Pc2 Franklin Aggregates

Metal/Non-Metal, SurfaceCrushed, Broken Limestone NECMilwaukee, WisconsinMine ID 4700060

Operator Payne & Dolan IncController not shownMSHA status Active since Jan 23, 2014

What MSHA has on file for this mine

Citations and orders
216
since Feb 28, 2000 · 166 to the operator, 50 to contractors · 32 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Aug 24 to Aug 28, 2026Inspectors 1 | Hours on site 26.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 24, 2026
Closed outINSPECTION_END_DT
Aug 28, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F037BE8
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
26.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
45

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 9 to Feb 12, 2026Inspectors 1 | Hours on site 22.25

The inspection

BeganINSPECTION_BEGIN_DT
Feb 9, 2026
Closed outINSPECTION_END_DT
Feb 12, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F02E1F0
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
22.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
36

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 7 to Jul 11, 2025Inspectors 1 | Hours on site 23.75

The inspection

BeganINSPECTION_BEGIN_DT
Jul 7, 2025
Closed outINSPECTION_END_DT
Jul 11, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0175BD
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
23.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
38.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 27 to Feb 5, 2025Inspectors 1 | Hours on site 30.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 27, 2025
Closed outINSPECTION_END_DT
Feb 5, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F00EF94
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
30.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
62.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Aug 12 to Aug 15, 2024Inspectors 2 | Hours on site 10.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 12, 2024
Closed outINSPECTION_END_DT
Aug 15, 2024
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6708268
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
30.25
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
10.25
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
30.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 6 to May 10, 2024Inspectors 1 | Hours on site 17

The inspection

BeganINSPECTION_BEGIN_DT
May 6, 2024
Closed outINSPECTION_END_DT
May 10, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742390
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17
Total inspection hoursSUM_TOTAL_INSP_HOURS
24.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Mar 11 to Mar 12, 2024Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
Mar 11, 2024
Closed outINSPECTION_END_DT
Mar 12, 2024
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6742382
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.5
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
2.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 5 to Feb 9, 2024Inspectors 1 | Hours on site 19.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 5, 2024
Closed outINSPECTION_END_DT
Feb 9, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742376
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
19.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
33
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 9 to Aug 16, 2023Inspectors 1 | Hours on site 23.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 9, 2023
Closed outINSPECTION_END_DT
Aug 16, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6909902
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
23.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
38.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Non-Chargeable Accident Investigation
Jul 19 to Jul 20, 2023Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 19, 2023
Closed outINSPECTION_END_DT
Jul 20, 2023
ActivityACTIVITY
Non-Chargeable Accident Investigation
Activity codeACTIVITY_CODE
E33
Program areaPROGRAM_AREA
M/NM--Non-Chargeable Accident Investigation
Event numberEVENT_NO
6909095
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Feb 2, 2023Inspectors 1 | Hours on site 1.75

The inspection

BeganINSPECTION_BEGIN_DT
Feb 2, 2023
Closed outINSPECTION_END_DT
Feb 2, 2023
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6905692
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 23 to Feb 3, 2023Inspectors 1 | Hours on site 21.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 23, 2023
Closed outINSPECTION_END_DT
Feb 3, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742346
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
21.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
32

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 13 to Jun 15, 2022Inspectors 1 | Hours on site 22.75

The inspection

BeganINSPECTION_BEGIN_DT
Jun 13, 2022
Closed outINSPECTION_END_DT
Jun 15, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905712
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
22.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
36.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 20 to Nov 3, 2021Inspectors 1 | Hours on site 43.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 20, 2021
Closed outINSPECTION_END_DT
Nov 3, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905051
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
43.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
78

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 2 to Jun 8, 2021Inspectors 1 | Hours on site 26.75

The inspection

BeganINSPECTION_BEGIN_DT
Jun 2, 2021
Closed outINSPECTION_END_DT
Jun 8, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6840592
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
26.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
51.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 11 to Jan 13, 2021Inspectors 1 | Hours on site 14.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 11, 2021
Closed outINSPECTION_END_DT
Jan 13, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6840547
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
23.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Jul 20, 2020Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 20, 2020
Closed outINSPECTION_END_DT
Jul 20, 2020
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6840150
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 23 to Jun 30, 2020Inspectors 2 | Hours on site 44.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 23, 2020
Closed outINSPECTION_END_DT
Jun 30, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6840142
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
44.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
70.25
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
17.75
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
26.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Mar 5, 2020Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Mar 5, 2020
Closed outINSPECTION_END_DT
Mar 5, 2020
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6834587
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Jan 15, 2020Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 15, 2020
Closed outINSPECTION_END_DT
Jan 15, 2020
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6834576
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 13 to Jan 23, 2020Inspectors 1 | Hours on site 32

The inspection

BeganINSPECTION_BEGIN_DT
Jan 13, 2020
Closed outINSPECTION_END_DT
Jan 23, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6834575
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
32
Total inspection hoursSUM_TOTAL_INSP_HOURS
55.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 25, 2019Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Sep 25, 2019
Closed outINSPECTION_END_DT
Sep 25, 2019
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6834159
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Part 50 Audit
Sep 25, 2019Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Sep 25, 2019
Closed outINSPECTION_END_DT
Sep 25, 2019
ActivityACTIVITY
Part 50 Audit
Activity codeACTIVITY_CODE
E25
Program areaPROGRAM_AREA
M/NM--Part 50 Audit
Event numberEVENT_NO
6834160
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 26 to Sep 5, 2019Inspectors 2 | Hours on site 50

The inspection

BeganINSPECTION_BEGIN_DT
Aug 26, 2019
Closed outINSPECTION_END_DT
Sep 5, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6834152
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
50
Total inspection hoursSUM_TOTAL_INSP_HOURS
88
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
18.5
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
26.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Dec 12, 2018Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Dec 12, 2018
Closed outINSPECTION_END_DT
Dec 12, 2018
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6742305
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
1.5
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

25 most recent of 86 inspections and other MSHA visits since Feb 28, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Aug 27, 2026
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5118984
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 27, 2026
Time issuedVIOLATION_ISSUE_TIME
1030
Date of occurrenceVIOLATION_OCCUR_DT
Aug 27, 2026
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 27, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Aug 27, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Aug 27, 2026
Terminated, timeTERMINATION_TIME
1050
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Oct 21, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
New Berlin Grading, Inc.
Operator IDVIOLATOR_ID
K624
Contractor IDCONTRACTOR_ID
K624
Inspection eventEVENT_NO
F037BE8
Inspection beganINSPECTION_BEGIN_DT
Aug 24, 2026
Inspection closed outINSPECTION_END_DT
Aug 28, 2026
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Aug 26, 2026
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5118983
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 26, 2026
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Aug 26, 2026
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 26, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 26, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Aug 26, 2026
Terminated, timeTERMINATION_TIME
1305
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Bill first printedBILL_PRINT_DT
Oct 15, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 15, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F037BE8
Inspection beganINSPECTION_BEGIN_DT
Aug 24, 2026
Inspection closed outINSPECTION_END_DT
Aug 28, 2026
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Amount paidAMOUNT_PAID

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 25, 2026
Type: Citation
Standard: 56.11003
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5118982
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 25, 2026
Time issuedVIOLATION_ISSUE_TIME
1325
Date of occurrenceVIOLATION_OCCUR_DT
Aug 25, 2026
30 CFR part and sectionPART_SECTION
56.11003
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 26, 2026
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Aug 26, 2026
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Aug 26, 2026
Terminated, timeTERMINATION_TIME
0910
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Bill first printedBILL_PRINT_DT
Oct 15, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 15, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F037BE8
Inspection beganINSPECTION_BEGIN_DT
Aug 24, 2026
Inspection closed outINSPECTION_END_DT
Aug 28, 2026
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Amount paidAMOUNT_PAID

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 11, 2026
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9697282
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 11, 2026
Time issuedVIOLATION_ISSUE_TIME
0830
Date of occurrenceVIOLATION_OCCUR_DT
Feb 11, 2026
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 11, 2026
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Feb 11, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Feb 12, 2026
Terminated, timeTERMINATION_TIME
0850
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 19, 2026
Final order dateFINAL_ORDER_ISSUE_DT
May 18, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 29, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F02E1F0
Inspection beganINSPECTION_BEGIN_DT
Feb 9, 2026
Inspection closed outINSPECTION_END_DT
Feb 12, 2026
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 10, 2026
Type: Citation
Standard: 56.14112(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9697280
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1003
Date of occurrenceVIOLATION_OCCUR_DT
Feb 10, 2026
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 10, 2026
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Feb 10, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Feb 10, 2026
Terminated, timeTERMINATION_TIME
1340
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 19, 2026
Final order dateFINAL_ORDER_ISSUE_DT
May 18, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 29, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F02E1F0
Inspection beganINSPECTION_BEGIN_DT
Feb 9, 2026
Inspection closed outINSPECTION_END_DT
Feb 12, 2026
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 10, 2026
Type: Citation
Standard: 56.4102
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9697281
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1005
Date of occurrenceVIOLATION_OCCUR_DT
Feb 10, 2026
30 CFR part and sectionPART_SECTION
56.4102
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 10, 2026
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Feb 10, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Feb 10, 2026
Terminated, timeTERMINATION_TIME
1340
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 19, 2026
Final order dateFINAL_ORDER_ISSUE_DT
May 18, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 29, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F02E1F0
Inspection beganINSPECTION_BEGIN_DT
Feb 9, 2026
Inspection closed outINSPECTION_END_DT
Feb 12, 2026
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 9, 2025
Type: Citation
Standard: 56.11001
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
6154963
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 9, 2025
Time issuedVIOLATION_ISSUE_TIME
1138
Date of occurrenceVIOLATION_OCCUR_DT
Jul 9, 2025
30 CFR part and sectionPART_SECTION
56.11001
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 10, 2025
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Jul 10, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Jul 9, 2025
Terminated, timeTERMINATION_TIME
1607
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 20, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Sep 24, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 24, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
New Berlin Grading, Inc.
Operator IDVIOLATOR_ID
K624
Contractor IDCONTRACTOR_ID
K624
Inspection eventEVENT_NO
F0175BD
Inspection beganINSPECTION_BEGIN_DT
Jul 7, 2025
Inspection closed outINSPECTION_END_DT
Jul 11, 2025
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 4, 2025
Type: Citation
Standard: 56.14100(c)
S&S: Y
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $177.00
Details

The citation

Citation or order numberVIOLATION_NO
6154925
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 4, 2025
Time issuedVIOLATION_ISSUE_TIME
1530
Date of occurrenceVIOLATION_OCCUR_DT
Feb 4, 2025
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 5, 2025
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Feb 5, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Feb 5, 2025
Terminated, timeTERMINATION_TIME
1201
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
177
Current proposed assessmentAMOUNT_DUE
177
Amount paidAMOUNT_PAID
177
Bill first printedBILL_PRINT_DT
Mar 19, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 25, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 16, 2025

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
New Berlin Grading, Inc.
Operator IDVIOLATOR_ID
K624
Contractor IDCONTRACTOR_ID
K624
Inspection eventEVENT_NO
F00EF94
Inspection beganINSPECTION_BEGIN_DT
Jan 27, 2025
Inspection closed outINSPECTION_END_DT
Feb 5, 2025
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 4, 2025
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $288.00
Details

The citation

Citation or order numberVIOLATION_NO
6154923
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 4, 2025
Time issuedVIOLATION_ISSUE_TIME
1035
Date of occurrenceVIOLATION_OCCUR_DT
Feb 4, 2025
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 5, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 5, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 5, 2025
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
288
Current proposed assessmentAMOUNT_DUE
288
Amount paidAMOUNT_PAID
288
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 25, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 22, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
12

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F00EF94
Inspection beganINSPECTION_BEGIN_DT
Jan 27, 2025
Inspection closed outINSPECTION_END_DT
Feb 5, 2025
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 4, 2025
Type: Citation
Standard: 56.4102
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
6154924
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 4, 2025
Time issuedVIOLATION_ISSUE_TIME
1120
Date of occurrenceVIOLATION_OCCUR_DT
Feb 4, 2025
30 CFR part and sectionPART_SECTION
56.4102
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 4, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 4, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 4, 2025
Terminated, timeTERMINATION_TIME
1445
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 25, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 22, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
12

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F00EF94
Inspection beganINSPECTION_BEGIN_DT
Jan 27, 2025
Inspection closed outINSPECTION_END_DT
Feb 5, 2025
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 29, 2025
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
6154922
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 29, 2025
Time issuedVIOLATION_ISSUE_TIME
1150
Date of occurrenceVIOLATION_OCCUR_DT
Jan 29, 2025
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 29, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jan 29, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jan 29, 2025
Terminated, timeTERMINATION_TIME
1537
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 25, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 22, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
F00EF94
Inspection beganINSPECTION_BEGIN_DT
Jan 27, 2025
Inspection closed outINSPECTION_END_DT
Feb 5, 2025
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695081
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1045
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2024
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 9, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 9, 2024
Terminated, timeTERMINATION_TIME
0935
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Jul 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 11, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742390
Inspection beganINSPECTION_BEGIN_DT
May 6, 2024
Inspection closed outINSPECTION_END_DT
May 10, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695087
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1700
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2024
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
May 9, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
May 9, 2024
Terminated, timeTERMINATION_TIME
1005
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Jul 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 11, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742390
Inspection beganINSPECTION_BEGIN_DT
May 6, 2024
Inspection closed outINSPECTION_END_DT
May 10, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695086
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1120
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2024
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
May 9, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
May 9, 2024
Terminated, timeTERMINATION_TIME
0935
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Jul 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 11, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742390
Inspection beganINSPECTION_BEGIN_DT
May 6, 2024
Inspection closed outINSPECTION_END_DT
May 10, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 7, 2024
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $421.00
Details

The citation

Citation or order numberVIOLATION_NO
9695080
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 7, 2024
Time issuedVIOLATION_ISSUE_TIME
1315
Date of occurrenceVIOLATION_OCCUR_DT
May 7, 2024
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
May 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
May 8, 2024
Terminated, timeTERMINATION_TIME
1343
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
421
Current proposed assessmentAMOUNT_DUE
421
Amount paidAMOUNT_PAID
421
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Jul 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 11, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742390
Inspection beganINSPECTION_BEGIN_DT
May 6, 2024
Inspection closed outINSPECTION_END_DT
May 10, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 8, 2024
Type: Citation
Standard: 56.14110
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695010
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
0924
Date of occurrenceVIOLATION_OCCUR_DT
Feb 8, 2024
30 CFR part and sectionPART_SECTION
56.14110
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1535
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 9, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 8, 2024
Type: Citation
Standard: 56.12018
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695011
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1429
Date of occurrenceVIOLATION_OCCUR_DT
Feb 8, 2024
30 CFR part and sectionPART_SECTION
56.12018
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1642
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 9, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 8, 2024
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695014
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1136
Date of occurrenceVIOLATION_OCCUR_DT
Feb 8, 2024
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1145
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1145
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1142
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 21, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 29, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 2, 2024

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
CTW Corporation
Operator IDVIOLATOR_ID
C0399
Contractor IDCONTRACTOR_ID
C0399
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 8, 2024
Type: Order
Standard: 46.5(a)
S&S: Y
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $164.00
Details

The citation

Citation or order numberVIOLATION_NO
9695015
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1145
Date of occurrenceVIOLATION_OCCUR_DT
Feb 8, 2024
30 CFR part and sectionPART_SECTION
46.5(a)
Section of the Act, primarySECTION_OF_ACT_1
104(g)(1)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

TerminatedTERMINATION_DT
Jun 10, 2024
Terminated, timeTERMINATION_TIME
1224
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
164
Current proposed assessmentAMOUNT_DUE
164
Amount paidAMOUNT_PAID
164
Bill first printedBILL_PRINT_DT
Mar 21, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 29, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 2, 2024

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
CTW Corporation
Operator IDVIOLATOR_ID
C0399
Contractor IDCONTRACTOR_ID
C0399
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (17)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 8, 2024
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695013
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1458
Date of occurrenceVIOLATION_OCCUR_DT
Feb 8, 2024
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1530
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1530
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1506
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 9, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 8, 2024
Type: Citation
Standard: 56.14115(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695012
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1439
Date of occurrenceVIOLATION_OCCUR_DT
Feb 8, 2024
30 CFR part and sectionPART_SECTION
56.14115(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1442
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 9, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 7, 2024
Type: Citation
Standard: 56.4503
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695009
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 7, 2024
Time issuedVIOLATION_ISSUE_TIME
1347
Date of occurrenceVIOLATION_OCCUR_DT
Feb 7, 2024
30 CFR part and sectionPART_SECTION
56.4503
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1545
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 9, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 6, 2024
Type: Citation
Standard: 56.20003(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695003
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 6, 2024
Time issuedVIOLATION_ISSUE_TIME
1400
Date of occurrenceVIOLATION_OCCUR_DT
Feb 6, 2024
30 CFR part and sectionPART_SECTION
56.20003(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 7, 2024
Originally due, timeORIG_TERM_DUE_TIME
1630
Latest dueLATEST_TERM_DUE_DT
Feb 7, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1630
TerminatedTERMINATION_DT
Feb 7, 2024
Terminated, timeTERMINATION_TIME
1500
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 17, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 9, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Payne & Dolan Inc
Operator IDVIOLATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 6, 2024
Type: Citation
Standard: 56.18002(b)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695008
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 6, 2024
Time issuedVIOLATION_ISSUE_TIME
1145
Date of occurrenceVIOLATION_OCCUR_DT
Feb 6, 2024
30 CFR part and sectionPART_SECTION
56.18002(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 6, 2024
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Feb 6, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Feb 6, 2024
Terminated, timeTERMINATION_TIME
1150
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 20, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 24, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 5, 2024

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Musson Brothers Inc
Operator IDVIOLATOR_ID
2MD
Contractor IDCONTRACTOR_ID
2MD
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 6, 2024
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695005
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 6, 2024
Time issuedVIOLATION_ISSUE_TIME
0850
Date of occurrenceVIOLATION_OCCUR_DT
Feb 6, 2024
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 6, 2024
Originally due, timeORIG_TERM_DUE_TIME
0905
Latest dueLATEST_TERM_DUE_DT
Feb 6, 2024
Latest due, timeLATEST_TERM_DUE_TIME
0905
TerminatedTERMINATION_DT
Feb 6, 2024
Terminated, timeTERMINATION_TIME
0856
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Mar 20, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Apr 24, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 5, 2024

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Musson Brothers Inc
Operator IDVIOLATOR_ID
2MD
Contractor IDCONTRACTOR_ID
2MD
Inspection eventEVENT_NO
6742376
Inspection beganINSPECTION_BEGIN_DT
Feb 5, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

216 citations and orders since Feb 28, 2000: 166 issued to the operator, 50 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Aug 27, 2026
Citation number: 5118984
Standard: 56.4201(a)(2)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5118984
Assessment control numberASSESS_CASE_NO
000651408
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2026
Citation issuedISSUE_DT
Aug 27, 2026
Date of occurrenceOCCURRENCE_DT
Aug 27, 2026
Bill first printedBILL_PRINT_DT
Oct 21, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
11520
Size of mineSIZE_OF_MINE
11520
History period startHISTORY_START_DT
May 27, 2025
History period endHISTORY_END_DT
Aug 26, 2026

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
New Berlin Grading, Inc.
IDVIOLATOR_ID
K624
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 27, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F037BE8
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (4)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Aug 26, 2026
Citation number: 5118983
Standard: 56.14112(a)(1)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
5118983
Assessment control numberASSESS_CASE_NO
000651190
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 15, 2026
Citation issuedISSUE_DT
Aug 26, 2026
Date of occurrenceOCCURRENCE_DT
Aug 26, 2026
Bill first printedBILL_PRINT_DT
Oct 15, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
0.27
Operator hours worked at the mineVIOLATOR_MINE_HRS
36107
Size of mineSIZE_OF_MINE
36107
Controller hours workedCONTROLLER_HRS
200681
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
200681
History period startHISTORY_START_DT
May 26, 2025
History period endHISTORY_END_DT
Aug 25, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F037BE8
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 25, 2026
Citation number: 5118982
Standard: 56.11003
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
5118982
Assessment control numberASSESS_CASE_NO
000651190
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 15, 2026
Citation issuedISSUE_DT
Aug 25, 2026
Date of occurrenceOCCURRENCE_DT
Aug 25, 2026
Bill first printedBILL_PRINT_DT
Oct 15, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11003
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
0.3
Operator hours worked at the mineVIOLATOR_MINE_HRS
36107
Size of mineSIZE_OF_MINE
36107
Controller hours workedCONTROLLER_HRS
200681
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
200681
History period startHISTORY_START_DT
May 25, 2025
History period endHISTORY_END_DT
Aug 24, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F037BE8
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 11, 2026
Citation number: 9697282
Standard: 56.14107(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9697282
Assessment control numberASSESS_CASE_NO
000637815
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 29, 2026
Citation issuedISSUE_DT
Feb 11, 2026
Date of occurrenceOCCURRENCE_DT
Feb 11, 2026
Final order dateFINAL_ORDER_DT
May 18, 2026
Bill first printedBILL_PRINT_DT
Mar 19, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 18, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.23
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.077
Operator hours worked at the mineVIOLATOR_MINE_HRS
36107
Size of mineSIZE_OF_MINE
36107
Controller hours workedCONTROLLER_HRS
200681
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
200681
History period startHISTORY_START_DT
Nov 11, 2024
History period endHISTORY_END_DT
Feb 10, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02E1F0
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 10, 2026
Citation number: 9697281
Standard: 56.4102
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9697281
Assessment control numberASSESS_CASE_NO
000637815
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 29, 2026
Citation issuedISSUE_DT
Feb 10, 2026
Date of occurrenceOCCURRENCE_DT
Feb 10, 2026
Final order dateFINAL_ORDER_DT
May 18, 2026
Bill first printedBILL_PRINT_DT
Mar 19, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 18, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4102
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
0.27
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.091
Operator hours worked at the mineVIOLATOR_MINE_HRS
36107
Size of mineSIZE_OF_MINE
36107
Controller hours workedCONTROLLER_HRS
200681
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
200681
History period startHISTORY_START_DT
Nov 10, 2024
History period endHISTORY_END_DT
Feb 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02E1F0
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 10, 2026
Citation number: 9697280
Standard: 56.14112(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9697280
Assessment control numberASSESS_CASE_NO
000637815
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 29, 2026
Citation issuedISSUE_DT
Feb 10, 2026
Date of occurrenceOCCURRENCE_DT
Feb 10, 2026
Final order dateFINAL_ORDER_DT
May 18, 2026
Bill first printedBILL_PRINT_DT
Mar 19, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 18, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
0.27
Operator hours worked at the mineVIOLATOR_MINE_HRS
36107
Size of mineSIZE_OF_MINE
36107
Controller hours workedCONTROLLER_HRS
200681
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
200681
History period startHISTORY_START_DT
Nov 10, 2024
History period endHISTORY_END_DT
Feb 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02E1F0
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 9, 2025
Citation number: 6154963
Standard: 56.11001
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6154963
Assessment control numberASSESS_CASE_NO
000627094
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 24, 2025
Citation issuedISSUE_DT
Jul 9, 2025
Date of occurrenceOCCURRENCE_DT
Jul 9, 2025
Final order dateFINAL_ORDER_DT
Sep 24, 2025
Bill first printedBILL_PRINT_DT
Aug 20, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 24, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
12636
Size of mineSIZE_OF_MINE
12636
History period startHISTORY_START_DT
Apr 9, 2024
History period endHISTORY_END_DT
Jul 8, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
New Berlin Grading, Inc.
IDVIOLATOR_ID
K624
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 27, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0175BD
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 4, 2025
Citation number: 6154924
Standard: 56.4102
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6154924
Assessment control numberASSESS_CASE_NO
000616695
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 22, 2025
Citation issuedISSUE_DT
Feb 4, 2025
Date of occurrenceOCCURRENCE_DT
Feb 4, 2025
Final order dateFINAL_ORDER_DT
Apr 25, 2025
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 25, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4102
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
10
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
12
Violations per inspection dayVPID
1.08
Operator hours worked at the mineVIOLATOR_MINE_HRS
43696
Size of mineSIZE_OF_MINE
43696
Controller hours workedCONTROLLER_HRS
230150
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
230150
History period startHISTORY_START_DT
Nov 4, 2023
History period endHISTORY_END_DT
Feb 3, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00EF94
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 4, 2025
Citation number: 6154925
Standard: 56.14100(c)
Proposed penalty: $177.00
Current assessment: $177.00
Paid against proposed penalty: $177.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6154925
Assessment control numberASSESS_CASE_NO
000616922
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 16, 2025
Citation issuedISSUE_DT
Feb 4, 2025
Date of occurrenceOCCURRENCE_DT
Feb 4, 2025
Final order dateFINAL_ORDER_DT
Apr 25, 2025
Bill first printedBILL_PRINT_DT
Mar 19, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 25, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
177.00
Current assessmentCURRENT_ASSESSMENT_AMT
177.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
177.00

Penalty points

Violation history pointsPENALTY_POINTS
62
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
6

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
12636
Size of mineSIZE_OF_MINE
12636
History period startHISTORY_START_DT
Nov 4, 2023
History period endHISTORY_END_DT
Feb 3, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
New Berlin Grading, Inc.
IDVIOLATOR_ID
K624
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 27, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00EF94
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 4, 2025
Citation number: 6154923
Standard: 56.12028
Proposed penalty: $288.00
Current assessment: $288.00
Paid against proposed penalty: $288.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6154923
Assessment control numberASSESS_CASE_NO
000616695
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 22, 2025
Citation issuedISSUE_DT
Feb 4, 2025
Date of occurrenceOCCURRENCE_DT
Feb 4, 2025
Final order dateFINAL_ORDER_DT
Apr 25, 2025
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 25, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
288.00
Current assessmentCURRENT_ASSESSMENT_AMT
288.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
288.00

Penalty points

Violation history pointsPENALTY_POINTS
68
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
10
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
12
Violations per inspection dayVPID
1.08
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
0.167
Operator hours worked at the mineVIOLATOR_MINE_HRS
43696
Size of mineSIZE_OF_MINE
43696
Controller hours workedCONTROLLER_HRS
230150
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
230150
History period startHISTORY_START_DT
Nov 4, 2023
History period endHISTORY_END_DT
Feb 3, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00EF94
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 29, 2025
Citation number: 6154922
Standard: 56.14107(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6154922
Assessment control numberASSESS_CASE_NO
000616695
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 22, 2025
Citation issuedISSUE_DT
Jan 29, 2025
Date of occurrenceOCCURRENCE_DT
Jan 29, 2025
Final order dateFINAL_ORDER_DT
Apr 25, 2025
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 25, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
3

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
1.63
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.125
Operator hours worked at the mineVIOLATOR_MINE_HRS
43696
Size of mineSIZE_OF_MINE
43696
Controller hours workedCONTROLLER_HRS
230150
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
230150
History period startHISTORY_START_DT
Oct 29, 2023
History period endHISTORY_END_DT
Jan 28, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00EF94
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9695086
Standard: 56.12004
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695086
Assessment control numberASSESS_CASE_NO
000601551
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 10, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Jul 17, 2024
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
1.55
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742390
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9695087
Standard: 56.12004
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695087
Assessment control numberASSESS_CASE_NO
000601551
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 10, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Jul 17, 2024
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
1.55
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742390
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9695081
Standard: 56.12028
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695081
Assessment control numberASSESS_CASE_NO
000601551
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 10, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Jul 17, 2024
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
1.55
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.091
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742390
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 7, 2024
Citation number: 9695080
Standard: 56.12028
Proposed penalty: $421.00
Current assessment: $421.00
Paid against proposed penalty: $421.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695080
Assessment control numberASSESS_CASE_NO
000601551
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 10, 2024
Citation issuedISSUE_DT
May 7, 2024
Date of occurrenceOCCURRENCE_DT
May 7, 2024
Final order dateFINAL_ORDER_DT
Jul 17, 2024
Bill first printedBILL_PRINT_DT
Jun 13, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
421.00
Current assessmentCURRENT_ASSESSMENT_AMT
421.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
421.00

Penalty points

Violation history pointsPENALTY_POINTS
73
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
17
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
1.7
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.1
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Feb 7, 2023
History period endHISTORY_END_DT
May 6, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742390
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 8, 2024
Citation number: 9695012
Standard: 56.14115(b)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695012
Assessment control numberASSESS_CASE_NO
000595788
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 9, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 8, 2024
Final order dateFINAL_ORDER_DT
Apr 17, 2024
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14115(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.69
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Nov 8, 2022
History period endHISTORY_END_DT
Feb 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 8, 2024
Citation number: 9695015
Standard: 46.5(a)
Proposed penalty: $164.00
Current assessment: $164.00
Paid against proposed penalty: $164.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695015
Assessment control numberASSESS_CASE_NO
000596169
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 8, 2024
Final order dateFINAL_ORDER_DT
Apr 29, 2024
Bill first printedBILL_PRINT_DT
Mar 21, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 29, 2024
Citation typeCITATION_TYPE_CD
Order
30 CFR standardCFR_STANDARD_CD
46.5(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(g)(1)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
164.00
Current assessmentCURRENT_ASSESSMENT_AMT
164.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
164.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Nov 8, 2022
History period endHISTORY_END_DT
Feb 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
CTW Corporation
IDVIOLATOR_ID
C0399
Operator start at the mine, as assessedVIOLATOR_START_DT
Feb 7, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 8, 2024
Citation number: 9695013
Standard: 56.14107(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695013
Assessment control numberASSESS_CASE_NO
000595788
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 9, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 8, 2024
Final order dateFINAL_ORDER_DT
Apr 17, 2024
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.69
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Nov 8, 2022
History period endHISTORY_END_DT
Feb 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 8, 2024
Citation number: 9695011
Standard: 56.12018
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695011
Assessment control numberASSESS_CASE_NO
000595788
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 9, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 8, 2024
Final order dateFINAL_ORDER_DT
Apr 17, 2024
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12018
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.69
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.077
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Nov 8, 2022
History period endHISTORY_END_DT
Feb 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 8, 2024
Citation number: 9695010
Standard: 56.14110
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695010
Assessment control numberASSESS_CASE_NO
000595788
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 9, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 8, 2024
Final order dateFINAL_ORDER_DT
Apr 17, 2024
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14110
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.69
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Nov 8, 2022
History period endHISTORY_END_DT
Feb 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 8, 2024
Citation number: 9695014
Standard: 56.14207
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695014
Assessment control numberASSESS_CASE_NO
000596169
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 31, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 8, 2024
Final order dateFINAL_ORDER_DT
Apr 29, 2024
Bill first printedBILL_PRINT_DT
Mar 21, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 29, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Nov 8, 2022
History period endHISTORY_END_DT
Feb 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
CTW Corporation
IDVIOLATOR_ID
C0399
Operator start at the mine, as assessedVIOLATOR_START_DT
Feb 7, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 7, 2024
Citation number: 9695009
Standard: 56.4503
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695009
Assessment control numberASSESS_CASE_NO
000595788
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 9, 2024
Citation issuedISSUE_DT
Feb 7, 2024
Date of occurrenceOCCURRENCE_DT
Feb 7, 2024
Final order dateFINAL_ORDER_DT
Apr 17, 2024
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4503
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
32
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.69
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Nov 7, 2022
History period endHISTORY_END_DT
Feb 6, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 6, 2024
Citation number: 9695007
Standard: 56.12004
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695007
Assessment control numberASSESS_CASE_NO
000596037
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 3, 2024
Citation issuedISSUE_DT
Feb 6, 2024
Date of occurrenceOCCURRENCE_DT
Feb 6, 2024
Final order dateFINAL_ORDER_DT
Apr 24, 2024
Bill first printedBILL_PRINT_DT
Mar 20, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 24, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Mine Act interestMINEACT_INTEREST_AMT
0.84
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Nov 6, 2022
History period endHISTORY_END_DT
Feb 5, 2024

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Musson Brothers Inc
IDVIOLATOR_ID
2MD
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 16, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (19)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 6, 2024
Citation number: 9695003
Standard: 56.20003(c)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695003
Assessment control numberASSESS_CASE_NO
000595788
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 9, 2024
Citation issuedISSUE_DT
Feb 6, 2024
Date of occurrenceOCCURRENCE_DT
Feb 6, 2024
Final order dateFINAL_ORDER_DT
Apr 17, 2024
Bill first printedBILL_PRINT_DT
Mar 14, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
11
Violations per inspection dayVPID
0.82
Operator hours worked at the mineVIOLATOR_MINE_HRS
34923
Size of mineSIZE_OF_MINE
34923
Controller hours workedCONTROLLER_HRS
198254
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
198254
History period startHISTORY_START_DT
Nov 6, 2022
History period endHISTORY_END_DT
Feb 5, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Payne & Dolan Inc
IDVIOLATOR_ID
L06188
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 29, 1988
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 6, 2024
Citation number: 9695005
Standard: 56.4101
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695005
Assessment control numberASSESS_CASE_NO
000596037
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 3, 2024
Citation issuedISSUE_DT
Feb 6, 2024
Date of occurrenceOCCURRENCE_DT
Feb 6, 2024
Final order dateFINAL_ORDER_DT
Apr 24, 2024
Bill first printedBILL_PRINT_DT
Mar 20, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 24, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Mine Act interestMINEACT_INTEREST_AMT
0.84
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Nov 6, 2022
History period endHISTORY_END_DT
Feb 5, 2024

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Musson Brothers Inc
IDVIOLATOR_ID
2MD
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 16, 2011
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742376
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (19)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

25 most recent of 215 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

NO DYS AWY FRM WRK,NO RSTR ACT
17
DAYS AWAY FROM WORK ONLY
13
DYS AWY FRM WRK & RESTRCTD ACT
5
ALL OTHER CASES (INCL 1ST AID)
2
OCCUPATNAL ILLNESS NOT DEG 1-6
1
Date: Jun 29, 2026
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220262170001
DateACCIDENT_DT
Jun 29, 2026
TimeACCIDENT_TIME
0600
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
CONTAINERS,NEC
Source of injury codeINJURY_SOURCE_CD
008
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
980 XE
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Returned to workRETURN_TO_WORK_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 23, 2026
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220261340005
DateACCIDENT_DT
Apr 23, 2026
TimeACCIDENT_TIME
1550
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Idle
Activity codeACTIVITY_CD
034
Source of injuryINJURY_SOURCE
PULVERIZED MINERAL (DUST)
Source of injury codeINJURY_SOURCE_CD
092
Nature of injuryNATURE_INJURY
SCRATCH,ABRASION,SUPERFCL
Nature of injury codeNATURE_INJURY_CD
310
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
Apr 23, 2026

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 10, 2025
Degree of injury: ALL OTHER CASES (INCL 1ST AID)
Classification: STRIKING OR BUMPING
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220251740004
DateACCIDENT_DT
Jun 10, 2025
TimeACCIDENT_TIME
0930
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
ALL OTHER CASES (INCL 1ST AID)
Degree of injury codeDEGREE_INJURY_CD
10
ClassificationCLASSIFICATION
STRIKING OR BUMPING
Classification codeCLASSIFICATION_CD
20
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HEAD,NEC
Part of body codeINJ_BODY_PART_CD
100
Returned to workRETURN_TO_WORK_DT
Jun 10, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Screen, Vibrator, Shaker, Rock screener, Scalper
Equipment codeMINING_EQUIP_CD
58
Equipment manufacturerEQUIP_MFR_NAME
Cedar Rapids
Equipment manufacturer codeEQUIP_MFR_CD
019
Equipment model numberEQUIP_MODEL_NO
7 x 20
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 6, 2025
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220251400002
DateACCIDENT_DT
May 6, 2025
TimeACCIDENT_TIME
1030
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Returned to workRETURN_TO_WORK_DT
May 6, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 6, 2024
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Bodily reaction, NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220243510001
DateACCIDENT_DT
Dec 6, 2024
TimeACCIDENT_TIME
0730
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Bodily reaction, NEC
Accident type codeACCIDENT_TYPE_CD
26
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
BODILY MOTION
Source of injury codeINJURY_SOURCE_CD
002
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Returned to workRETURN_TO_WORK_DT
Dec 6, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
50x62
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 26, 2024
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Struck against stationary object
Days lost: 4
Details

The report

Document numberDOCUMENT_NO
220240850001
DateACCIDENT_DT
Feb 26, 2024
TimeACCIDENT_TIME
1600
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320240850001

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
ELBOW
Part of body codeINJ_BODY_PART_CD
312
Days lostDAYS_LOST
4
Returned to workRETURN_TO_WORK_DT
Mar 18, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Washers
Equipment codeMINING_EQUIP_CD
69
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
2009344
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 8, 2024
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220240300001
DateACCIDENT_DT
Jan 8, 2024
TimeACCIDENT_TIME
1250
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
PUMPS,FANS,COMP,ENG,NEC
Source of injury codeINJURY_SOURCE_CD
098
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Returned to workRETURN_TO_WORK_DT
Jan 8, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Pump, Slurry pump, Sump pump
Equipment codeMINING_EQUIP_CD
48
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
S12C
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Oct 20, 2021
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Fall from ladders
Days lost: 41
Details

The report

Document numberDOCUMENT_NO
220213050012
DateACCIDENT_DT
Oct 20, 2021
TimeACCIDENT_TIME
1100
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Fall from ladders
Accident type codeACCIDENT_TYPE_CD
14
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320220070001

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
SKULL
Part of body codeINJ_BODY_PART_CD
160
Days lostDAYS_LOST
41
Returned to workRETURN_TO_WORK_DT
Jan 4, 2022

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
385 BL
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 30, 2021
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220212180002
DateACCIDENT_DT
Jul 30, 2021
TimeACCIDENT_TIME
1340
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Returned to workRETURN_TO_WORK_DT
Jul 30, 2021

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
988G
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Mar 1, 2019
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220190660016
DateACCIDENT_DT
Mar 1, 2019
TimeACCIDENT_TIME
0745
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
CROWBAR,PRY BAR
Source of injury codeINJURY_SOURCE_CD
048
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Mar 1, 2019

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
Equipment model numberEQUIP_MODEL_NO
NA
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 21, 2019
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Fall from machine
Days lost: 34
Details

The report

Document numberDOCUMENT_NO
220190300047
DateACCIDENT_DT
Jan 21, 2019
TimeACCIDENT_TIME
1630
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall from machine
Accident type codeACCIDENT_TYPE_CD
12
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320190720006

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
Part of body codeINJ_BODY_PART_CD
440
Days lostDAYS_LOST
34
Returned to workRETURN_TO_WORK_DT
Mar 11, 2019

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Bulldozer, Dozer, Crawler tractor, Push cat
Equipment codeMINING_EQUIP_CD
08
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
D6R
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Contractor IDCONTRACTOR_ID
2MD
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME

Date: Apr 5, 2018
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 8
Details

The report

Document numberDOCUMENT_NO
220181010002
DateACCIDENT_DT
Apr 5, 2018
TimeACCIDENT_TIME
0645
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320181100001

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
WRENCH
Source of injury codeINJURY_SOURCE_CD
050
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days lostDAYS_LOST
8
Returned to workRETURN_TO_WORK_DT
May 14, 2018

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 16, 2017
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion in pulling or pushing objects
Days lost: 54
Details

The report

Document numberDOCUMENT_NO
220181300001
DateACCIDENT_DT
Aug 16, 2017
TimeACCIDENT_TIME
0900
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320182670001

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
WRENCH
Source of injury codeINJURY_SOURCE_CD
050
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days lostDAYS_LOST
54
Returned to workRETURN_TO_WORK_DT
Sep 17, 2018

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 20, 2017
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220170550003
DateACCIDENT_DT
Feb 20, 2017
TimeACCIDENT_TIME
1130
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Feb 20, 2017

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 20, 2016
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220161180001
DateACCIDENT_DT
Apr 20, 2016
TimeACCIDENT_TIME
1050
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
KNIFE
Source of injury codeINJURY_SOURCE_CD
049
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
ABDOMEN/INTERNAL ORGANS
Part of body codeINJ_BODY_PART_CD
410
Returned to workRETURN_TO_WORK_DT
Apr 20, 2016

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 15, 2016
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion in pulling or pushing objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220162140007
DateACCIDENT_DT
Feb 15, 2016
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
0800
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
WRENCH
Source of injury codeINJURY_SOURCE_CD
050
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Returned to workRETURN_TO_WORK_DT
Feb 15, 2016

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 25, 2016
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion in wielding or throwing objects
Days lost: 19
Details

The report

Document numberDOCUMENT_NO
220160290005
DateACCIDENT_DT
Jan 25, 2016
TimeACCIDENT_TIME
1000
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion in wielding or throwing objects
Accident type codeACCIDENT_TYPE_CD
29
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320161580001

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
KNIFE
Source of injury codeINJURY_SOURCE_CD
049
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days of restricted workDAYS_RESTRICT
5
Days lostDAYS_LOST
19
Returned to workRETURN_TO_WORK_DT
May 31, 2016

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 7, 2015
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220152240001
DateACCIDENT_DT
Aug 7, 2015
TimeACCIDENT_TIME
0920
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
KNIFE
Source of injury codeINJURY_SOURCE_CD
049
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
THIGH/FEMUR
Part of body codeINJ_BODY_PART_CD
511
Returned to workRETURN_TO_WORK_DT
Aug 7, 2015

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 28, 2015
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Flash burns (welding)
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220150330003
DateACCIDENT_DT
Jan 28, 2015
TimeACCIDENT_TIME
1400
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Flash burns (welding)
Accident type codeACCIDENT_TYPE_CD
40
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Welding or cutting
Activity codeACTIVITY_CD
093
Source of injuryINJURY_SOURCE
MACHINE,NEC-WELDR,OFC MAC
Source of injury codeINJURY_SOURCE_CD
074
Nature of injuryNATURE_INJURY
ELECT.ARC BURN-NOT CONTAC
Nature of injury codeNATURE_INJURY_CD
301
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Jan 30, 2015

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Welding machine, Torch, Cutting torch, Arc welder, Air arc
Equipment codeMINING_EQUIP_CD
70
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 27, 2014
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 3
Details

The report

Document numberDOCUMENT_NO
220141550001
DateACCIDENT_DT
May 27, 2014
TimeACCIDENT_TIME
1700
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Days lostDAYS_LOST
3
Returned to workRETURN_TO_WORK_DT
Jun 3, 2014

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
2ZR1016a
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 19, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220131120005
DateACCIDENT_DT
Apr 19, 2013
TimeACCIDENT_TIME
0900
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520
Returned to workRETURN_TO_WORK_DT
Apr 19, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 15, 2010
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 7
Details

The report

Document numberDOCUMENT_NO
220102640035
DateACCIDENT_DT
Sep 15, 2010
TimeACCIDENT_TIME
1450
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320103480017

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
BELT CONVEYORS
Source of injury codeINJURY_SOURCE_CD
035
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
55
Days lostDAYS_LOST
7
Returned to workRETURN_TO_WORK_DT
Dec 13, 2010

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Conveyor, Belt feeder, Stage loader, Hopper shaker, Belt structure
Equipment codeMINING_EQUIP_CD
13
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Mar 1, 2010
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion in wielding or throwing objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220100630037
DateACCIDENT_DT
Mar 1, 2010
TimeACCIDENT_TIME
1645
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion in wielding or throwing objects
Accident type codeACCIDENT_TYPE_CD
29
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
AXE,HAMMER,SLEDGE
Source of injury codeINJURY_SOURCE_CD
046
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Returned to workRETURN_TO_WORK_DT
Mar 1, 2010

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crane, Cherry picker, Lift basket, Scissor truck, Boom truck
Equipment codeMINING_EQUIP_CD
14
Equipment manufacturerEQUIP_MFR_NAME
Bucyrus-Erie
Equipment manufacturer codeEQUIP_MFR_CD
015
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 15, 2010
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220100480045
DateACCIDENT_DT
Feb 15, 2010
TimeACCIDENT_TIME
1400
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
KNIFE
Source of injury codeINJURY_SOURCE_CD
049
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Feb 15, 2010

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 14, 2009
Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6
Classification: DISORDERS (REPEATED TRAUMA)
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220092720023
DateACCIDENT_DT
Sep 14, 2009
TimeACCIDENT_TIME
1200
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
OCCUPATNAL ILLNESS NOT DEG 1-6
Degree of injury codeDEGREE_INJURY_CD
07
ClassificationCLASSIFICATION
DISORDERS (REPEATED TRAUMA)
Classification codeCLASSIFICATION_CD
31
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Unknown
Activity codeACTIVITY_CD
099
Source of injuryINJURY_SOURCE
MISCELLANEOUS,NEC
Source of injury codeINJURY_SOURCE_CD
127
Nature of injuryNATURE_INJURY
JOINT,TENDON,MUSCL INFLAM
Nature of injury codeNATURE_INJURY_CD
270
Part of bodyINJ_BODY_PART
ELBOW
Part of body codeINJ_BODY_PART_CD
312
Returned to workRETURN_TO_WORK_DT
Sep 25, 2009

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Controller IDCONTROLLER_ID
M02666
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

25 most recent of 38 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 0
Hours worked: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (4)

Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 0
Hours worked: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (4)

Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 19
Hours worked: 28,715
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
19
Hours workedANNUAL_HRS
28715
Average hours per employeeAVG_EMPLOYEE_HOURS
1511

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 18
Hours worked: 36,107
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
18
Hours workedANNUAL_HRS
36107
Average hours per employeeAVG_EMPLOYEE_HOURS
2006

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,143
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1143
Average hours per employeeAVG_EMPLOYEE_HOURS
1143

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 22
Hours worked: 43,696
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
22
Hours workedANNUAL_HRS
43696
Average hours per employeeAVG_EMPLOYEE_HOURS
1986

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 2,760
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2760
Average hours per employeeAVG_EMPLOYEE_HOURS
1380

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 18
Hours worked: 34,923
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
18
Hours workedANNUAL_HRS
34923
Average hours per employeeAVG_EMPLOYEE_HOURS
1940

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,196
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1196
Average hours per employeeAVG_EMPLOYEE_HOURS
1196

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 20
Hours worked: 40,491
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
20
Hours workedANNUAL_HRS
40491
Average hours per employeeAVG_EMPLOYEE_HOURS
2025

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,244
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1244
Average hours per employeeAVG_EMPLOYEE_HOURS
1244

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 18
Hours worked: 36,285
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
18
Hours workedANNUAL_HRS
36285
Average hours per employeeAVG_EMPLOYEE_HOURS
2016

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,370
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1370
Average hours per employeeAVG_EMPLOYEE_HOURS
1370

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 21
Hours worked: 41,092
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
21
Hours workedANNUAL_HRS
41092
Average hours per employeeAVG_EMPLOYEE_HOURS
1957

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 1,611
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1611
Average hours per employeeAVG_EMPLOYEE_HOURS
1611

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 23
Hours worked: 45,831
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
23
Hours workedANNUAL_HRS
45831
Average hours per employeeAVG_EMPLOYEE_HOURS
1993

Mine

Mine IDMINE_ID
4700060
Mine name in this fileCURR_MINE_NM
PC2 Franklin Aggregates
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Peru IL Field Office
Nearest town
Franklin
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
14
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
PC2 Franklin Aggregates
Mine IDMINE_ID
4700060
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Jan 23, 2014
Legal entity typeCOMPANY_TYPE
Corporation
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
55

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Payne & Dolan Inc
Operator IDCURRENT_OPERATOR_ID
L06188
Controller IDCURRENT_CONTROLLER_ID
M02666
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Nov 29, 1988

Location and MSHA office

StateSTATE
WI
Bureau of Mines state codeBOM_STATE_CD
47
FIPS county codeFIPS_CNTY_CD
079
FIPS county nameFIPS_CNTY_NM
Milwaukee
Nearest townNEAREST_TOWN
Franklin
MSHA districtDISTRICT
M4
MSHA office codeOFFICE_CD
M4821
MSHA officeOFFICE_NAME
Peru IL Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
150
Most recent assessment control numberASSESS_CTRL_NO
000651408

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Limestone NEC
Primary commodity codePRIMARY_SIC_CD
142200
Primary SIC codePRIMARY_SIC_CD_1
1422
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
14
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Payne & Dolan Inc
From: Nov 29, 1988
To: No end date
Controller: Not shown
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Payne & Dolan Inc
Operator IDOPERATOR_ID
L06188
Operator fromOPERATOR_START_DT
Nov 29, 1988

Controller

Controller IDCONTROLLER_ID
M02666
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Franklin Aggregates Inc
From: Sep 19, 1983
To: Nov 28, 1988
Controller: Not shown
From : Sep 19, 1983
To : Nov 28, 1988
Details

Operator

OperatorOPERATOR_NAME
Franklin Aggregates Inc
Operator IDOPERATOR_ID
L06713
Operator fromOPERATOR_START_DT
Sep 19, 1983
Operator toOPERATOR_END_DT
Nov 28, 1988

Controller

Controller IDCONTROLLER_ID
M05347
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Sep 19, 1983
Controller toCONTROLLER_END_DT
Nov 28, 1988

Mine

Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

Operator: Franklin Stone Products Inc
From: Jan 1, 1950
To: Sep 18, 1983
Controller: Not shown
From : Jan 1, 1950
To : Sep 18, 1983
Details

Operator

OperatorOPERATOR_NAME
Franklin Stone Products Inc
Operator IDOPERATOR_ID
L06712
Operator fromOPERATOR_START_DT
Jan 1, 1950
Operator toOPERATOR_END_DT
Sep 18, 1983

Controller

Controller IDCONTROLLER_ID
M05346
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950
Controller toCONTROLLER_END_DT
Sep 18, 1983

Mine

Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

Payne & Dolan Inc·Contact title Safety Manager·Street not recorded, Waukesha WI 53188

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Payne & Dolan Inc
Contact titleCONTACT_TITLE
Safety Manager
CityCITY
Waukesha
StateSTATE_ABBR
WI
State nameSTATE
Wisconsin
ZIP codeZIP_CD
53188
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
55

Mine

Mine IDMINE_ID
4700060
Mine name in this fileMINE_NAME
PC2 Franklin Aggregates
Nearest townNEAREST_TOWN
Franklin
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Jan 23, 2014
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Limestone NEC
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology