, 2019Inspectors 1 | Hours on site 5.75Began: Apr 29, 2019Ended: Apr 30, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 29, 2019
- Closed outINSPECTION_END_DT
- Apr 30, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6828536
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 24 to Oct 25, 2018Inspectors 1 | Hours on site 7.5Began: Oct 24, 2018Ended: Oct 25, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 24, 2018
- Closed outINSPECTION_END_DT
- Oct 25, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6728466
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 25, 2018Inspectors 1 | Hours on site 10.25Began: Apr 25, 2018Ended: Apr 25, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 25, 2018
- Closed outINSPECTION_END_DT
- Apr 25, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6728332
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 44 inspections and other MSHA visits since Sep 14, 2009; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Apr 13, 2026Type: CitationStandard: 56.14107(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5106631
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1616
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 13, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 13, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1701
- Latest dueLATEST_TERM_DUE_DT
- Apr 13, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1701
- TerminatedTERMINATION_DT
- Apr 13, 2026
- Terminated, timeTERMINATION_TIME
- 1659
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 11, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F029BCA
- Inspection beganINSPECTION_BEGIN_DT
- Apr 13, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Nov 12, 2025Type: CitationStandard: 47.41(a)(1)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9680858
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 12, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1239
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 12, 2025
- 30 CFR part and sectionPART_SECTION
- 47.41(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 12, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1330
- Latest dueLATEST_TERM_DUE_DT
- Nov 12, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1330
- TerminatedTERMINATION_DT
- Nov 12, 2025
- Terminated, timeTERMINATION_TIME
- 1245
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 15, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 9, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F029BA7
- Inspection beganINSPECTION_BEGIN_DT
- Nov 12, 2025
- Inspection closed outINSPECTION_END_DT
- Nov 13, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 30, 2025Type: CitationStandard: 56.9314S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $755.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5102203
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1035
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2025
- 30 CFR part and sectionPART_SECTION
- 56.9314
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 30, 2025
- Terminated, timeTERMINATION_TIME
- 1530
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 755
- Current proposed assessmentAMOUNT_DUE
- 755
- Amount paidAMOUNT_PAID
- 755
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 23, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F01112E
- Inspection beganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 29, 2025Type: CitationStandard: 56.18002S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5102202
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1915
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.18002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 2100
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 2100
- TerminatedTERMINATION_DT
- Apr 30, 2025
- Terminated, timeTERMINATION_TIME
- 1725
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 23, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F01112E
- Inspection beganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 29, 2025Type: CitationStandard: 47.44(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9680498
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1250
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 29, 2025
- 30 CFR part and sectionPART_SECTION
- 47.44(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Apr 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Apr 29, 2025
- Terminated, timeTERMINATION_TIME
- 1255
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 23, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F01112E
- Inspection beganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 29, 2025Type: CitationStandard: 56.14101(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9680499
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1320
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14101(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- May 5, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0700
- TerminatedTERMINATION_DT
- May 12, 2025
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 23, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F01112E
- Inspection beganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 29, 2025Type: CitationStandard: 56.11027S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9680500
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1640
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11027
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Apr 30, 2025
- Terminated, timeTERMINATION_TIME
- 1540
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 23, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F01112E
- Inspection beganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 29, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5102201
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1810
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Apr 30, 2025
- Terminated, timeTERMINATION_TIME
- 1555
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 23, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F01112E
- Inspection beganINSPECTION_BEGIN_DT
- Apr 28, 2025
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 22, 2025Type: CitationStandard: 56.11001S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9999535
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1521
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 23, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jan 23, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jan 23, 2025
- Terminated, timeTERMINATION_TIME
- 0838
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 6, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 13, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F014EB0
- Inspection beganINSPECTION_BEGIN_DT
- Jan 22, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 22, 2025Type: CitationStandard: 47.41(a)(1)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9999534
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1439
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2025
- 30 CFR part and sectionPART_SECTION
- 47.41(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 22, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jan 22, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jan 22, 2025
- Terminated, timeTERMINATION_TIME
- 1443
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 6, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 13, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- F014EB0
- Inspection beganINSPECTION_BEGIN_DT
- Jan 22, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2025
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Feb 28, 2024Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9773962
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 28, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1220
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 28, 2024
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 28, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Feb 28, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Feb 28, 2024
- Terminated, timeTERMINATION_TIME
- 1450
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Apr 17, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- May 25, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 7, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6232818
- Inspection beganINSPECTION_BEGIN_DT
- Feb 10, 2024
- Inspection closed outINSPECTION_END_DT
- Mar 6, 2024
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 5, 2023Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9507838
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 5, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1345
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 5, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 12, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jan 12, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jan 10, 2023
- Terminated, timeTERMINATION_TIME
- 1730
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Feb 7, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 16, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 17, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6873527
- Inspection beganINSPECTION_BEGIN_DT
- Jan 5, 2023
- Inspection closed outINSPECTION_END_DT
- Jan 15, 2023
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 9, 2022Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433812
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1225
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 10, 2022
- Terminated, timeTERMINATION_TIME
- 0703
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 9, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 9, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6874270
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 10, 2022
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 9, 2022Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433811
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1150
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 10, 2022
- Terminated, timeTERMINATION_TIME
- 0723
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 9, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 9, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6874270
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 10, 2022
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 9, 2022Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433814
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1228
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 10, 2022
- Terminated, timeTERMINATION_TIME
- 0702
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 9, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 9, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6874270
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 10, 2022
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 9, 2022Type: CitationStandard: 56.4130(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433815
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1234
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.4130(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 10, 2022
- Terminated, timeTERMINATION_TIME
- 0715
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 9, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 9, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6874270
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 10, 2022
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 9, 2022Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433813
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1227
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 10, 2022
- Terminated, timeTERMINATION_TIME
- 0704
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 9, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 9, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6874270
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 10, 2022
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Feb 9, 2022Type: CitationStandard: 56.20014S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9618093
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 9, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 0908
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 9, 2022
- 30 CFR part and sectionPART_SECTION
- 56.20014
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 3
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 9, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Feb 9, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Feb 9, 2022
- Terminated, timeTERMINATION_TIME
- 0915
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Apr 5, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- May 18, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 4, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6874210
- Inspection beganINSPECTION_BEGIN_DT
- Feb 9, 2022
- Inspection closed outINSPECTION_END_DT
- Feb 9, 2022
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2021Type: CitationStandard: 56.3130S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $622.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9503000
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 2145
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 31, 2021
- 30 CFR part and sectionPART_SECTION
- 56.3130
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Apr 26, 2021
- Terminated, timeTERMINATION_TIME
- 0829
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 622
- Current proposed assessmentAMOUNT_DUE
- 622
- Amount paidAMOUNT_PAID
- 622
- Bill first printedBILL_PRINT_DT
- Jun 9, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 10, 2021
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 14, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6873675
- Inspection beganINSPECTION_BEGIN_DT
- Apr 4, 2021
- Inspection closed outINSPECTION_END_DT
- Apr 6, 2021
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 1, 2020Type: CitationStandard: 56.11012S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9502925
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 1, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1020
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 1, 2020
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 1, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Sep 1, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Sep 1, 2020
- Terminated, timeTERMINATION_TIME
- 1330
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Oct 6, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 20, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 17, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6873615
- Inspection beganINSPECTION_BEGIN_DT
- Aug 31, 2020
- Inspection closed outINSPECTION_END_DT
- Sep 2, 2020
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 14, 2020Type: CitationStandard: 56.4130(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9502056
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 14, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1600
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 14, 2020
- 30 CFR part and sectionPART_SECTION
- 56.4130(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 15, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jan 15, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jan 15, 2020
- Terminated, timeTERMINATION_TIME
- 0746
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Mar 19, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 23, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 4, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6828877
- Inspection beganINSPECTION_BEGIN_DT
- Jan 14, 2020
- Inspection closed outINSPECTION_END_DT
- Jan 15, 2020
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 30, 2019Type: CitationStandard: 56.11001S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433384
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 30, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0715
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 30, 2019
- 30 CFR part and sectionPART_SECTION
- 56.11001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Apr 30, 2019
- Terminated, timeTERMINATION_TIME
- 0910
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Jun 4, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 10, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 27, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6828536
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2019
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2019
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 29, 2019Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9433372
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 29, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1515
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 29, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 0700
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 0700
- TerminatedTERMINATION_DT
- Apr 29, 2019
- Terminated, timeTERMINATION_TIME
- 1530
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Jun 4, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 10, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 27, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6828536
- Inspection beganINSPECTION_BEGIN_DT
- Apr 29, 2019
- Inspection closed outINSPECTION_END_DT
- Apr 30, 2019
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 24, 2018Type: CitationStandard: 56.4130(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9377647
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 24, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 1115
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 24, 2018
- 30 CFR part and sectionPART_SECTION
- 56.4130(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 24, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Oct 24, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Oct 24, 2018
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Dec 12, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 1, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 27, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6728466
- Inspection beganINSPECTION_BEGIN_DT
- Oct 24, 2018
- Inspection closed outINSPECTION_END_DT
- Oct 25, 2018
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 17, 2018Type: CitationStandard: 56.9300(b)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $589.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9377309
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 17, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 0910
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 17, 2018
- 30 CFR part and sectionPART_SECTION
- 56.9300(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 17, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jan 17, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jan 17, 2018
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 589
- Current proposed assessmentAMOUNT_DUE
- 589
- Amount paidAMOUNT_PAID
- 589
- Bill first printedBILL_PRINT_DT
- Feb 27, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 28, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 18, 2018
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Granite Construction Company
- Operator IDVIOLATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Inspection eventEVENT_NO
- 6728104
- Inspection beganINSPECTION_BEGIN_DT
- Jan 16, 2018
- Inspection closed outINSPECTION_END_DT
- Jan 17, 2018
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
61 citations and orders since Sep 15, 2009: 55 issued to the operator, 6 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Apr 13, 2026Citation number: 5106631Standard: 56.14107(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5106631
- Assessment control numberASSESS_CASE_NO
- 000642196
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 18, 2026
- Citation issuedISSUE_DT
- Apr 13, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 13, 2026
- Final order dateFINAL_ORDER_DT
- Jul 11, 2026
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 11, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 40162
- Size of mineSIZE_OF_MINE
- 40162
- Controller hours workedCONTROLLER_HRS
- 1062531
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 1062531
- History period startHISTORY_START_DT
- Jan 13, 2025
- History period endHISTORY_END_DT
- Apr 12, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F029BCA
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 12, 2025Citation number: 9680858Standard: 47.41(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9680858
- Assessment control numberASSESS_CASE_NO
- 000634391
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 6, 2026
- Citation issuedISSUE_DT
- Nov 12, 2025
- Date of occurrenceOCCURRENCE_DT
- Nov 12, 2025
- Final order dateFINAL_ORDER_DT
- Feb 15, 2026
- Bill first printedBILL_PRINT_DT
- Jan 8, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 15, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.50
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 6
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.73
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 1187553
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 1187553
- History period startHISTORY_START_DT
- Aug 12, 2024
- History period endHISTORY_END_DT
- Nov 11, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F029BA7
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (9)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 30, 2025Citation number: 5102203Standard: 56.9314Proposed penalty: $755.00Current assessment: $755.00Paid against proposed penalty: $755.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5102203
- Assessment control numberASSESS_CASE_NO
- 000622248
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 23, 2025
- Citation issuedISSUE_DT
- Apr 30, 2025
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2025
- Final order dateFINAL_ORDER_DT
- Jul 25, 2025
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9314
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 755.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 755.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 755.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 80
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Jan 30, 2024
- History period endHISTORY_END_DT
- Apr 29, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01112E
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 29, 2025Citation number: 9680498Standard: 47.44(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9680498
- Assessment control numberASSESS_CASE_NO
- 000622248
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 23, 2025
- Citation issuedISSUE_DT
- Apr 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Apr 29, 2025
- Final order dateFINAL_ORDER_DT
- Jul 25, 2025
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.44(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Jan 29, 2024
- History period endHISTORY_END_DT
- Apr 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01112E
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 29, 2025Citation number: 5102202Standard: 56.18002Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5102202
- Assessment control numberASSESS_CASE_NO
- 000622248
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 23, 2025
- Citation issuedISSUE_DT
- Apr 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Apr 29, 2025
- Final order dateFINAL_ORDER_DT
- Jul 25, 2025
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.18002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 50
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Jan 29, 2024
- History period endHISTORY_END_DT
- Apr 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01112E
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 29, 2025Citation number: 5102201Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5102201
- Assessment control numberASSESS_CASE_NO
- 000622248
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 23, 2025
- Citation issuedISSUE_DT
- Apr 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Apr 29, 2025
- Final order dateFINAL_ORDER_DT
- Jul 25, 2025
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.143
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Jan 29, 2024
- History period endHISTORY_END_DT
- Apr 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01112E
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 29, 2025Citation number: 9680499Standard: 56.14101(a)(2)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9680499
- Assessment control numberASSESS_CASE_NO
- 000622248
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 23, 2025
- Citation issuedISSUE_DT
- Apr 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Apr 29, 2025
- Final order dateFINAL_ORDER_DT
- Jul 25, 2025
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14101(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Jan 29, 2024
- History period endHISTORY_END_DT
- Apr 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01112E
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 29, 2025Citation number: 9680500Standard: 56.11027Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9680500
- Assessment control numberASSESS_CASE_NO
- 000622248
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 23, 2025
- Citation issuedISSUE_DT
- Apr 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Apr 29, 2025
- Final order dateFINAL_ORDER_DT
- Jul 25, 2025
- Bill first printedBILL_PRINT_DT
- Jun 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11027
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Jan 29, 2024
- History period endHISTORY_END_DT
- Apr 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F01112E
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 9999535Standard: 56.11001Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9999535
- Assessment control numberASSESS_CASE_NO
- 000616052
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 15, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 13, 2025
- Bill first printedBILL_PRINT_DT
- Mar 6, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 13, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F014EB0
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 9999534Standard: 47.41(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9999534
- Assessment control numberASSESS_CASE_NO
- 000616052
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 15, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 13, 2025
- Bill first printedBILL_PRINT_DT
- Mar 6, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 13, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 36858
- Size of mineSIZE_OF_MINE
- 36858
- Controller hours workedCONTROLLER_HRS
- 818756
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 818756
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F014EB0
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 28, 2024Citation number: 9773962Standard: 56.20003(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9773962
- Assessment control numberASSESS_CASE_NO
- 000597582
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 28, 2024
- Citation issuedISSUE_DT
- Feb 28, 2024
- Date of occurrenceOCCURRENCE_DT
- Feb 28, 2024
- Final order dateFINAL_ORDER_DT
- May 25, 2024
- Bill first printedBILL_PRINT_DT
- Apr 17, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 25, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 37376
- Size of mineSIZE_OF_MINE
- 37376
- Controller hours workedCONTROLLER_HRS
- 773017
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 773017
- History period startHISTORY_START_DT
- Nov 28, 2022
- History period endHISTORY_END_DT
- Feb 27, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6232818
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 5, 2023Citation number: 9507838Standard: 56.14112(a)(1)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9507838
- Assessment control numberASSESS_CASE_NO
- 000570938
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 17, 2023
- Citation issuedISSUE_DT
- Jan 5, 2023
- Date of occurrenceOCCURRENCE_DT
- Jan 5, 2023
- Final order dateFINAL_ORDER_DT
- Mar 16, 2023
- Bill first printedBILL_PRINT_DT
- Feb 7, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 16, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 41146
- Size of mineSIZE_OF_MINE
- 41146
- Controller hours workedCONTROLLER_HRS
- 613052
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 613052
- History period startHISTORY_START_DT
- Oct 5, 2021
- History period endHISTORY_END_DT
- Jan 4, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6873527
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 9, 2022Citation number: 9433812Standard: 56.4201(a)(2)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433812
- Assessment control numberASSESS_CASE_NO
- 000564201
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 9, 2022
- Citation issuedISSUE_DT
- Aug 9, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 9, 2022
- Final order dateFINAL_ORDER_DT
- Nov 9, 2022
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 9, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 39424
- Size of mineSIZE_OF_MINE
- 39424
- Controller hours workedCONTROLLER_HRS
- 605538
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 605538
- History period startHISTORY_START_DT
- May 9, 2021
- History period endHISTORY_END_DT
- Aug 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6874270
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 9, 2022Citation number: 9433815Standard: 56.4130(b)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433815
- Assessment control numberASSESS_CASE_NO
- 000564201
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 9, 2022
- Citation issuedISSUE_DT
- Aug 9, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 9, 2022
- Final order dateFINAL_ORDER_DT
- Nov 9, 2022
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 9, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4130(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 39424
- Size of mineSIZE_OF_MINE
- 39424
- Controller hours workedCONTROLLER_HRS
- 605538
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 605538
- History period startHISTORY_START_DT
- May 9, 2021
- History period endHISTORY_END_DT
- Aug 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6874270
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 9, 2022Citation number: 9433813Standard: 56.12032Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433813
- Assessment control numberASSESS_CASE_NO
- 000564201
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 9, 2022
- Citation issuedISSUE_DT
- Aug 9, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 9, 2022
- Final order dateFINAL_ORDER_DT
- Nov 9, 2022
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 9, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 39424
- Size of mineSIZE_OF_MINE
- 39424
- Controller hours workedCONTROLLER_HRS
- 605538
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 605538
- History period startHISTORY_START_DT
- May 9, 2021
- History period endHISTORY_END_DT
- Aug 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6874270
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 9, 2022Citation number: 9433811Standard: 56.12018Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433811
- Assessment control numberASSESS_CASE_NO
- 000564201
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 9, 2022
- Citation issuedISSUE_DT
- Aug 9, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 9, 2022
- Final order dateFINAL_ORDER_DT
- Nov 9, 2022
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 9, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 39424
- Size of mineSIZE_OF_MINE
- 39424
- Controller hours workedCONTROLLER_HRS
- 605538
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 605538
- History period startHISTORY_START_DT
- May 9, 2021
- History period endHISTORY_END_DT
- Aug 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6874270
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 9, 2022Citation number: 9433814Standard: 56.4201(a)(2)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433814
- Assessment control numberASSESS_CASE_NO
- 000564201
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 9, 2022
- Citation issuedISSUE_DT
- Aug 9, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 9, 2022
- Final order dateFINAL_ORDER_DT
- Nov 9, 2022
- Bill first printedBILL_PRINT_DT
- Oct 4, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 9, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 39424
- Size of mineSIZE_OF_MINE
- 39424
- Controller hours workedCONTROLLER_HRS
- 605538
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 605538
- History period startHISTORY_START_DT
- May 9, 2021
- History period endHISTORY_END_DT
- Aug 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6874270
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 9, 2022Citation number: 9618093Standard: 56.20014Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9618093
- Assessment control numberASSESS_CASE_NO
- 000552519
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 4, 2022
- Citation issuedISSUE_DT
- Feb 9, 2022
- Date of occurrenceOCCURRENCE_DT
- Feb 9, 2022
- Final order dateFINAL_ORDER_DT
- May 18, 2022
- Bill first printedBILL_PRINT_DT
- Apr 5, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 18, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20014
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 4
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 39424
- Size of mineSIZE_OF_MINE
- 39424
- Controller hours workedCONTROLLER_HRS
- 605538
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 605538
- History period startHISTORY_START_DT
- Nov 9, 2020
- History period endHISTORY_END_DT
- Feb 8, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6874210
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2021Citation number: 9503000Standard: 56.3130Proposed penalty: $622.00Current assessment: $622.00Paid against proposed penalty: $622.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9503000
- Assessment control numberASSESS_CASE_NO
- 000536295
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 14, 2021
- Citation issuedISSUE_DT
- Apr 6, 2021
- Date of occurrenceOCCURRENCE_DT
- Mar 31, 2021
- Final order dateFINAL_ORDER_DT
- Aug 10, 2021
- Bill first printedBILL_PRINT_DT
- Jun 9, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 10, 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.3130
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 622.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 622.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 622.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 80
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 40254
- Size of mineSIZE_OF_MINE
- 40254
- Controller hours workedCONTROLLER_HRS
- 559141
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 559141
- History period startHISTORY_START_DT
- Dec 31, 2019
- History period endHISTORY_END_DT
- Mar 30, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6873675
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 1, 2020Citation number: 9502925Standard: 56.11012Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9502925
- Assessment control numberASSESS_CASE_NO
- 000523335
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 17, 2021
- Citation issuedISSUE_DT
- Sep 1, 2020
- Date of occurrenceOCCURRENCE_DT
- Sep 1, 2020
- Final order dateFINAL_ORDER_DT
- Nov 20, 2020
- Bill first printedBILL_PRINT_DT
- Oct 6, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 20, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.46
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 0.46
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 1.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 38043
- Size of mineSIZE_OF_MINE
- 38043
- Controller hours workedCONTROLLER_HRS
- 565041
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 565041
- History period startHISTORY_START_DT
- Jun 1, 2019
- History period endHISTORY_END_DT
- Aug 31, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6873615
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (10)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 14, 2020Citation number: 9502056Standard: 56.4130(b)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9502056
- Assessment control numberASSESS_CASE_NO
- 000511045
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 17, 2020
- Citation issuedISSUE_DT
- Jan 14, 2020
- Date of occurrenceOCCURRENCE_DT
- Jan 14, 2020
- Final order dateFINAL_ORDER_DT
- Apr 23, 2020
- Bill first printedBILL_PRINT_DT
- Mar 19, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 23, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4130(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.46
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 38043
- Size of mineSIZE_OF_MINE
- 38043
- Controller hours workedCONTROLLER_HRS
- 564483
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 564483
- History period startHISTORY_START_DT
- Oct 14, 2018
- History period endHISTORY_END_DT
- Jan 13, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6828877
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 30, 2019Citation number: 9433384Standard: 56.11001Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433384
- Assessment control numberASSESS_CASE_NO
- 000492347
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 27, 2019
- Citation issuedISSUE_DT
- Apr 30, 2019
- Date of occurrenceOCCURRENCE_DT
- Apr 30, 2019
- Final order dateFINAL_ORDER_DT
- Jul 10, 2019
- Bill first printedBILL_PRINT_DT
- Jun 4, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 10, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35448
- Size of mineSIZE_OF_MINE
- 35448
- Controller hours workedCONTROLLER_HRS
- 562114
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 562114
- History period startHISTORY_START_DT
- Jan 30, 2018
- History period endHISTORY_END_DT
- Apr 29, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6828536
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 29, 2019Citation number: 9433372Standard: 56.14100(b)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9433372
- Assessment control numberASSESS_CASE_NO
- 000492347
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 27, 2019
- Citation issuedISSUE_DT
- Apr 29, 2019
- Date of occurrenceOCCURRENCE_DT
- Apr 29, 2019
- Final order dateFINAL_ORDER_DT
- Jul 10, 2019
- Bill first printedBILL_PRINT_DT
- Jun 4, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 10, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35448
- Size of mineSIZE_OF_MINE
- 35448
- Controller hours workedCONTROLLER_HRS
- 562114
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 562114
- History period startHISTORY_START_DT
- Jan 29, 2018
- History period endHISTORY_END_DT
- Apr 28, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6828536
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 24, 2018Citation number: 9377647Standard: 56.4130(a)(2)Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9377647
- Assessment control numberASSESS_CASE_NO
- 000479495
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 27, 2019
- Citation issuedISSUE_DT
- Oct 24, 2018
- Date of occurrenceOCCURRENCE_DT
- Oct 24, 2018
- Final order dateFINAL_ORDER_DT
- Feb 1, 2019
- Bill first printedBILL_PRINT_DT
- Dec 12, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 1, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4130(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.25
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31230
- Size of mineSIZE_OF_MINE
- 31230
- Controller hours workedCONTROLLER_HRS
- 545961
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 545961
- History period startHISTORY_START_DT
- Jul 24, 2017
- History period endHISTORY_END_DT
- Oct 23, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6728466
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 17, 2018Citation number: 9377309Standard: 56.9300(b)Proposed penalty: $589.00Current assessment: $589.00Paid against proposed penalty: $589.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9377309
- Assessment control numberASSESS_CASE_NO
- 000459298
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 18, 2018
- Citation issuedISSUE_DT
- Jan 17, 2018
- Date of occurrenceOCCURRENCE_DT
- Jan 17, 2018
- Final order dateFINAL_ORDER_DT
- Apr 28, 2018
- Bill first printedBILL_PRINT_DT
- Feb 27, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 28, 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 589.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 589.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 589.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 80
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 0.11
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 31230
- Size of mineSIZE_OF_MINE
- 31230
- Controller hours workedCONTROLLER_HRS
- 543336
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 543336
- History period startHISTORY_START_DT
- Oct 17, 2016
- History period endHISTORY_END_DT
- Jan 16, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Granite Construction Company
- IDVIOLATOR_ID
- L00039
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 30, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6728104
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7821
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 61 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Nov 30, 2010Citation issued: Oct 7, 2010Docket: WEST 2011-271MStandard: 56.11001Proposed penalty: $150.00Penalty after decision: $150.00Decided: Oct 27, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8562084
- Citation issuedCITATION_ISSUE_DT
- Oct 7, 2010
- Hearing request receivedCONTEST_DT
- Nov 30, 2010
- Docket numberDOCKET_NO
- WEST 2011-271M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 27, 2011
- Petition duePETITION_DUE_DT
- Jan 14, 2011
- Petition filedPETITION_FILED_DT
- Feb 23, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 150.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 150.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.11001
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Nov 30, 2010Citation issued: Oct 6, 2010Docket: WEST 2011-271MStandard: 56.15004Proposed penalty: $100.00Penalty after decision: $100.00Decided: Oct 27, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8562079
- Citation issuedCITATION_ISSUE_DT
- Oct 6, 2010
- Hearing request receivedCONTEST_DT
- Nov 30, 2010
- Docket numberDOCKET_NO
- WEST 2011-271M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 27, 2011
- Petition duePETITION_DUE_DT
- Jan 14, 2011
- Petition filedPETITION_FILED_DT
- Feb 23, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.15004
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Nov 30, 2010Citation issued: Oct 6, 2010Docket: WEST 2011-271MStandard: 56.20003(b)Proposed penalty: $150.00Penalty after decision: $150.00Decided: Oct 27, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8562080
- Citation issuedCITATION_ISSUE_DT
- Oct 6, 2010
- Hearing request receivedCONTEST_DT
- Nov 30, 2010
- Docket numberDOCKET_NO
- WEST 2011-271M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 27, 2011
- Petition duePETITION_DUE_DT
- Jan 14, 2011
- Petition filedPETITION_FILED_DT
- Feb 23, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 150.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 150.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Nov 30, 2010Citation issued: Oct 5, 2010Docket: WEST 2011-271MStandard: 56.20003(b)Proposed penalty: $150.00Penalty after decision: $150.00Decided: Oct 27, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8562074
- Citation issuedCITATION_ISSUE_DT
- Oct 5, 2010
- Hearing request receivedCONTEST_DT
- Nov 30, 2010
- Docket numberDOCKET_NO
- WEST 2011-271M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 27, 2011
- Petition duePETITION_DUE_DT
- Jan 14, 2011
- Petition filedPETITION_FILED_DT
- Feb 23, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 150.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 150.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Nov 30, 2010Citation issued: Oct 5, 2010Docket: WEST 2011-271MStandard: 56.12032Proposed penalty: $499.00Penalty after decision: $499.00Decided: Oct 27, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8562077
- Citation issuedCITATION_ISSUE_DT
- Oct 5, 2010
- Hearing request receivedCONTEST_DT
- Nov 30, 2010
- Docket numberDOCKET_NO
- WEST 2011-271M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Oct 27, 2011
- Petition duePETITION_DUE_DT
- Jan 14, 2011
- Petition filedPETITION_FILED_DT
- Feb 23, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 499.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 499.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12032
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7821
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
5 contested citations and orders; decision types are MSHA's own text.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- PERM TOT OR PERM PRTL DISABLTY
- 1
- ACCIDENT ONLY
- 1
Date: May 13, 2016Degree of injury: ACCIDENT ONLYClassification: FIREAccident type: Accident type, without injuriesDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220161440033
- DateACCIDENT_DT
- May 13, 2016
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 1100
- Degree of injuryDEGREE_INJURY
- ACCIDENT ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 00
- ClassificationCLASSIFICATION
- FIRE
- Classification codeCLASSIFICATION_CD
- 08
- Accident typeACCIDENT_TYPE
- Accident type, without injuries
- Accident type codeACCIDENT_TYPE_CD
- 44
- Immediately reportable typeIMMED_NOTIFY
- MINE FIRE
- Immediately reportable codeIMMED_NOTIFY_CD
- 06
- MSHA investigation beganINVEST_BEGIN_DT
- May 13, 2016
Injury
- Activity at the timeACTIVITY
- NO VALUE FOUND
- Activity codeACTIVITY_CD
- ?
- Source of injuryINJURY_SOURCE
- NO VALUE FOUND
- Source of injury codeINJURY_SOURCE_CD
- ?
- Nature of injuryNATURE_INJURY
- NO VALUE FOUND
- Nature of injury codeNATURE_INJURY_CD
- ?
- Part of bodyINJ_BODY_PART
- NO VALUE FOUND
- Part of body codeINJ_BODY_PART_CD
- ?
