Skip to content
SafetyRecord logoSafetyRecord

Trp Amador Quarry

Metal/Non-Metal, SurfaceSand, CommonAmador, CaliforniaMine ID 0405981

Operator Triangle Rock ProductsController Vulcan Materials CompanyMSHA status Intermittent since Feb 11, 2025

What MSHA has on file for this mine

Citations and orders
2
since May 8, 2025 · 0 to the operator, 2 to contractors · 0 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
2 years
one row per part of the mine

MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Oct 23, 2025Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Oct 23, 2025
Closed outINSPECTION_END_DT
Oct 23, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0105C5
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Triangle Rock Products
Operator IDOPERATOR_ID
L13967
Controller at the timeCONTROLLER_NAME
Vulcan Materials Company
Controller IDCONTROLLER_ID
0071891
Mine IDMINE_ID
0405981
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 8, 2025Inspectors 1 | Hours on site 4.25

The inspection

BeganINSPECTION_BEGIN_DT
May 8, 2025
Closed outINSPECTION_END_DT
May 8, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F011130
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Vulcan Materials Company
Operator IDOPERATOR_ID
L00017
Controller at the timeCONTROLLER_NAME
Vulcan Materials Company
Controller IDCONTROLLER_ID
0071891
Mine IDMINE_ID
0405981
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

2 inspections and other MSHA visits since May 8, 2025; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 23, 2025
Type: Citation
Standard: 56.4201(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
8912439
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 23, 2025
Time issuedVIOLATION_ISSUE_TIME
1005
Date of occurrenceVIOLATION_OCCUR_DT
Oct 23, 2025
30 CFR part and sectionPART_SECTION
56.4201(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 23, 2025
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Oct 23, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Oct 23, 2025
Terminated, timeTERMINATION_TIME
1015
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Dec 26, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Feb 27, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 2, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
JWT Corporation
Operator IDVIOLATOR_ID
A9123
Contractor IDCONTRACTOR_ID
A9123
Inspection eventEVENT_NO
F0105C5
Inspection beganINSPECTION_BEGIN_DT
Oct 23, 2025
Inspection closed outINSPECTION_END_DT
Oct 23, 2025
Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: May 8, 2025
Type: Citation
Standard: 56.11012
S&S: N
Negligence: LowNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5102217
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2025
Time issuedVIOLATION_ISSUE_TIME
1025
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2025
30 CFR part and sectionPART_SECTION
56.11012
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 8, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
May 8, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
May 8, 2025
Terminated, timeTERMINATION_TIME
1330
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jun 26, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Aug 6, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
JWT Corporation
Operator IDVIOLATOR_ID
A9123
Contractor IDCONTRACTOR_ID
A9123
Inspection eventEVENT_NO
F011130
Inspection beganINSPECTION_BEGIN_DT
May 8, 2025
Inspection closed outINSPECTION_END_DT
May 8, 2025
Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

2 citations and orders since May 8, 2025: 0 issued to the operator, 2 to contractors working at the mine. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Oct 23, 2025
Citation number: 8912439
Standard: 56.4201(a)(1)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8912439
Assessment control numberASSESS_CASE_NO
000633679
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 27, 2026
Citation issuedISSUE_DT
Oct 23, 2025
Date of occurrenceOCCURRENCE_DT
Oct 23, 2025
Final order dateFINAL_ORDER_DT
Feb 27, 2026
Bill first printedBILL_PRINT_DT
Dec 26, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 27, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Mine Act interestMINEACT_INTEREST_AMT
1.76
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
50
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
8
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator hours worked at the mineVIOLATOR_MINE_HRS
25878
Size of mineSIZE_OF_MINE
25878
History period startHISTORY_START_DT
Jul 23, 2024
History period endHISTORY_END_DT
Oct 22, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
JWT Corporation
IDVIOLATOR_ID
A9123
Operator start at the mine, as assessedVIOLATOR_START_DT
May 8, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0105C5
Mine IDMINE_ID
0405981
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (14)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: May 8, 2025
Citation number: 5102217
Standard: 56.11012
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5102217
Assessment control numberASSESS_CASE_NO
000623211
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 28, 2025
Citation issuedISSUE_DT
May 8, 2025
Date of occurrenceOCCURRENCE_DT
May 8, 2025
Final order dateFINAL_ORDER_DT
Aug 6, 2025
Bill first printedBILL_PRINT_DT
Jun 26, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 6, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11012
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
34
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Contractor size pointsCONTRACTOR_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator hours worked at the mineVIOLATOR_MINE_HRS
25878
Size of mineSIZE_OF_MINE
25878
History period startHISTORY_START_DT
Feb 8, 2024
History period endHISTORY_END_DT
May 7, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
JWT Corporation
IDVIOLATOR_ID
A9123
Operator start at the mine, as assessedVIOLATOR_START_DT
May 8, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F011130
Mine IDMINE_ID
0405981
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

2 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Employment and hours worked

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 558
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
558
Average hours per employeeAVG_EMPLOYEE_HOURS
558

Mine

Mine IDMINE_ID
0405981
Mine name in this fileCURR_MINE_NM
TRP Amador Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 1,827
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1827
Average hours per employeeAVG_EMPLOYEE_HOURS
1827

Mine

Mine IDMINE_ID
0405981
Mine name in this fileCURR_MINE_NM
TRP Amador Quarry
StateSTATE_ABBR
CA
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 2 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Vacaville CA Field Office
Nearest town
Ione
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
3
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
TRP Amador Quarry
Mine IDMINE_ID
0405981
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Feb 11, 2025
Legal entity typeCOMPANY_TYPE
Other

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Triangle Rock Products
Operator IDCURRENT_OPERATOR_ID
L13967
ControllerCURRENT_CONTROLLER_NAME
Vulcan Materials Company
Controller IDCURRENT_CONTROLLER_ID
0071891
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Aug 1, 2025

Location and MSHA office

StateSTATE
CA
Bureau of Mines state codeBOM_STATE_CD
04
FIPS county codeFIPS_CNTY_CD
005
FIPS county nameFIPS_CNTY_NM
Amador
Nearest townNEAREST_TOWN
Ione
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7821
MSHA officeOFFICE_NAME
Vacaville CA Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
71
Most recent assessment control numberASSESS_CTRL_NO
000633679

Commodity

Primary commodity (SIC)PRIMARY_SIC
Sand, Common
Primary commodity codePRIMARY_SIC_CD
144201
Primary SIC codePRIMARY_SIC_CD_1
1442
Primary SIC suffixPRIMARY_SIC_CD_SFX
01
Primary industry groupPRIMARY_CANVASS
SandAndGravel
Primary industry group codePRIMARY_CANVASS_CD
5

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
3
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Triangle Rock Products
From: Aug 1, 2025
To: No end date
Controller: Vulcan Materials Company
From : Nov 16, 2007
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Triangle Rock Products
Operator IDOPERATOR_ID
L13967
Operator fromOPERATOR_START_DT
Aug 1, 2025

Controller

ControllerCONTROLLER_NAME
Vulcan Materials Company
Controller IDCONTROLLER_ID
0071891
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Nov 16, 2007

Mine

Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT

Operator: Triangle Rock Products
From: Aug 1, 2025
To: No end date
Controller: Legacy Vulcan Corp (Form:Vulcan Materials Co)
From : Jan 6, 1999
To : Nov 15, 2007
Details

Operator

OperatorOPERATOR_NAME
Triangle Rock Products
Operator IDOPERATOR_ID
L13967
Operator fromOPERATOR_START_DT
Aug 1, 2025

Controller

ControllerCONTROLLER_NAME
Legacy Vulcan Corp (Form:Vulcan Materials Co)
Controller IDCONTROLLER_ID
M00024
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 6, 1999
Controller toCONTROLLER_END_DT
Nov 15, 2007

Mine

Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Operator toOPERATOR_END_DT

Operator: Triangle Rock Products
From: Aug 1, 2025
To: No end date
Controller: Calmat Company
From : Nov 9, 1987
To : Jan 5, 1999
Details

Operator

OperatorOPERATOR_NAME
Triangle Rock Products
Operator IDOPERATOR_ID
L13967
Operator fromOPERATOR_START_DT
Aug 1, 2025

Controller

ControllerCONTROLLER_NAME
Calmat Company
Controller IDCONTROLLER_ID
M00112
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Nov 9, 1987
Controller toCONTROLLER_END_DT
Jan 5, 1999

Mine

Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Operator toOPERATOR_END_DT

Operator: Vulcan Materials Company
From: Jan 20, 2025
To: Jul 31, 2025
Controller: Vulcan Materials Company
From : Nov 16, 2007
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Vulcan Materials Company
Operator IDOPERATOR_ID
L00017
Operator fromOPERATOR_START_DT
Jan 20, 2025
Operator toOPERATOR_END_DT
Jul 31, 2025

Controller

ControllerCONTROLLER_NAME
Vulcan Materials Company
Controller IDCONTROLLER_ID
0071891
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Nov 16, 2007

Mine

Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: Vulcan Materials Company
From: Jan 20, 2025
To: Jul 31, 2025
Controller: Legacy Vulcan Corp (Form:Vulcan Materials Co)
From : Jan 1, 1950
To : Nov 15, 2007
Details

Operator

OperatorOPERATOR_NAME
Vulcan Materials Company
Operator IDOPERATOR_ID
L00017
Operator fromOPERATOR_START_DT
Jan 20, 2025
Operator toOPERATOR_END_DT
Jul 31, 2025

Controller

ControllerCONTROLLER_NAME
Legacy Vulcan Corp (Form:Vulcan Materials Co)
Controller IDCONTROLLER_ID
M00024
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Nov 15, 2007

Mine

Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

As MSHA records it, newest operator first.

Address of record

Triangle Rock Products·Contact title Director - Safety & Health·16013 E Foothill Blvd, Irwindale CA 91702

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Triangle Rock Products
Contact titleCONTACT_TITLE
Director - Safety & Health
StreetSTREET
16013 E Foothill Blvd
CityCITY
Irwindale
StateSTATE_ABBR
CA
State nameSTATE
California
ZIP codeZIP_CD
91702
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
06

Mine

Mine IDMINE_ID
0405981
Mine name in this fileMINE_NAME
TRP Amador Quarry
Nearest townNEAREST_TOWN
Ione
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Feb 11, 2025
Primary commodity (SIC)PRIMARY_SIC_CD
Sand, Common
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology