Plant 4
Metal/Non-Metal, Surface·Construction Sand and Gravel·Clearwater, Idaho·Mine ID 1002343
Operator Western Construction of Lewiston, Inc.·Controller not shown·MSHA status Intermittent since Jan 24, 2023
MSHA records as of Oct 23, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Not on record for this mine in MSHA's files: contested citations, imminent danger orders (list starts July 1, 2010), accident, injury or illness reports (file starts January 2000).
Inspections
Began: Sep 21, 2026Ended: Sep 22, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details ⌄
- EVENT_NO
- F043CD2
- MINE_ID
- 1002343
- INSPECTION_BEGIN_DT
- Sep 21, 2026
- INSPECTION_END_DT
- Sep 22, 2026
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- CAL_YR
- 2026
- CAL_QTR
- 3
- FISCAL_YR
- 2026
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 21.75
- SUM_TOTAL_ON_SITE_HOURS
- 5.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Mar 25, 2026Ended: Mar 26, 2026Activity: Mine Idle ActivityInspectors: 1Hours on site: 2.25Details ⌄
- EVENT_NO
- F023BF0
- MINE_ID
- 1002343
- INSPECTION_BEGIN_DT
- Mar 25, 2026
- INSPECTION_END_DT
- Mar 26, 2026
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- CAL_YR
- 2026
- CAL_QTR
- 1
- FISCAL_YR
- 2026
- FISCAL_QTR
- 2
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E28
- ACTIVITY
- Mine Idle Activity
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Mine Idle Activity
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 9
- SUM_TOTAL_ON_SITE_HOURS
- 2.25
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Aug 20, 2025Ended: Aug 21, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.5Details ⌄
- EVENT_NO
- 6948576
- MINE_ID
- 1002343
- INSPECTION_BEGIN_DT
- Aug 20, 2025
- INSPECTION_END_DT
- Aug 21, 2025
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- CAL_YR
- 2025
- CAL_QTR
- 3
- FISCAL_YR
- 2025
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 11
- SUM_TOTAL_ON_SITE_HOURS
- 2.5
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Sep 3, 2024Ended: Sep 5, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1Details ⌄
- EVENT_NO
- 6946698
- MINE_ID
- 1002343
- INSPECTION_BEGIN_DT
- Sep 3, 2024
- INSPECTION_END_DT
- Sep 5, 2024
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- CAL_YR
- 2024
- CAL_QTR
- 3
- FISCAL_YR
- 2024
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 15.25
- SUM_TOTAL_ON_SITE_HOURS
- 1
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Aug 22, 2023Ended: Aug 23, 2023Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1Details ⌄
- EVENT_NO
- 6946602
- MINE_ID
- 1002343
- INSPECTION_BEGIN_DT
- Aug 22, 2023
- INSPECTION_END_DT
- Aug 23, 2023
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E15
- ACTIVITY
- Compliance Follow-up Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 6.75
- SUM_TOTAL_ON_SITE_HOURS
- 1
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
Began: Aug 13, 2023Ended: Aug 17, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.75Details ⌄
- EVENT_NO
- 6860798
- MINE_ID
- 1002343
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- INSPECT_OFFICE_CD
- M6821
- ACTIVITY_CODE
- E01
- ACTIVITY
- Regular Safety and Health Inspection
- ACTIVE_SECTIONS
- 0
- IDLE_SECTIONS
- 0
- SHAFT_SLOPE_SINK
- 0
- IMPOUND_CONSTR
- 0
- BLDG_CONSTR_SITES
- 0
- DRAGLINES
- 0
- UNCLASSIFIED_CONSTR
- 0
- CO_RECORDS
- N
- SURF_UG_MINE
- N
- SURF_FACILITY_MINE
- N
- REFUSE_PILES
- N
- EXPLOSIVE_STORAGE
- N
- OUTBY_AREAS
- N
- MAJOR_CONSTR
- N
- SHAFTS_SLOPES
- N
- IMPOUNDMENTS
- N
- MISC_AREA
- N
- PROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- SAMPLE_CNT_AIR
- 0
- SAMPLE_CNT_DUSTSPOT
- 0
- SAMPLE_CNT_DUSTSURVEY
- 0
- SAMPLE_CNT_RESPDUST
- 0
- SAMPLE_CNT_NOISE
- 0
- SAMPLE_CNT_OTHER
- 0
- NBR_INSPECTOR
- 1
- SUM_TOTAL_INSP_HOURS
- 30.75
- SUM_TOTAL_ON_SITE_HOURS
- 3.75
- COAL_METAL_IND
- M
- SUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- Not recorded
- SUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- Not recorded
6 inspections and other MSHA visits since Aug 13, 2023; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Mar 25, 2026Type: CitationStandard: 56.1000S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $151.00Details ⌄
- EVENT_NO
- F023BF0
- INSPECTION_BEGIN_DT
- Mar 25, 2026
- INSPECTION_END_DT
- Mar 26, 2026
- VIOLATION_NO
- 5054054
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Mar 25, 2026
- VIOLATION_OCCUR_DT
- Mar 25, 2026
- CAL_YR
- 2026
- CAL_QTR
- 1
- FISCAL_YR
- 2026
- FISCAL_QTR
- 2
- VIOLATION_ISSUE_TIME
- 1315
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.1000
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Mar 31, 2026
- ORIG_TERM_DUE_TIME
- 1600
- LATEST_TERM_DUE_DT
- Mar 31, 2026
- LATEST_TERM_DUE_TIME
- 1600
- TERMINATION_DT
- Mar 25, 2026
- TERMINATION_TIME
- 1600
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- NoLikelihood
- INJ_ILLNESS
- NoLostDays
- NO_AFFECTED
- 0
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Jun 14, 2026
- PROPOSED_PENALTY
- 151
- AMOUNT_DUE
- 151
- AMOUNT_PAID
- 151
- BILL_PRINT_DT
- May 6, 2026
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- May 19, 2026
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 1
Issued: Aug 20, 2025Type: CitationStandard: 56.3200S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $366.00Details ⌄
- EVENT_NO
- 6948576
- INSPECTION_BEGIN_DT
- Aug 20, 2025
- INSPECTION_END_DT
- Aug 21, 2025
- VIOLATION_NO
- 5052799
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 20, 2025
- VIOLATION_OCCUR_DT
- Aug 20, 2025
- CAL_YR
- 2025
- CAL_QTR
- 3
- FISCAL_YR
- 2025
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1132
- SIG_SUB
- Y
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.3200
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 20, 2025
- ORIG_TERM_DUE_TIME
- 1400
- LATEST_TERM_DUE_DT
- Aug 20, 2025
- LATEST_TERM_DUE_TIME
- 1400
- TERMINATION_DT
- Aug 21, 2025
- TERMINATION_TIME
- 1259
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Reasonably
- INJ_ILLNESS
- Fatal
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Dec 24, 2025
- PROPOSED_PENALTY
- 366
- AMOUNT_DUE
- 366
- AMOUNT_PAID
- 366
- BILL_PRINT_DT
- Nov 14, 2025
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Mar 23, 2026
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 1
Issued: Aug 15, 2023Type: CitationStandard: 50.30(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722845
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 15, 2023
- VIOLATION_OCCUR_DT
- Aug 15, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1118
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 50.30(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 15, 2023
- ORIG_TERM_DUE_TIME
- 1400
- LATEST_TERM_DUE_DT
- Aug 15, 2023
- LATEST_TERM_DUE_TIME
- 1400
- TERMINATION_DT
- Aug 15, 2023
- TERMINATION_TIME
- 1119
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- NoLikelihood
- INJ_ILLNESS
- NoLostDays
- NO_AFFECTED
- 0
- NEGLIGENCE
- LowNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 1
Issued: Aug 14, 2023Type: CitationStandard: 56.9315S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722841
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1127
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.9315
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 17, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 17, 2023
- TERMINATION_TIME
- 0804
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14103S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $346.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722832
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1045
- SIG_SUB
- Y
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14103
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 17, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 17, 2023
- TERMINATION_TIME
- 0806
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Reasonably
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 346
- AMOUNT_DUE
- 346
- AMOUNT_PAID
- 346
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722838
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1126
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14100(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 24, 2023
- LATEST_TERM_DUE_TIME
- 1000
- TERMINATION_DT
- Aug 23, 2023
- TERMINATION_TIME
- 0917
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722834
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1052
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14132(a)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 24, 2023
- LATEST_TERM_DUE_TIME
- 1000
- TERMINATION_DT
- Aug 23, 2023
- TERMINATION_TIME
- 0914
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14132(b)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722840
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1118
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14132(b)(1)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 17, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 17, 2023
- TERMINATION_TIME
- 0812
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722835
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1053
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14100(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 24, 2023
- LATEST_TERM_DUE_TIME
- 1000
- TERMINATION_DT
- Aug 23, 2023
- TERMINATION_TIME
- 0914
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14100(c)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $346.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722833
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1046
- SIG_SUB
- Y
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14100(c)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 17, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 17, 2023
- TERMINATION_TIME
- 0806
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Reasonably
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 346
- AMOUNT_DUE
- 346
- AMOUNT_PAID
- 346
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.14132S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722837
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1125
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.14132
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 24, 2023
- LATEST_TERM_DUE_TIME
- 1000
- TERMINATION_DT
- Aug 23, 2023
- TERMINATION_TIME
- 0917
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.20008S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $439.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722836
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1057
- SIG_SUB
- Y
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.20008
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 17, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 17, 2023
- TERMINATION_TIME
- 0811
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Reasonably
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 3
- NEGLIGENCE
- HighNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 439
- AMOUNT_DUE
- 439
- AMOUNT_PAID
- 439
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722839
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1115
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.4101
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 15, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 15, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 14, 2023
- TERMINATION_TIME
- 1116
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- LostDays
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
Issued: Aug 14, 2023Type: CitationStandard: 56.9100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details ⌄
- EVENT_NO
- 6860798
- INSPECTION_BEGIN_DT
- Aug 13, 2023
- INSPECTION_END_DT
- Aug 17, 2023
- VIOLATION_NO
- 9722831
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_TYPE
- Surface
- COAL_METAL_IND
- M
- CONTRACTOR_ID
- Not recorded
- VIOLATION_ISSUE_DT
- Aug 14, 2023
- VIOLATION_OCCUR_DT
- Aug 14, 2023
- CAL_YR
- 2023
- CAL_QTR
- 3
- FISCAL_YR
- 2023
- FISCAL_QTR
- 4
- VIOLATION_ISSUE_TIME
- 1028
- SIG_SUB
- N
- SECTION_OF_ACT
- Not recorded
- PART_SECTION
- 56.9100(b)
- SECTION_OF_ACT_1
- 104(a)
- SECTION_OF_ACT_2
- Not recorded
- CIT_ORD_SAFE
- Citation
- ORIG_TERM_DUE_DT
- Aug 17, 2023
- ORIG_TERM_DUE_TIME
- 1200
- LATEST_TERM_DUE_DT
- Aug 17, 2023
- LATEST_TERM_DUE_TIME
- 1200
- TERMINATION_DT
- Aug 17, 2023
- TERMINATION_TIME
- 0803
- TERMINATION_TYPE
- Terminated
- VACATE_DT
- Not recorded
- VACATE_TIME
- Not recorded
- INITIAL_VIOL_NO
- Not recorded
- REPLACED_BY_ORDER_NO
- Not recorded
- LIKELIHOOD
- Unlikely
- INJ_ILLNESS
- Permanent
- NO_AFFECTED
- 1
- NEGLIGENCE
- ModNegligence
- WRITTEN_NOTICE
- N
- ENFORCEMENT_AREA
- Not recorded
- SPECIAL_ASSESS
- N
- PRIMARY_OR_MILL
- Primary
- RIGHT_TO_CONF_DT
- Not recorded
- ASMT_GENERATED_IND
- N
- FINAL_ORDER_ISSUE_DT
- Nov 9, 2023
- PROPOSED_PENALTY
- 143
- AMOUNT_DUE
- 143
- AMOUNT_PAID
- 143
- BILL_PRINT_DT
- Oct 3, 2023
- LAST_ACTION_CD
- Paid
- LAST_ACTION_DT
- Oct 24, 2023
- DOCKET_NO
- Not recorded
- DOCKET_STATUS_CD
- Not recorded
- CONTESTED_IND
- N
- CONTESTED_DT
- Not recorded
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
14 citations and orders since Aug 14, 2023: 14 issued to the operator, 0 to contractors working at the mine. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Mar 25, 2026Citation number: 5054054Standard: 56.1000Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails ⌄
- EVENT_NBR
- F023BF0
- VIOLATION_NO
- 5054054
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000640800
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.1000
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- May 19, 2026
- OCCURRENCE_DT
- Mar 25, 2026
- ISSUE_DT
- Mar 25, 2026
- FINAL_ORDER_DT
- Jun 14, 2026
- BILL_PRINT_DT
- May 6, 2026
- BILL_PRINT_FISCAL_YR
- 2026
- PROPOSED_PENALTY_AMT
- 151.00
- CURRENT_ASSESSMENT_AMT
- 151.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 151.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 35
- GRAVITY_PERSONS_POINTS
- 0
- GRAVITY_INJURY_POINTS
- 0
- GRAVITY_LIKELIHOOD_POINTS
- 0
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 1
- VIOLATOR_INSPECTION_DAY_CNT
- 1
- VPID
- 1
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 631
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 631
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 17730
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 17730
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Jun 14, 2026
- HISTORY_START_DT
- Dec 25, 2024
- HISTORY_END_DT
- Mar 24, 2026
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 20, 2025Citation number: 5052799Standard: 56.3200Proposed penalty: $366.00Current assessment: $366.00Paid against proposed penalty: $366.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6948576
- VIOLATION_NO
- 5052799
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000630358
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.3200
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Mar 4, 2026
- OCCURRENCE_DT
- Aug 20, 2025
- ISSUE_DT
- Aug 20, 2025
- FINAL_ORDER_DT
- Dec 24, 2025
- BILL_PRINT_DT
- Nov 14, 2025
- BILL_PRINT_FISCAL_YR
- 2026
- PROPOSED_PENALTY_AMT
- 366.00
- CURRENT_ASSESSMENT_AMT
- 366.00
- MINEACT_INTEREST_AMT
- 2.46
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 366.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 71
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 20
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 1
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 1262
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 1262
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 22883
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 22883
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Dec 24, 2025
- HISTORY_START_DT
- May 20, 2024
- HISTORY_END_DT
- Aug 19, 2025
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 15, 2023Citation number: 9722845Standard: 50.30(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722845
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 50.30(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 15, 2023
- ISSUE_DT
- Aug 15, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 10
- GRAVITY_PERSONS_POINTS
- 0
- GRAVITY_INJURY_POINTS
- 0
- GRAVITY_LIKELIHOOD_POINTS
- 0
- NEGLIGENCE_POINTS
- 10
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 1
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 14, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722838Standard: 56.14100(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722838
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14100(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 41
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722832Standard: 56.14103Proposed penalty: $346.00Current assessment: $346.00Paid against proposed penalty: $346.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722832
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14103
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 346.00
- CURRENT_ASSESSMENT_AMT
- 346.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 346.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 71
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722841Standard: 56.9315Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722841
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.9315
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 36
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722836Standard: 56.20008Proposed penalty: $439.00Current assessment: $439.00Paid against proposed penalty: $439.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722836
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.20008
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 439.00
- CURRENT_ASSESSMENT_AMT
- 439.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 439.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 74
- GRAVITY_PERSONS_POINTS
- 4
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722839Standard: 56.4101Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722839
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.4101
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 36
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722833Standard: 56.14100(c)Proposed penalty: $346.00Current assessment: $346.00Paid against proposed penalty: $346.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722833
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- Y
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14100(c)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 346.00
- CURRENT_ASSESSMENT_AMT
- 346.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 346.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 71
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 30
- NEGLIGENCE_POINTS
- 35
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722837Standard: 56.14132Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722837
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14132
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 41
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722835Standard: 56.14100(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722835
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14100(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 41
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722834Standard: 56.14132(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722834
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14132(a)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 41
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722831Standard: 56.9100(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722831
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.9100(b)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 41
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 10
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
Issued: Aug 14, 2023Citation number: 9722840Standard: 56.14132(b)(1)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails ⌄
- EVENT_NBR
- 6860798
- VIOLATION_NO
- 9722840
- MINE_ID
- 1002343
- VIOLATOR_ID
- 0159813
- VIOLATOR_NAME
- Western Construction of Lewiston, Inc.
- VIOLATOR_TYPE_CD
- Operator
- COAL_METAL_IND
- M
- OFFICE_CD
- M6821
- ASSESS_CASE_NO
- 000585819
- PRIMARY_ACTION_CD
- 104(a)
- SIG_SUB_IND
- N
- MINE_ACT_SECTION_CD
- Not recorded
- GOOD_FAITH_IND
- Y
- EXCESSIVE_HISTORY_IND
- N
- CFR_STANDARD_CD
- 56.14132(b)(1)
- CITATION_TYPE_CD
- Citation
- ASSESS_TYPE_CD
- Regular
- ASSESS_CASE_STATUS_CD
- Closed
- ASSESS_CASE_STATUS_DT
- Oct 24, 2023
- OCCURRENCE_DT
- Aug 14, 2023
- ISSUE_DT
- Aug 14, 2023
- FINAL_ORDER_DT
- Nov 9, 2023
- BILL_PRINT_DT
- Oct 3, 2023
- BILL_PRINT_FISCAL_YR
- 2024
- PROPOSED_PENALTY_AMT
- 143.00
- CURRENT_ASSESSMENT_AMT
- 143.00
- MINEACT_INTEREST_AMT
- 0.00
- EXLATE_INTEREST_AMT
- 0.00
- PAID_PROPOSED_PENALTY_AMT
- 143.00
- PAID_MINEACT_INTEREST_AMT
- 0.00
- PAID_EXLATE_INTEREST_AMT
- 0.00
- PENALTY_POINTS
- 36
- GRAVITY_PERSONS_POINTS
- 1
- GRAVITY_INJURY_POINTS
- 5
- GRAVITY_LIKELIHOOD_POINTS
- 10
- NEGLIGENCE_POINTS
- 20
- CONTRACTOR_SIZE_POINTS
- 0
- GOOD_FAITH_POINTS
- 0
- VIOLATOR_VIOLATION_CNT
- 0
- VIOLATOR_INSPECTION_DAY_CNT
- 0
- VPID
- 0
- VIOLATION_PER_INSP_DAY_POINTS
- 0
- VIOLATOR_REPEATED_VIOL_CNT
- 0
- RPID
- 0
- VIOLATOR_REPEATED_VIOL_POINTS
- 0
- VIOLATOR_MINE_HRS
- 2823
- VIOLATOR_PRODUCTION_AMT
- 0
- SIZE_OF_MINE
- 2823
- MINE_SIZE_POINTS
- 0
- CONTROLLER_HRS
- 29695
- CONTROLLER_PRODUCTION_AMT
- 0
- SIZE_OF_CONTROLLING_ENTITY
- 29695
- CONTROLLER_SIZE_POINTS
- 0
- DELINQUENT_DT
- Nov 9, 2023
- HISTORY_START_DT
- Aug 1, 2022
- HISTORY_END_DT
- Aug 13, 2023
- VIOLATOR_START_DT
- Aug 1, 2022
- VIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
14 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Employment and hours worked
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 154Details ⌄
- MINE_ID
- 1002343
- CURR_MINE_NM
- Plant 4
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2026
- ANNUAL_HRS
- 154
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 1
- AVG_EMPLOYEE_HOURS
- 154
- C_M_IND
- M
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 631Details ⌄
- MINE_ID
- 1002343
- CURR_MINE_NM
- Plant 4
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2025
- ANNUAL_HRS
- 631
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 3
- AVG_EMPLOYEE_HOURS
- 210
- C_M_IND
- M
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 2Hours worked: 1,262Details ⌄
- MINE_ID
- 1002343
- CURR_MINE_NM
- Plant 4
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2024
- ANNUAL_HRS
- 1262
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 2
- AVG_EMPLOYEE_HOURS
- 631
- C_M_IND
- M
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 3,269Details ⌄
- MINE_ID
- 1002343
- CURR_MINE_NM
- Plant 4
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2023
- ANNUAL_HRS
- 3269
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 4
- AVG_EMPLOYEE_HOURS
- 817
- C_M_IND
- M
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 2,823Details ⌄
- MINE_ID
- 1002343
- CURR_MINE_NM
- Plant 4
- STATE_ABBR
- ID
- SUBUNIT_CD
- 03
- SUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- CALENDAR_YR
- 2022
- ANNUAL_HRS
- 2823
- ANNUAL_COAL_PROD
- 0
- AVG_ANNUAL_EMPL
- 5
- AVG_EMPLOYEE_HOURS
- 565
- C_M_IND
- M
What the operator reported to MSHA for the 5 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Helena MT Field Office
- Nearest town
- Orofino
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 5
- Tailing ponds
- 0
- Safety committee
- N
- Portable operation
- Y
Every field in MSHA's mine record
- MINE_ID
- 1002343
- CURRENT_MINE_NAME
- Plant 4
- COAL_METAL_IND
- M
- CURRENT_MINE_TYPE
- Surface
- CURRENT_MINE_STATUS
- Intermittent
- CURRENT_STATUS_DT
- Jan 24, 2023
- CURRENT_CONTROLLER_ID
- 0144021
- CURRENT_CONTROLLER_NAME
- Not recorded
- CURRENT_OPERATOR_ID
- 0159813
- CURRENT_OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- STATE
- ID
- BOM_STATE_CD
- 10
- FIPS_CNTY_CD
- 035
- FIPS_CNTY_NM
- Clearwater
- CONG_DIST_CD
- Not recorded
- COMPANY_TYPE
- Corporation
- CURRENT_CONTROLLER_BEGIN_DT
- Aug 1, 2022
- DISTRICT
- M6
- OFFICE_CD
- M6821
- OFFICE_NAME
- Helena MT Field Office
- ASSESS_CTRL_NO
- 000640800
- PRIMARY_SIC_CD
- 144200
- PRIMARY_SIC
- Construction Sand and Gravel
- PRIMARY_SIC_CD_1
- 1442
- PRIMARY_SIC_CD_SFX
- 00
- SECONDARY_SIC_CD
- Not recorded
- SECONDARY_SIC
- Not recorded
- SECONDARY_SIC_CD_1
- Not recorded
- SECONDARY_SIC_CD_SFX
- Not recorded
- PRIMARY_CANVASS_CD
- 5
- PRIMARY_CANVASS
- SandAndGravel
- SECONDARY_CANVASS_CD
- Not recorded
- SECONDARY_CANVASS
- Not recorded
- CURRENT_103I
- Not recorded
- CURRENT_103I_DT
- Not recorded
- PORTABLE_OPERATION
- Y
- PORTABLE_FIPS_ST_CD
- 16
- DAYS_PER_WEEK
- 5
- HOURS_PER_SHIFT
- 8
- PROD_SHIFTS_PER_DAY
- 1
- MAINT_SHIFTS_PER_DAY
- 0
- NO_EMPLOYEES
- 5
- PART48_TRAINING
- Y
- AVG_MINE_HEIGHT
- Not recorded
- MINE_GAS_CATEGORY_CD
- Not recorded
- METHANE_LIBERATION
- Not recorded
- NO_PRODUCING_PITS
- Not recorded
- NO_NONPRODUCING_PITS
- Not recorded
- NO_TAILING_PONDS
- 0
- PILLAR_RECOVERY_USED
- N
- HIGHWALL_MINER_USED
- N
- MULTIPLE_PITS
- N
- SAFETY_COMMITTEE_IND
- N
- MILES_FROM_OFFICE
- 287
- NEAREST_TOWN
- Orofino
Operator and controller history
Operator: Western Construction of Lewiston, Inc.From: Aug 1, 2022To: No end dateController: Not shownFrom : Oct 23, 2018To : No end dateDetails ⌄
- CONTROLLER_ID
- 0144021
- CONTROLLER_NAME
- Not recorded
- CONTROLLER_START_DT
- Oct 23, 2018
- CONTROLLER_END_DT
- Not recorded
- CONTROLLER_TYPE
- PERSON
- COAL_METAL_IND
- M
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- MINE_STATUS
- Intermittent
- OPERATOR_ID
- 0159813
- OPERATOR_NAME
- Western Construction of Lewiston, Inc.
- OPERATOR_START_DT
- Aug 1, 2022
- OPERATOR_END_DT
- Not recorded
As MSHA records it, newest operator first.
Address of record
- Business
- Western Construction of Lewiston, Inc.
- Contact title
- Office Admin
- Address
- Street not shown, Lewiston ID 83501
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
- MINE_ID
- 1002343
- MINE_NAME
- Plant 4
- CONTACT_TITLE
- Office Admin
- NEAREST_TOWN
- Orofino
- BUSINESS_NAME
- Western Construction of Lewiston, Inc.
- STREET
- Not recorded
- PO_BOX
- Not recorded
- CITY
- Lewiston
- STATE_ABBR
- ID
- FIPS_STATE_CD
- 16
- STATE
- Idaho
- ZIP_CD
- 83501
- COUNTRY
- USA
- PROVINCE
- Not recorded
- POSTAL_CD
- Not recorded
- MINE_TYPE_CD
- Surface
- MINE_STATUS
- Intermittent
- MINE_STATUS_DT
- Jan 24, 2023
- PRIMARY_SIC_CD
- Construction Sand and Gravel
- COAL_METAL_IND
- M
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Oct 23, 2026. Data and methodology