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Screen, Vibrator, Shaker, Rock screener, Scalper
- Equipment codeMINING_EQUIP_CD
- 58
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- 999
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Reportable injuries or illnessesNO_INJURIES, Schedule charge, daysSCHEDULE_CHARGE
Not recorded by MSHA (6)
Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Contractor IDCONTRACTOR_ID
Date: Jul 22, 2010Degree of injury: PERM TOT OR PERM PRTL DISABLTYClassification: MACHINERYAccident type: Caught in, under or between a moving and a stationary objectDays lost: 34Details
The report
- Document numberDOCUMENT_NO
- 220102080049
- DateACCIDENT_DT
- Jul 22, 2010
- TimeACCIDENT_TIME
- 1120
- Shift beganSHIFT_BEGIN_TIME
- 0430
- Degree of injuryDEGREE_INJURY
- PERM TOT OR PERM PRTL DISABLTY
- Degree of injury codeDEGREE_INJURY_CD
- 02
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- SERIOUS INJURY
- Immediately reportable codeIMMED_NOTIFY_CD
- 02
- MSHA investigation beganINVEST_BEGIN_DT
- Jul 23, 2010
- Returned to Duty document numberCLOSED_DOC_NO
- 320110630017
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- WRENCH
- Source of injury codeINJURY_SOURCE_CD
- 050
- Nature of injuryNATURE_INJURY
- AMPUTATION OR ENUCLEATION
- Nature of injury codeNATURE_INJURY_CD
- 100
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Schedule charge, daysSCHEDULE_CHARGE
- 100
- Days lostDAYS_LOST
- 34
- Returned to workRETURN_TO_WORK_DT
- Sep 13, 2010
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 06
Who and period
- Operator at the timeOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Controller at the timeCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Contractor IDCONTRACTOR_ID
- AIT
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (1)
Equipment model numberEQUIP_MODEL_NO
2 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 7,144Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 7144
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1429
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 20Hours worked: 35,595Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 20
- Hours workedANNUAL_HRS
- 35595
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1780
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 11,360Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 11360
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2272
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 19Hours worked: 40,162Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 19
- Hours workedANNUAL_HRS
- 40162
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2114
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 9,608Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 9608
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1922
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 17Hours worked: 36,858Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 17
- Hours workedANNUAL_HRS
- 36858
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2168
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 8,224Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 8224
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2056
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 17Hours worked: 37,376Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 17
- Hours workedANNUAL_HRS
- 37376
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2199
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 7,624Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 7624
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1906
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 17Hours worked: 41,146Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 17
- Hours workedANNUAL_HRS
- 41146
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2420
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 6,568Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 6568
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1642
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 17Hours worked: 39,424Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 17
- Hours workedANNUAL_HRS
- 39424
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2319
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 6,120Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 6120
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2040
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 17Hours worked: 40,254Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 17
- Hours workedANNUAL_HRS
- 40254
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2368
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 5,784Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 5784
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1928
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 17Hours worked: 38,043Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 17
- Hours workedANNUAL_HRS
- 38043
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2238
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileCURR_MINE_NM
- Vernalis Plant
- StateSTATE_ABBR
- CA
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Vacaville CA Field Office
- Nearest town
- Vernalis
- Days worked per week
- 5
- Hours per shift
- 10
- Production shifts per day
- 1
- Maintenance shifts per day
- 1
- Employees, current record
- 20
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Vernalis Plant
- Mine IDMINE_ID
- 0405783
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Sep 30, 2010
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Granite Construction Company
- Operator IDCURRENT_OPERATOR_ID
- L00039
- ControllerCURRENT_CONTROLLER_NAME
- Granite Construction Inc
- Controller IDCURRENT_CONTROLLER_ID
- M00079
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Apr 30, 2009
Location and MSHA office
- StateSTATE
- CA
- Bureau of Mines state codeBOM_STATE_CD
- 04
- FIPS county codeFIPS_CNTY_CD
- 077
- FIPS county nameFIPS_CNTY_NM
- San Joaquin
- Nearest townNEAREST_TOWN
- Vernalis
- MSHA districtDISTRICT
- M7
- MSHA office codeOFFICE_CD
- M7821
- MSHA officeOFFICE_NAME
- Vacaville CA Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 70
- Most recent assessment control numberASSESS_CTRL_NO
- 000642196
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Sand, Industrial NEC
- Primary commodity codePRIMARY_SIC_CD
- 144600
- Primary SIC codePRIMARY_SIC_CD_1
- 1446
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Nonmetal
- Primary industry group codePRIMARY_CANVASS_CD
- 7
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 10
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 20
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (1)
Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Granite Construction CompanyFrom: Apr 30, 2009To: No end dateController: Granite Construction IncFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Granite Construction Company
- Operator IDOPERATOR_ID
- L00039
- Operator fromOPERATOR_START_DT
- Apr 30, 2009
Controller
- ControllerCONTROLLER_NAME
- Granite Construction Inc
- Controller IDCONTROLLER_ID
- M00079
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
Granite Construction Company·Contact title Plants Safety Manager·1000 North Warm Springs Road, Salt Lake City UT 84116
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Granite Construction Company
- Contact titleCONTACT_TITLE
- Plants Safety Manager
- StreetSTREET
- 1000 North Warm Springs Road
- CityCITY
- Salt Lake City
- StateSTATE_ABBR
- UT
- State nameSTATE
- Utah
- ZIP codeZIP_CD
- 84116
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 49
Mine
- Mine IDMINE_ID
- 0405783
- Mine name in this fileMINE_NAME
- Vernalis Plant
- Nearest townNEAREST_TOWN
- Vernalis
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Sep 30, 2010
- Primary commodity (SIC)PRIMARY_SIC_CD
- Sand, Industrial NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology