Hartmann Pit
Metal/Non-Metal, Surface·Construction Sand and Gravel·Ozaukee, Wisconsin·Mine ID 4700853
Operator Hartmann Sand & Gravel Company Inc·Controller not shown·MSHA status Active since Dec 5, 2011
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionApr 6 to Apr 9, 2026Inspectors 1 | Hours on site 5Began: Apr 6, 2026Ended: Apr 9, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Closed outINSPECTION_END_DT
- Apr 9, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F02EFDD
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 9 to Feb 10, 2026Inspectors 1 | Hours on site 9.5Began: Feb 9, 2026Ended: Feb 10, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 9, 2026
- Closed outINSPECTION_END_DT
- Feb 10, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F02EC64
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 21 to Jul 23, 2025Inspectors 1 | Hours on site 4.5Began: Jul 21, 2025Ended: Jul 23, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 21, 2025
- Closed outINSPECTION_END_DT
- Jul 23, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F0175C4
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 4 to Nov 5, 2024Inspectors 1 | Hours on site 7.75Began: Nov 4, 2024Ended: Nov 5, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 4, 2024
- Closed outINSPECTION_END_DT
- Nov 5, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F00EF85
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 24 to Jun 25, 2024Inspectors 1 | Hours on site 6Began: Jun 24, 2024Ended: Jun 25, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 24, 2024
- Closed outINSPECTION_END_DT
- Jun 25, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F003E8D
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 31 to Feb 2, 2024Inspectors 1 | Hours on site 8Began: Jan 31, 2024Ended: Feb 2, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 31, 2024
- Closed outINSPECTION_END_DT
- Feb 2, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6909872
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 17, 2023Inspectors 1 | Hours on site 6Began: May 17, 2023Ended: May 17, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2023
- Closed outINSPECTION_END_DT
- May 17, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6909504
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionOct 17 to Oct 19, 2022Inspectors 1 | Hours on site 6Began: Oct 17, 2022Ended: Oct 19, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 17, 2022
- Closed outINSPECTION_END_DT
- Oct 19, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6905958
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 14 to Jun 15, 2022Inspectors 1 | Hours on site 7.75Began: Jun 14, 2022Ended: Jun 15, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 14, 2022
- Closed outINSPECTION_END_DT
- Jun 15, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6905830
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 11 to Jan 12, 2022Inspectors 1 | Hours on site 4.5Began: Jan 11, 2022Ended: Jan 12, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 11, 2022
- Closed outINSPECTION_END_DT
- Jan 12, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6905158
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 24 to Aug 25, 2021Inspectors 1 | Hours on site 7.75Began: Aug 24, 2021Ended: Aug 25, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 24, 2021
- Closed outINSPECTION_END_DT
- Aug 25, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6905026
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 1 to Mar 2, 2021Inspectors 1 | Hours on site 11.5Began: Mar 1, 2021Ended: Mar 2, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 1, 2021
- Closed outINSPECTION_END_DT
- Mar 2, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6840725
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 22
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 8 to Jun 9, 2020Inspectors 1 | Hours on site 7Began: Jun 8, 2020Ended: Jun 9, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 8, 2020
- Closed outINSPECTION_END_DT
- Jun 9, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6834855
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 18 to Dec 19, 2019Inspectors 1 | Hours on site 5.5Began: Dec 18, 2019Ended: Dec 19, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 18, 2019
- Closed outINSPECTION_END_DT
- Dec 19, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6834821
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 18, 2019Inspectors 1 | Hours on site 5.75Began: Jun 18, 2019Ended: Jun 18, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 18, 2019
- Closed outINSPECTION_END_DT
- Jun 18, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6749775
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 4, 2018Inspectors 1 | Hours on site 3Began: Dec 4, 2018Ended: Dec 4, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 4, 2018
- Closed outINSPECTION_END_DT
- Dec 4, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6749737
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 22, 2018Inspectors 1 | Hours on site 4.75Began: May 22, 2018Ended: May 22, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 22, 2018
- Closed outINSPECTION_END_DT
- May 22, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6742978
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionOct 18 to Oct 19, 2017Inspectors 1 | Hours on site 3.25Began: Oct 18, 2017Ended: Oct 19, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 18, 2017
- Closed outINSPECTION_END_DT
- Oct 19, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6742919
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 11, 2017Inspectors 1 | Hours on site 4.25Began: Jul 11, 2017Ended: Jul 11, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 11, 2017
- Closed outINSPECTION_END_DT
- Jul 11, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6742235
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 28, 2017Inspectors 1 | Hours on site 2.25Began: Mar 28, 2017Ended: Mar 28, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 28, 2017
- Closed outINSPECTION_END_DT
- Mar 28, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6742110
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 16, 2016Inspectors 1 | Hours on site 2.75Began: Aug 16, 2016Ended: Aug 16, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 16, 2016
- Closed outINSPECTION_END_DT
- Aug 16, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6705069
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 2, 2016Inspectors 1 | Hours on site 4.25Began: Feb 2, 2016Ended: Feb 2, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 2, 2016
- Closed outINSPECTION_END_DT
- Feb 2, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6702930
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 30 to Jul 1, 2015Inspectors 1 | Hours on site 5.5Began: Jun 30, 2015Ended: Jul 1, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 30, 2015
- Closed outINSPECTION_END_DT
- Jul 1, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6702054
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 27, 2015Inspectors 1 | Hours on site 7.75Began: Jan 27, 2015Ended: Jan 27, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 27, 2015
- Closed outINSPECTION_END_DT
- Jan 27, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6702029
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 16, 2014Inspectors 1 | Hours on site 8.5Began: Apr 16, 2014Ended: Apr 16, 2014Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 16, 2014
- Closed outINSPECTION_END_DT
- Apr 16, 2014
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6636827
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4821
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
25 most recent of 53 inspections and other MSHA visits since Sep 27, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Feb 10, 2026Type: CitationStandard: 56.11016S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5118507
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 10, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1100
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 10, 2026
- 30 CFR part and sectionPART_SECTION
- 56.11016
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 10, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1115
- Latest dueLATEST_TERM_DUE_DT
- Feb 10, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Feb 10, 2026
- Terminated, timeTERMINATION_TIME
- 1448
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 9, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 16, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 21, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- F02EC64
- Inspection beganINSPECTION_BEGIN_DT
- Feb 9, 2026
- Inspection closed outINSPECTION_END_DT
- Feb 10, 2026
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 10, 2026Type: CitationStandard: 56.9301S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5118506
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 10, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0939
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 10, 2026
- 30 CFR part and sectionPART_SECTION
- 56.9301
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 10, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Feb 10, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Feb 10, 2026
- Terminated, timeTERMINATION_TIME
- 1341
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 9, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 16, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 21, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- F02EC64
- Inspection beganINSPECTION_BEGIN_DT
- Feb 9, 2026
- Inspection closed outINSPECTION_END_DT
- Feb 10, 2026
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 10, 2026Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5118508
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 10, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1425
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 10, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 10, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1425
- Latest dueLATEST_TERM_DUE_DT
- Feb 10, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1425
- TerminatedTERMINATION_DT
- Feb 10, 2026
- Terminated, timeTERMINATION_TIME
- 1426
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 9, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 16, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 21, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- F02EC64
- Inspection beganINSPECTION_BEGIN_DT
- Feb 9, 2026
- Inspection closed outINSPECTION_END_DT
- Feb 10, 2026
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 17, 2023Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9690400
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 17, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1053
- Date of occurrenceVIOLATION_OCCUR_DT
- May 17, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 18, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- May 18, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- May 17, 2023
- Terminated, timeTERMINATION_TIME
- 1144
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jul 6, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 9, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 26, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6909504
- Inspection beganINSPECTION_BEGIN_DT
- May 17, 2023
- Inspection closed outINSPECTION_END_DT
- May 17, 2023
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 19, 2022Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9690255
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 19, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1120
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 19, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 19, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Oct 19, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Oct 19, 2022
- Terminated, timeTERMINATION_TIME
- 1124
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Dec 8, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 11, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 22, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6905958
- Inspection beganINSPECTION_BEGIN_DT
- Oct 17, 2022
- Inspection closed outINSPECTION_END_DT
- Oct 19, 2022
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 14, 2022Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9621507
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 14, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1500
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 14, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 14, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jun 14, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jun 14, 2022
- Terminated, timeTERMINATION_TIME
- 1650
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Aug 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 14, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 25, 2022
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6905830
- Inspection beganINSPECTION_BEGIN_DT
- Jun 14, 2022
- Inspection closed outINSPECTION_END_DT
- Jun 15, 2022
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 14, 2022Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9621506
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 14, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1325
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 14, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 15, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Jun 15, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Jun 14, 2022
- Terminated, timeTERMINATION_TIME
- 1703
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Aug 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 14, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 25, 2022
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6905830
- Inspection beganINSPECTION_BEGIN_DT
- Jun 14, 2022
- Inspection closed outINSPECTION_END_DT
- Jun 15, 2022
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 9, 2020Type: CitationStandard: 56.14105S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9445615
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 9, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1015
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 9, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14105
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 9, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jun 9, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jun 9, 2020
- Terminated, timeTERMINATION_TIME
- 1205
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Aug 6, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 14, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 19, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6834855
- Inspection beganINSPECTION_BEGIN_DT
- Jun 8, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 9, 2020
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 9, 2020Type: CitationStandard: 56.9300(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9445616
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 9, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1035
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 9, 2020
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 9, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jun 9, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jun 9, 2020
- Terminated, timeTERMINATION_TIME
- 1100
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Aug 6, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 14, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 19, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6834855
- Inspection beganINSPECTION_BEGIN_DT
- Jun 8, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 9, 2020
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 18, 2019Type: CitationStandard: 56.14100(c)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9444345
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 18, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1408
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 18, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14100(c)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 18, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Dec 18, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Dec 18, 2019
- Terminated, timeTERMINATION_TIME
- 1415
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Feb 6, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 11, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 19, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6834821
- Inspection beganINSPECTION_BEGIN_DT
- Dec 18, 2019
- Inspection closed outINSPECTION_END_DT
- Dec 19, 2019
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 18, 2019Type: CitationStandard: 56.12032S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9386600
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 18, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1100
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 18, 2019
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 18, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 18, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jun 18, 2019
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Aug 8, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 11, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 20, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6749775
- Inspection beganINSPECTION_BEGIN_DT
- Jun 18, 2019
- Inspection closed outINSPECTION_END_DT
- Jun 18, 2019
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 22, 2018Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8957515
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 22, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 0917
- Date of occurrenceVIOLATION_OCCUR_DT
- May 22, 2018
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 22, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- May 22, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- May 22, 2018
- Terminated, timeTERMINATION_TIME
- 1040
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Jul 12, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 17, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 31, 2018
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6742978
- Inspection beganINSPECTION_BEGIN_DT
- May 22, 2018
- Inspection closed outINSPECTION_END_DT
- May 22, 2018
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 22, 2018Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8957514
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 22, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 0756
- Date of occurrenceVIOLATION_OCCUR_DT
- May 22, 2018
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 22, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- May 22, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- May 22, 2018
- Terminated, timeTERMINATION_TIME
- 0815
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Jul 12, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 17, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 31, 2018
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6742978
- Inspection beganINSPECTION_BEGIN_DT
- May 22, 2018
- Inspection closed outINSPECTION_END_DT
- May 22, 2018
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 18, 2017Type: CitationStandard: 56.14100(c)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $116.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8945985
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 18, 2017
- Time issuedVIOLATION_ISSUE_TIME
- 0945
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 18, 2017
- 30 CFR part and sectionPART_SECTION
- 56.14100(c)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 18, 2017
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 18, 2017
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 18, 2017
- Terminated, timeTERMINATION_TIME
- 1527
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 116
- Current proposed assessmentAMOUNT_DUE
- 116
- Amount paidAMOUNT_PAID
- 116
- Bill first printedBILL_PRINT_DT
- Dec 7, 2017
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 21, 2017
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6742919
- Inspection beganINSPECTION_BEGIN_DT
- Oct 18, 2017
- Inspection closed outINSPECTION_END_DT
- Oct 19, 2017
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 2, 2016Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8849179
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 2, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 1007
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 2, 2016
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 2, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Feb 2, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Feb 2, 2016
- Terminated, timeTERMINATION_TIME
- 1012
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Mar 10, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 20, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 29, 2016
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6702930
- Inspection beganINSPECTION_BEGIN_DT
- Feb 2, 2016
- Inspection closed outINSPECTION_END_DT
- Feb 2, 2016
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 30, 2015Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8849357
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 30, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 0850
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 30, 2015
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 30, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Jun 30, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Jun 30, 2015
- Terminated, timeTERMINATION_TIME
- 1111
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Aug 6, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 11, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 25, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6702054
- Inspection beganINSPECTION_BEGIN_DT
- Jun 30, 2015
- Inspection closed outINSPECTION_END_DT
- Jul 1, 2015
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 30, 2015Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8849358
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 30, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 0947
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 30, 2015
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 30, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1030
- Latest dueLATEST_TERM_DUE_DT
- Jun 30, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1030
- TerminatedTERMINATION_DT
- Jun 30, 2015
- Terminated, timeTERMINATION_TIME
- 1003
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Aug 6, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 11, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 25, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6702054
- Inspection beganINSPECTION_BEGIN_DT
- Jun 30, 2015
- Inspection closed outINSPECTION_END_DT
- Jul 1, 2015
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 27, 2015Type: CitationStandard: 56.4101S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8849254
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 27, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 0900
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 27, 2015
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 27, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 0930
- Latest dueLATEST_TERM_DUE_DT
- Jan 27, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 0930
- TerminatedTERMINATION_DT
- Jan 27, 2015
- Terminated, timeTERMINATION_TIME
- 0915
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Mar 12, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 15, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 30, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6702029
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2015
- Inspection closed outINSPECTION_END_DT
- Jan 27, 2015
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 16, 2014Type: CitationStandard: 56.12023S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8742860
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 16, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 0845
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 16, 2014
- 30 CFR part and sectionPART_SECTION
- 56.12023
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 16, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Apr 16, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Apr 16, 2014
- Terminated, timeTERMINATION_TIME
- 0930
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jun 12, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 19, 2014
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 2, 2014
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6636827
- Inspection beganINSPECTION_BEGIN_DT
- Apr 16, 2014
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2014
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 16, 2014Type: CitationStandard: 56.4203S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8742859
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 16, 2014
- Time issuedVIOLATION_ISSUE_TIME
- 0830
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 16, 2014
- 30 CFR part and sectionPART_SECTION
- 56.4203
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 16, 2014
- Originally due, timeORIG_TERM_DUE_TIME
- 0845
- Latest dueLATEST_TERM_DUE_DT
- Apr 16, 2014
- Latest due, timeLATEST_TERM_DUE_TIME
- 0845
- TerminatedTERMINATION_DT
- Apr 16, 2014
- Terminated, timeTERMINATION_TIME
- 0832
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jun 12, 2014
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 19, 2014
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 2, 2014
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6636827
- Inspection beganINSPECTION_BEGIN_DT
- Apr 16, 2014
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2014
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 10, 2012Type: CitationStandard: 56.14130(e)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6143750
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 10, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1617
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 10, 2012
- 30 CFR part and sectionPART_SECTION
- 56.14130(e)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 31, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Dec 7, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Dec 11, 2012
- Terminated, timeTERMINATION_TIME
- 1337
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 11, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6572466
- Inspection beganINSPECTION_BEGIN_DT
- Oct 10, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 11, 2012
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 10, 2012Type: CitationStandard: 56.4501S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $108.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6143748
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 10, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1219
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 10, 2012
- 30 CFR part and sectionPART_SECTION
- 56.4501
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 11, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 11, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 11, 2012
- Terminated, timeTERMINATION_TIME
- 0945
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 108
- Current proposed assessmentAMOUNT_DUE
- 108
- Amount paidAMOUNT_PAID
- 108
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 11, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6572466
- Inspection beganINSPECTION_BEGIN_DT
- Oct 10, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 11, 2012
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 10, 2012Type: CitationStandard: 56.12034S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $540.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6143747
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 10, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1159
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 10, 2012
- 30 CFR part and sectionPART_SECTION
- 56.12034
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 10, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1215
- Latest dueLATEST_TERM_DUE_DT
- Oct 10, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1215
- TerminatedTERMINATION_DT
- Oct 10, 2012
- Terminated, timeTERMINATION_TIME
- 1244
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 540
- Current proposed assessmentAMOUNT_DUE
- 540
- Amount paidAMOUNT_PAID
- 540
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 11, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6572466
- Inspection beganINSPECTION_BEGIN_DT
- Oct 10, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 11, 2012
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 10, 2012Type: CitationStandard: 56.14107(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6143749
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 10, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1357
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 10, 2012
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 11, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 11, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 11, 2012
- Terminated, timeTERMINATION_TIME
- 0957
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 11, 2013
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6572466
- Inspection beganINSPECTION_BEGIN_DT
- Oct 10, 2012
- Inspection closed outINSPECTION_END_DT
- Oct 11, 2012
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 8, 2012Type: CitationStandard: 47.32(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8670209
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 8, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 0951
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 8, 2012
- 30 CFR part and sectionPART_SECTION
- 47.32(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 8, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Aug 8, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Aug 8, 2012
- Terminated, timeTERMINATION_TIME
- 0959
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Oct 11, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2012
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 23, 2012
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDVIOLATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Inspection eventEVENT_NO
- 6580242
- Inspection beganINSPECTION_BEGIN_DT
- Aug 8, 2012
- Inspection closed outINSPECTION_END_DT
- Aug 8, 2012
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
72 citations and orders since Sep 27, 2000: 71 issued to the operator, 1 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Feb 10, 2026Citation number: 5118508Standard: 56.14207Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5118508
- Assessment control numberASSESS_CASE_NO
- 000639183
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 21, 2026
- Citation issuedISSUE_DT
- Feb 10, 2026
- Date of occurrenceOCCURRENCE_DT
- Feb 10, 2026
- Final order dateFINAL_ORDER_DT
- May 16, 2026
- Bill first printedBILL_PRINT_DT
- Apr 9, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 16, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10490
- Size of mineSIZE_OF_MINE
- 10490
- Controller hours workedCONTROLLER_HRS
- 20862
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 20862
- History period startHISTORY_START_DT
- Nov 10, 2024
- History period endHISTORY_END_DT
- Feb 9, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02EC64
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 10, 2026Citation number: 5118507Standard: 56.11016Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5118507
- Assessment control numberASSESS_CASE_NO
- 000639183
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 21, 2026
- Citation issuedISSUE_DT
- Feb 10, 2026
- Date of occurrenceOCCURRENCE_DT
- Feb 10, 2026
- Final order dateFINAL_ORDER_DT
- May 16, 2026
- Bill first printedBILL_PRINT_DT
- Apr 9, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 16, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11016
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10490
- Size of mineSIZE_OF_MINE
- 10490
- Controller hours workedCONTROLLER_HRS
- 20862
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 20862
- History period startHISTORY_START_DT
- Nov 10, 2024
- History period endHISTORY_END_DT
- Feb 9, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02EC64
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 10, 2026Citation number: 5118506Standard: 56.9301Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5118506
- Assessment control numberASSESS_CASE_NO
- 000639183
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 21, 2026
- Citation issuedISSUE_DT
- Feb 10, 2026
- Date of occurrenceOCCURRENCE_DT
- Feb 10, 2026
- Final order dateFINAL_ORDER_DT
- May 16, 2026
- Bill first printedBILL_PRINT_DT
- Apr 9, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 16, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9301
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 2
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10490
- Size of mineSIZE_OF_MINE
- 10490
- Controller hours workedCONTROLLER_HRS
- 20862
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 20862
- History period startHISTORY_START_DT
- Nov 10, 2024
- History period endHISTORY_END_DT
- Feb 9, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02EC64
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 17, 2023Citation number: 9690400Standard: 56.14100(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9690400
- Assessment control numberASSESS_CASE_NO
- 000580622
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 26, 2023
- Citation issuedISSUE_DT
- May 17, 2023
- Date of occurrenceOCCURRENCE_DT
- May 17, 2023
- Final order dateFINAL_ORDER_DT
- Aug 9, 2023
- Bill first printedBILL_PRINT_DT
- Jul 6, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 9, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9520
- Size of mineSIZE_OF_MINE
- 9520
- Controller hours workedCONTROLLER_HRS
- 20128
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 20128
- History period startHISTORY_START_DT
- Feb 17, 2022
- History period endHISTORY_END_DT
- May 16, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6909504
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 19, 2022Citation number: 9690255Standard: 56.12004Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9690255
- Assessment control numberASSESS_CASE_NO
- 000568040
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 22, 2022
- Citation issuedISSUE_DT
- Oct 19, 2022
- Date of occurrenceOCCURRENCE_DT
- Oct 19, 2022
- Final order dateFINAL_ORDER_DT
- Jan 11, 2023
- Bill first printedBILL_PRINT_DT
- Dec 8, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 11, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.25
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9877
- Size of mineSIZE_OF_MINE
- 9877
- Controller hours workedCONTROLLER_HRS
- 21134
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 21134
- History period startHISTORY_START_DT
- Jul 19, 2021
- History period endHISTORY_END_DT
- Oct 18, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6905958
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 14, 2022Citation number: 9621506Standard: 56.14132(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9621506
- Assessment control numberASSESS_CASE_NO
- 000560589
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 25, 2022
- Citation issuedISSUE_DT
- Jun 14, 2022
- Date of occurrenceOCCURRENCE_DT
- Jun 14, 2022
- Final order dateFINAL_ORDER_DT
- Sep 14, 2022
- Bill first printedBILL_PRINT_DT
- Aug 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 14, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 52
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9877
- Size of mineSIZE_OF_MINE
- 9877
- Controller hours workedCONTROLLER_HRS
- 21134
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 21134
- History period startHISTORY_START_DT
- Mar 14, 2021
- History period endHISTORY_END_DT
- Jun 13, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6905830
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 14, 2022Citation number: 9621507Standard: 56.12004Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9621507
- Assessment control numberASSESS_CASE_NO
- 000560589
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 25, 2022
- Citation issuedISSUE_DT
- Jun 14, 2022
- Date of occurrenceOCCURRENCE_DT
- Jun 14, 2022
- Final order dateFINAL_ORDER_DT
- Sep 14, 2022
- Bill first printedBILL_PRINT_DT
- Aug 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 14, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9877
- Size of mineSIZE_OF_MINE
- 9877
- Controller hours workedCONTROLLER_HRS
- 21134
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 21134
- History period startHISTORY_START_DT
- Mar 14, 2021
- History period endHISTORY_END_DT
- Jun 13, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6905830
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 9, 2020Citation number: 9445615Standard: 56.14105Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9445615
- Assessment control numberASSESS_CASE_NO
- 000520048
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 19, 2020
- Citation issuedISSUE_DT
- Jun 9, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 9, 2020
- Final order dateFINAL_ORDER_DT
- Sep 14, 2020
- Bill first printedBILL_PRINT_DT
- Aug 6, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 14, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14105
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 32
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6798
- Size of mineSIZE_OF_MINE
- 6798
- Controller hours workedCONTROLLER_HRS
- 17207
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 17207
- History period startHISTORY_START_DT
- Mar 9, 2019
- History period endHISTORY_END_DT
- Jun 8, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6834855
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 9, 2020Citation number: 9445616Standard: 56.9300(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9445616
- Assessment control numberASSESS_CASE_NO
- 000520048
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 19, 2020
- Citation issuedISSUE_DT
- Jun 9, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 9, 2020
- Final order dateFINAL_ORDER_DT
- Sep 14, 2020
- Bill first printedBILL_PRINT_DT
- Aug 6, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 14, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6798
- Size of mineSIZE_OF_MINE
- 6798
- Controller hours workedCONTROLLER_HRS
- 17207
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 17207
- History period startHISTORY_START_DT
- Mar 9, 2019
- History period endHISTORY_END_DT
- Jun 8, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6834855
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 18, 2019Citation number: 9444345Standard: 56.14100(c)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9444345
- Assessment control numberASSESS_CASE_NO
- 000508936
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 19, 2020
- Citation issuedISSUE_DT
- Dec 18, 2019
- Date of occurrenceOCCURRENCE_DT
- Dec 18, 2019
- Final order dateFINAL_ORDER_DT
- Mar 11, 2020
- Bill first printedBILL_PRINT_DT
- Feb 6, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 11, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(c)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4935
- Size of mineSIZE_OF_MINE
- 4935
- Controller hours workedCONTROLLER_HRS
- 17248
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 17248
- History period startHISTORY_START_DT
- Sep 18, 2018
- History period endHISTORY_END_DT
- Dec 17, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6834821
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 18, 2019Citation number: 9386600Standard: 56.12032Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9386600
- Assessment control numberASSESS_CASE_NO
- 000497203
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 20, 2019
- Citation issuedISSUE_DT
- Jun 18, 2019
- Date of occurrenceOCCURRENCE_DT
- Jun 18, 2019
- Final order dateFINAL_ORDER_DT
- Sep 11, 2019
- Bill first printedBILL_PRINT_DT
- Aug 8, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 11, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4935
- Size of mineSIZE_OF_MINE
- 4935
- Controller hours workedCONTROLLER_HRS
- 17248
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 17248
- History period startHISTORY_START_DT
- Mar 18, 2018
- History period endHISTORY_END_DT
- Jun 17, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6749775
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 22, 2018Citation number: 8957514Standard: 56.12004Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8957514
- Assessment control numberASSESS_CASE_NO
- 000468860
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 31, 2018
- Citation issuedISSUE_DT
- May 22, 2018
- Date of occurrenceOCCURRENCE_DT
- May 22, 2018
- Final order dateFINAL_ORDER_DT
- Aug 17, 2018
- Bill first printedBILL_PRINT_DT
- Jul 12, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 17, 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3894
- Size of mineSIZE_OF_MINE
- 3894
- Controller hours workedCONTROLLER_HRS
- 13644
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13644
- History period startHISTORY_START_DT
- Feb 22, 2017
- History period endHISTORY_END_DT
- May 21, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6742978
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 22, 2018Citation number: 8957515Standard: 56.12004Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8957515
- Assessment control numberASSESS_CASE_NO
- 000468860
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 31, 2018
- Citation issuedISSUE_DT
- May 22, 2018
- Date of occurrenceOCCURRENCE_DT
- May 22, 2018
- Final order dateFINAL_ORDER_DT
- Aug 17, 2018
- Bill first printedBILL_PRINT_DT
- Jul 12, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 17, 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3894
- Size of mineSIZE_OF_MINE
- 3894
- Controller hours workedCONTROLLER_HRS
- 13644
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 13644
- History period startHISTORY_START_DT
- Feb 22, 2017
- History period endHISTORY_END_DT
- May 21, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6742978
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 18, 2017Citation number: 8945985Standard: 56.14100(c)Proposed penalty: $116.00Current assessment: $116.00Paid against proposed penalty: $116.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8945985
- Assessment control numberASSESS_CASE_NO
- 000454373
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 19, 2017
- Citation issuedISSUE_DT
- Oct 18, 2017
- Date of occurrenceOCCURRENCE_DT
- Oct 18, 2017
- Final order dateFINAL_ORDER_DT
- Jan 21, 2018
- Bill first printedBILL_PRINT_DT
- Dec 7, 2017
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(c)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 116.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 116.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 116.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4402
- Size of mineSIZE_OF_MINE
- 4402
- Controller hours workedCONTROLLER_HRS
- 14222
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 14222
- History period startHISTORY_START_DT
- Jul 18, 2016
- History period endHISTORY_END_DT
- Oct 17, 2017
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6742919
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 2, 2016Citation number: 8849179Standard: 56.12004Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8849179
- Assessment control numberASSESS_CASE_NO
- 000405374
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 29, 2016
- Citation issuedISSUE_DT
- Feb 2, 2016
- Date of occurrenceOCCURRENCE_DT
- Feb 2, 2016
- Final order dateFINAL_ORDER_DT
- Apr 20, 2016
- Bill first printedBILL_PRINT_DT
- Mar 10, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 20, 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.333
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5389
- Size of mineSIZE_OF_MINE
- 5389
- Controller hours workedCONTROLLER_HRS
- 14415
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 14415
- History period startHISTORY_START_DT
- Nov 2, 2014
- History period endHISTORY_END_DT
- Feb 1, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6702930
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 30, 2015Citation number: 8849358Standard: 56.12004Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8849358
- Assessment control numberASSESS_CASE_NO
- 000388980
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 25, 2015
- Citation issuedISSUE_DT
- Jun 30, 2015
- Date of occurrenceOCCURRENCE_DT
- Jun 30, 2015
- Final order dateFINAL_ORDER_DT
- Sep 11, 2015
- Bill first printedBILL_PRINT_DT
- Aug 6, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 11, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.75
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5412
- Size of mineSIZE_OF_MINE
- 5412
- Controller hours workedCONTROLLER_HRS
- 11084
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11084
- History period startHISTORY_START_DT
- Mar 30, 2014
- History period endHISTORY_END_DT
- Jun 29, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6702054
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 30, 2015Citation number: 8849357Standard: 56.14107(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8849357
- Assessment control numberASSESS_CASE_NO
- 000388980
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 25, 2015
- Citation issuedISSUE_DT
- Jun 30, 2015
- Date of occurrenceOCCURRENCE_DT
- Jun 30, 2015
- Final order dateFINAL_ORDER_DT
- Sep 11, 2015
- Bill first printedBILL_PRINT_DT
- Aug 6, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 11, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.75
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5412
- Size of mineSIZE_OF_MINE
- 5412
- Controller hours workedCONTROLLER_HRS
- 11084
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11084
- History period startHISTORY_START_DT
- Mar 30, 2014
- History period endHISTORY_END_DT
- Jun 29, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6702054
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 27, 2015Citation number: 8849254Standard: 56.4101Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8849254
- Assessment control numberASSESS_CASE_NO
- 000376476
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 30, 2015
- Citation issuedISSUE_DT
- Jan 27, 2015
- Date of occurrenceOCCURRENCE_DT
- Jan 27, 2015
- Final order dateFINAL_ORDER_DT
- Apr 15, 2015
- Bill first printedBILL_PRINT_DT
- Mar 12, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 15, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 27
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5412
- Size of mineSIZE_OF_MINE
- 5412
- Controller hours workedCONTROLLER_HRS
- 11084
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 11084
- History period startHISTORY_START_DT
- Oct 27, 2013
- History period endHISTORY_END_DT
- Jan 26, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6702029
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 16, 2014Citation number: 8742860Standard: 56.12023Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8742860
- Assessment control numberASSESS_CASE_NO
- 000353527
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 1, 2014
- Citation issuedISSUE_DT
- Apr 16, 2014
- Date of occurrenceOCCURRENCE_DT
- Apr 16, 2014
- Final order dateFINAL_ORDER_DT
- Jul 19, 2014
- Bill first printedBILL_PRINT_DT
- Jun 12, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2014
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 19, 2014
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12023
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4323
- Size of mineSIZE_OF_MINE
- 4323
- Controller hours workedCONTROLLER_HRS
- 10141
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10141
- History period startHISTORY_START_DT
- Jan 16, 2013
- History period endHISTORY_END_DT
- Apr 15, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6636827
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 16, 2014Citation number: 8742859Standard: 56.4203Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8742859
- Assessment control numberASSESS_CASE_NO
- 000353527
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 1, 2014
- Citation issuedISSUE_DT
- Apr 16, 2014
- Date of occurrenceOCCURRENCE_DT
- Apr 16, 2014
- Final order dateFINAL_ORDER_DT
- Jul 19, 2014
- Bill first printedBILL_PRINT_DT
- Jun 12, 2014
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2014
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 19, 2014
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4203
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4323
- Size of mineSIZE_OF_MINE
- 4323
- Controller hours workedCONTROLLER_HRS
- 10141
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 10141
- History period startHISTORY_START_DT
- Jan 16, 2013
- History period endHISTORY_END_DT
- Apr 15, 2014
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6636827
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 10, 2012Citation number: 6143750Standard: 56.14130(e)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6143750
- Assessment control numberASSESS_CASE_NO
- 000308766
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2012
- Citation issuedISSUE_DT
- Oct 10, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 10, 2012
- Final order dateFINAL_ORDER_DT
- Jan 11, 2013
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14130(e)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3118
- Size of mineSIZE_OF_MINE
- 3118
- Controller hours workedCONTROLLER_HRS
- 9361
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9361
- History period startHISTORY_START_DT
- Jul 10, 2011
- History period endHISTORY_END_DT
- Oct 9, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6572466
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 10, 2012Citation number: 6143747Standard: 56.12034Proposed penalty: $540.00Current assessment: $540.00Paid against proposed penalty: $540.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6143747
- Assessment control numberASSESS_CASE_NO
- 000308766
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2012
- Citation issuedISSUE_DT
- Oct 10, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 10, 2012
- Final order dateFINAL_ORDER_DT
- Jan 11, 2013
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12034
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 540.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 540.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 540.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 81
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3118
- Size of mineSIZE_OF_MINE
- 3118
- Controller hours workedCONTROLLER_HRS
- 9361
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9361
- History period startHISTORY_START_DT
- Jul 10, 2011
- History period endHISTORY_END_DT
- Oct 9, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6572466
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 10, 2012Citation number: 6143749Standard: 56.14107(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6143749
- Assessment control numberASSESS_CASE_NO
- 000308766
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2012
- Citation issuedISSUE_DT
- Oct 10, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 10, 2012
- Final order dateFINAL_ORDER_DT
- Jan 11, 2013
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.6
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3118
- Size of mineSIZE_OF_MINE
- 3118
- Controller hours workedCONTROLLER_HRS
- 9361
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9361
- History period startHISTORY_START_DT
- Jul 10, 2011
- History period endHISTORY_END_DT
- Oct 9, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6572466
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 10, 2012Citation number: 6143748Standard: 56.4501Proposed penalty: $108.00Current assessment: $108.00Paid against proposed penalty: $108.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6143748
- Assessment control numberASSESS_CASE_NO
- 000308766
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2012
- Citation issuedISSUE_DT
- Oct 10, 2012
- Date of occurrenceOCCURRENCE_DT
- Oct 10, 2012
- Final order dateFINAL_ORDER_DT
- Jan 11, 2013
- Bill first printedBILL_PRINT_DT
- Dec 6, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 11, 2013
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4501
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 108.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 108.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 108.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3118
- Size of mineSIZE_OF_MINE
- 3118
- Controller hours workedCONTROLLER_HRS
- 9361
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9361
- History period startHISTORY_START_DT
- Jul 10, 2011
- History period endHISTORY_END_DT
- Oct 9, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6572466
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 8, 2012Citation number: 8670209Standard: 47.32(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8670209
- Assessment control numberASSESS_CASE_NO
- 000303358
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 23, 2012
- Citation issuedISSUE_DT
- Aug 8, 2012
- Date of occurrenceOCCURRENCE_DT
- Aug 8, 2012
- Final order dateFINAL_ORDER_DT
- Nov 16, 2012
- Bill first printedBILL_PRINT_DT
- Oct 11, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2013
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.32(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 3.25
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3118
- Size of mineSIZE_OF_MINE
- 3118
- Controller hours workedCONTROLLER_HRS
- 9361
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9361
- History period startHISTORY_START_DT
- May 8, 2011
- History period endHISTORY_END_DT
- Aug 7, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Hartmann Sand & Gravel Company Inc
- IDVIOLATOR_ID
- L34106
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 1, 1950
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6580242
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4821
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 72 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 1
Date: Jun 21, 2008Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220081780057
- DateACCIDENT_DT
- Jun 21, 2008
- TimeACCIDENT_TIME
- 1030
- Shift beganSHIFT_BEGIN_TIME
- 0800
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- MSHA investigation beganINVEST_BEGIN_DT
- Jun 21, 2008
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- WRENCH
- Source of injury codeINJURY_SOURCE_CD
- 050
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Jun 21, 2008
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- 6635
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Controller IDCONTROLLER_ID
- M34106
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
1 report filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 2,462Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 2462
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 821
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 6,432Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 6432
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1072
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 3,601Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 3601
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 900
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 10,490Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 10490
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1311
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 3,500Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 3500
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 875
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 9,390Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 9390
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1341
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 4,100Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 4100
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1025
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 9,335Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 9335
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1334
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 3,788Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 3788
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 947
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 9,520Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 9520
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1190
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 3,642Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 3642
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 911
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 9,877Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 9877
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1097
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 2,525Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 2525
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 631
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 6,434Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 6434
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 804
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 3,574Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 3574
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1191
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 6,798Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 6798
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1133
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileCURR_MINE_NM
- Hartmann Pit
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Peru IL Field Office
- Nearest town
- Fredonia
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 5
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Hartmann Pit
- Mine IDMINE_ID
- 4700853
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Dec 5, 2011
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDCURRENT_OPERATOR_ID
- L34106
- Controller IDCURRENT_CONTROLLER_ID
- M34106
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Jan 1, 1950
Location and MSHA office
- StateSTATE
- WI
- Bureau of Mines state codeBOM_STATE_CD
- 47
- FIPS county codeFIPS_CNTY_CD
- 089
- FIPS county nameFIPS_CNTY_NM
- Ozaukee
- Congressional districtCONG_DIST_CD
- 09
- Nearest townNEAREST_TOWN
- Fredonia
- MSHA districtDISTRICT
- M4
- MSHA office codeOFFICE_CD
- M4821
- MSHA officeOFFICE_NAME
- Peru IL Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 193
- Most recent assessment control numberASSESS_CTRL_NO
- 000639183
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Construction Sand and Gravel
- Primary commodity codePRIMARY_SIC_CD
- 144200
- Primary SIC codePRIMARY_SIC_CD_1
- 1442
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- SandAndGravel
- Primary industry group codePRIMARY_CANVASS_CD
- 5
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 5
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Hartmann Sand & Gravel Company IncFrom: Jan 1, 1950To: No end dateController: Not shownFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Hartmann Sand & Gravel Company Inc
- Operator IDOPERATOR_ID
- L34106
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
Controller
- Controller IDCONTROLLER_ID
- M34106
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
Hartmann Sand & Gravel Company Inc·Contact title Controller·Street not recorded, FREDONIA WI 53021
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Hartmann Sand & Gravel Company Inc
- Contact titleCONTACT_TITLE
- Controller
- CityCITY
- FREDONIA
- StateSTATE_ABBR
- WI
- State nameSTATE
- Wisconsin
- ZIP codeZIP_CD
- 53021
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 55
Mine
- Mine IDMINE_ID
- 4700853
- Mine name in this fileMINE_NAME
- Hartmann Pit
- Nearest townNEAREST_TOWN
- Fredonia
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Dec 5, 2011
- Primary commodity (SIC)PRIMARY_SIC_CD
- Construction Sand and Gravel
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (4)
StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology