What MSHA has on file for this mine

Citations and orders
321
since Jan 31, 2001 · 288 to the operator, 33 to contractors · 72 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Apr 7 to Apr 8, 2026Inspectors 1 | Hours on site 17.5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 7, 2026
Closed outINSPECTION_END_DT
Apr 8, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03A2CA
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
29.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 5 to Jan 6, 2026Inspectors 1 | Hours on site 8.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 5, 2026
Closed outINSPECTION_END_DT
Jan 6, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F024C80
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 28 to Jul 30, 2025Inspectors 1 | Hours on site 18.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 28, 2025
Closed outINSPECTION_END_DT
Jul 30, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0172FE
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
18.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
25.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
May 5, 2025Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
May 5, 2025
Closed outINSPECTION_END_DT
May 5, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F014844
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Apr 21 to Apr 23, 2025Inspectors 1 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Apr 21, 2025
Closed outINSPECTION_END_DT
Apr 23, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F014842
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
20.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 3 to Mar 7, 2025Inspectors 1 | Hours on site 27.25

The inspection

BeganINSPECTION_BEGIN_DT
Mar 3, 2025
Closed outINSPECTION_END_DT
Mar 7, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F01713F
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
27.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
38.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 21 to Aug 23, 2024Inspectors 1 | Hours on site 16.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 21, 2024
Closed outINSPECTION_END_DT
Aug 23, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904925
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
16.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
28

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 13 to Feb 15, 2024Inspectors 2 | Hours on site 30.25

The inspection

BeganINSPECTION_BEGIN_DT
Feb 13, 2024
Closed outINSPECTION_END_DT
Feb 15, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6951001
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
30.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
50
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
11.25
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
17.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 20 to Jul 26, 2023Inspectors 3 | Hours on site 15.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 20, 2023
Closed outINSPECTION_END_DT
Jul 26, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904839
InspectorsNBR_INSPECTOR
3
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
31

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
May 17, 2023Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2023
Closed outINSPECTION_END_DT
May 17, 2023
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6904739
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 27 to Mar 1, 2023Inspectors 1 | Hours on site 10.75

The inspection

BeganINSPECTION_BEGIN_DT
Feb 27, 2023
Closed outINSPECTION_END_DT
Mar 1, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904804
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
23.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 30 to Apr 6, 2022Inspectors 1 | Hours on site 25.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 30, 2022
Closed outINSPECTION_END_DT
Apr 6, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904506
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
25.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
45.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 6 to Nov 10, 2021Inspectors 1 | Hours on site 26.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 6, 2021
Closed outINSPECTION_END_DT
Nov 10, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904317
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
26.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
44

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Aug 30, 2021Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 30, 2021
Closed outINSPECTION_END_DT
Aug 30, 2021
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6904039
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 17 to Aug 19, 2021Inspectors 1 | Hours on site 20

The inspection

BeganINSPECTION_BEGIN_DT
Aug 17, 2021
Closed outINSPECTION_END_DT
Aug 19, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904037
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
20
Total inspection hoursSUM_TOTAL_INSP_HOURS
29.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Mar 9, 2021Inspectors 1 | Hours on site 13

The inspection

BeganINSPECTION_BEGIN_DT
Mar 9, 2021
Closed outINSPECTION_END_DT
Mar 9, 2021
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6839377
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
13
Total inspection hoursSUM_TOTAL_INSP_HOURS
21.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 1 to Feb 3, 2021Inspectors 1 | Hours on site 19

The inspection

BeganINSPECTION_BEGIN_DT
Feb 1, 2021
Closed outINSPECTION_END_DT
Feb 3, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904003
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
19
Total inspection hoursSUM_TOTAL_INSP_HOURS
29

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Sep 30, 2020Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 30, 2020
Closed outINSPECTION_END_DT
Sep 30, 2020
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6839716
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 28 to Jul 29, 2020Inspectors 1 | Hours on site 16.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 28, 2020
Closed outINSPECTION_END_DT
Jul 29, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6839244
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
16.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
31.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 25 to Apr 1, 2020Inspectors 1 | Hours on site 29.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 25, 2020
Closed outINSPECTION_END_DT
Apr 1, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6839024
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
29.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
51.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Jul 10, 2019Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Jul 10, 2019
Closed outINSPECTION_END_DT
Jul 10, 2019
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6831036
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Apr 2, 2019Inspectors 1 | Hours on site 13.5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 2, 2019
Closed outINSPECTION_END_DT
Apr 2, 2019
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6831608
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
13.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
20

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Mar 25, 2019Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 25, 2019
Closed outINSPECTION_END_DT
Mar 25, 2019
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6831810
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 4 to Mar 18, 2019Inspectors 2 | Hours on site 28

The inspection

BeganINSPECTION_BEGIN_DT
Mar 4, 2019
Closed outINSPECTION_END_DT
Mar 18, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6831607
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
28
Total inspection hoursSUM_TOTAL_INSP_HOURS
59.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Jan 15 to Jan 24, 2019Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Jan 15, 2019
Closed outINSPECTION_END_DT
Jan 24, 2019
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6831139
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 89 inspections and other MSHA visits since Mar 21, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Apr 8, 2026
Type: Citation
Standard: 56.14100(c)
S&S: Y
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $366.00
Details

The citation

Citation or order numberVIOLATION_NO
5117111
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 8, 2026
Time issuedVIOLATION_ISSUE_TIME
0815
Date of occurrenceVIOLATION_OCCUR_DT
Apr 8, 2026
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 8, 2026
Originally due, timeORIG_TERM_DUE_TIME
0845
Latest dueLATEST_TERM_DUE_DT
Apr 8, 2026
Latest due, timeLATEST_TERM_DUE_TIME
0845
TerminatedTERMINATION_DT
Apr 8, 2026
Terminated, timeTERMINATION_TIME
1335
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
366
Current proposed assessmentAMOUNT_DUE
366
Amount paidAMOUNT_PAID
366
Bill first printedBILL_PRINT_DT
May 20, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 13, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
F03A2CA
Inspection beganINSPECTION_BEGIN_DT
Apr 7, 2026
Inspection closed outINSPECTION_END_DT
Apr 8, 2026
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 8, 2026
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117110
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 8, 2026
Time issuedVIOLATION_ISSUE_TIME
0810
Date of occurrenceVIOLATION_OCCUR_DT
Apr 8, 2026
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 8, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Apr 8, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Apr 8, 2026
Terminated, timeTERMINATION_TIME
1042
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
May 20, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 13, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
F03A2CA
Inspection beganINSPECTION_BEGIN_DT
Apr 7, 2026
Inspection closed outINSPECTION_END_DT
Apr 8, 2026
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 7, 2026
Type: Citation
Standard: 56.13011
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117109
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 7, 2026
Time issuedVIOLATION_ISSUE_TIME
1453
Date of occurrenceVIOLATION_OCCUR_DT
Apr 7, 2026
30 CFR part and sectionPART_SECTION
56.13011
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 8, 2026
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Apr 8, 2026
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Apr 8, 2026
Terminated, timeTERMINATION_TIME
0828
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
May 13, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 19, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 28, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
F03A2CA
Inspection beganINSPECTION_BEGIN_DT
Apr 7, 2026
Inspection closed outINSPECTION_END_DT
Apr 8, 2026
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 5, 2026
Type: Citation
Standard: 56.14112(b)
S&S: Y
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117028
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 5, 2026
Time issuedVIOLATION_ISSUE_TIME
1514
Date of occurrenceVIOLATION_OCCUR_DT
Jan 5, 2026
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 5, 2026
Originally due, timeORIG_TERM_DUE_TIME
1545
Latest dueLATEST_TERM_DUE_DT
Jan 5, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1545
TerminatedTERMINATION_DT
Jan 6, 2026
Terminated, timeTERMINATION_TIME
0653
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Feb 18, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Mar 25, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 7, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
12

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
F024C80
Inspection beganINSPECTION_BEGIN_DT
Jan 5, 2026
Inspection closed outINSPECTION_END_DT
Jan 6, 2026
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 30, 2025
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117411
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 30, 2025
Time issuedVIOLATION_ISSUE_TIME
1047
Date of occurrenceVIOLATION_OCCUR_DT
Jul 30, 2025
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 1, 2025
Originally due, timeORIG_TERM_DUE_TIME
0700
Latest dueLATEST_TERM_DUE_DT
Aug 1, 2025
Latest due, timeLATEST_TERM_DUE_TIME
0700
TerminatedTERMINATION_DT
Jul 30, 2025
Terminated, timeTERMINATION_TIME
1455
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Sep 17, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Oct 22, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 30, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
F0172FE
Inspection beganINSPECTION_BEGIN_DT
Jul 28, 2025
Inspection closed outINSPECTION_END_DT
Jul 30, 2025
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 29, 2025
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117409
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 29, 2025
Time issuedVIOLATION_ISSUE_TIME
0819
Date of occurrenceVIOLATION_OCCUR_DT
Jul 29, 2025
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 29, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 29, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 29, 2025
Terminated, timeTERMINATION_TIME
0945
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Sep 24, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Nov 6, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 21, 2025

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
F0172FE
Inspection beganINSPECTION_BEGIN_DT
Jul 28, 2025
Inspection closed outINSPECTION_END_DT
Jul 30, 2025
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jul 29, 2025
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117410
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 29, 2025
Time issuedVIOLATION_ISSUE_TIME
0843
Date of occurrenceVIOLATION_OCCUR_DT
Jul 29, 2025
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 29, 2025
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Jul 29, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Jul 29, 2025
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Sep 24, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Nov 6, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 21, 2025

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
F0172FE
Inspection beganINSPECTION_BEGIN_DT
Jul 28, 2025
Inspection closed outINSPECTION_END_DT
Jul 30, 2025
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Apr 22, 2025
Type: Order
Standard: 56.5001(a)/56.5005
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6190193
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Apr 22, 2025
Time issuedVIOLATION_ISSUE_TIME
0935
Date of occurrenceVIOLATION_OCCUR_DT
Apr 22, 2025
30 CFR part and sectionPART_SECTION
56.5001(a)/56.5005
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Mill
Preceding citationINITIAL_VIOL_NO
6177984

Abatement

TerminatedTERMINATION_DT
May 5, 2025
Terminated, timeTERMINATION_TIME
0940
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
F014842
Inspection beganINSPECTION_BEGIN_DT
Apr 21, 2025
Inspection closed outINSPECTION_END_DT
Apr 23, 2025
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (29)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 18, 2025
Type: Citation
Standard: 56.5001(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $168.00
Details

The citation

Citation or order numberVIOLATION_NO
6177984
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 18, 2025
Time issuedVIOLATION_ISSUE_TIME
0846
Date of occurrenceVIOLATION_OCCUR_DT
Mar 5, 2025
30 CFR part and sectionPART_SECTION
56.5001(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill
Replaced by orderREPLACED_BY_ORDER_NO
6190193

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 26, 2025
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Apr 11, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1200
Termination typeTERMINATION_TYPE
ReplacedByOrder

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
168
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
May 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Mar 24, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 7, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
12
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
F01713F
Inspection beganINSPECTION_BEGIN_DT
Mar 3, 2025
Inspection closed outINSPECTION_END_DT
Mar 7, 2025
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, TerminatedTERMINATION_DT, Terminated, timeTERMINATION_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 4, 2025
Type: Citation
Standard: 56.11027
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
6177982
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 4, 2025
Time issuedVIOLATION_ISSUE_TIME
0920
Date of occurrenceVIOLATION_OCCUR_DT
Mar 4, 2025
30 CFR part and sectionPART_SECTION
56.11027
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 4, 2025
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Mar 4, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Mar 4, 2025
Terminated, timeTERMINATION_TIME
1040
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Apr 16, 2025
Final order dateFINAL_ORDER_ISSUE_DT
May 28, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 25, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
12
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
F01713F
Inspection beganINSPECTION_BEGIN_DT
Mar 3, 2025
Inspection closed outINSPECTION_END_DT
Mar 7, 2025
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 23, 2024
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627914
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 23, 2024
Time issuedVIOLATION_ISSUE_TIME
0431
Date of occurrenceVIOLATION_OCCUR_DT
Aug 23, 2024
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 23, 2024
Originally due, timeORIG_TERM_DUE_TIME
0500
Latest dueLATEST_TERM_DUE_DT
Aug 23, 2024
Latest due, timeLATEST_TERM_DUE_TIME
0500
TerminatedTERMINATION_DT
Aug 23, 2024
Terminated, timeTERMINATION_TIME
0440
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 20, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6904925
Inspection beganINSPECTION_BEGIN_DT
Aug 21, 2024
Inspection closed outINSPECTION_END_DT
Aug 23, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 23, 2024
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627915
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 23, 2024
Time issuedVIOLATION_ISSUE_TIME
0910
Date of occurrenceVIOLATION_OCCUR_DT
Aug 23, 2024
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 23, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 23, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 23, 2024
Terminated, timeTERMINATION_TIME
1022
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 20, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6904925
Inspection beganINSPECTION_BEGIN_DT
Aug 21, 2024
Inspection closed outINSPECTION_END_DT
Aug 23, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 22, 2024
Type: Citation
Standard: 56.12018
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627910
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 22, 2024
Time issuedVIOLATION_ISSUE_TIME
0808
Date of occurrenceVIOLATION_OCCUR_DT
Aug 22, 2024
30 CFR part and sectionPART_SECTION
56.12018
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 22, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 22, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 23, 2024
Terminated, timeTERMINATION_TIME
0646
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 20, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6904925
Inspection beganINSPECTION_BEGIN_DT
Aug 21, 2024
Inspection closed outINSPECTION_END_DT
Aug 23, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 22, 2024
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627913
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 22, 2024
Time issuedVIOLATION_ISSUE_TIME
1140
Date of occurrenceVIOLATION_OCCUR_DT
Aug 22, 2024
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 22, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 22, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 22, 2024
Terminated, timeTERMINATION_TIME
1315
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 20, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6904925
Inspection beganINSPECTION_BEGIN_DT
Aug 21, 2024
Inspection closed outINSPECTION_END_DT
Aug 23, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 22, 2024
Type: Citation
Standard: 56.11002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627912
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 22, 2024
Time issuedVIOLATION_ISSUE_TIME
0916
Date of occurrenceVIOLATION_OCCUR_DT
Aug 22, 2024
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 22, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 22, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 22, 2024
Terminated, timeTERMINATION_TIME
1311
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 20, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6904925
Inspection beganINSPECTION_BEGIN_DT
Aug 21, 2024
Inspection closed outINSPECTION_END_DT
Aug 23, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 22, 2024
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627911
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 22, 2024
Time issuedVIOLATION_ISSUE_TIME
0827
Date of occurrenceVIOLATION_OCCUR_DT
Aug 22, 2024
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 22, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 22, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 23, 2024
Terminated, timeTERMINATION_TIME
0929
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 20, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6904925
Inspection beganINSPECTION_BEGIN_DT
Aug 21, 2024
Inspection closed outINSPECTION_END_DT
Aug 23, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 14, 2024
Type: Citation
Standard: 56.14100(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9626767
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 14, 2024
Time issuedVIOLATION_ISSUE_TIME
0854
Date of occurrenceVIOLATION_OCCUR_DT
Feb 14, 2024
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 14, 2024
Originally due, timeORIG_TERM_DUE_TIME
0930
Latest dueLATEST_TERM_DUE_DT
Feb 14, 2024
Latest due, timeLATEST_TERM_DUE_TIME
0930
TerminatedTERMINATION_DT
Feb 14, 2024
Terminated, timeTERMINATION_TIME
0903
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 22, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 7, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6951001
Inspection beganINSPECTION_BEGIN_DT
Feb 13, 2024
Inspection closed outINSPECTION_END_DT
Feb 15, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 14, 2024
Type: Citation
Standard: 56.4104(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9626768
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 14, 2024
Time issuedVIOLATION_ISSUE_TIME
0905
Date of occurrenceVIOLATION_OCCUR_DT
Feb 14, 2024
30 CFR part and sectionPART_SECTION
56.4104(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 14, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 14, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 15, 2024
Terminated, timeTERMINATION_TIME
0909
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 22, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 7, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6951001
Inspection beganINSPECTION_BEGIN_DT
Feb 13, 2024
Inspection closed outINSPECTION_END_DT
Feb 15, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 14, 2024
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9626769
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 14, 2024
Time issuedVIOLATION_ISSUE_TIME
1035
Date of occurrenceVIOLATION_OCCUR_DT
Feb 14, 2024
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 14, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 14, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 14, 2024
Terminated, timeTERMINATION_TIME
1445
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 22, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 7, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6951001
Inspection beganINSPECTION_BEGIN_DT
Feb 13, 2024
Inspection closed outINSPECTION_END_DT
Feb 15, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 13, 2024
Type: Citation
Standard: 56.4104(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9626766
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 13, 2024
Time issuedVIOLATION_ISSUE_TIME
1545
Date of occurrenceVIOLATION_OCCUR_DT
Feb 13, 2024
30 CFR part and sectionPART_SECTION
56.4104(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 13, 2024
Originally due, timeORIG_TERM_DUE_TIME
1615
Latest dueLATEST_TERM_DUE_DT
Feb 13, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1615
TerminatedTERMINATION_DT
Feb 13, 2024
Terminated, timeTERMINATION_TIME
1602
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 22, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 7, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6951001
Inspection beganINSPECTION_BEGIN_DT
Feb 13, 2024
Inspection closed outINSPECTION_END_DT
Feb 15, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 13, 2024
Type: Citation
Standard: 56.14100(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9626764
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 13, 2024
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Feb 13, 2024
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 13, 2024
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Feb 13, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Feb 13, 2024
Terminated, timeTERMINATION_TIME
1230
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 22, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 7, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6951001
Inspection beganINSPECTION_BEGIN_DT
Feb 13, 2024
Inspection closed outINSPECTION_END_DT
Feb 15, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 13, 2024
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9626765
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 13, 2024
Time issuedVIOLATION_ISSUE_TIME
1135
Date of occurrenceVIOLATION_OCCUR_DT
Feb 13, 2024
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 13, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 13, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 14, 2024
Terminated, timeTERMINATION_TIME
0920
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 22, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 7, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
GLC Minerals LLC
Operator IDVIOLATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Inspection eventEVENT_NO
6951001
Inspection beganINSPECTION_BEGIN_DT
Feb 13, 2024
Inspection closed outINSPECTION_END_DT
Feb 15, 2024
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 26, 2023
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626462
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 26, 2023
Time issuedVIOLATION_ISSUE_TIME
0852
Date of occurrenceVIOLATION_OCCUR_DT
Jul 26, 2023
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 2, 2023
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Aug 2, 2023
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Sep 5, 2023
Terminated, timeTERMINATION_TIME
1614
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Sep 20, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 25, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 4, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
6904839
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2023
Inspection closed outINSPECTION_END_DT
Jul 26, 2023
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jul 20, 2023
Type: Citation
Standard: 56.4201(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626460
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 20, 2023
Time issuedVIOLATION_ISSUE_TIME
1126
Date of occurrenceVIOLATION_OCCUR_DT
Jul 20, 2023
30 CFR part and sectionPART_SECTION
56.4201(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 21, 2023
Terminated, timeTERMINATION_TIME
0806
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Aug 23, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 1, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 5, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
6904839
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2023
Inspection closed outINSPECTION_END_DT
Jul 26, 2023
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jul 20, 2023
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626458
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 20, 2023
Time issuedVIOLATION_ISSUE_TIME
1105
Date of occurrenceVIOLATION_OCCUR_DT
Jul 20, 2023
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 21, 2023
Terminated, timeTERMINATION_TIME
0825
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Aug 23, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Oct 1, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 5, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
Operator IDVIOLATOR_ID
C2878
Contractor IDCONTRACTOR_ID
C2878
Inspection eventEVENT_NO
6904839
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2023
Inspection closed outINSPECTION_END_DT
Jul 26, 2023
Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine type in this fileMINE_TYPE
Facility
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

321 citations and orders since Jan 31, 2001: 288 issued to the operator, 33 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Apr 8, 2026
Citation number: 5117110
Standard: 56.14132(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117110
Assessment control numberASSESS_CASE_NO
000641669
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 13, 2026
Citation issuedISSUE_DT
Apr 8, 2026
Date of occurrenceOCCURRENCE_DT
Apr 8, 2026
Final order dateFINAL_ORDER_DT
Jun 25, 2026
Bill first printedBILL_PRINT_DT
May 20, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
780
Size of mineSIZE_OF_MINE
780
History period startHISTORY_START_DT
Jan 8, 2025
History period endHISTORY_END_DT
Apr 7, 2026

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A2CA
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 8, 2026
Citation number: 5117111
Standard: 56.14100(c)
Proposed penalty: $366.00
Current assessment: $366.00
Paid against proposed penalty: $366.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117111
Assessment control numberASSESS_CASE_NO
000641669
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 13, 2026
Citation issuedISSUE_DT
Apr 8, 2026
Date of occurrenceOCCURRENCE_DT
Apr 8, 2026
Final order dateFINAL_ORDER_DT
Jun 25, 2026
Bill first printedBILL_PRINT_DT
May 20, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
366.00
Current assessmentCURRENT_ASSESSMENT_AMT
366.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
366.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
780
Size of mineSIZE_OF_MINE
780
History period startHISTORY_START_DT
Jan 8, 2025
History period endHISTORY_END_DT
Apr 7, 2026

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A2CA
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Apr 7, 2026
Citation number: 5117109
Standard: 56.13011
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117109
Assessment control numberASSESS_CASE_NO
000641365
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2026
Citation issuedISSUE_DT
Apr 7, 2026
Date of occurrenceOCCURRENCE_DT
Apr 7, 2026
Final order dateFINAL_ORDER_DT
Jun 19, 2026
Bill first printedBILL_PRINT_DT
May 13, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 19, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.13011
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
0.31
Operator hours worked at the mineVIOLATOR_MINE_HRS
55966
Size of mineSIZE_OF_MINE
55966
Controller hours workedCONTROLLER_HRS
71966
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
71966
History period startHISTORY_START_DT
Jan 7, 2025
History period endHISTORY_END_DT
Apr 6, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03A2CA
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 5, 2026
Citation number: 5117028
Standard: 56.14112(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117028
Assessment control numberASSESS_CASE_NO
000636028
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 7, 2026
Citation issuedISSUE_DT
Jan 5, 2026
Date of occurrenceOCCURRENCE_DT
Jan 5, 2026
Final order dateFINAL_ORDER_DT
Mar 25, 2026
Bill first printedBILL_PRINT_DT
Feb 18, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 25, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
12
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
55966
Size of mineSIZE_OF_MINE
55966
Controller hours workedCONTROLLER_HRS
71966
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
71966
History period startHISTORY_START_DT
Oct 5, 2024
History period endHISTORY_END_DT
Jan 4, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F024C80
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 30, 2025
Citation number: 5117411
Standard: 56.14112(a)(1)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117411
Assessment control numberASSESS_CASE_NO
000628780
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 30, 2025
Citation issuedISSUE_DT
Jul 30, 2025
Date of occurrenceOCCURRENCE_DT
Jul 30, 2025
Final order dateFINAL_ORDER_DT
Oct 22, 2025
Bill first printedBILL_PRINT_DT
Sep 17, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
10
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
13
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
51874
Size of mineSIZE_OF_MINE
51874
Controller hours workedCONTROLLER_HRS
67874
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
67874
History period startHISTORY_START_DT
Apr 30, 2024
History period endHISTORY_END_DT
Jul 29, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0172FE
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 29, 2025
Citation number: 5117409
Standard: 56.4201(a)(2)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117409
Assessment control numberASSESS_CASE_NO
000629236
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 21, 2025
Citation issuedISSUE_DT
Jul 29, 2025
Date of occurrenceOCCURRENCE_DT
Jul 29, 2025
Final order dateFINAL_ORDER_DT
Nov 6, 2025
Bill first printedBILL_PRINT_DT
Sep 24, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 6, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Apr 29, 2024
History period endHISTORY_END_DT
Jul 28, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0172FE
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jul 29, 2025
Citation number: 5117410
Standard: 56.4101
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117410
Assessment control numberASSESS_CASE_NO
000629236
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 21, 2025
Citation issuedISSUE_DT
Jul 29, 2025
Date of occurrenceOCCURRENCE_DT
Jul 29, 2025
Final order dateFINAL_ORDER_DT
Nov 6, 2025
Bill first printedBILL_PRINT_DT
Sep 24, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 6, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Apr 29, 2024
History period endHISTORY_END_DT
Jul 28, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0172FE
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Mar 18, 2025
Citation number: 6177984
Standard: 56.5001(a)
Proposed penalty: $168.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6177984
Assessment control numberASSESS_CASE_NO
000620775
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 7, 2026
Citation issuedISSUE_DT
Mar 18, 2025
Date of occurrenceOCCURRENCE_DT
Mar 5, 2025
Final order dateFINAL_ORDER_DT
Mar 24, 2026
Bill first printedBILL_PRINT_DT
May 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 14, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.5001(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
168.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
12
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
12
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
10
Violations per inspection dayVPID
1.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
51874
Size of mineSIZE_OF_MINE
51874
Controller hours workedCONTROLLER_HRS
67874
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
67874
History period startHISTORY_START_DT
Dec 5, 2023
History period endHISTORY_END_DT
Mar 4, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01713F
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (3)

Significant and substantialSIG_SUB_IND, Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 4, 2025
Citation number: 6177982
Standard: 56.11027
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6177982
Assessment control numberASSESS_CASE_NO
000618662
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 19, 2026
Citation issuedISSUE_DT
Mar 4, 2025
Date of occurrenceOCCURRENCE_DT
Mar 4, 2025
Final order dateFINAL_ORDER_DT
May 28, 2025
Bill first printedBILL_PRINT_DT
Apr 16, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 28, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11027
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Mine Act interestMINEACT_INTEREST_AMT
1.56
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.56

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
14
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
12
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
51874
Size of mineSIZE_OF_MINE
51874
Controller hours workedCONTROLLER_HRS
67874
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
67874
History period startHISTORY_START_DT
Dec 4, 2023
History period endHISTORY_END_DT
Mar 3, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01713F
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (9)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 23, 2024
Citation number: 9627915
Standard: 50.30(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627915
Assessment control numberASSESS_CASE_NO
000606963
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2024
Citation issuedISSUE_DT
Aug 23, 2024
Date of occurrenceOCCURRENCE_DT
Aug 23, 2024
Final order dateFINAL_ORDER_DT
Nov 20, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 20, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
12
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1.22
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.111
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
May 23, 2023
History period endHISTORY_END_DT
Aug 22, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904925
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 23, 2024
Citation number: 9627914
Standard: 56.14207
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627914
Assessment control numberASSESS_CASE_NO
000606963
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2024
Citation issuedISSUE_DT
Aug 23, 2024
Date of occurrenceOCCURRENCE_DT
Aug 23, 2024
Final order dateFINAL_ORDER_DT
Nov 20, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 20, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
12
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1.22
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
May 23, 2023
History period endHISTORY_END_DT
Aug 22, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904925
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 22, 2024
Citation number: 9627911
Standard: 56.12028
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627911
Assessment control numberASSESS_CASE_NO
000606963
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2024
Citation issuedISSUE_DT
Aug 22, 2024
Date of occurrenceOCCURRENCE_DT
Aug 22, 2024
Final order dateFINAL_ORDER_DT
Nov 20, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 20, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
1.57
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
May 22, 2023
History period endHISTORY_END_DT
Aug 21, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904925
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 22, 2024
Citation number: 9627910
Standard: 56.12018
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627910
Assessment control numberASSESS_CASE_NO
000606963
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2024
Citation issuedISSUE_DT
Aug 22, 2024
Date of occurrenceOCCURRENCE_DT
Aug 22, 2024
Final order dateFINAL_ORDER_DT
Nov 20, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 20, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12018
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
1.57
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
May 22, 2023
History period endHISTORY_END_DT
Aug 21, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904925
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 22, 2024
Citation number: 9627912
Standard: 56.11002
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627912
Assessment control numberASSESS_CASE_NO
000606963
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2024
Citation issuedISSUE_DT
Aug 22, 2024
Date of occurrenceOCCURRENCE_DT
Aug 22, 2024
Final order dateFINAL_ORDER_DT
Nov 20, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 20, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
1.57
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
May 22, 2023
History period endHISTORY_END_DT
Aug 21, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904925
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 22, 2024
Citation number: 9627913
Standard: 56.20003(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627913
Assessment control numberASSESS_CASE_NO
000606963
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2024
Citation issuedISSUE_DT
Aug 22, 2024
Date of occurrenceOCCURRENCE_DT
Aug 22, 2024
Final order dateFINAL_ORDER_DT
Nov 20, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 20, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
16
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
11
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
1.57
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
May 22, 2023
History period endHISTORY_END_DT
Aug 21, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904925
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 14, 2024
Citation number: 9626769
Standard: 56.14107(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626769
Assessment control numberASSESS_CASE_NO
000597752
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2024
Citation issuedISSUE_DT
Feb 14, 2024
Date of occurrenceOCCURRENCE_DT
Feb 14, 2024
Final order dateFINAL_ORDER_DT
May 22, 2024
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 22, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
0.63
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
Nov 14, 2022
History period endHISTORY_END_DT
Feb 13, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951001
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 14, 2024
Citation number: 9626767
Standard: 56.14100(c)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626767
Assessment control numberASSESS_CASE_NO
000597752
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2024
Citation issuedISSUE_DT
Feb 14, 2024
Date of occurrenceOCCURRENCE_DT
Feb 14, 2024
Final order dateFINAL_ORDER_DT
May 22, 2024
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 22, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
0.63
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
Nov 14, 2022
History period endHISTORY_END_DT
Feb 13, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951001
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 14, 2024
Citation number: 9626768
Standard: 56.4104(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626768
Assessment control numberASSESS_CASE_NO
000597752
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2024
Citation issuedISSUE_DT
Feb 14, 2024
Date of occurrenceOCCURRENCE_DT
Feb 14, 2024
Final order dateFINAL_ORDER_DT
May 22, 2024
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 22, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4104(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
8
Violations per inspection dayVPID
0.63
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
Nov 14, 2022
History period endHISTORY_END_DT
Feb 13, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951001
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 13, 2024
Citation number: 9626764
Standard: 56.14100(c)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626764
Assessment control numberASSESS_CASE_NO
000597752
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2024
Citation issuedISSUE_DT
Feb 13, 2024
Date of occurrenceOCCURRENCE_DT
Feb 13, 2024
Final order dateFINAL_ORDER_DT
May 22, 2024
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 22, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
43
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.83
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
Nov 13, 2022
History period endHISTORY_END_DT
Feb 12, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951001
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 13, 2024
Citation number: 9626765
Standard: 56.14132(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626765
Assessment control numberASSESS_CASE_NO
000597752
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2024
Citation issuedISSUE_DT
Feb 13, 2024
Date of occurrenceOCCURRENCE_DT
Feb 13, 2024
Final order dateFINAL_ORDER_DT
May 22, 2024
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 22, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.83
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
Nov 13, 2022
History period endHISTORY_END_DT
Feb 12, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951001
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 13, 2024
Citation number: 9626766
Standard: 56.4104(b)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626766
Assessment control numberASSESS_CASE_NO
000597752
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 28, 2024
Citation issuedISSUE_DT
Feb 13, 2024
Date of occurrenceOCCURRENCE_DT
Feb 13, 2024
Final order dateFINAL_ORDER_DT
May 22, 2024
Bill first printedBILL_PRINT_DT
Apr 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 22, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4104(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.83
Operator hours worked at the mineVIOLATOR_MINE_HRS
54877
Size of mineSIZE_OF_MINE
54877
Controller hours workedCONTROLLER_HRS
70877
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
70877
History period startHISTORY_START_DT
Nov 13, 2022
History period endHISTORY_END_DT
Feb 12, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951001
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 26, 2023
Citation number: 9626462
Standard: 50.30(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626462
Assessment control numberASSESS_CASE_NO
000585621
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 4, 2023
Citation issuedISSUE_DT
Jul 26, 2023
Date of occurrenceOCCURRENCE_DT
Jul 26, 2023
Final order dateFINAL_ORDER_DT
Oct 25, 2023
Bill first printedBILL_PRINT_DT
Sep 20, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 25, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
21
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
History period startHISTORY_START_DT
Apr 26, 2022
History period endHISTORY_END_DT
Jul 25, 2023

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking & Excavating, LLC.
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904839
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (21)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jul 20, 2023
Citation number: 9626461
Standard: 56.4101
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626461
Assessment control numberASSESS_CASE_NO
000583556
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 4, 2023
Citation issuedISSUE_DT
Jul 20, 2023
Date of occurrenceOCCURRENCE_DT
Jul 20, 2023
Final order dateFINAL_ORDER_DT
Oct 1, 2023
Bill first printedBILL_PRINT_DT
Aug 23, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 1, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
History period startHISTORY_START_DT
Apr 20, 2022
History period endHISTORY_END_DT
Jul 19, 2023

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking and Excavating LLC
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904839
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jul 20, 2023
Citation number: 9626457
Standard: 47.41(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626457
Assessment control numberASSESS_CASE_NO
000585193
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 27, 2023
Citation issuedISSUE_DT
Jul 20, 2023
Date of occurrenceOCCURRENCE_DT
Jul 20, 2023
Final order dateFINAL_ORDER_DT
Oct 22, 2023
Bill first printedBILL_PRINT_DT
Sep 13, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.41(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
51682
Size of mineSIZE_OF_MINE
51682
Controller hours workedCONTROLLER_HRS
67682
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
67682
History period startHISTORY_START_DT
Apr 20, 2022
History period endHISTORY_END_DT
Jul 19, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
GLC Minerals LLC
IDVIOLATOR_ID
L09391
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1987
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904839
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 20, 2023
Citation number: 9626460
Standard: 56.4201(a)(1)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626460
Assessment control numberASSESS_CASE_NO
000583556
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 4, 2023
Citation issuedISSUE_DT
Jul 20, 2023
Date of occurrenceOCCURRENCE_DT
Jul 20, 2023
Final order dateFINAL_ORDER_DT
Oct 1, 2023
Bill first printedBILL_PRINT_DT
Aug 23, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 1, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
History period startHISTORY_START_DT
Apr 20, 2022
History period endHISTORY_END_DT
Jul 19, 2023

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Tisler Trucking and Excavating LLC
IDVIOLATOR_ID
C2878
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 9, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904839
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

25 most recent of 318 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Jun 1, 2025
Citation issued: Mar 18, 2025
Docket: LAKE 2025-0257
Standard: 56.5001(a)
Proposed penalty: $168.00
Penalty after decision: $151.00
Decided: Feb 11, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6177984
Citation issuedCITATION_ISSUE_DT
Mar 18, 2025
Hearing request receivedCONTEST_DT
Jun 1, 2025
Docket numberDOCKET_NO
LAKE 2025-0257
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Young
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Feb 11, 2026
Petition duePETITION_DUE_DT
Jul 16, 2025
Petition filedPETITION_FILED_DT
Jul 14, 2025

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
168.00
Penalty after the decisionDECISION_PENALTY_AMT
151.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.5001(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.

Other fields

ISSUING_FIELD_OFFICE
M4641

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

1 contested citation or order; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

NO DYS AWY FRM WRK,NO RSTR ACT
13
DAYS AWAY FROM WORK ONLY
10
DYS AWY FRM WRK & RESTRCTD ACT
5
DAYS RESTRICTED ACTIVITY ONLY
2
Date: May 15, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220231370013
DateACCIDENT_DT
May 15, 2023
TimeACCIDENT_TIME
1930
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
BOILR,PRES VSL,AIR HOS,OX
Source of injury codeINJURY_SOURCE_CD
003
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FACE,NEC
Part of body codeINJ_BODY_PART_CD
140
Returned to workRETURN_TO_WORK_DT
May 15, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 10, 2022
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion in wielding or throwing objects
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220221080016
DateACCIDENT_DT
Jan 10, 2022
TimeACCIDENT_TIME
1715
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion in wielding or throwing objects
Accident type codeACCIDENT_TYPE_CD
29
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
AXE,HAMMER,SLEDGE
Source of injury codeINJURY_SOURCE_CD
046
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
5
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Jan 24, 2022

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 7, 2021
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: STEPPING OR KNEELING ON OBJECT
Accident type: Struck against stationary object
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220211930024
DateACCIDENT_DT
Jun 7, 2021
TimeACCIDENT_TIME
2335
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
STEPPING OR KNEELING ON OBJECT
Classification codeCLASSIFICATION_CD
19
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Jun 11, 2021

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 13, 2021
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: MACHINERY
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220211930010
DateACCIDENT_DT
May 13, 2021
TimeACCIDENT_TIME
0830
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
HAND TOOLS,POWERED,NEC
Source of injury codeINJURY_SOURCE_CD
057
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days of restricted workDAYS_RESTRICT
5
Returned to workRETURN_TO_WORK_DT
May 27, 2021

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Mar 20, 2021
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion NEC
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220211040022
DateACCIDENT_DT
Mar 20, 2021
TimeACCIDENT_TIME
0830
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320211930023

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
100
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Jun 30, 2021

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 9, 2020
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220201910008
DateACCIDENT_DT
Jul 9, 2020
TimeACCIDENT_TIME
0300
Shift beganSHIFT_BEGIN_TIME
1830
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jul 9, 2020

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 26, 2020
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: STRIKING OR BUMPING
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220201210015
DateACCIDENT_DT
Apr 26, 2020
TimeACCIDENT_TIME
1800
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
STRIKING OR BUMPING
Classification codeCLASSIFICATION_CD
20
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
STEEL RAIL (ALL KINDS)
Source of injury codeINJURY_SOURCE_CD
084
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
NECK
Part of body codeINJ_BODY_PART_CD
200
Returned to workRETURN_TO_WORK_DT
Apr 26, 2020

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 22, 2019
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion in pulling or pushing objects
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220192060030
DateACCIDENT_DT
Jul 22, 2019
TimeACCIDENT_TIME
0830
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320192120005

Injury

Activity at the timeACTIVITY
Chute, Pull or free
Activity codeACTIVITY_CD
010
Source of injuryINJURY_SOURCE
CROWBAR,PRY BAR
Source of injury codeINJURY_SOURCE_CD
048
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Jul 26, 2019

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 14, 2018
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: MACHINERY
Accident type: Over-exertion in wielding or throwing objects
Days lost: 35
Details

The report

Document numberDOCUMENT_NO
220183620007
DateACCIDENT_DT
Dec 14, 2018
TimeACCIDENT_TIME
0845
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Over-exertion in wielding or throwing objects
Accident type codeACCIDENT_TYPE_CD
29
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320200020005

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
HAND TOOLS,POWERED,NEC
Source of injury codeINJURY_SOURCE_CD
057
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days of restricted workDAYS_RESTRICT
135
Days lostDAYS_LOST
35
Returned to workRETURN_TO_WORK_DT
Dec 30, 2019

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 22, 2017
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: STEPPING OR KNEELING ON OBJECT
Accident type: Struck against stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220172430006
DateACCIDENT_DT
Aug 22, 2017
TimeACCIDENT_TIME
0730
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
STEPPING OR KNEELING ON OBJECT
Classification codeCLASSIFICATION_CD
19
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
Part of body codeINJ_BODY_PART_CD
530
Returned to workRETURN_TO_WORK_DT
Aug 22, 2017

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 6, 2017
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Bodily reaction, NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220171030016
DateACCIDENT_DT
Apr 6, 2017
TimeACCIDENT_TIME
1115
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Bodily reaction, NEC
Accident type codeACCIDENT_TYPE_CD
26
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Crawling, Kneeling
Activity codeACTIVITY_CD
016
Source of injuryINJURY_SOURCE
BODILY MOTION
Source of injury codeINJURY_SOURCE_CD
002
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Returned to workRETURN_TO_WORK_DT
Apr 7, 2017

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 10, 2017
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 30
Details

The report

Document numberDOCUMENT_NO
220170480018
DateACCIDENT_DT
Feb 10, 2017
TimeACCIDENT_TIME
0800
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320171300003

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
CONTAINERS,NEC
Source of injury codeINJURY_SOURCE_CD
008
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
ABDOMEN/INTERNAL ORGANS
Part of body codeINJ_BODY_PART_CD
410
Days of restricted workDAYS_RESTRICT
31
Days lostDAYS_LOST
30
Returned to workRETURN_TO_WORK_DT
May 9, 2017

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Oct 12, 2015
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 19
Details

The report

Document numberDOCUMENT_NO
220153000005
DateACCIDENT_DT
Oct 12, 2015
TimeACCIDENT_TIME
1000
Shift beganSHIFT_BEGIN_TIME
0252
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320153270005

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
OTHER INJURY,NEC
Nature of injury codeNATURE_INJURY_CD
390
Part of bodyINJ_BODY_PART
ABDOMEN/INTERNAL ORGANS
Part of body codeINJ_BODY_PART_CD
410
Days lostDAYS_LOST
19
Returned to workRETURN_TO_WORK_DT
Nov 23, 2015

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 29, 2014
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220150160028
DateACCIDENT_DT
Dec 29, 2014
TimeACCIDENT_TIME
1509
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Returned to workRETURN_TO_WORK_DT
Dec 30, 2014

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 25, 2014
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220142690015
DateACCIDENT_DT
Sep 25, 2014
TimeACCIDENT_TIME
1030
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320142720028

Injury

Activity at the timeACTIVITY
Mill equipment
Activity codeACTIVITY_CD
063
Source of injuryINJURY_SOURCE
MACHINE-MILL,CLEANING PLT
Source of injury codeINJURY_SOURCE_CD
075
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
MULTIPLE PARTS (MORE THAN ONE MAJOR)
Part of body codeINJ_BODY_PART_CD
700
Returned to workRETURN_TO_WORK_DT
Sep 26, 2014

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Packaging machine, Bagger, Sewing machine, Palletizer
Equipment codeMINING_EQUIP_CD
46
Equipment manufacturerEQUIP_MFR_NAME
Westfalia
Equipment manufacturer codeEQUIP_MFR_CD
111
Equipment model numberEQUIP_MODEL_NO
410D
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 5, 2014
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion NEC
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220141570024
DateACCIDENT_DT
Jun 5, 2014
TimeACCIDENT_TIME
1300
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320141620015

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
HAND TOOLS,NONPOWERED,NEC
Source of injury codeINJURY_SOURCE_CD
051
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
Part of body codeINJ_BODY_PART_CD
440
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Jun 9, 2014

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 22, 2013
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 9
Details

The report

Document numberDOCUMENT_NO
220131540004
DateACCIDENT_DT
May 22, 2013
TimeACCIDENT_TIME
0200
Shift beganSHIFT_BEGIN_TIME
2300
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320131650002

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
PALLETS
Source of injury codeINJURY_SOURCE_CD
114
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
3
Days lostDAYS_LOST
9
Returned to workRETURN_TO_WORK_DT
Jun 9, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Mar 18, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220130870001
DateACCIDENT_DT
Mar 18, 2013
TimeACCIDENT_TIME
1340
Shift beganSHIFT_BEGIN_TIME
0800
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320131650001

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Returned to workRETURN_TO_WORK_DT
Mar 18, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 14, 2013
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 105
Details

The report

Document numberDOCUMENT_NO
220130220004
DateACCIDENT_DT
Jan 14, 2013
TimeACCIDENT_TIME
2245
Shift beganSHIFT_BEGIN_TIME
1445
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320131710002

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
MULTIPLE PARTS (MORE THAN ONE MAJOR)
Part of body codeINJ_BODY_PART_CD
700
Days lostDAYS_LOST
105
Returned to workRETURN_TO_WORK_DT
Jun 12, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 24, 2012
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Absorption of radiations, caustics, toxic and noxious substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220121790005
DateACCIDENT_DT
Jun 24, 2012
TimeACCIDENT_TIME
2245
Shift beganSHIFT_BEGIN_TIME
2245
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Absorption of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
38
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Mantrip
Activity codeACTIVITY_CD
062
Source of injuryINJURY_SOURCE
ANIMALS,INSCTS,BRDS,REPTL
Source of injury codeINJURY_SOURCE_CD
001
Nature of injuryNATURE_INJURY
POISONING,SYSTEMIC
Nature of injury codeNATURE_INJURY_CD
280
Part of bodyINJ_BODY_PART
BODY SYSTEMS
Part of body codeINJ_BODY_PART_CD
600
Returned to workRETURN_TO_WORK_DT
Jun 25, 2012

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Mancar, Mantrip, Personnel carrier, Porta bus, Jeep, Jitney, ATV
Equipment codeMINING_EQUIP_CD
37
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 16, 2012
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220121380008
DateACCIDENT_DT
May 16, 2012
TimeACCIDENT_TIME
0820
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling coal, Rock, Ore
Activity codeACTIVITY_CD
026
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
May 16, 2012

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Conveyor, Belt feeder, Stage loader, Hopper shaker, Belt structure
Equipment codeMINING_EQUIP_CD
13
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 7, 2012
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220120460005
DateACCIDENT_DT
Feb 7, 2012
TimeACCIDENT_TIME
1400
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320130810001

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
WRENCH
Source of injury codeINJURY_SOURCE_CD
050
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
WRIST
Part of body codeINJ_BODY_PART_CD
320
Returned to workRETURN_TO_WORK_DT
Feb 7, 2012

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 17, 2010
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220100540004
DateACCIDENT_DT
Feb 17, 2010
TimeACCIDENT_TIME
1415
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Electrical maintenance
Activity codeACTIVITY_CD
020
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Feb 18, 2010

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 5, 2010
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: MACHINERY
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220100690003
DateACCIDENT_DT
Jan 5, 2010
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
0645
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Mill equipment
Activity codeACTIVITY_CD
063
Source of injuryINJURY_SOURCE
MACHINE-MILL,CLEANING PLT
Source of injury codeINJURY_SOURCE_CD
075
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
3
Returned to workRETURN_TO_WORK_DT
Mar 2, 2010

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Packaging machine, Bagger, Sewing machine, Palletizer
Equipment codeMINING_EQUIP_CD
46
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Oct 22, 2008
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 1
Details

The report

Document numberDOCUMENT_NO
220091480033
DateACCIDENT_DT
Oct 22, 2008
TimeACCIDENT_TIME
2045
Shift beganSHIFT_BEGIN_TIME
1445
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Oct 22, 2008

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
HGHWY ORE CARIER,LRGE TRK
Source of injury codeINJURY_SOURCE_CD
104
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
LOWER EXTREMITIES, MULTIPLE PARTS
Part of body codeINJ_BODY_PART_CD
550
Days lostDAYS_LOST
1
Returned to workRETURN_TO_WORK_DT
Oct 24, 2008

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Ore haulage trucks - off highway trucks
Equipment codeMINING_EQUIP_CD
44
Equipment manufacturerEQUIP_MFR_NAME
Ford
Equipment manufacturer codeEQUIP_MFR_CD
041
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Controller IDCONTROLLER_ID
M07372
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

25 most recent of 30 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 24
Hours worked: 41,240
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
41240
Average hours per employeeAVG_EMPLOYEE_HOURS
1718

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 23
Hours worked: 33,886
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
23
Hours workedANNUAL_HRS
33886
Average hours per employeeAVG_EMPLOYEE_HOURS
1473

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 24
Hours worked: 55,966
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
55966
Average hours per employeeAVG_EMPLOYEE_HOURS
2332

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 25
Hours worked: 51,461
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
25
Hours workedANNUAL_HRS
51461
Average hours per employeeAVG_EMPLOYEE_HOURS
2058

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 24
Hours worked: 51,874
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
51874
Average hours per employeeAVG_EMPLOYEE_HOURS
2161

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 27
Hours worked: 51,930
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
27
Hours workedANNUAL_HRS
51930
Average hours per employeeAVG_EMPLOYEE_HOURS
1923

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 25
Hours worked: 54,877
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
25
Hours workedANNUAL_HRS
54877
Average hours per employeeAVG_EMPLOYEE_HOURS
2195

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 25
Hours worked: 49,964
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
25
Hours workedANNUAL_HRS
49964
Average hours per employeeAVG_EMPLOYEE_HOURS
1999

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 23
Hours worked: 51,682
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
23
Hours workedANNUAL_HRS
51682
Average hours per employeeAVG_EMPLOYEE_HOURS
2247

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 24
Hours worked: 47,910
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
47910
Average hours per employeeAVG_EMPLOYEE_HOURS
1996

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 24
Hours worked: 53,385
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
53385
Average hours per employeeAVG_EMPLOYEE_HOURS
2224

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 24
Hours worked: 45,308
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
45308
Average hours per employeeAVG_EMPLOYEE_HOURS
1888

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 23
Hours worked: 56,308
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
23
Hours workedANNUAL_HRS
56308
Average hours per employeeAVG_EMPLOYEE_HOURS
2448

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 21
Hours worked: 44,536
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
21
Hours workedANNUAL_HRS
44536
Average hours per employeeAVG_EMPLOYEE_HOURS
2121

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 24
Hours worked: 54,860
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
24
Hours workedANNUAL_HRS
54860
Average hours per employeeAVG_EMPLOYEE_HOURS
2286

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 19
Hours worked: 40,127
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
19
Hours workedANNUAL_HRS
40127
Average hours per employeeAVG_EMPLOYEE_HOURS
2112

Mine

Mine IDMINE_ID
4702545
Mine name in this fileCURR_MINE_NM
GLC Minerals, LLC.
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Marquette MI Field Office
Nearest town
Green Bay, WI
Days worked per week
7
Hours per shift
12
Production shifts per day
2
Maintenance shifts per day
1
Employees, current record
48
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
GLC Minerals, LLC.
Mine IDMINE_ID
4702545
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Facility
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Dec 14, 1978
Legal entity typeCOMPANY_TYPE
Other

Operator and controller

OperatorCURRENT_OPERATOR_NAME
GLC Minerals LLC
Operator IDCURRENT_OPERATOR_ID
L09391
Controller IDCURRENT_CONTROLLER_ID
M07372
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jan 1, 1987

Location and MSHA office

StateSTATE
WI
Bureau of Mines state codeBOM_STATE_CD
47
FIPS county codeFIPS_CNTY_CD
009
FIPS county nameFIPS_CNTY_NM
Brown
Nearest townNEAREST_TOWN
Green Bay, WI
MSHA districtDISTRICT
M4
MSHA office codeOFFICE_CD
M4641
MSHA officeOFFICE_NAME
Marquette MI Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
177
Most recent assessment control numberASSESS_CTRL_NO
000641669

Commodity

Primary commodity (SIC)PRIMARY_SIC
Lime
Primary commodity codePRIMARY_SIC_CD
327400
Primary SIC codePRIMARY_SIC_CD_1
3274
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
7
Hours per shiftHOURS_PER_SHIFT
12
Production shifts per dayPROD_SHIFTS_PER_DAY
2
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
48
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (1)

Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (15)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: GLC Minerals LLC
From: Jan 1, 1987
To: No end date
Controller: Not shown
From : Jan 1, 1987
To : No end date
Details

Operator

OperatorOPERATOR_NAME
GLC Minerals LLC
Operator IDOPERATOR_ID
L09391
Operator fromOPERATOR_START_DT
Jan 1, 1987

Controller

Controller IDCONTROLLER_ID
M07372
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1987

Mine

Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: F Hurlbut Company
From: Mar 9, 1978
To: Dec 31, 1986
Controller: F Hurlbut Company
From : Mar 9, 1978
To : Dec 31, 1986
Details

Operator

OperatorOPERATOR_NAME
F Hurlbut Company
Operator IDOPERATOR_ID
L09390
Operator fromOPERATOR_START_DT
Mar 9, 1978
Operator toOPERATOR_END_DT
Dec 31, 1986

Controller

ControllerCONTROLLER_NAME
F Hurlbut Company
Controller IDCONTROLLER_ID
M07371
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Mar 9, 1978
Controller toCONTROLLER_END_DT
Dec 31, 1986

Mine

Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

As MSHA records it, newest operator first.

Address of record

GLC Minerals LLC·Contact title Office Manager·Street not recorded, Green Bay WI 54303

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
GLC Minerals LLC
Contact titleCONTACT_TITLE
Office Manager
CityCITY
Green Bay
StateSTATE_ABBR
WI
State nameSTATE
Wisconsin
ZIP codeZIP_CD
54303
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
55

Mine

Mine IDMINE_ID
4702545
Mine name in this fileMINE_NAME
GLC Minerals, LLC.
Nearest townNEAREST_TOWN
Green Bay, WI
Mine typeMINE_TYPE_CD
Facility
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Dec 14, 1978
Primary commodity (SIC)PRIMARY_SIC_CD
Lime
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology