Inspections
Spot InspectionSep 22, 2026Inspectors 1 | Hours on site 0Began: Sep 22, 2026Ended: Sep 22, 2026Activity: Spot InspectionInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 22, 2026
- Closed outINSPECTION_END_DT
- Sep 22, 2026
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6904977
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 20 to Apr 23, 2026Inspectors 1 | Hours on site 24Began: Apr 20, 2026Ended: Apr 23, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 24Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 20, 2026
- Closed outINSPECTION_END_DT
- Apr 23, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F016F71
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 24
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 39.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 27 to Jan 29, 2026Inspectors 2 | Hours on site 35.75Began: Jan 27, 2026Ended: Jan 29, 2026Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 35.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 27, 2026
- Closed outINSPECTION_END_DT
- Jan 29, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F024C85
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 35.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 67
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 9 to Jul 16, 2025Inspectors 1 | Hours on site 31.25Began: Jul 9, 2025Ended: Jul 16, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 31.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Closed outINSPECTION_END_DT
- Jul 16, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F00FCBC
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 31.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 52.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionFeb 6, 2025Inspectors 1 | Hours on site 1.25Began: Feb 6, 2025Ended: Feb 6, 2025Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 6, 2025
- Closed outINSPECTION_END_DT
- Feb 6, 2025
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- F016AAB
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 2.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 21 to Jan 30, 2025Inspectors 1 | Hours on site 36.5Began: Jan 21, 2025Ended: Jan 30, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 36.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Closed outINSPECTION_END_DT
- Jan 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6951100
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 36.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 65.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Verbal Hazard Complaint InspectionsNov 5, 2024Inspectors 1 | Hours on site 2.75Began: Nov 5, 2024Ended: Nov 5, 2024Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 2.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 5, 2024
- Closed outINSPECTION_END_DT
- Nov 5, 2024
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 6951085
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 1 to Apr 9, 2024Inspectors 1 | Hours on site 25.5Began: Apr 1, 2024Ended: Apr 9, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 25.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 1, 2024
- Closed outINSPECTION_END_DT
- Apr 9, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6906356
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 25.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 46.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 18, 2023 to Jan 10, 2024Inspectors 1 | Hours on site 22.75Began: Dec 18, 2023Ended: Jan 10, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 22.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 18, 2023
- Closed outINSPECTION_END_DT
- Jan 10, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6906889
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 22.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 41.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionFeb 28 to Mar 1, 2023Inspectors 1 | Hours on site 22Began: Feb 28, 2023Ended: Mar 1, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 22Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 28, 2023
- Closed outINSPECTION_END_DT
- Mar 1, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6906713
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 22
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 5 to Oct 12, 2022Inspectors 1 | Hours on site 26.75Began: Oct 5, 2022Ended: Oct 12, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 26.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 5, 2022
- Closed outINSPECTION_END_DT
- Oct 12, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6906186
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 45
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 29 to Aug 31, 2022Inspectors 1 | Hours on site 16.75Began: Aug 29, 2022Ended: Aug 31, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 29, 2022
- Closed outINSPECTION_END_DT
- Aug 31, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6906413
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 6 to Jan 19, 2022Inspectors 1 | Hours on site 38Began: Jan 6, 2022Ended: Jan 19, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 38Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 6, 2022
- Closed outINSPECTION_END_DT
- Jan 19, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6901485
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 38
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 77.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionSep 15, 2021Inspectors 1 | Hours on site 1.5Began: Sep 15, 2021Ended: Sep 15, 2021Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 15, 2021
- Closed outINSPECTION_END_DT
- Sep 15, 2021
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6904150
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 30 to Sep 8, 2021Inspectors 1 | Hours on site 28.5Began: Aug 30, 2021Ended: Sep 8, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 28.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 30, 2021
- Closed outINSPECTION_END_DT
- Sep 8, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6904142
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 28.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 56.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Part 50 AuditApr 19, 2021Inspectors 2 | Hours on site 0.5Began: Apr 19, 2021Ended: Apr 19, 2021Activity: Part 50 AuditInspectors: 2Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 19, 2021
- Closed outINSPECTION_END_DT
- Apr 19, 2021
- ActivityACTIVITY
- Part 50 Audit
- Activity codeACTIVITY_CODE
- E25
- Program areaPROGRAM_AREA
- M/NM--Part 50 Audit
- Event numberEVENT_NO
- 6902234
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 11 to Jan 14, 2021Inspectors 1 | Hours on site 8.25Began: Jan 11, 2021Ended: Jan 14, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 11, 2021
- Closed outINSPECTION_END_DT
- Jan 14, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6839733
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 15 to Jun 22, 2020Inspectors 1 | Hours on site 23.5Began: Jun 15, 2020Ended: Jun 22, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 23.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 15, 2020
- Closed outINSPECTION_END_DT
- Jun 22, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6839225
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 23.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 44.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 15 to Jan 29, 2020Inspectors 1 | Hours on site 39.25Began: Jan 15, 2020Ended: Jan 29, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 39.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 15, 2020
- Closed outINSPECTION_END_DT
- Jan 29, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6831675
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 39.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 81.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 24, 2019Inspectors 1 | Hours on site 1.5Began: Sep 24, 2019Ended: Sep 24, 2019Activity: Spot InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 24, 2019
- Closed outINSPECTION_END_DT
- Sep 24, 2019
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6831871
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 2.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsAug 1, 2019Inspectors 1 | Hours on site 0.5Began: Aug 1, 2019Ended: Aug 1, 2019Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 1, 2019
- Closed outINSPECTION_END_DT
- Aug 1, 2019
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6831186
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 29 to Aug 1, 2019Inspectors 1 | Hours on site 30.5Began: Jul 29, 2019Ended: Aug 1, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 30.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 29, 2019
- Closed outINSPECTION_END_DT
- Aug 1, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6831185
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 30.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 49.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionMar 11 to Mar 12, 2019Inspectors 1 | Hours on site 9.25Began: Mar 11, 2019Ended: Mar 12, 2019Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 9.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 11, 2019
- Closed outINSPECTION_END_DT
- Mar 12, 2019
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6831431
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 22 to Feb 13, 2019Inspectors 1 | Hours on site 35.25Began: Jan 22, 2019Ended: Feb 13, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 35.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 22, 2019
- Closed outINSPECTION_END_DT
- Feb 13, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6831425
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 35.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 90
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 21 to Apr 3, 2018Inspectors 1 | Hours on site 29.5Began: Mar 21, 2018Ended: Apr 3, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 29.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 21, 2018
- Closed outINSPECTION_END_DT
- Apr 3, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6744749
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 29.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 64.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 89 inspections and other MSHA visits since Mar 2, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Sep 22, 2026Type: CitationStandard: 50.20(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5116486
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 22, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0926
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 22, 2026
- 30 CFR part and sectionPART_SECTION
- 50.20(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 24, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Sep 24, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Sep 30, 2026
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6904977
- Inspection beganINSPECTION_BEGIN_DT
- Sep 22, 2026
- Inspection closed outINSPECTION_END_DT
- Sep 22, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (21)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID
Issued: Sep 22, 2026Type: CitationStandard: 50.20(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5116485
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 22, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0916
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 22, 2026
- 30 CFR part and sectionPART_SECTION
- 50.20(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 24, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Sep 24, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Sep 30, 2026
- Terminated, timeTERMINATION_TIME
- 0939
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6904977
- Inspection beganINSPECTION_BEGIN_DT
- Sep 22, 2026
- Inspection closed outINSPECTION_END_DT
- Sep 22, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (21)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID
Issued: Apr 21, 2026Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117349
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 21, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1020
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 21, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 21, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Apr 21, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Apr 21, 2026
- Terminated, timeTERMINATION_TIME
- 1045
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 17, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 25, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 22
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F016F71
- Inspection beganINSPECTION_BEGIN_DT
- Apr 20, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 23, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2026Type: CitationStandard: 56.12018S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117277
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1012
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Jan 28, 2026
- Terminated, timeTERMINATION_TIME
- 1034
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 18, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F024C85
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 29, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2026Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117278
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1059
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1130
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1130
- TerminatedTERMINATION_DT
- Jan 28, 2026
- Terminated, timeTERMINATION_TIME
- 1102
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 18, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F024C85
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 29, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 27, 2026Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117043
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 27, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1338
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 27, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 27, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 27, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 28, 2026
- Terminated, timeTERMINATION_TIME
- 1558
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 18, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F024C85
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 29, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 27, 2026Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117044
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 27, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1452
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 27, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 27, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 27, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 27, 2026
- Terminated, timeTERMINATION_TIME
- 1453
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- May 18, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F024C85
- Inspection beganINSPECTION_BEGIN_DT
- Jan 27, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 29, 2026
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 16, 2025Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $465.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487517
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 16, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0659
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 16, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jul 16, 2025
- Terminated, timeTERMINATION_TIME
- 0934
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 465
- Current proposed assessmentAMOUNT_DUE
- 465
- Amount paidAMOUNT_PAID
- 465
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 16, 2025Type: CitationStandard: 56.4201(a)(1)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487518
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 16, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1025
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 16, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 16, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 16, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 16, 2025
- Terminated, timeTERMINATION_TIME
- 1046
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 16, 2025Type: CitationStandard: 56.12030S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $209.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487516
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 16, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0641
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 16, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12030
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 16, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1530
- Latest dueLATEST_TERM_DUE_DT
- Jul 16, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1530
- TerminatedTERMINATION_DT
- Jul 16, 2025
- Terminated, timeTERMINATION_TIME
- 0725
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 209
- Current proposed assessmentAMOUNT_DUE
- 209
- Amount paidAMOUNT_PAID
- 209
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 16, 2025Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $465.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487515
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 16, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0555
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 16, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jul 16, 2025
- Terminated, timeTERMINATION_TIME
- 0933
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 465
- Current proposed assessmentAMOUNT_DUE
- 465
- Amount paidAMOUNT_PAID
- 465
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 16, 2025Type: CitationStandard: 41.12S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487519
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 16, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1148
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 16, 2025
- 30 CFR part and sectionPART_SECTION
- 41.12
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 21, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1430
- Latest dueLATEST_TERM_DUE_DT
- Jul 21, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1430
- TerminatedTERMINATION_DT
- Jul 18, 2025
- Terminated, timeTERMINATION_TIME
- 1839
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 15, 2025Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $549.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487514
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 15, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1336
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 15, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 15, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jul 15, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jul 15, 2025
- Terminated, timeTERMINATION_TIME
- 1424
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 549
- Current proposed assessmentAMOUNT_DUE
- 549
- Amount paidAMOUNT_PAID
- 549
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 24, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 10, 2025Type: CitationStandard: 56.12034S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $366.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487511
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 10, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1105
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 10, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12034
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 10, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1430
- Latest dueLATEST_TERM_DUE_DT
- Jul 10, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1430
- TerminatedTERMINATION_DT
- Jul 10, 2025
- Terminated, timeTERMINATION_TIME
- 1136
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 366
- Current proposed assessmentAMOUNT_DUE
- 366
- Amount paidAMOUNT_PAID
- 366
- Bill first printedBILL_PRINT_DT
- Aug 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 17, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 10, 2025Type: CitationStandard: 56.12028S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $165.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487513
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 10, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1240
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 10, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12028
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 10, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1430
- Latest dueLATEST_TERM_DUE_DT
- Jul 10, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1430
- TerminatedTERMINATION_DT
- Jul 10, 2025
- Terminated, timeTERMINATION_TIME
- 1304
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 165
- Current proposed assessmentAMOUNT_DUE
- 165
- Amount paidAMOUNT_PAID
- 165
- Bill first printedBILL_PRINT_DT
- Aug 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 17, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 10, 2025Type: CitationStandard: 56.20003(b)S&S: YNegligence: LowNegligenceIssued to: OperatorProposed penalty: $549.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9487512
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 10, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1129
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 10, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 11, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 11, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 15, 2025
- Terminated, timeTERMINATION_TIME
- 1243
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 549
- Current proposed assessmentAMOUNT_DUE
- 549
- Amount paidAMOUNT_PAID
- 549
- Bill first printedBILL_PRINT_DT
- Aug 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 17, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- F00FCBC
- Inspection beganINSPECTION_BEGIN_DT
- Jul 9, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 16, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 30, 2025Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667533
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 30, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1207
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 30, 2025
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1208
- Latest dueLATEST_TERM_DUE_DT
- Jan 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1208
- TerminatedTERMINATION_DT
- Jan 30, 2025
- Terminated, timeTERMINATION_TIME
- 1208
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 30, 2025Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667532
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 30, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1205
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 30, 2025
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1206
- Latest dueLATEST_TERM_DUE_DT
- Jan 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1206
- TerminatedTERMINATION_DT
- Jan 30, 2025
- Terminated, timeTERMINATION_TIME
- 1206
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 29, 2025Type: CitationStandard: 56.14107(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $883.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667531
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0929
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 3, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Feb 3, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Feb 6, 2025
- Terminated, timeTERMINATION_TIME
- 0745
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 883
- Current proposed assessmentAMOUNT_DUE
- 883
- Amount paidAMOUNT_PAID
- 883
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2025Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667530
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1628
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1640
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2025Type: CitationStandard: 56.18002(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667528
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0730
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.18002(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jan 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Feb 6, 2025
- Terminated, timeTERMINATION_TIME
- 0730
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 28, 2025Type: CitationStandard: 56.11027S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667529
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1536
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11027
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1715
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 27, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667526
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 27, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1444
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 27, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 27, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jan 27, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jan 27, 2025
- Terminated, timeTERMINATION_TIME
- 1531
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 27, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667527
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 27, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1458
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 27, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 27, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Jan 27, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1010
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jan 22, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8667524
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1611
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 23, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jan 23, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jan 23, 2025
- Terminated, timeTERMINATION_TIME
- 0855
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 21, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- 3M Company
- Operator IDVIOLATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Inspection eventEVENT_NO
- 6951100
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
429 citations and orders since Mar 29, 2000: 405 issued to the operator, 24 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Apr 21, 2026Citation number: 5117349Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117349
- Assessment control numberASSESS_CASE_NO
- 000643252
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2026
- Citation issuedISSUE_DT
- Apr 21, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 21, 2026
- Final order dateFINAL_ORDER_DT
- Jul 25, 2026
- Bill first printedBILL_PRINT_DT
- Jun 17, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 22
- Violations per inspection dayVPID
- 0.95
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 4
- Repeat violations per inspection dayRPID
- 0.182
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 116623
- Size of mineSIZE_OF_MINE
- 116623
- Controller hours workedCONTROLLER_HRS
- 880823
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 880823
- History period startHISTORY_START_DT
- Jan 21, 2025
- History period endHISTORY_END_DT
- Apr 20, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F016F71
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2026Citation number: 5117277Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117277
- Assessment control numberASSESS_CASE_NO
- 000637660
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2026
- Citation issuedISSUE_DT
- Jan 28, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2026
- Final order dateFINAL_ORDER_DT
- May 18, 2026
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 18, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
- Violations per inspection dayVPID
- 1.24
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.118
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 116623
- Size of mineSIZE_OF_MINE
- 116623
- Controller hours workedCONTROLLER_HRS
- 880823
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 880823
- History period startHISTORY_START_DT
- Oct 28, 2024
- History period endHISTORY_END_DT
- Jan 27, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F024C85
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2026Citation number: 5117278Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117278
- Assessment control numberASSESS_CASE_NO
- 000637660
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2026
- Citation issuedISSUE_DT
- Jan 28, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2026
- Final order dateFINAL_ORDER_DT
- May 18, 2026
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 18, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
- Violations per inspection dayVPID
- 1.24
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 4
- Repeat violations per inspection dayRPID
- 0.235
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 116623
- Size of mineSIZE_OF_MINE
- 116623
- Controller hours workedCONTROLLER_HRS
- 880823
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 880823
- History period startHISTORY_START_DT
- Oct 28, 2024
- History period endHISTORY_END_DT
- Jan 27, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F024C85
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 27, 2026Citation number: 5117043Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117043
- Assessment control numberASSESS_CASE_NO
- 000637660
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2026
- Citation issuedISSUE_DT
- Jan 27, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 27, 2026
- Final order dateFINAL_ORDER_DT
- May 18, 2026
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 18, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 1.4
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 4
- Repeat violations per inspection dayRPID
- 0.267
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 116623
- Size of mineSIZE_OF_MINE
- 116623
- Controller hours workedCONTROLLER_HRS
- 880823
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 880823
- History period startHISTORY_START_DT
- Oct 27, 2024
- History period endHISTORY_END_DT
- Jan 26, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F024C85
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 27, 2026Citation number: 5117044Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117044
- Assessment control numberASSESS_CASE_NO
- 000637660
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 9, 2026
- Citation issuedISSUE_DT
- Jan 27, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 27, 2026
- Final order dateFINAL_ORDER_DT
- May 18, 2026
- Bill first printedBILL_PRINT_DT
- Mar 18, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 18, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 21
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 1.4
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 4
- Repeat violations per inspection dayRPID
- 0.267
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 116623
- Size of mineSIZE_OF_MINE
- 116623
- Controller hours workedCONTROLLER_HRS
- 880823
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 880823
- History period startHISTORY_START_DT
- Oct 27, 2024
- History period endHISTORY_END_DT
- Jan 26, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F024C85
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 16, 2025Citation number: 9487516Standard: 56.12030Proposed penalty: $209.00Current assessment: $209.00Paid against proposed penalty: $209.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487516
- Assessment control numberASSESS_CASE_NO
- 000628782
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 19, 2026
- Citation issuedISSUE_DT
- Jul 16, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 16, 2025
- Final order dateFINAL_ORDER_DT
- Oct 25, 2025
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12030
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 209.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 209.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.33
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 209.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 2.33
Penalty points
- Violation history pointsPENALTY_POINTS
- 64
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 1.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 16, 2024
- History period endHISTORY_END_DT
- Jul 15, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 16, 2025Citation number: 9487518Standard: 56.4201(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487518
- Assessment control numberASSESS_CASE_NO
- 000628782
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 19, 2026
- Citation issuedISSUE_DT
- Jul 16, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 16, 2025
- Final order dateFINAL_ORDER_DT
- Oct 25, 2025
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.69
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.69
Penalty points
- Violation history pointsPENALTY_POINTS
- 54
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 1.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 16, 2024
- History period endHISTORY_END_DT
- Jul 15, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 16, 2025Citation number: 9487515Standard: 56.12004Proposed penalty: $465.00Current assessment: $465.00Paid against proposed penalty: $465.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487515
- Assessment control numberASSESS_CASE_NO
- 000628782
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 19, 2026
- Citation issuedISSUE_DT
- Jul 16, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 16, 2025
- Final order dateFINAL_ORDER_DT
- Oct 25, 2025
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 465.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 465.00
- Mine Act interestMINEACT_INTEREST_AMT
- 5.19
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 465.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 5.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 74
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 1.23
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 3
- Repeat violations per inspection dayRPID
- 0.231
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 16, 2024
- History period endHISTORY_END_DT
- Jul 15, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (7)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 16, 2025Citation number: 9487517Standard: 56.12004Proposed penalty: $465.00Current assessment: $465.00Paid against proposed penalty: $465.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487517
- Assessment control numberASSESS_CASE_NO
- 000628782
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 19, 2026
- Citation issuedISSUE_DT
- Jul 16, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 16, 2025
- Final order dateFINAL_ORDER_DT
- Oct 25, 2025
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 465.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 465.00
- Mine Act interestMINEACT_INTEREST_AMT
- 5.19
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 465.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 5.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 74
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 1.23
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 3
- Repeat violations per inspection dayRPID
- 0.231
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 16, 2024
- History period endHISTORY_END_DT
- Jul 15, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (7)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 16, 2025Citation number: 9487519Standard: 41.12Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487519
- Assessment control numberASSESS_CASE_NO
- 000628782
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 19, 2026
- Citation issuedISSUE_DT
- Jul 16, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 16, 2025
- Final order dateFINAL_ORDER_DT
- Oct 25, 2025
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 41.12
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.69
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.69
Penalty points
- Violation history pointsPENALTY_POINTS
- 33
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 1.23
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 16, 2024
- History period endHISTORY_END_DT
- Jul 15, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 15, 2025Citation number: 9487514Standard: 56.12032Proposed penalty: $549.00Current assessment: $549.00Paid against proposed penalty: $549.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487514
- Assessment control numberASSESS_CASE_NO
- 000628782
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 19, 2026
- Citation issuedISSUE_DT
- Jul 15, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 15, 2025
- Final order dateFINAL_ORDER_DT
- Oct 25, 2025
- Bill first printedBILL_PRINT_DT
- Sep 17, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 549.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 549.00
- Mine Act interestMINEACT_INTEREST_AMT
- 6.14
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 549.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 6.14
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 1.45
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 15, 2024
- History period endHISTORY_END_DT
- Jul 14, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (9)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 10, 2025Citation number: 9487513Standard: 56.12028Proposed penalty: $165.00Current assessment: $165.00Paid against proposed penalty: $165.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487513
- Assessment control numberASSESS_CASE_NO
- 000626740
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 19, 2025
- Citation issuedISSUE_DT
- Jul 10, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 10, 2025
- Final order dateFINAL_ORDER_DT
- Sep 17, 2025
- Bill first printedBILL_PRINT_DT
- Aug 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 17, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12028
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 165.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 165.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 165.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.78
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 10, 2024
- History period endHISTORY_END_DT
- Jul 9, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 10, 2025Citation number: 9487511Standard: 56.12034Proposed penalty: $366.00Current assessment: $366.00Paid against proposed penalty: $366.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487511
- Assessment control numberASSESS_CASE_NO
- 000626740
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 19, 2025
- Citation issuedISSUE_DT
- Jul 10, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 10, 2025
- Final order dateFINAL_ORDER_DT
- Sep 17, 2025
- Bill first printedBILL_PRINT_DT
- Aug 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 17, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12034
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 366.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 366.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 366.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 71
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.78
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 10, 2024
- History period endHISTORY_END_DT
- Jul 9, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 10, 2025Citation number: 9487512Standard: 56.20003(b)Proposed penalty: $549.00Current assessment: $549.00Paid against proposed penalty: $549.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9487512
- Assessment control numberASSESS_CASE_NO
- 000626740
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 19, 2025
- Citation issuedISSUE_DT
- Jul 10, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 10, 2025
- Final order dateFINAL_ORDER_DT
- Sep 17, 2025
- Bill first printedBILL_PRINT_DT
- Aug 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 17, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 549.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 549.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 549.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.78
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Apr 10, 2024
- History period endHISTORY_END_DT
- Jul 9, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00FCBC
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 30, 2025Citation number: 8667533Standard: 50.30(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667533
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 30, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 30, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
- Violations per inspection dayVPID
- 0.38
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 30, 2023
- History period endHISTORY_END_DT
- Jan 29, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 30, 2025Citation number: 8667532Standard: 50.30(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667532
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 30, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 30, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
- Violations per inspection dayVPID
- 0.38
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 30, 2023
- History period endHISTORY_END_DT
- Jan 29, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 29, 2025Citation number: 8667531Standard: 56.14107(a)Proposed penalty: $883.00Current assessment: $883.00Paid against proposed penalty: $883.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667531
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 29, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 883.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 883.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 883.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 82
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 0.46
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 29, 2023
- History period endHISTORY_END_DT
- Jan 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 8667528Standard: 56.18002(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667528
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.18002(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 8667530Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667530
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 8667529Standard: 56.11027Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667529
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11027
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 27, 2025Citation number: 8667526Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667526
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 27, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 27, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 27, 2023
- History period endHISTORY_END_DT
- Jan 26, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 27, 2025Citation number: 8667527Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667527
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 27, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 27, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 27, 2023
- History period endHISTORY_END_DT
- Jan 26, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 8667524Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667524
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.091
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 8667523Standard: 56.12004Proposed penalty: $177.00Current assessment: $177.00Paid against proposed penalty: $177.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667523
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 177.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 177.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 177.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 62
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.182
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 8667522Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8667522
- Assessment control numberASSESS_CASE_NO
- 000616528
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 21, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 12, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 47
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.55
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.182
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 138081
- Size of mineSIZE_OF_MINE
- 138081
- Controller hours workedCONTROLLER_HRS
- 943263
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 943263
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- 3M Company
- IDVIOLATOR_ID
- L00273
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1990
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6951100
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 425 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Jan 25, 2011Citation issued: Dec 7, 2010Docket: LAKE 2011-338MStandard: 56.14112(a)(1)Proposed penalty: $2,106.00Penalty after decision: $425.00Decided: Sep 22, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552071
- Citation issuedCITATION_ISSUE_DT
- Dec 7, 2010
- Hearing request receivedCONTEST_DT
- Jan 25, 2011
- Docket numberDOCKET_NO
- LAKE 2011-338M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 22, 2011
- Petition duePETITION_DUE_DT
- Mar 11, 2011
- Petition filedPETITION_FILED_DT
- Mar 11, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 2106.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 425.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14112(a)(1)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M4000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Duluth District
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jan 28, 2011Citation issued: Dec 7, 2010Docket: LAKE 2011-346MStandard: 56.16009Proposed penalty: $2,161.00Penalty after decision: $2,000.00Decided: Dec 13, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552073
- Citation issuedCITATION_ISSUE_DT
- Dec 7, 2010
- Hearing request receivedCONTEST_DT
- Jan 28, 2011
- Docket numberDOCKET_NO
- LAKE 2011-346M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Dec 13, 2011
- Petition duePETITION_DUE_DT
- Mar 14, 2011
- Petition filedPETITION_FILED_DT
- Mar 14, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 2161.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 2000.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.16009
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(d)(1)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 4
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 4
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- HighNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jan 25, 2011Citation issued: Dec 7, 2010Docket: LAKE 2011-338MStandard: 56.14107(a)Proposed penalty: $6,996.00Penalty after decision: $285.00Decided: Sep 22, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552070
- Citation issuedCITATION_ISSUE_DT
- Dec 7, 2010
- Hearing request receivedCONTEST_DT
- Jan 25, 2011
- Docket numberDOCKET_NO
- LAKE 2011-338M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 22, 2011
- Petition duePETITION_DUE_DT
- Mar 11, 2011
- Petition filedPETITION_FILED_DT
- Mar 11, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 6996.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 285.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14107(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M4000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Duluth District
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jan 28, 2011Citation issued: Dec 7, 2010Docket: LAKE 2011-346MStandard: 56.16007(b)Proposed penalty: $2,000.00Penalty after decision: $1,700.00Decided: Dec 13, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552074
- Citation issuedCITATION_ISSUE_DT
- Dec 7, 2010
- Hearing request receivedCONTEST_DT
- Jan 28, 2011
- Docket numberDOCKET_NO
- LAKE 2011-346M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Dec 13, 2011
- Petition duePETITION_DUE_DT
- Mar 14, 2011
- Petition filedPETITION_FILED_DT
- Mar 14, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 2000.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 1700.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.16007(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Order
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(d)(1)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 2
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 2
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- HighNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR701
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Denver
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jan 25, 2011Citation issued: Nov 30, 2010Docket: LAKE 2011-338MStandard: 56.14107(a)Proposed penalty: $1,412.00Penalty after decision: $634.00Decided: Sep 22, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552065
- Citation issuedCITATION_ISSUE_DT
- Nov 30, 2010
- Hearing request receivedCONTEST_DT
- Jan 25, 2011
- Docket numberDOCKET_NO
- LAKE 2011-338M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 22, 2011
- Petition duePETITION_DUE_DT
- Mar 11, 2011
- Petition filedPETITION_FILED_DT
- Mar 11, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1412.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 634.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14107(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M4000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Duluth District
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jan 25, 2011Citation issued: Nov 30, 2010Docket: LAKE 2011-338MStandard: 56.20003(a)Proposed penalty: $2,106.00Penalty after decision: $946.00Decided: Sep 22, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552064
- Citation issuedCITATION_ISSUE_DT
- Nov 30, 2010
- Hearing request receivedCONTEST_DT
- Jan 25, 2011
- Docket numberDOCKET_NO
- LAKE 2011-338M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 22, 2011
- Petition duePETITION_DUE_DT
- Mar 11, 2011
- Petition filedPETITION_FILED_DT
- Mar 11, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 2106.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 946.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M4000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Duluth District
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jan 25, 2011Citation issued: Nov 30, 2010Docket: LAKE 2011-338MStandard: 56.14112(a)(1)Proposed penalty: $2,678.00Penalty after decision: $946.00Decided: Sep 22, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6552066
- Citation issuedCITATION_ISSUE_DT
- Nov 30, 2010
- Hearing request receivedCONTEST_DT
- Jan 25, 2011
- Docket numberDOCKET_NO
- LAKE 2011-338M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Michael
- Judge, last nameJUDGE_LAST_NAME
- Zielinski
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 22, 2011
- Petition duePETITION_DUE_DT
- Mar 11, 2011
- Petition filedPETITION_FILED_DT
- Mar 11, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 2678.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 946.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14112(a)(1)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 3
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M4000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M4000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Duluth District
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
Other fields
- ISSUING_FIELD_OFFICE
- M4661
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
7 contested citations and orders; decision types are MSHA's own text.
Imminent danger orders, section 107(a)
Issued: Dec 7, 2010Order number: 6552072Terminated: Dec 7, 2010Issued to: ContractorDetails
The order
- Order numberVIOLATION_NO
- 6552072
- IssuedVIOLATION_DATE_ISSUED
- Dec 7, 2010
- TerminatedTERMINATION_DATE
- Dec 7, 2010
- Issued toVIOLATOR_TYPE
- Contractor
Who
- Operator at the timeOPERATOR_NAME_VIOLATIONS
- 3M Company
- ContractorCONTRACTOR_NAME
- Miron Construction Co Inc
- Contractor IDCONTRACTOR_ID
- 3VS
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- StateSTATE_ABBREVIATION
- WI
- Coal or Metal/Non-MetalCOAL_OR_METAL
- M
Not recorded by MSHA (2)
Controller at the timeCONTROLLER_NAME_VIOLATIONS, Controller IDCONTROLLER_ID_VIOLATIONS
1 imminent danger order in MSHA's list, which starts July 1, 2010.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS RESTRICTED ACTIVITY ONLY
- 32
- NO DYS AWY FRM WRK,NO RSTR ACT
- 28
- DAYS AWAY FROM WORK ONLY
- 15
- DYS AWY FRM WRK & RESTRCTD ACT
- 12
- OCCUPATNAL ILLNESS NOT DEG 1-6
- 10
- ACCIDENT ONLY
- 3
- NO VALUE FOUND
- 1
Date: Oct 22, 2026Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220263030016
- DateACCIDENT_DT
- Oct 22, 2026
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Couple or uncouple mine car
- Activity codeACTIVITY_CD
- 015
- Source of injuryINJURY_SOURCE
- MCH PWR TRNSMSN APPR,NEC
- Source of injury codeINJURY_SOURCE_CD
- 081
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2027
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Not recorded by MSHA (8)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jun 16, 2026Degree of injury: DAYS AWAY FROM WORK ONLYClassification: EXPLODING VESSELS UNDER PRESSUREAccident type: Struck by flying objectDays lost: 1Details
The report
- Document numberDOCUMENT_NO
- 220261730003
- DateACCIDENT_DT
- Jun 16, 2026
- TimeACCIDENT_TIME
- 1310
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- EXPLODING VESSELS UNDER PRESSURE
- Classification codeCLASSIFICATION_CD
- 03
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- BOILR,PRES VSL,AIR HOS,OX
- Source of injury codeINJURY_SOURCE_CD
- 003
- Nature of injuryNATURE_INJURY
- UNCLASSIFIED,NOT DETERMED
- Nature of injury codeNATURE_INJURY_CD
- 400
- Part of bodyINJ_BODY_PART
- KNEE/PATELLA
- Part of body codeINJ_BODY_PART_CD
- 512
- Days lostDAYS_LOST
- 1
- Returned to workRETURN_TO_WORK_DT
- Jun 18, 2026
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Mine car, Ore or coal car, Boxcar, Hopper car
- Equipment codeMINING_EQUIP_CD
- 42
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- 808922
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Jun 11, 2026Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 3Details
The report
- Document numberDOCUMENT_NO
- 220261680009
- DateACCIDENT_DT
- Jun 11, 2026
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 0800
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- FLOOR,WALKING SURF-NOT UG
- Source of injury codeINJURY_SOURCE_CD
- 010
- Nature of injuryNATURE_INJURY
- CONCUSSION-BRAIN,CEREBRAL
- Nature of injury codeNATURE_INJURY_CD
- 140
- Part of bodyINJ_BODY_PART
- BRAIN
- Part of body codeINJ_BODY_PART_CD
- 110
- Days lostDAYS_LOST
- 3
- Returned to workRETURN_TO_WORK_DT
- Jun 15, 2026
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Dec 18, 2025Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220260060006
- DateACCIDENT_DT
- Dec 18, 2025
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 1300
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320262670009
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- UPPER ARM/HUMERUS
- Part of body codeINJ_BODY_PART_CD
- 311
- Days of restricted workDAYS_RESTRICT
- 34
- Returned to workRETURN_TO_WORK_DT
- Feb 3, 2026
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Dec 1, 2025Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220263030018
- DateACCIDENT_DT
- Dec 1, 2025
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- WORKING SURF OUTSIDE,NEC
- Source of injury codeINJURY_SOURCE_CD
- 120
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Returned to workRETURN_TO_WORK_DT
- Dec 1, 2025
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jun 29, 2025Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDTOOLS (NONPOWERED)Accident type: Over-exertion in wielding or throwing objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220252020013
- DateACCIDENT_DT
- Jun 29, 2025
- TimeACCIDENT_TIME
- 2100
- Shift beganSHIFT_BEGIN_TIME
- 1430
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Over-exertion in wielding or throwing objects
- Accident type codeACCIDENT_TYPE_CD
- 29
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320262670010
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- AXE,HAMMER,SLEDGE
- Source of injury codeINJURY_SOURCE_CD
- 046
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Days of restricted workDAYS_RESTRICT
- 45
- Returned to workRETURN_TO_WORK_DT
- Aug 29, 2025
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Nov 4, 2024Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Struck by falling objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220243180006
- DateACCIDENT_DT
- Nov 4, 2024
- TimeACCIDENT_TIME
- 0830
- Shift beganSHIFT_BEGIN_TIME
- 0730
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by falling object
- Accident type codeACCIDENT_TYPE_CD
- 04
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CONTUSN,BRUISE,INTAC SKIN
- Nature of injury codeNATURE_INJURY_CD
- 160
- Part of bodyINJ_BODY_PART
- FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
- Part of body codeINJ_BODY_PART_CD
- 530
- Days of restricted workDAYS_RESTRICT
- 5
- Returned to workRETURN_TO_WORK_DT
- Nov 11, 2024
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Contractor IDCONTRACTOR_ID
- 3VS
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: May 1, 2023Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 52Details
The report
- Document numberDOCUMENT_NO
- 220232510003
- DateACCIDENT_DT
- May 1, 2023
- TimeACCIDENT_TIME
- 0700
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320242680005
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Days of restricted workDAYS_RESTRICT
- 61
- Days lostDAYS_LOST
- 52
- Returned to workRETURN_TO_WORK_DT
- Jan 30, 2024
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jul 29, 2022Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6Classification: DISORDERS (REPEATED TRAUMA)Accident type: NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220232080033
- DateACCIDENT_DT
- Jul 29, 2022
- TimeACCIDENT_TIME
- 0700
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- OCCUPATNAL ILLNESS NOT DEG 1-6
- Degree of injury codeDEGREE_INJURY_CD
- 07
- ClassificationCLASSIFICATION
- DISORDERS (REPEATED TRAUMA)
- Classification codeCLASSIFICATION_CD
- 31
- Accident typeACCIDENT_TYPE
- NEC
- Accident type codeACCIDENT_TYPE_CD
- 42
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Unknown
- Activity codeACTIVITY_CD
- 099
- Source of injuryINJURY_SOURCE
- NOISE,NEC
- Source of injury codeINJURY_SOURCE_CD
- 096
- Nature of injuryNATURE_INJURY
- HEARING LOSS OR IMPAIRMNT
- Nature of injury codeNATURE_INJURY_CD
- 240
- Part of bodyINJ_BODY_PART
- EAR(S) INTERNAL & HEARING
- Part of body codeINJ_BODY_PART_CD
- 122
- Returned to workRETURN_TO_WORK_DT
- Jul 29, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jun 7, 2022Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220221730036
- DateACCIDENT_DT
- Jun 7, 2022
- TimeACCIDENT_TIME
- 0100
- Shift beganSHIFT_BEGIN_TIME
- 2300
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320221960002
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- CHUTE & SLIDE-CONVYR HOPR
- Source of injury codeINJURY_SOURCE_CD
- 034
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 35
- Returned to workRETURN_TO_WORK_DT
- Jul 15, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Mar 15, 2020Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220200860003
- DateACCIDENT_DT
- Mar 15, 2020
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320211050014
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 34
- Days lostDAYS_LOST
- 2
- Returned to workRETURN_TO_WORK_DT
- May 5, 2020
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Dec 27, 2019Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Struck by... NECDays lost: 1Details
The report
- Document numberDOCUMENT_NO
- 220200020012
- DateACCIDENT_DT
- Dec 27, 2019
- TimeACCIDENT_TIME
- 1200
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- EAR(S) EXTERNAL
- Part of body codeINJ_BODY_PART_CD
- 121
- Days lostDAYS_LOST
- 1
- Returned to workRETURN_TO_WORK_DT
- Dec 30, 2019
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Apr 17, 2019Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220191360042
- DateACCIDENT_DT
- Apr 17, 2019
- TimeACCIDENT_TIME
- 0700
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- BAGS
- Source of injury codeINJURY_SOURCE_CD
- 004
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- FOREARM/ULNAR/RADIUS
- Part of body codeINJ_BODY_PART_CD
- 313
- Days lostDAYS_LOST
- 2
- Returned to workRETURN_TO_WORK_DT
- May 13, 2019
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Mar 6, 2018Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 48Details
The report
- Document numberDOCUMENT_NO
- 220181010012
- DateACCIDENT_DT
- Mar 6, 2018
- TimeACCIDENT_TIME
- 0213
- Shift beganSHIFT_BEGIN_TIME
- 2230
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320183020025
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- KNEE/PATELLA
- Part of body codeINJ_BODY_PART_CD
- 512
- Days of restricted workDAYS_RESTRICT
- 74
- Days lostDAYS_LOST
- 48
- Returned to workRETURN_TO_WORK_DT
- Aug 27, 2018
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 27, 2017Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220172750033
- DateACCIDENT_DT
- Sep 27, 2017
- TimeACCIDENT_TIME
- 1900
- Shift beganSHIFT_BEGIN_TIME
- 1500
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320173050006
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- BAGS
- Source of injury codeINJURY_SOURCE_CD
- 004
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Days of restricted workDAYS_RESTRICT
- 13
- Returned to workRETURN_TO_WORK_DT
- Oct 19, 2017
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Nov 4, 2016Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: SLIP OR FALL OF PERSONAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220163280018
- DateACCIDENT_DT
- Nov 4, 2016
- TimeACCIDENT_TIME
- 1400
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320163550009
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- STEPS
- Source of injury codeINJURY_SOURCE_CD
- 011
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- LOWER LEG/TIBIA/FIBULA
- Part of body codeINJ_BODY_PART_CD
- 513
- Days of restricted workDAYS_RESTRICT
- 14
- Returned to workRETURN_TO_WORK_DT
- Nov 29, 2016
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jul 9, 2015Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: MACHINERYAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220152030007
- DateACCIDENT_DT
- Jul 9, 2015
- TimeACCIDENT_TIME
- 1300
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320153210010
Injury
- Activity at the timeACTIVITY
- Grinding
- Activity codeACTIVITY_CD
- 024
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Days of restricted workDAYS_RESTRICT
- 59
- Returned to workRETURN_TO_WORK_DT
- Sep 30, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Makita
- Equipment manufacturer codeEQUIP_MFR_CD
- 141
- Equipment model numberEQUIP_MODEL_NO
- 9557
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Contractor IDCONTRACTOR_ID
- 3VS
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (1)
MSHA investigation beganINVEST_BEGIN_DT
Date: May 24, 2015Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220151600025
- DateACCIDENT_DT
- May 24, 2015
- TimeACCIDENT_TIME
- 1330
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- PULVERIZED MINERAL (DUST)
- Source of injury codeINJURY_SOURCE_CD
- 092
- Nature of injuryNATURE_INJURY
- SCRATCH,ABRASION,SUPERFCL
- Nature of injury codeNATURE_INJURY_CD
- 310
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- May 25, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Feb 24, 2015Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: STEPPING OR KNEELING ON OBJECTAccident type: Struck against stationary objectDays lost: 1Details
The report
- Document numberDOCUMENT_NO
- 220150610029
- DateACCIDENT_DT
- Feb 24, 2015
- TimeACCIDENT_TIME
- 1430
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- STEPPING OR KNEELING ON OBJECT
- Classification codeCLASSIFICATION_CD
- 19
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320150640006
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
- Part of body codeINJ_BODY_PART_CD
- 530
- Days of restricted workDAYS_RESTRICT
- 2
- Days lostDAYS_LOST
- 1
- Returned to workRETURN_TO_WORK_DT
- Mar 3, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Feb 23, 2015Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6Classification: OCCUPATIONAL SKIN DISEASESAccident type: Absorption of radiations, caustics, toxic and noxious substancesDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220150610026
- DateACCIDENT_DT
- Feb 23, 2015
- TimeACCIDENT_TIME
- 1700
- Shift beganSHIFT_BEGIN_TIME
- 1500
- Degree of injuryDEGREE_INJURY
- OCCUPATNAL ILLNESS NOT DEG 1-6
- Degree of injury codeDEGREE_INJURY_CD
- 07
- ClassificationCLASSIFICATION
- OCCUPATIONAL SKIN DISEASES
- Classification codeCLASSIFICATION_CD
- 26
- Accident typeACCIDENT_TYPE
- Absorption of radiations, caustics, toxic and noxious substances
- Accident type codeACCIDENT_TYPE_CD
- 38
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320150760006
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- MISCELLANEOUS,NEC
- Source of injury codeINJURY_SOURCE_CD
- 127
- Nature of injuryNATURE_INJURY
- DERMATITIS,RASH,SKIN INFL
- Nature of injury codeNATURE_INJURY_CD
- 190
- Part of bodyINJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- Part of body codeINJ_BODY_PART_CD
- 700
- Days of restricted workDAYS_RESTRICT
- 9
- Returned to workRETURN_TO_WORK_DT
- Mar 6, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Feb 1, 2015Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220150400011
- DateACCIDENT_DT
- Feb 1, 2015
- TimeACCIDENT_TIME
- 1300
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Returned to workRETURN_TO_WORK_DT
- Feb 2, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jan 30, 2015Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Struck against stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220150340006
- DateACCIDENT_DT
- Jan 30, 2015
- TimeACCIDENT_TIME
- 0330
- Shift beganSHIFT_BEGIN_TIME
- 0300
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320150500001
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Days of restricted workDAYS_RESTRICT
- 14
- Returned to workRETURN_TO_WORK_DT
- Feb 19, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Dec 15, 2014Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220143520011
- DateACCIDENT_DT
- Dec 15, 2014
- TimeACCIDENT_TIME
- 0857
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320150400011
Injury
- Activity at the timeACTIVITY
- Electrical maintenance
- Activity codeACTIVITY_CD
- 020
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 34
- Returned to workRETURN_TO_WORK_DT
- Feb 5, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 23, 2014Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 7Details
The report
- Document numberDOCUMENT_NO
- 220143360016
- DateACCIDENT_DT
- Sep 23, 2014
- TimeACCIDENT_TIME
- 1100
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320151320030
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- BOILR,PRES VSL,AIR HOS,OX
- Source of injury codeINJURY_SOURCE_CD
- 003
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Days of restricted workDAYS_RESTRICT
- 124
- Days lostDAYS_LOST
- 7
- Returned to workRETURN_TO_WORK_DT
- May 11, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Apr 11, 2014Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: HANDLING OF MATERIALSAccident type: Over-exertion in pulling or pushing objectsDays lost: 7Details
The report
- Document numberDOCUMENT_NO
- 220141320042
- DateACCIDENT_DT
- Apr 11, 2014
- TimeACCIDENT_TIME
- 0251
- Shift beganSHIFT_BEGIN_TIME
- 2300
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in pulling or pushing objects
- Accident type codeACCIDENT_TYPE_CD
- 28
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320142260014
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Days of restricted workDAYS_RESTRICT
- 57
- Days lostDAYS_LOST
- 7
- Returned to workRETURN_TO_WORK_DT
- Aug 11, 2014
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Controller at the timeCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
25 most recent of 101 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 55Hours worked: 48,720Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 55
- Hours workedANNUAL_HRS
- 48720
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 886
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 30Hours worked: 21,962Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 30
- Hours workedANNUAL_HRS
- 21962
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 732
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 55Hours worked: 116,623Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 55
- Hours workedANNUAL_HRS
- 116623
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2120
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 29Hours worked: 47,267Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 29
- Hours workedANNUAL_HRS
- 47267
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1630
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 62Hours worked: 138,081Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 62
- Hours workedANNUAL_HRS
- 138081
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2227
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 31Hours worked: 41,262Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 31
- Hours workedANNUAL_HRS
- 41262
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1331
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 56Hours worked: 130,265Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 56
- Hours workedANNUAL_HRS
- 130265
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2326
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 31Hours worked: 50,795Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 31
- Hours workedANNUAL_HRS
- 50795
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1639
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 60Hours worked: 134,953Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 60
- Hours workedANNUAL_HRS
- 134953
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2249
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 30Hours worked: 56,385Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 30
- Hours workedANNUAL_HRS
- 56385
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1880
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 61Hours worked: 133,358Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 61
- Hours workedANNUAL_HRS
- 133358
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2186
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 30Hours worked: 49,226Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 30
- Hours workedANNUAL_HRS
- 49226
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1641
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 54Hours worked: 129,132Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 54
- Hours workedANNUAL_HRS
- 129132
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2391
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 31Hours worked: 54,569Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 31
- Hours workedANNUAL_HRS
- 54569
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1760
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 54Hours worked: 132,952Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 54
- Hours workedANNUAL_HRS
- 132952
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2462
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 31Hours worked: 54,137Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 31
- Hours workedANNUAL_HRS
- 54137
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1746
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileCURR_MINE_NM
- 3M - Downtown Plant
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Marquette MI Field Office
- Nearest town
- Wausau, WI
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 3
- Maintenance shifts per day
- 0
- Employees, current record
- 114
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- 3M - Downtown Plant
- Mine IDMINE_ID
- 4702918
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Intermittent
- Status sinceCURRENT_STATUS_DT
- Jun 30, 2026
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- 3M Company
- Operator IDCURRENT_OPERATOR_ID
- L00273
- ControllerCURRENT_CONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCURRENT_CONTROLLER_ID
- M00221
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Dec 1, 1990
Location and MSHA office
- StateSTATE
- WI
- Bureau of Mines state codeBOM_STATE_CD
- 47
- FIPS county codeFIPS_CNTY_CD
- 073
- FIPS county nameFIPS_CNTY_NM
- Marathon
- Nearest townNEAREST_TOWN
- Wausau, WI
- MSHA districtDISTRICT
- M4
- MSHA office codeOFFICE_CD
- M4641
- MSHA officeOFFICE_NAME
- Marquette MI Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 260
- Most recent assessment control numberASSESS_CTRL_NO
- 000643252
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Granite
- Primary commodity codePRIMARY_SIC_CD
- 142300
- Primary SIC codePRIMARY_SIC_CD_1
- 1423
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 3
- Workers employedNO_EMPLOYEES
- 114
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: 3M CompanyFrom: Dec 1, 1990To: No end dateController: Minnesota Mining & Manufacturing CompanyFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- 3M Company
- Operator IDOPERATOR_ID
- L00273
- Operator fromOPERATOR_START_DT
- Dec 1, 1990
Controller
- ControllerCONTROLLER_NAME
- Minnesota Mining & Manufacturing Company
- Controller IDCONTROLLER_ID
- M00221
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
3M Company·Contact title EHS Manager·144 Rosecrans Street, WAUSAU WI 54401
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- 3M Company
- Contact titleCONTACT_TITLE
- EHS Manager
- StreetSTREET
- 144 Rosecrans Street
- CityCITY
- WAUSAU
- StateSTATE_ABBR
- WI
- State nameSTATE
- Wisconsin
- ZIP codeZIP_CD
- 54401
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 55
Mine
- Mine IDMINE_ID
- 4702918
- Mine name in this fileMINE_NAME
- 3M - Downtown Plant
- Nearest townNEAREST_TOWN
- Wausau, WI
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Intermittent
- Status sinceMINE_STATUS_DT
- Jun 30, 2026
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Granite
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology