Plant #1
Metal/Non-Metal, Surface·Construction Sand and Gravel·Bonner, Idaho·Mine ID 1001887
Operator Peak Sand & Gravel Inc·Controller not shown·MSHA status Active since Dec 8, 2021
MSHA records as of Oct 23, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Not on record for this mine in MSHA's files: contested citations.
Inspections
Began: Aug 17, 2026Ended: Aug 18, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details ⌄
- EVENT_NO
- F029FCD
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Aug 17, 2026
- INSPECTION_END_DT
- Aug 18, 2026
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2026
- CAL_QTR
- 3
- FISCAL_YR
- 2026
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 18
- SUM_TOTAL_ON_SITE_HOURS
- 9
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Dec 15, 2025Ended: Dec 16, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.25Details ⌄
- EVENT_NO
- F02724B
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Dec 15, 2025
- INSPECTION_END_DT
- Dec 16, 2025
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2025
- CAL_QTR
- 4
- FISCAL_YR
- 2026
- FISCAL_QTR
- 1
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 18.5
- SUM_TOTAL_ON_SITE_HOURS
- 5.25
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Aug 25, 2025Ended: Aug 28, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12Details ⌄
- EVENT_NO
- F023BC4
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Aug 25, 2025
- INSPECTION_END_DT
- Aug 28, 2025
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2025
- CAL_QTR
- 3
- FISCAL_YR
- 2025
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 21.5
- SUM_TOTAL_ON_SITE_HOURS
- 12
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Mar 3, 2025Ended: Mar 4, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.5Details ⌄
- EVENT_NO
- F017DA8
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Mar 3, 2025
- INSPECTION_END_DT
- Mar 4, 2025
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2025
- CAL_QTR
- 1
- FISCAL_YR
- 2025
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 19.75
- SUM_TOTAL_ON_SITE_HOURS
- 3.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Jul 31, 2024Ended: Aug 1, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details ⌄
- EVENT_NO
- 6975471
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Jul 31, 2024
- INSPECTION_END_DT
- Aug 1, 2024
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2024
- CAL_QTR
- 3
- FISCAL_YR
- 2024
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 5.75
- SUM_TOTAL_ON_SITE_HOURS
- 4
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Jan 29, 2024Ended: Jan 31, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1.75Details ⌄
- EVENT_NO
- 6946637
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Jan 29, 2024
- INSPECTION_END_DT
- Jan 31, 2024
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2024
- CAL_QTR
- 1
- FISCAL_YR
- 2024
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 22.75
- SUM_TOTAL_ON_SITE_HOURS
- 1.75
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Jul 18, 2023Ended: Jul 27, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12.5Details ⌄
- EVENT_NO
- 6321360
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Jul 18, 2023
- INSPECTION_END_DT
- Jul 27, 2023
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 22.5
- SUM_TOTAL_ON_SITE_HOURS
- 12.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Feb 27, 2023Ended: Mar 1, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details ⌄
- EVENT_NO
- 6860650
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Feb 27, 2023
- INSPECTION_END_DT
- Mar 1, 2023
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2023
- CAL_QTR
- 1
- FISCAL_YR
- 2023
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 21.5
- SUM_TOTAL_ON_SITE_HOURS
- 6
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Jul 19, 2022Ended: Jul 22, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.5Details ⌄
- EVENT_NO
- 6319469
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Jul 19, 2022
- INSPECTION_END_DT
- Jul 22, 2022
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2022
- CAL_QTR
- 3
- FISCAL_YR
- 2022
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 32
- SUM_TOTAL_ON_SITE_HOURS
- 4.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Mar 21, 2022Ended: Mar 22, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details ⌄
- EVENT_NO
- 6855522
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Mar 21, 2022
- INSPECTION_END_DT
- Mar 22, 2022
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2022
- CAL_QTR
- 1
- FISCAL_YR
- 2022
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 14.75
- SUM_TOTAL_ON_SITE_HOURS
- 6
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: May 4, 2021Ended: May 5, 2021Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0Details ⌄
- EVENT_NO
- 6857491
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- May 4, 2021
- INSPECTION_END_DT
- May 5, 2021
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2021
- CAL_QTR
- 2
- FISCAL_YR
- 2021
- FISCAL_QTR
- 3
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E17
- ACTIVITY
- Special Emphasis Programs
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Special Emphasis Programs
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 2
- SUM_TOTAL_ON_SITE_HOURS
- 0
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Dec 18, 2020Ended: Dec 18, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details ⌄
- EVENT_NO
- 6855003
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Dec 18, 2020
- INSPECTION_END_DT
- Dec 18, 2020
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2020
- CAL_QTR
- 4
- FISCAL_YR
- 2021
- FISCAL_QTR
- 1
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 9.75
- SUM_TOTAL_ON_SITE_HOURS
- 5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Mar 8, 2020Ended: Mar 11, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16.25Details ⌄
- EVENT_NO
- 6852114
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Mar 8, 2020
- INSPECTION_END_DT
- Mar 11, 2020
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2020
- CAL_QTR
- 1
- FISCAL_YR
- 2020
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 29.5
- SUM_TOTAL_ON_SITE_HOURS
- 16.25
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Oct 31, 2018Ended: Nov 1, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.5Details ⌄
- EVENT_NO
- 6822849
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Oct 31, 2018
- INSPECTION_END_DT
- Nov 1, 2018
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2018
- CAL_QTR
- 4
- FISCAL_YR
- 2019
- FISCAL_QTR
- 1
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 16
- SUM_TOTAL_ON_SITE_HOURS
- 8.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Jan 3, 2018Ended: Jan 3, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.5Details ⌄
- EVENT_NO
- 6725974
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Jan 3, 2018
- INSPECTION_END_DT
- Jan 3, 2018
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2018
- CAL_QTR
- 1
- FISCAL_YR
- 2018
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 30.5
- SUM_TOTAL_ON_SITE_HOURS
- 7.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Sep 12, 2017Ended: Sep 12, 2017Activity: Part 50 AuditInspectors: 1Hours on site: 2Details ⌄
- EVENT_NO
- 6725631
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Sep 12, 2017
- INSPECTION_END_DT
- Sep 12, 2017
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2017
- CAL_QTR
- 3
- FISCAL_YR
- 2017
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E25
- ACTIVITY
- Part 50 Audit
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Part 50 Audit
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 15
- SUM_TOTAL_ON_SITE_HOURS
- 2
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Dec 13, 2016Ended: Dec 13, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.25Details ⌄
- EVENT_NO
- 6725164
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Dec 13, 2016
- INSPECTION_END_DT
- Dec 13, 2016
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2016
- CAL_QTR
- 4
- FISCAL_YR
- 2017
- FISCAL_QTR
- 1
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 19.5
- SUM_TOTAL_ON_SITE_HOURS
- 6.25
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Mar 8, 2016Ended: Mar 8, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.5Details ⌄
- EVENT_NO
- 6596680
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Mar 8, 2016
- INSPECTION_END_DT
- Mar 8, 2016
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2016
- CAL_QTR
- 1
- FISCAL_YR
- 2016
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 23
- SUM_TOTAL_ON_SITE_HOURS
- 11.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Aug 5, 2015Ended: Aug 10, 2015Activity: Mine Idle ActivityInspectors: 1Hours on site: 1.5Details ⌄
- EVENT_NO
- 6696942
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Aug 5, 2015
- INSPECTION_END_DT
- Aug 10, 2015
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2015
- CAL_QTR
- 3
- FISCAL_YR
- 2015
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E28
- ACTIVITY
- Mine Idle Activity
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Mine Idle Activity
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 2.5
- SUM_TOTAL_ON_SITE_HOURS
- 1.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Sep 11, 2014Ended: Sep 11, 2014Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details ⌄
- EVENT_NO
- 6692827
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Sep 11, 2014
- INSPECTION_END_DT
- Sep 11, 2014
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2014
- CAL_QTR
- 3
- FISCAL_YR
- 2014
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M7611
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 17.5
- SUM_TOTAL_ON_SITE_HOURS
- 4
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: May 1, 2013Ended: May 1, 2013Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details ⌄
- EVENT_NO
- 6593412
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- May 1, 2013
- INSPECTION_END_DT
- May 1, 2013
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2013
- CAL_QTR
- 2
- FISCAL_YR
- 2013
- FISCAL_QTR
- 3
- INSPECT_OFFICE_CD
- M7641
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 10.5
- SUM_TOTAL_ON_SITE_HOURS
- 6
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Nov 20, 2012Ended: Nov 21, 2012Activity: Mine Idle ActivityInspectors: 1Hours on site: 2Details ⌄
- EVENT_NO
- 1156696
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Nov 20, 2012
- INSPECTION_END_DT
- Nov 21, 2012
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2012
- CAL_QTR
- 4
- FISCAL_YR
- 2013
- FISCAL_QTR
- 1
- INSPECT_OFFICE_CD
- M7641
- ACTIVITY_CODE
- E28
- ACTIVITY
- Mine Idle Activity
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Mine Idle Activity
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 8.5
- SUM_TOTAL_ON_SITE_HOURS
- 2
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Apr 23, 2012Ended: Apr 25, 2012Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details ⌄
- EVENT_NO
- 1158500
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Apr 23, 2012
- INSPECTION_END_DT
- Apr 25, 2012
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2012
- CAL_QTR
- 2
- FISCAL_YR
- 2012
- FISCAL_QTR
- 3
- INSPECT_OFFICE_CD
- M7641
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 21
- SUM_TOTAL_ON_SITE_HOURS
- 8
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Mar 1, 2011Ended: Mar 1, 2011Activity: Mine Idle ActivityInspectors: 1Hours on site: 1Details ⌄
- EVENT_NO
- 1154985
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Mar 1, 2011
- INSPECTION_END_DT
- Mar 1, 2011
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2011
- CAL_QTR
- 1
- FISCAL_YR
- 2011
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M7641
- ACTIVITY_CODE
- E28
- ACTIVITY
- Mine Idle Activity
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Mine Idle Activity
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 2.5
- SUM_TOTAL_ON_SITE_HOURS
- 1
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Jun 29, 2010Ended: Jul 1, 2010Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.5Details ⌄
- EVENT_NO
- 1154456
- MINE_ID
- 1001887
- INSPECTION_BEGIN_DT
- Jun 29, 2010
- INSPECTION_END_DT
- Jul 1, 2010
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CAL_YR
- 2010
- CAL_QTR
- 3
- FISCAL_YR
- 2010
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M7641
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 18
- SUM_TOTAL_ON_SITE_HOURS
- 6.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
25 most recent of 41 inspections and other MSHA visits since May 8, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Dec 16, 2025Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details ⌄
- EVENT_NO
- F02724B
- INSPECTION_BEGIN_DT
- Dec 15, 2025
- INSPECTION_END_DT
- Dec 16, 2025
- VIOLATION_NO
- 5055943
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Dec 16, 2025
- VIOLATION_OCCUR_DT
- Dec 16, 2025
- CAL_YR
- 2025
- CAL_QTR
- 4
- FISCAL_YR
- 2026
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1152
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.12018
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Dec 16, 2025
- ORIG_TERM_DUE_TIME
- 1230
- LATEST_TERM_DUE_DT
- Dec 16, 2025
- LATEST_TERM_DUE_TIME
- 1230
- TERMINATION_DT
- Dec 16, 2025
- TERMINATION_TIME
- 1158
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 12, 2026
- PROPOSED_PENALTY
- 151
- AMOUNT_DUE
- 151
- AMOUNT_PAID
- 151
- BILL_PRINT_DT
- Feb 5, 2026
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Feb 14, 2026
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
Issued: Dec 16, 2025Type: CitationStandard: 56.12028S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details ⌄
- EVENT_NO
- F02724B
- INSPECTION_BEGIN_DT
- Dec 15, 2025
- INSPECTION_END_DT
- Dec 16, 2025
- VIOLATION_NO
- 5055942
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Dec 16, 2025
- VIOLATION_OCCUR_DT
- Dec 16, 2025
- CAL_YR
- 2025
- CAL_QTR
- 4
- FISCAL_YR
- 2026
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1137
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.12028
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Dec 16, 2025
- ORIG_TERM_DUE_TIME
- 1230
- LATEST_TERM_DUE_DT
- Dec 16, 2025
- LATEST_TERM_DUE_TIME
- 1230
- TERMINATION_DT
- Dec 16, 2025
- TERMINATION_TIME
- 1141
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 12, 2026
- PROPOSED_PENALTY
- 151
- AMOUNT_DUE
- 151
- AMOUNT_PAID
- 151
- BILL_PRINT_DT
- Feb 5, 2026
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Feb 14, 2026
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
Issued: Dec 16, 2025Type: CitationStandard: 56.16005S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details ⌄
- EVENT_NO
- F02724B
- INSPECTION_BEGIN_DT
- Dec 15, 2025
- INSPECTION_END_DT
- Dec 16, 2025
- VIOLATION_NO
- 5055941
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Dec 16, 2025
- VIOLATION_OCCUR_DT
- Dec 16, 2025
- CAL_YR
- 2025
- CAL_QTR
- 4
- FISCAL_YR
- 2026
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1053
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.16005
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Dec 16, 2025
- ORIG_TERM_DUE_TIME
- 1130
- LATEST_TERM_DUE_DT
- Dec 16, 2025
- LATEST_TERM_DUE_TIME
- 1130
- TERMINATION_DT
- Dec 16, 2025
- TERMINATION_TIME
- 1057
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 12, 2026
- PROPOSED_PENALTY
- 151
- AMOUNT_DUE
- 151
- AMOUNT_PAID
- 151
- BILL_PRINT_DT
- Feb 5, 2026
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Feb 14, 2026
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
Issued: Aug 26, 2025Type: CitationStandard: 56.11001S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details ⌄
- EVENT_NO
- F023BC4
- INSPECTION_BEGIN_DT
- Aug 25, 2025
- INSPECTION_END_DT
- Aug 28, 2025
- VIOLATION_NO
- 9829974
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 26, 2025
- VIOLATION_OCCUR_DT
- Aug 26, 2025
- CAL_YR
- 2025
- CAL_QTR
- 3
- FISCAL_YR
- 2025
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 0622
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.11001
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 26, 2025
- ORIG_TERM_DUE_TIME
- 0700
- LATEST_TERM_DUE_DT
- Aug 26, 2025
- LATEST_TERM_DUE_TIME
- 0700
- TERMINATION_DT
- Aug 26, 2025
- TERMINATION_TIME
- 0625
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 6, 2025
- PROPOSED_PENALTY
- 151
- AMOUNT_DUE
- 151
- AMOUNT_PAID
- 151
- BILL_PRINT_DT
- Sep 30, 2025
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 17, 2025
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Mar 4, 2025Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details ⌄
- EVENT_NO
- F017DA8
- INSPECTION_BEGIN_DT
- Mar 3, 2025
- INSPECTION_END_DT
- Mar 4, 2025
- VIOLATION_NO
- 9828520
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 4, 2025
- VIOLATION_OCCUR_DT
- Mar 4, 2025
- CAL_YR
- 2025
- CAL_QTR
- 1
- FISCAL_YR
- 2025
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1224
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14100(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 4, 2025
- ORIG_TERM_DUE_TIME
- 1300
- LATEST_TERM_DUE_DT
- Mar 4, 2025
- LATEST_TERM_DUE_TIME
- 1300
- TERMINATION_DT
- Mar 4, 2025
- TERMINATION_TIME
- 1228
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 4, 2025
- PROPOSED_PENALTY
- 151
- AMOUNT_DUE
- 151
- AMOUNT_PAID
- 151
- BILL_PRINT_DT
- Apr 29, 2025
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- May 14, 2025
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Jul 25, 2023Type: CitationStandard: 56.9315S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $252.00Details ⌄
- EVENT_NO
- 6321360
- INSPECTION_BEGIN_DT
- Jul 18, 2023
- INSPECTION_END_DT
- Jul 27, 2023
- VIOLATION_NO
- 9557618
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Jul 25, 2023
- VIOLATION_OCCUR_DT
- Jul 25, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1750
- SIG_SUB
- Y
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.9315
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Jul 25, 2023
- ORIG_TERM_DUE_TIME
- 2230
- LATEST_TERM_DUE_DT
- Jul 25, 2023
- LATEST_TERM_DUE_TIME
- 2230
- TERMINATION_DT
- Jul 25, 2023
- TERMINATION_TIME
- 1820
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Reasonably
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 3
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Oct 11, 2023
- PROPOSED_PENALTY
- 252
- AMOUNT_DUE
- 252
- AMOUNT_PAID
- 252
- BILL_PRINT_DT
- Sep 6, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Sep 21, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 4
- VIOLATOR_INSPECTION_DAY_CNT
- 4
Issued: Jul 18, 2023Type: OrderStandard: Not recordedS&S: Not recordedNegligence: Not recordedIssued to: OperatorProposed penalty: None recordedDetails ⌄
- EVENT_NO
- 6321360
- INSPECTION_BEGIN_DT
- Jul 18, 2023
- INSPECTION_END_DT
- Jul 27, 2023
- VIOLATION_NO
- 9557616
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Jul 18, 2023
- VIOLATION_OCCUR_DT
- Jul 18, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 0940
- SIG_SUB
- Not recorded
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- Not recorded
- SECTION_OF_ACT_1
- 107(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Order
- ORIG_TERM_DUE_DT
- Not recorded
- ORIG_TERM_DUE_TIME
- Not recorded
- LATEST_TERM_DUE_DT
- Not recorded
- LATEST_TERM_DUE_TIME
- Not recorded
- TERMINATION_DT
- Jul 18, 2023
- TERMINATION_TIME
- 0942
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Not recorded
- INJ_ILLNESS
- Not recorded
- NO_AFFECTED
- 0
- NEGLIGENCE
- Not recorded
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Not recorded
- PROPOSED_PENALTY
- Not recorded
- AMOUNT_DUE
- Not recorded
- AMOUNT_PAID
- Not recorded
- BILL_PRINT_DT
- Not recorded
- LAST_ACTION_CD
- Not recorded
- LAST_ACTION_DT
- Not recorded
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- Not recorded
- VIOLATOR_INSPECTION_DAY_CNT
- Not recorded
Issued: Jul 18, 2023Type: CitationStandard: 56.16002(c)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $1,762.00Details ⌄
- EVENT_NO
- 6321360
- INSPECTION_BEGIN_DT
- Jul 18, 2023
- INSPECTION_END_DT
- Jul 27, 2023
- VIOLATION_NO
- 9557617
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Jul 18, 2023
- VIOLATION_OCCUR_DT
- Jul 18, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 0941
- SIG_SUB
- Y
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.16002(c)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Not recorded
- ORIG_TERM_DUE_TIME
- Not recorded
- LATEST_TERM_DUE_DT
- Not recorded
- LATEST_TERM_DUE_TIME
- Not recorded
- TERMINATION_DT
- Jul 25, 2023
- TERMINATION_TIME
- 0630
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Reasonably
- INJ_ILLNESS
- Fatal
- NO_AFFECTED
- 2
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Oct 11, 2023
- PROPOSED_PENALTY
- 1762
- AMOUNT_DUE
- 1762
- AMOUNT_PAID
- 1762
- BILL_PRINT_DT
- Sep 6, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Sep 21, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 4
- VIOLATOR_INSPECTION_DAY_CNT
- 3
Issued: Mar 1, 2023Type: CitationStandard: 47.44(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860650
- INSPECTION_BEGIN_DT
- Feb 27, 2023
- INSPECTION_END_DT
- Mar 1, 2023
- VIOLATION_NO
- 9653914
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 1, 2023
- VIOLATION_OCCUR_DT
- Mar 1, 2023
- CAL_YR
- 2023
- CAL_QTR
- 1
- FISCAL_YR
- 2023
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 0930
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 47.44(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 1, 2023
- ORIG_TERM_DUE_TIME
- 0935
- LATEST_TERM_DUE_DT
- Mar 1, 2023
- LATEST_TERM_DUE_TIME
- 0935
- TERMINATION_DT
- Mar 1, 2023
- TERMINATION_TIME
- 0935
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- May 20, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Apr 5, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Apr 26, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 3
Issued: Mar 22, 2022Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details ⌄
- EVENT_NO
- 6855522
- INSPECTION_BEGIN_DT
- Mar 21, 2022
- INSPECTION_END_DT
- Mar 22, 2022
- VIOLATION_NO
- 9472385
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 22, 2022
- VIOLATION_OCCUR_DT
- Mar 22, 2022
- CAL_YR
- 2022
- CAL_QTR
- 1
- FISCAL_YR
- 2022
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 0957
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.12004
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 22, 2022
- ORIG_TERM_DUE_TIME
- 1500
- LATEST_TERM_DUE_DT
- Mar 22, 2022
- LATEST_TERM_DUE_TIME
- 1500
- TERMINATION_DT
- Mar 22, 2022
- TERMINATION_TIME
- 1142
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Fatal
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 18, 2022
- PROPOSED_PENALTY
- 133
- AMOUNT_DUE
- 133
- AMOUNT_PAID
- 133
- BILL_PRINT_DT
- May 11, 2022
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Jun 16, 2022
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Mar 22, 2022Type: CitationStandard: 56.15001S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details ⌄
- EVENT_NO
- 6855522
- INSPECTION_BEGIN_DT
- Mar 21, 2022
- INSPECTION_END_DT
- Mar 22, 2022
- VIOLATION_NO
- 9472386
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 22, 2022
- VIOLATION_OCCUR_DT
- Mar 22, 2022
- CAL_YR
- 2022
- CAL_QTR
- 1
- FISCAL_YR
- 2022
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1018
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.15001
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 22, 2022
- ORIG_TERM_DUE_TIME
- 1100
- LATEST_TERM_DUE_DT
- Mar 22, 2022
- LATEST_TERM_DUE_TIME
- 1100
- TERMINATION_DT
- Mar 22, 2022
- TERMINATION_TIME
- 1031
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- LowNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 18, 2022
- PROPOSED_PENALTY
- 133
- AMOUNT_DUE
- 133
- AMOUNT_PAID
- 133
- BILL_PRINT_DT
- May 11, 2022
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Jun 16, 2022
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Mar 22, 2022Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details ⌄
- EVENT_NO
- 6855522
- INSPECTION_BEGIN_DT
- Mar 21, 2022
- INSPECTION_END_DT
- Mar 22, 2022
- VIOLATION_NO
- 9472384
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 22, 2022
- VIOLATION_OCCUR_DT
- Mar 22, 2022
- CAL_YR
- 2022
- CAL_QTR
- 1
- FISCAL_YR
- 2022
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 0904
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14107(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 22, 2022
- ORIG_TERM_DUE_TIME
- 1500
- LATEST_TERM_DUE_DT
- Mar 22, 2022
- LATEST_TERM_DUE_TIME
- 1500
- TERMINATION_DT
- Mar 22, 2022
- TERMINATION_TIME
- 1141
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 18, 2022
- PROPOSED_PENALTY
- 133
- AMOUNT_DUE
- 133
- AMOUNT_PAID
- 133
- BILL_PRINT_DT
- May 11, 2022
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Jun 16, 2022
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Dec 18, 2020Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $125.00Details ⌄
- EVENT_NO
- 6855003
- INSPECTION_BEGIN_DT
- Dec 18, 2020
- INSPECTION_END_DT
- Dec 18, 2020
- VIOLATION_NO
- 9471804
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Dec 18, 2020
- VIOLATION_OCCUR_DT
- Dec 18, 2020
- CAL_YR
- 2020
- CAL_QTR
- 4
- FISCAL_YR
- 2021
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1120
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14107(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Dec 18, 2020
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Dec 18, 2020
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Dec 18, 2020
- TERMINATION_TIME
- 1500
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Fatal
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 31, 2021
- PROPOSED_PENALTY
- 125
- AMOUNT_DUE
- 125
- AMOUNT_PAID
- 125
- BILL_PRINT_DT
- Feb 11, 2021
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 15, 2021
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 4
- VIOLATOR_INSPECTION_DAY_CNT
- 4
Issued: Mar 10, 2020Type: CitationStandard: 56.14101(a)(3)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details ⌄
- EVENT_NO
- 6852114
- INSPECTION_BEGIN_DT
- Mar 8, 2020
- INSPECTION_END_DT
- Mar 11, 2020
- VIOLATION_NO
- 9471279
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 10, 2020
- VIOLATION_OCCUR_DT
- Mar 10, 2020
- CAL_YR
- 2020
- CAL_QTR
- 1
- FISCAL_YR
- 2020
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1331
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14101(a)(3)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 11, 2020
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Mar 11, 2020
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Mar 11, 2020
- TERMINATION_TIME
- 1007
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 2
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 17, 2020
- PROPOSED_PENALTY
- 123
- AMOUNT_DUE
- 123
- AMOUNT_PAID
- 123
- BILL_PRINT_DT
- May 7, 2020
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Nov 15, 2020
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Mar 10, 2020Type: CitationStandard: 56.4101S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $123.00Details ⌄
- EVENT_NO
- 6852114
- INSPECTION_BEGIN_DT
- Mar 8, 2020
- INSPECTION_END_DT
- Mar 11, 2020
- VIOLATION_NO
- 9471277
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 10, 2020
- VIOLATION_OCCUR_DT
- Mar 10, 2020
- CAL_YR
- 2020
- CAL_QTR
- 1
- FISCAL_YR
- 2020
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1148
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.4101
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 10, 2020
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Mar 10, 2020
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Mar 11, 2020
- TERMINATION_TIME
- 1110
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 17, 2020
- PROPOSED_PENALTY
- 123
- AMOUNT_DUE
- 123
- AMOUNT_PAID
- 123
- BILL_PRINT_DT
- May 7, 2020
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Nov 15, 2020
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Mar 10, 2020Type: CitationStandard: 56.12030S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $275.00Details ⌄
- EVENT_NO
- 6852114
- INSPECTION_BEGIN_DT
- Mar 8, 2020
- INSPECTION_END_DT
- Mar 11, 2020
- VIOLATION_NO
- 9471278
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 10, 2020
- VIOLATION_OCCUR_DT
- Mar 10, 2020
- CAL_YR
- 2020
- CAL_QTR
- 1
- FISCAL_YR
- 2020
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1157
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.12030
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 10, 2020
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Mar 10, 2020
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Mar 10, 2020
- TERMINATION_TIME
- 1200
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Fatal
- NO_AFFECTED
- 1
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 17, 2020
- PROPOSED_PENALTY
- 275
- AMOUNT_DUE
- 275
- AMOUNT_PAID
- 275
- BILL_PRINT_DT
- May 7, 2020
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Nov 15, 2020
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Mar 10, 2020Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details ⌄
- EVENT_NO
- 6852114
- INSPECTION_BEGIN_DT
- Mar 8, 2020
- INSPECTION_END_DT
- Mar 11, 2020
- VIOLATION_NO
- 9471276
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 10, 2020
- VIOLATION_OCCUR_DT
- Mar 10, 2020
- CAL_YR
- 2020
- CAL_QTR
- 1
- FISCAL_YR
- 2020
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1108
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14107(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 10, 2020
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Mar 10, 2020
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Mar 10, 2020
- TERMINATION_TIME
- 1323
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 17, 2020
- PROPOSED_PENALTY
- 123
- AMOUNT_DUE
- 123
- AMOUNT_PAID
- 123
- BILL_PRINT_DT
- May 7, 2020
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Nov 15, 2020
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Oct 31, 2018Type: CitationStandard: 56.14112(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details ⌄
- EVENT_NO
- 6822849
- INSPECTION_BEGIN_DT
- Oct 31, 2018
- INSPECTION_END_DT
- Nov 1, 2018
- VIOLATION_NO
- 9370798
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Oct 31, 2018
- VIOLATION_OCCUR_DT
- Oct 31, 2018
- CAL_YR
- 2018
- CAL_QTR
- 4
- FISCAL_YR
- 2019
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1200
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14112(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Oct 31, 2018
- ORIG_TERM_DUE_TIME
- 1500
- LATEST_TERM_DUE_DT
- Oct 31, 2018
- LATEST_TERM_DUE_TIME
- 1500
- TERMINATION_DT
- Oct 31, 2018
- TERMINATION_TIME
- 1220
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jan 10, 2019
- PROPOSED_PENALTY
- 118
- AMOUNT_DUE
- 118
- AMOUNT_PAID
- 118
- BILL_PRINT_DT
- Dec 6, 2018
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Jan 3, 2019
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Oct 31, 2018Type: CitationStandard: 56.4102S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details ⌄
- EVENT_NO
- 6822849
- INSPECTION_BEGIN_DT
- Oct 31, 2018
- INSPECTION_END_DT
- Nov 1, 2018
- VIOLATION_NO
- 9370800
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Oct 31, 2018
- VIOLATION_OCCUR_DT
- Oct 31, 2018
- CAL_YR
- 2018
- CAL_QTR
- 4
- FISCAL_YR
- 2019
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1345
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.4102
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Oct 31, 2018
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Oct 31, 2018
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Nov 1, 2018
- TERMINATION_TIME
- 0930
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jan 10, 2019
- PROPOSED_PENALTY
- 118
- AMOUNT_DUE
- 118
- AMOUNT_PAID
- 118
- BILL_PRINT_DT
- Dec 6, 2018
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Jan 3, 2019
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Oct 31, 2018Type: CitationStandard: 56.14112(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details ⌄
- EVENT_NO
- 6822849
- INSPECTION_BEGIN_DT
- Oct 31, 2018
- INSPECTION_END_DT
- Nov 1, 2018
- VIOLATION_NO
- 9370799
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Oct 31, 2018
- VIOLATION_OCCUR_DT
- Oct 31, 2018
- CAL_YR
- 2018
- CAL_QTR
- 4
- FISCAL_YR
- 2019
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1245
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14112(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Oct 31, 2018
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Oct 31, 2018
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Oct 31, 2018
- TERMINATION_TIME
- 1445
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jan 10, 2019
- PROPOSED_PENALTY
- 118
- AMOUNT_DUE
- 118
- AMOUNT_PAID
- 118
- BILL_PRINT_DT
- Dec 6, 2018
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Jan 3, 2019
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Jan 3, 2018Type: CitationStandard: 56.12019S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details ⌄
- EVENT_NO
- 6725974
- INSPECTION_BEGIN_DT
- Jan 3, 2018
- INSPECTION_END_DT
- Jan 3, 2018
- VIOLATION_NO
- 9370148
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Jan 3, 2018
- VIOLATION_OCCUR_DT
- Jan 3, 2018
- CAL_YR
- 2018
- CAL_QTR
- 1
- FISCAL_YR
- 2018
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1110
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.12019
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Jan 4, 2018
- ORIG_TERM_DUE_TIME
- 1110
- LATEST_TERM_DUE_DT
- Jan 4, 2018
- LATEST_TERM_DUE_TIME
- 1110
- TERMINATION_DT
- Jan 3, 2018
- TERMINATION_TIME
- 1115
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Fatal
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- Not recorded
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 17, 2018
- PROPOSED_PENALTY
- 118
- AMOUNT_DUE
- 118
- AMOUNT_PAID
- 118
- BILL_PRINT_DT
- Feb 8, 2018
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 14, 2018
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Jan 3, 2018Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details ⌄
- EVENT_NO
- 6725974
- INSPECTION_BEGIN_DT
- Jan 3, 2018
- INSPECTION_END_DT
- Jan 3, 2018
- VIOLATION_NO
- 9370149
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Jan 3, 2018
- VIOLATION_OCCUR_DT
- Jan 15, 2017
- CAL_YR
- 2018
- CAL_QTR
- 1
- FISCAL_YR
- 2018
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1150
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 50.30(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Jan 4, 2018
- ORIG_TERM_DUE_TIME
- 1150
- LATEST_TERM_DUE_DT
- Jan 4, 2018
- LATEST_TERM_DUE_TIME
- 1150
- TERMINATION_DT
- Jan 3, 2018
- TERMINATION_TIME
- 1151
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- NoLikelihood
- INJ_ILLNESS
- NoLostDays
- NO_AFFECTED
- 0
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- Not recorded
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 17, 2018
- PROPOSED_PENALTY
- 118
- AMOUNT_DUE
- 118
- AMOUNT_PAID
- 118
- BILL_PRINT_DT
- Feb 8, 2018
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 14, 2018
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
Issued: Jan 3, 2018Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details ⌄
- EVENT_NO
- 6725974
- INSPECTION_BEGIN_DT
- Jan 3, 2018
- INSPECTION_END_DT
- Jan 3, 2018
- VIOLATION_NO
- 9370147
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Jan 3, 2018
- VIOLATION_OCCUR_DT
- Jan 3, 2018
- CAL_YR
- 2018
- CAL_QTR
- 1
- FISCAL_YR
- 2018
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 0910
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14107(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Jan 4, 2018
- ORIG_TERM_DUE_TIME
- 0910
- LATEST_TERM_DUE_DT
- Jan 4, 2018
- LATEST_TERM_DUE_TIME
- 0910
- TERMINATION_DT
- Jan 3, 2018
- TERMINATION_TIME
- 1314
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- Not recorded
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 17, 2018
- PROPOSED_PENALTY
- 118
- AMOUNT_DUE
- 118
- AMOUNT_PAID
- 118
- BILL_PRINT_DT
- Feb 8, 2018
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 14, 2018
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
Issued: Dec 13, 2016Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $116.00Details ⌄
- EVENT_NO
- 6725164
- INSPECTION_BEGIN_DT
- Dec 13, 2016
- INSPECTION_END_DT
- Dec 13, 2016
- VIOLATION_NO
- 8998028
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Dec 13, 2016
- VIOLATION_OCCUR_DT
- Dec 13, 2016
- CAL_YR
- 2016
- CAL_QTR
- 4
- FISCAL_YR
- 2017
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1430
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14112(a)(1)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Dec 14, 2016
- ORIG_TERM_DUE_TIME
- 0800
- LATEST_TERM_DUE_DT
- Dec 14, 2016
- LATEST_TERM_DUE_TIME
- 0800
- TERMINATION_DT
- Dec 13, 2016
- TERMINATION_TIME
- 1730
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- Not recorded
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 18, 2017
- PROPOSED_PENALTY
- 116
- AMOUNT_DUE
- 116
- AMOUNT_PAID
- 116
- BILL_PRINT_DT
- Feb 9, 2017
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 7, 2017
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 3
Issued: Dec 13, 2016Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $116.00Details ⌄
- EVENT_NO
- 6725164
- INSPECTION_BEGIN_DT
- Dec 13, 2016
- INSPECTION_END_DT
- Dec 13, 2016
- VIOLATION_NO
- 8998027
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Dec 13, 2016
- VIOLATION_OCCUR_DT
- Dec 13, 2016
- CAL_YR
- 2016
- CAL_QTR
- 4
- FISCAL_YR
- 2017
- FISCAL_QTR
- 1
- VIOLATION_ISSUE_TIME
- 1400
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14107(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Dec 14, 2016
- ORIG_TERM_DUE_TIME
- 0800
- LATEST_TERM_DUE_DT
- Dec 14, 2016
- LATEST_TERM_DUE_TIME
- 0800
- TERMINATION_DT
- Dec 13, 2016
- TERMINATION_TIME
- 1725
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- Not recorded
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Mar 18, 2017
- PROPOSED_PENALTY
- 116
- AMOUNT_DUE
- 116
- AMOUNT_PAID
- 116
- BILL_PRINT_DT
- Feb 9, 2017
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 7, 2017
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 3
67 citations and orders since Jul 26, 2000: 65 issued to the operator, 2 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Dec 16, 2025Citation number: 5055941Standard: 56.16005Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails ⌄
- EVENT_NBR
- F02724B
- VIOLATION_NO
- 5055941
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000635160
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.16005
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Feb 14, 2026
- OCCURRENCE_DT
- Dec 16, 2025
- ISSUE_DT
- Dec 16, 2025
- FINAL_ORDER_DT
- Mar 12, 2026
- BILL_PRINT_DT
- Feb 5, 2026
- BILL_PRINT_FISCAL_YR
- 2026
- PROPOSED_PENALTY_AMT
- 151.00
- CURRENT_ASSESSMENT_AMT
- 151.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 151.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 44
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
- VPID
- 0.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 16945
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 16945
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 80982
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 80982
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Mar 12, 2026
- HISTORY_START_DT
- Sep 16, 2024
- HISTORY_END_DT
- Dec 15, 2025
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Dec 16, 2025Citation number: 5055942Standard: 56.12028Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails ⌄
- EVENT_NBR
- F02724B
- VIOLATION_NO
- 5055942
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000635160
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.12028
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Feb 14, 2026
- OCCURRENCE_DT
- Dec 16, 2025
- ISSUE_DT
- Dec 16, 2025
- FINAL_ORDER_DT
- Mar 12, 2026
- BILL_PRINT_DT
- Feb 5, 2026
- BILL_PRINT_FISCAL_YR
- 2026
- PROPOSED_PENALTY_AMT
- 151.00
- CURRENT_ASSESSMENT_AMT
- 151.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 151.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 39
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
- VPID
- 0.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 16945
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 16945
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 80982
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 80982
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Mar 12, 2026
- HISTORY_START_DT
- Sep 16, 2024
- HISTORY_END_DT
- Dec 15, 2025
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Dec 16, 2025Citation number: 5055943Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails ⌄
- EVENT_NBR
- F02724B
- VIOLATION_NO
- 5055943
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000635160
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.12018
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Feb 14, 2026
- OCCURRENCE_DT
- Dec 16, 2025
- ISSUE_DT
- Dec 16, 2025
- FINAL_ORDER_DT
- Mar 12, 2026
- BILL_PRINT_DT
- Feb 5, 2026
- BILL_PRINT_FISCAL_YR
- 2026
- PROPOSED_PENALTY_AMT
- 151.00
- CURRENT_ASSESSMENT_AMT
- 151.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 151.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 39
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
- VPID
- 0.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 16945
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 16945
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 80982
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 80982
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Mar 12, 2026
- HISTORY_START_DT
- Sep 16, 2024
- HISTORY_END_DT
- Dec 15, 2025
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 26, 2025Citation number: 9829974Standard: 56.11001Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails ⌄
- EVENT_NBR
- F023BC4
- VIOLATION_NO
- 9829974
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000629423
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.11001
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 17, 2025
- OCCURRENCE_DT
- Aug 26, 2025
- ISSUE_DT
- Aug 26, 2025
- FINAL_ORDER_DT
- Nov 6, 2025
- BILL_PRINT_DT
- Sep 30, 2025
- BILL_PRINT_FISCAL_YR
- 2025
- PROPOSED_PENALTY_AMT
- 151.00
- CURRENT_ASSESSMENT_AMT
- 151.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 151.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 39
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 0.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 16945
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 16945
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 80982
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 80982
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Nov 6, 2025
- HISTORY_START_DT
- May 26, 2024
- HISTORY_END_DT
- Aug 25, 2025
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 4, 2025Citation number: 9828520Standard: 56.14100(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails ⌄
- EVENT_NBR
- F017DA8
- VIOLATION_NO
- 9828520
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000619357
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14100(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- May 14, 2025
- OCCURRENCE_DT
- Mar 4, 2025
- ISSUE_DT
- Mar 4, 2025
- FINAL_ORDER_DT
- Jun 4, 2025
- BILL_PRINT_DT
- Apr 29, 2025
- BILL_PRINT_FISCAL_YR
- 2025
- PROPOSED_PENALTY_AMT
- 151.00
- CURRENT_ASSESSMENT_AMT
- 151.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 151.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 39
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 16945
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 16945
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 80982
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 80982
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 4, 2025
- HISTORY_START_DT
- Dec 4, 2023
- HISTORY_END_DT
- Mar 3, 2025
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Jul 25, 2023Citation number: 9557618Standard: 56.9315Proposed penalty: $252.00Current assessment: $252.00Paid against proposed penalty: $252.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6321360
- VIOLATION_NO
- 9557618
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000584438
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.9315
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Sep 21, 2023
- OCCURRENCE_DT
- Jul 25, 2023
- ISSUE_DT
- Jul 25, 2023
- FINAL_ORDER_DT
- Oct 11, 2023
- BILL_PRINT_DT
- Sep 6, 2023
- BILL_PRINT_FISCAL_YR
- 2023
- PROPOSED_PENALTY_AMT
- 252.00
- CURRENT_ASSESSMENT_AMT
- 252.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 252.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 67
- GRAVITY_PERSONS_POINTS
- 4
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 4
- VIOLATOR_INSPECTION_DAY_CNT
- 4
- VPID
- 1
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15080
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15080
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 67775
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 67775
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Oct 11, 2023
- HISTORY_START_DT
- Apr 25, 2022
- HISTORY_END_DT
- Jul 24, 2023
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Jul 18, 2023Citation number: 9557617Standard: 56.16002(c)Proposed penalty: $1,762.00Current assessment: $1,762.00Paid against proposed penalty: $1,762.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6321360
- VIOLATION_NO
- 9557617
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000584438
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- N
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.16002(c)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Sep 21, 2023
- OCCURRENCE_DT
- Jul 18, 2023
- ISSUE_DT
- Jul 18, 2023
- FINAL_ORDER_DT
- Oct 11, 2023
- BILL_PRINT_DT
- Sep 6, 2023
- BILL_PRINT_FISCAL_YR
- 2023
- PROPOSED_PENALTY_AMT
- 1762.00
- CURRENT_ASSESSMENT_AMT
- 1762.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 1762.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 90
- GRAVITY_PERSONS_POINTS
- 2
- GRAVITY_INJURY_POINTS
- 20
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 4
- VIOLATOR_INSPECTION_DAY_CNT
- 3
- VPID
- 1.33
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15080
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15080
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 67775
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 67775
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Oct 11, 2023
- HISTORY_START_DT
- Apr 18, 2022
- HISTORY_END_DT
- Jul 17, 2023
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 1, 2023Citation number: 9653914Standard: 47.44(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860650
- VIOLATION_NO
- 9653914
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000574172
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 47.44(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Apr 26, 2023
- OCCURRENCE_DT
- Mar 1, 2023
- ISSUE_DT
- Mar 1, 2023
- FINAL_ORDER_DT
- May 20, 2023
- BILL_PRINT_DT
- Apr 5, 2023
- BILL_PRINT_FISCAL_YR
- 2023
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 39
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 3
- VPID
- 1
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15080
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15080
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 67775
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 67775
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Not recorded
- HISTORY_START_DT
- Dec 1, 2021
- HISTORY_END_DT
- Feb 28, 2023
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 22, 2022Citation number: 9472386Standard: 56.15001Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6855522
- VIOLATION_NO
- 9472386
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000554528
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.15001
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Jun 16, 2022
- OCCURRENCE_DT
- Mar 22, 2022
- ISSUE_DT
- Mar 22, 2022
- FINAL_ORDER_DT
- Jun 18, 2022
- BILL_PRINT_DT
- May 11, 2022
- BILL_PRINT_FISCAL_YR
- 2022
- PROPOSED_PENALTY_AMT
- 133.00
- CURRENT_ASSESSMENT_AMT
- 133.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 133.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 29
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 10
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 18395
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 18395
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 65021
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 65021
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 18, 2022
- HISTORY_START_DT
- Dec 22, 2020
- HISTORY_END_DT
- Mar 21, 2022
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 22, 2022Citation number: 9472385Standard: 56.12004Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6855522
- VIOLATION_NO
- 9472385
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000554528
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.12004
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Jun 16, 2022
- OCCURRENCE_DT
- Mar 22, 2022
- ISSUE_DT
- Mar 22, 2022
- FINAL_ORDER_DT
- Jun 18, 2022
- BILL_PRINT_DT
- May 11, 2022
- BILL_PRINT_FISCAL_YR
- 2022
- PROPOSED_PENALTY_AMT
- 133.00
- CURRENT_ASSESSMENT_AMT
- 133.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 133.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 54
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 20
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 18395
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 18395
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 65021
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 65021
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 18, 2022
- HISTORY_START_DT
- Dec 22, 2020
- HISTORY_END_DT
- Mar 21, 2022
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 22, 2022Citation number: 9472384Standard: 56.14107(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6855522
- VIOLATION_NO
- 9472384
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000554528
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14107(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Jun 16, 2022
- OCCURRENCE_DT
- Mar 22, 2022
- ISSUE_DT
- Mar 22, 2022
- FINAL_ORDER_DT
- Jun 18, 2022
- BILL_PRINT_DT
- May 11, 2022
- BILL_PRINT_FISCAL_YR
- 2022
- PROPOSED_PENALTY_AMT
- 133.00
- CURRENT_ASSESSMENT_AMT
- 133.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 133.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 44
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 1
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 18395
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 18395
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 65021
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 65021
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 18, 2022
- HISTORY_START_DT
- Dec 22, 2020
- HISTORY_END_DT
- Mar 21, 2022
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Dec 18, 2020Citation number: 9471804Standard: 56.14107(a)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6855003
- VIOLATION_NO
- 9471804
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000529699
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14107(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 15, 2021
- OCCURRENCE_DT
- Dec 18, 2020
- ISSUE_DT
- Dec 18, 2020
- FINAL_ORDER_DT
- Mar 31, 2021
- BILL_PRINT_DT
- Feb 11, 2021
- BILL_PRINT_FISCAL_YR
- 2021
- PROPOSED_PENALTY_AMT
- 125.00
- CURRENT_ASSESSMENT_AMT
- 125.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 125.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 55
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 20
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 4
- VIOLATOR_INSPECTION_DAY_CNT
- 4
- VPID
- 1
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 1
- RPID
- 0.25
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 20849
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 20849
- MINE_SIZE_POINTS
- 3
- CONTROLLER_HRS
- 61505
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 61505
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Mar 31, 2021
- HISTORY_START_DT
- Sep 18, 2019
- HISTORY_END_DT
- Dec 17, 2020
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 10, 2020Citation number: 9471276Standard: 56.14107(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6852114
- VIOLATION_NO
- 9471276
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000514388
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14107(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Nov 15, 2020
- OCCURRENCE_DT
- Mar 10, 2020
- ISSUE_DT
- Mar 10, 2020
- FINAL_ORDER_DT
- Jun 17, 2020
- BILL_PRINT_DT
- May 7, 2020
- BILL_PRINT_FISCAL_YR
- 2020
- PROPOSED_PENALTY_AMT
- 123.00
- CURRENT_ASSESSMENT_AMT
- 123.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 123.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 45
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 20849
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 20849
- MINE_SIZE_POINTS
- 3
- CONTROLLER_HRS
- 61505
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 61505
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 17, 2020
- HISTORY_START_DT
- Dec 10, 2018
- HISTORY_END_DT
- Mar 9, 2020
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 10, 2020Citation number: 9471279Standard: 56.14101(a)(3)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6852114
- VIOLATION_NO
- 9471279
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000514388
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14101(a)(3)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Nov 15, 2020
- OCCURRENCE_DT
- Mar 10, 2020
- ISSUE_DT
- Mar 10, 2020
- FINAL_ORDER_DT
- Jun 17, 2020
- BILL_PRINT_DT
- May 7, 2020
- BILL_PRINT_FISCAL_YR
- 2020
- PROPOSED_PENALTY_AMT
- 123.00
- CURRENT_ASSESSMENT_AMT
- 123.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 123.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 41
- GRAVITY_PERSONS_POINTS
- 2
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 20849
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 20849
- MINE_SIZE_POINTS
- 3
- CONTROLLER_HRS
- 61505
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 61505
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 17, 2020
- HISTORY_START_DT
- Dec 10, 2018
- HISTORY_END_DT
- Mar 9, 2020
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 10, 2020Citation number: 9471278Standard: 56.12030Proposed penalty: $275.00Current assessment: $275.00Paid against proposed penalty: $275.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6852114
- VIOLATION_NO
- 9471278
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000514388
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.12030
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Nov 15, 2020
- OCCURRENCE_DT
- Mar 10, 2020
- ISSUE_DT
- Mar 10, 2020
- FINAL_ORDER_DT
- Jun 17, 2020
- BILL_PRINT_DT
- May 7, 2020
- BILL_PRINT_FISCAL_YR
- 2020
- PROPOSED_PENALTY_AMT
- 275.00
- CURRENT_ASSESSMENT_AMT
- 275.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 275.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 70
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 20
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 20849
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 20849
- MINE_SIZE_POINTS
- 3
- CONTROLLER_HRS
- 61505
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 61505
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 17, 2020
- HISTORY_START_DT
- Dec 10, 2018
- HISTORY_END_DT
- Mar 9, 2020
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Mar 10, 2020Citation number: 9471277Standard: 56.4101Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6852114
- VIOLATION_NO
- 9471277
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000514388
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.4101
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Nov 15, 2020
- OCCURRENCE_DT
- Mar 10, 2020
- ISSUE_DT
- Mar 10, 2020
- FINAL_ORDER_DT
- Jun 17, 2020
- BILL_PRINT_DT
- May 7, 2020
- BILL_PRINT_FISCAL_YR
- 2020
- PROPOSED_PENALTY_AMT
- 123.00
- CURRENT_ASSESSMENT_AMT
- 123.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 123.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 55
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 20849
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 20849
- MINE_SIZE_POINTS
- 3
- CONTROLLER_HRS
- 61505
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 61505
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jun 17, 2020
- HISTORY_START_DT
- Dec 10, 2018
- HISTORY_END_DT
- Mar 9, 2020
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Oct 31, 2018Citation number: 9370799Standard: 56.14112(b)Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6822849
- VIOLATION_NO
- 9370799
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000479107
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14112(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Jan 2, 2019
- OCCURRENCE_DT
- Oct 31, 2018
- ISSUE_DT
- Oct 31, 2018
- FINAL_ORDER_DT
- Jan 10, 2019
- BILL_PRINT_DT
- Dec 6, 2018
- BILL_PRINT_FISCAL_YR
- 2019
- PROPOSED_PENALTY_AMT
- 118.00
- CURRENT_ASSESSMENT_AMT
- 118.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 118.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 44
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 1.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15210
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15210
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 52114
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 52114
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jan 10, 2019
- HISTORY_START_DT
- Jul 31, 2017
- HISTORY_END_DT
- Oct 30, 2018
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Oct 31, 2018Citation number: 9370800Standard: 56.4102Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6822849
- VIOLATION_NO
- 9370800
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000479107
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.4102
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Jan 2, 2019
- OCCURRENCE_DT
- Oct 31, 2018
- ISSUE_DT
- Oct 31, 2018
- FINAL_ORDER_DT
- Jan 10, 2019
- BILL_PRINT_DT
- Dec 6, 2018
- BILL_PRINT_FISCAL_YR
- 2019
- PROPOSED_PENALTY_AMT
- 118.00
- CURRENT_ASSESSMENT_AMT
- 118.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 118.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 44
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 1.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15210
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15210
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 52114
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 52114
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jan 10, 2019
- HISTORY_START_DT
- Jul 31, 2017
- HISTORY_END_DT
- Oct 30, 2018
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Oct 31, 2018Citation number: 9370798Standard: 56.14112(b)Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6822849
- VIOLATION_NO
- 9370798
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000479107
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14112(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Jan 2, 2019
- OCCURRENCE_DT
- Oct 31, 2018
- ISSUE_DT
- Oct 31, 2018
- FINAL_ORDER_DT
- Jan 10, 2019
- BILL_PRINT_DT
- Dec 6, 2018
- BILL_PRINT_FISCAL_YR
- 2019
- PROPOSED_PENALTY_AMT
- 118.00
- CURRENT_ASSESSMENT_AMT
- 118.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 118.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 44
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 1.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15210
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15210
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 52114
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 52114
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Jan 10, 2019
- HISTORY_START_DT
- Jul 31, 2017
- HISTORY_END_DT
- Oct 30, 2018
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Jan 3, 2018Citation number: 9370148Standard: 56.12019Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6725974
- VIOLATION_NO
- 9370148
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000458498
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.12019
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 14, 2018
- OCCURRENCE_DT
- Jan 3, 2018
- ISSUE_DT
- Jan 3, 2018
- FINAL_ORDER_DT
- Mar 17, 2018
- BILL_PRINT_DT
- Feb 8, 2018
- BILL_PRINT_FISCAL_YR
- 2018
- PROPOSED_PENALTY_AMT
- 118.00
- CURRENT_ASSESSMENT_AMT
- 118.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 118.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 54
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 20
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 1.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15210
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15210
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 52114
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 52114
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Mar 17, 2018
- HISTORY_START_DT
- Oct 3, 2016
- HISTORY_END_DT
- Jan 2, 2018
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Jan 3, 2018Citation number: 9370149Standard: 50.30(a)Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6725974
- VIOLATION_NO
- 9370149
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000458498
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 50.30(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 14, 2018
- OCCURRENCE_DT
- Jan 15, 2017
- ISSUE_DT
- Jan 3, 2018
- FINAL_ORDER_DT
- Mar 17, 2018
- BILL_PRINT_DT
- Feb 8, 2018
- BILL_PRINT_FISCAL_YR
- 2018
- PROPOSED_PENALTY_AMT
- 118.00
- CURRENT_ASSESSMENT_AMT
- 118.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 118.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 22
- GRAVITY_PERSONS_POINTS
- 0
- GRAVITY_INJURY_POINTS
- 0
- GRAVITY_LIKELIHOOD_POINTS
- 0
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 4
- VPID
- 0.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 12133
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 12133
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 38357
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 38357
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Mar 17, 2018
- HISTORY_START_DT
- Oct 15, 2015
- HISTORY_END_DT
- Jan 14, 2017
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Jan 3, 2018Citation number: 9370147Standard: 56.14107(a)Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6725974
- VIOLATION_NO
- 9370147
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000458498
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14107(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 14, 2018
- OCCURRENCE_DT
- Jan 3, 2018
- ISSUE_DT
- Jan 3, 2018
- FINAL_ORDER_DT
- Mar 17, 2018
- BILL_PRINT_DT
- Feb 8, 2018
- BILL_PRINT_FISCAL_YR
- 2018
- PROPOSED_PENALTY_AMT
- 118.00
- CURRENT_ASSESSMENT_AMT
- 118.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 118.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 39
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 3
- VIOLATOR_INSPECTION_DAY_CNT
- 2
- VPID
- 1.5
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 1
- RPID
- 0.5
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 15210
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 15210
- MINE_SIZE_POINTS
- 2
- CONTROLLER_HRS
- 52114
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 52114
- CONTROLLER_SIZE_POINTS
- 1
- DELINQUENT_DT
- Mar 17, 2018
- HISTORY_START_DT
- Oct 3, 2016
- HISTORY_END_DT
- Jan 2, 2018
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Dec 13, 2016Citation number: 8998029Standard: 56.11027Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6725164
- VIOLATION_NO
- 8998029
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000431631
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.11027
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 7, 2017
- OCCURRENCE_DT
- Dec 13, 2016
- ISSUE_DT
- Dec 13, 2016
- FINAL_ORDER_DT
- Mar 18, 2017
- BILL_PRINT_DT
- Feb 9, 2017
- BILL_PRINT_FISCAL_YR
- 2017
- PROPOSED_PENALTY_AMT
- 116.00
- CURRENT_ASSESSMENT_AMT
- 116.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 116.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 57
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 3
- VPID
- 0.67
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 6723
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 6723
- MINE_SIZE_POINTS
- 1
- CONTROLLER_HRS
- 46382
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 46382
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Mar 18, 2017
- HISTORY_START_DT
- Sep 13, 2015
- HISTORY_END_DT
- Dec 12, 2016
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Dec 13, 2016Citation number: 8998027Standard: 56.14107(a)Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6725164
- VIOLATION_NO
- 8998027
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000431631
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14107(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 7, 2017
- OCCURRENCE_DT
- Dec 13, 2016
- ISSUE_DT
- Dec 13, 2016
- FINAL_ORDER_DT
- Mar 18, 2017
- BILL_PRINT_DT
- Feb 9, 2017
- BILL_PRINT_FISCAL_YR
- 2017
- PROPOSED_PENALTY_AMT
- 116.00
- CURRENT_ASSESSMENT_AMT
- 116.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 116.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 42
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 3
- VPID
- 0.67
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 6723
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 6723
- MINE_SIZE_POINTS
- 1
- CONTROLLER_HRS
- 46382
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 46382
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Mar 18, 2017
- HISTORY_START_DT
- Sep 13, 2015
- HISTORY_END_DT
- Dec 12, 2016
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Dec 13, 2016Citation number: 8998028Standard: 56.14112(a)(1)Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6725164
- VIOLATION_NO
- 8998028
- MINE_ID
- 1001887
- VIOLATOR_ID
- L13059
- VIOLATOR_NAME
- Peak Sand & Gravel Inc
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000431631
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14112(a)(1)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 7, 2017
- OCCURRENCE_DT
- Dec 13, 2016
- ISSUE_DT
- Dec 13, 2016
- FINAL_ORDER_DT
- Mar 18, 2017
- BILL_PRINT_DT
- Feb 9, 2017
- BILL_PRINT_FISCAL_YR
- 2017
- PROPOSED_PENALTY_AMT
- 116.00
- CURRENT_ASSESSMENT_AMT
- 116.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 116.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 42
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 2
- VIOLATOR_INSPECTION_DAY_CNT
- 3
- VPID
- 0.67
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 6723
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 6723
- MINE_SIZE_POINTS
- 1
- CONTROLLER_HRS
- 46382
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 46382
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Mar 18, 2017
- HISTORY_START_DT
- Sep 13, 2015
- HISTORY_END_DT
- Dec 12, 2016
- VIOLATOR_START_DT
- May 1, 1993
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
25 most recent of 65 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Imminent danger orders, section 107(a)
Issued: Jul 18, 2023Order number: 9557616Terminated: Jul 18, 2023Issued to: OperatorDetails ⌄
- COAL_OR_METAL
- M
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- OPERATOR_NAME_VIOLATIONS
- Peak Sand & Gravel Inc
- CONTROLLER_ID_VIOLATIONS
- M05100
- CONTROLLER_NAME_VIOLATIONS
- Not recorded
- CONTRACTOR_ID
- Not recorded
- CONTRACTOR_NAME
- Not recorded
- STATE_ABBREVIATION
- ID
- VIOLATOR_TYPE
- Operator
- VIOLATION_NO
- 9557616
- VIOLATION_DATE_ISSUED
- Jul 18, 2023
- TERMINATION_DATE
- Jul 18, 2023
1 imminent danger order in MSHA's list, which starts July 1, 2010.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS AWAY FROM WORK ONLY
- 2
- NO DYS AWY FRM WRK,NO RSTR ACT
- 1
Date: Aug 23, 2007Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details ⌄
- MINE_ID
- 1001887
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CONTRACTOR_ID
- Not recorded
- DOCUMENT_NO
- 220072390013
- SUBUNIT_CD
- 03
- SUBUNIT
- STRIP, QUARY, OPEN PIT
- ACCIDENT_DT
- Aug 23, 2007
- CAL_YR
- 2007
- CAL_QTR
- 3
- FISCAL_YR
- 2007
- FISCAL_QTR
- 4
- ACCIDENT_TIME
- 1630
- DEGREE_INJURY_CD
- 06
- DEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- FIPS_STATE_CD
- 16
- UG_LOCATION_CD
- ?
- UG_LOCATION
- NO VALUE FOUND
- UG_MINING_METHOD_CD
- ?
- UG_MINING_METHOD
- NO VALUE FOUND
- MINING_EQUIP_CD
- 30
- MINING_EQUIP
- Hoist, Car dropper, Hydraulic jack, Mine car retriever, Condor
- EQUIP_MFR_CD
- 119
- EQUIP_MFR_NAME
- Not on this list
- EQUIP_MODEL_NO
- Surge Bin
- SHIFT_BEGIN_TIME
- 0700
- CLASSIFICATION_CD
- 17
- CLASSIFICATION
- MACHINERY
- ACCIDENT_TYPE_CD
- 21
- ACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- NO_INJURIES
- 1
- ACTIVITY_CD
- 039
- ACTIVITY
- Machine maintenance
- INJURY_SOURCE_CD
- 068
- INJURY_SOURCE
- JACKS-MECH,HYDRL,AIR,ETC
- NATURE_INJURY_CD
- 170
- NATURE_INJURY
- CRUSHING
- INJ_BODY_PART_CD
- 340
- INJ_BODY_PART
- FINGER(S)/THUMB
- SCHEDULE_CHARGE
- 0
- DAYS_RESTRICT
- 0
- DAYS_LOST
- 0
- TRANS_TERM
- N
- RETURN_TO_WORK_DT
- Aug 24, 2007
- IMMED_NOTIFY_CD
- ?
- IMMED_NOTIFY
- NO VALUE FOUND
- INVEST_BEGIN_DT
- Not recorded
- CLOSED_DOC_NO
- Not recorded
- COAL_METAL_IND
- M
Date: Oct 22, 2003Degree of injury: DAYS AWAY FROM WORK ONLYClassification: ELECTRICALAccident type: Contact with hot objects or substancesDays lost: 6Details ⌄
- MINE_ID
- 1001887
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CONTRACTOR_ID
- Not recorded
- DOCUMENT_NO
- 220033000008
- SUBUNIT_CD
- 03
- SUBUNIT
- STRIP, QUARY, OPEN PIT
- ACCIDENT_DT
- Oct 22, 2003
- CAL_YR
- 2003
- CAL_QTR
- 4
- FISCAL_YR
- 2004
- FISCAL_QTR
- 1
- ACCIDENT_TIME
- 0800
- DEGREE_INJURY_CD
- 03
- DEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- FIPS_STATE_CD
- 16
- UG_LOCATION_CD
- ?
- UG_LOCATION
- NO VALUE FOUND
- UG_MINING_METHOD_CD
- ?
- UG_MINING_METHOD
- NO VALUE FOUND
- MINING_EQUIP_CD
- ?
- MINING_EQUIP
- NO VALUE FOUND
- EQUIP_MFR_CD
- ?
- EQUIP_MFR_NAME
- NO VALUE FOUND
- EQUIP_MODEL_NO
- ?
- SHIFT_BEGIN_TIME
- 700
- CLASSIFICATION_CD
- 01
- CLASSIFICATION
- ELECTRICAL
- ACCIDENT_TYPE_CD
- 33
- ACCIDENT_TYPE
- Contact with hot objects or substances
- NO_INJURIES
- 1
- ACTIVITY_CD
- 040
- ACTIVITY
- Move power cable
- INJURY_SOURCE_CD
- 045
- INJURY_SOURCE
- FLAME,FIRE,SMOKE,NEC
- NATURE_INJURY_CD
- 120
- NATURE_INJURY
- BURN OR SCALD (HEAT)
- INJ_BODY_PART_CD
- 700
- INJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- SCHEDULE_CHARGE
- Not recorded
- DAYS_RESTRICT
- Not recorded
- DAYS_LOST
- 6
- TRANS_TERM
- N
- RETURN_TO_WORK_DT
- Nov 5, 2003
- IMMED_NOTIFY_CD
- 13
- IMMED_NOTIFY
- NOT MARKED
- INVEST_BEGIN_DT
- Not recorded
- CLOSED_DOC_NO
- 320033100008
- COAL_METAL_IND
- M
Date: Jul 27, 2001Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between NECDays lost: 13Details ⌄
- MINE_ID
- 1001887
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- CONTRACTOR_ID
- Not recorded
- DOCUMENT_NO
- 220012200032
- SUBUNIT_CD
- 03
- SUBUNIT
- STRIP, QUARY, OPEN PIT
- ACCIDENT_DT
- Jul 27, 2001
- CAL_YR
- 2001
- CAL_QTR
- 3
- FISCAL_YR
- 2001
- FISCAL_QTR
- 4
- ACCIDENT_TIME
- 1015
- DEGREE_INJURY_CD
- 03
- DEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- FIPS_STATE_CD
- 16
- UG_LOCATION_CD
- ?
- UG_LOCATION
- NO VALUE FOUND
- UG_MINING_METHOD_CD
- ?
- UG_MINING_METHOD
- NO VALUE FOUND
- MINING_EQUIP_CD
- 15
- MINING_EQUIP
- Crusher, Breaker, Mills (ball and rod), Feeder breaker
- EQUIP_MFR_CD
- 3000
- EQUIP_MFR_NAME
- Not listed
- EQUIP_MODEL_NO
- 54
- SHIFT_BEGIN_TIME
- 530
- CLASSIFICATION_CD
- 09
- CLASSIFICATION
- HANDLING OF MATERIALS
- ACCIDENT_TYPE_CD
- 24
- ACCIDENT_TYPE
- Caught in, under or between NEC
- NO_INJURIES
- 1
- ACTIVITY_CD
- 039
- ACTIVITY
- Machine maintenance
- INJURY_SOURCE_CD
- 075
- INJURY_SOURCE
- MACHINE-MILL,CLEANING PLT
- NATURE_INJURY_CD
- 170
- NATURE_INJURY
- CRUSHING
- INJ_BODY_PART_CD
- 340
- INJ_BODY_PART
- FINGER(S)/THUMB
- SCHEDULE_CHARGE
- Not recorded
- DAYS_RESTRICT
- Not recorded
- DAYS_LOST
- 13
- TRANS_TERM
- N
- RETURN_TO_WORK_DT
- Aug 16, 2001
- IMMED_NOTIFY_CD
- 13
- IMMED_NOTIFY
- NOT MARKED
- INVEST_BEGIN_DT
- Not recorded
- CLOSED_DOC_NO
- 320012330002
- COAL_METAL_IND
- M
3 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 0Hours worked: 0Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 99
- SUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- CALENDAR_YR
- 2026
- ANNUAL_HRS
- 0
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 0
- AVG_EMPLOYEE_HOURS
- 0
- C_M_IND
- M
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 6,697Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2026
- ANNUAL_HRS
- 6697
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 6
- AVG_EMPLOYEE_HOURS
- 1116
- C_M_IND
- M
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 14,446Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2025
- ANNUAL_HRS
- 14446
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 7
- AVG_EMPLOYEE_HOURS
- 2064
- C_M_IND
- M
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 16,945Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2024
- ANNUAL_HRS
- 16945
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 8
- AVG_EMPLOYEE_HOURS
- 2118
- C_M_IND
- M
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 14,436Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2023
- ANNUAL_HRS
- 14436
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 6
- AVG_EMPLOYEE_HOURS
- 2406
- C_M_IND
- M
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 15,080Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2022
- ANNUAL_HRS
- 15080
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 7
- AVG_EMPLOYEE_HOURS
- 2154
- C_M_IND
- M
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 18,395Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2021
- ANNUAL_HRS
- 18395
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 7
- AVG_EMPLOYEE_HOURS
- 2628
- C_M_IND
- M
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 18,713Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2020
- ANNUAL_HRS
- 18713
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 7
- AVG_EMPLOYEE_HOURS
- 2673
- C_M_IND
- M
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 20,849Details ⌄
- MINE_ID
- 1001887
- CURR_MINE_NM
- Plant #1
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2019
- ANNUAL_HRS
- 20849
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 7
- AVG_EMPLOYEE_HOURS
- 2978
- C_M_IND
- M
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Helena MT Field Office
- Nearest town
- Newtown
- Days worked per week
- 5
- Hours per shift
- 10
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 7
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- Y
Every field in MSHA's mine record
- MINE_ID
- 1001887
- CURRENT_MINE_NAME
- Plant #1
- COAL_METAL_IND
- M
- CURRENT_MINE_TYPE
- Surface
- CURRENT_MINE_STATUS
- Active
- CURRENT_STATUS_DT
- Dec 8, 2021
- CURRENT_CONTROLLER_ID
- M05100
- CURRENT_CONTROLLER_NAME
- Not recorded
- CURRENT_OPERATOR_ID
- L13059
- CURRENT_OPERATOR_NAME
- Peak Sand & Gravel Inc
- STATE
- ID
- BOM_STATE_CD
- 10
- FIPS_CNTY_CD
- 017
- FIPS_CNTY_NM
- Bonner
- CONG_DIST_CD
- Not recorded
- COMPANY_TYPE
- Corporation
- CURRENT_CONTROLLER_BEGIN_DT
- May 1, 1993
- DISTRICT
- M6
- OFFICE_CD
- M6821
- OFFICE_NAME
- Helena MT Field Office
- ASSESS_CTRL_NO
- 000635160
- PRIMARY_SIC_CD
- 144200
- PRIMARY_SIC
- Construction Sand and Gravel
- PRIMARY_SIC_CD_1
- 1442
- PRIMARY_SIC_CD_SFX
- 00
- SECONDARY_SIC_CD
- Not recorded
- SECONDARY_SIC
- Not recorded
- SECONDARY_SIC_CD_1
- Not recorded
- SECONDARY_SIC_CD_SFX
- Not recorded
- PRIMARY_CANVASS_CD
- 5
- PRIMARY_CANVASS
- SandAndGravel
- SECONDARY_CANVASS_CD
- Not recorded
- SECONDARY_CANVASS
- Not recorded
- CURRENT_103I
- Never Had 103I Status
- CURRENT_103I_DT
- Not recorded
- PORTABLE_OPERATION
- Y
- PORTABLE_FIPS_ST_CD
- 16
- DAYS_PER_WEEK
- 5
- HOURS_PER_SHIFT
- 10
- PROD_SHIFTS_PER_DAY
- 1
- MAINT_SHIFTS_PER_DAY
- 0
- NO_EMPLOYEES
- 7
- PART48_TRAINING
- Y
- AVG_MINE_HEIGHT
- Not recorded
- MINE_GAS_CATEGORY_CD
- Not recorded
- METHANE_LIBERATION
- Not recorded
- NO_PRODUCING_PITS
- Not recorded
- NO_NONPRODUCING_PITS
- Not recorded
- NO_TAILING_PONDS
- 0
- PILLAR_RECOVERY_USED
- N
- HIGHWALL_MINER_USED
- N
- MULTIPLE_PITS
- N
- SAFETY_COMMITTEE_IND
- N
- MILES_FROM_OFFICE
- 325
- NEAREST_TOWN
- Newtown
Operator and controller history
Operator: Peak Sand & Gravel IncFrom: May 1, 1993To: No end dateController: Not shownFrom : May 1, 1993To : No end dateDetails ⌄
- CONTROLLER_ID
- M05100
- CONTROLLER_NAME
- Not recorded
- CONTROLLER_START_DT
- May 1, 1993
- CONTROLLER_END_DT
- Not recorded
- CONTROLLER_TYPE
- PERSON
- COAL_METAL_IND
- M
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- MINE_STATUS
- Active
- OPERATOR_ID
- L13059
- OPERATOR_NAME
- Peak Sand & Gravel Inc
- OPERATOR_START_DT
- May 1, 1993
- OPERATOR_END_DT
- Not recorded
As MSHA records it, newest operator first.
Address of record
- Business
- Peak Sand & Gravel Inc
- Contact title
- Controller
- Address
- Street not shown, Sandpoint ID 83864
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
- MINE_ID
- 1001887
- MINE_NAME
- Plant #1
- CONTACT_TITLE
- Controller
- NEAREST_TOWN
- Newtown
- BUSINESS_NAME
- Peak Sand & Gravel Inc
- STREET
- Not recorded
- PO_BOX
- Not recorded
- CITY
- Sandpoint
- STATE_ABBR
- ID
- FIPS_STATE_CD
- 16
- STATE
- Idaho
- ZIP_CD
- 83864
- COUNTRY
- USA
- PROVINCE
- Not recorded
- POSTAL_CD
- Not recorded
- MINE_TYPE_CD
- Surface
- MINE_STATUS
- Active
- MINE_STATUS_DT
- Dec 8, 2021
- PRIMARY_SIC_CD
- Construction Sand and Gravel
- COAL_METAL_IND
- M
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Oct 23, 2026. Data and methodology