Metal/Non-Metal, SurfaceCrushed, Broken Limestone NECOutagamie, WisconsinMine ID 4702937

Operator MCC, Inc.Controller not shownMSHA status Active since Oct 1, 2020

What MSHA has on file for this mine

Citations and orders
76
since May 2, 2000 · 75 to the operator, 1 to contractors · 14 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
1
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Spot Inspection
Sep 30, 2026Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Sep 30, 2026
Closed outINSPECTION_END_DT
Sep 30, 2026
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
F0471C5
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 8, 2026Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 8, 2026
Closed outINSPECTION_END_DT
Apr 8, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03B7F8
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Mar 19, 2026Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 19, 2026
Closed outINSPECTION_END_DT
Mar 19, 2026
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
F016F6E
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 19, 2025Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Nov 19, 2025
Closed outINSPECTION_END_DT
Nov 19, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F030019
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 12, 2025Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Aug 12, 2025
Closed outINSPECTION_END_DT
Aug 12, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0178E9
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 3, 2025Inspectors 1 | Hours on site 4.25

The inspection

BeganINSPECTION_BEGIN_DT
Feb 3, 2025
Closed outINSPECTION_END_DT
Feb 3, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F017138
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
8

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 15, 2024Inspectors 1 | Hours on site 5.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 15, 2024
Closed outINSPECTION_END_DT
Aug 15, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6951052
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 31 to Nov 1, 2023Inspectors 1 | Hours on site 14

The inspection

BeganINSPECTION_BEGIN_DT
Oct 31, 2023
Closed outINSPECTION_END_DT
Nov 1, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904778
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14
Total inspection hoursSUM_TOTAL_INSP_HOURS
24.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 8, 2023Inspectors 1 | Hours on site 6.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 8, 2023
Closed outINSPECTION_END_DT
Aug 8, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
0964731
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
8

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 31 to Feb 2, 2023Inspectors 1 | Hours on site 7.75

The inspection

BeganINSPECTION_BEGIN_DT
Jan 31, 2023
Closed outINSPECTION_END_DT
Feb 2, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905453
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 4 to Apr 5, 2022Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Apr 4, 2022
Closed outINSPECTION_END_DT
Apr 5, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6839859
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
19

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 2, 2022Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Mar 2, 2022
Closed outINSPECTION_END_DT
Mar 2, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6904187
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 9 to Apr 13, 2021Inspectors 1 | Hours on site 16

The inspection

BeganINSPECTION_BEGIN_DT
Apr 9, 2021
Closed outINSPECTION_END_DT
Apr 13, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6839915
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
16
Total inspection hoursSUM_TOTAL_INSP_HOURS
22.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 30 to Dec 1, 2020Inspectors 1 | Hours on site 8.25

The inspection

BeganINSPECTION_BEGIN_DT
Nov 30, 2020
Closed outINSPECTION_END_DT
Dec 1, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6839285
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Sep 29, 2020Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Sep 29, 2020
Closed outINSPECTION_END_DT
Sep 29, 2020
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6839486
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Jul 22, 2020Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 22, 2020
Closed outINSPECTION_END_DT
Jul 22, 2020
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6831051
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
0.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
Jul 22, 2020Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jul 22, 2020
Closed outINSPECTION_END_DT
Jul 22, 2020
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
6831049
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
1

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 29 to Oct 30, 2019Inspectors 1 | Hours on site 19

The inspection

BeganINSPECTION_BEGIN_DT
Oct 29, 2019
Closed outINSPECTION_END_DT
Oct 30, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6831884
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
19
Total inspection hoursSUM_TOTAL_INSP_HOURS
30.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 23, 2019Inspectors 1 | Hours on site 9.25

The inspection

BeganINSPECTION_BEGIN_DT
Jan 23, 2019
Closed outINSPECTION_END_DT
Jan 23, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6831562
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
26.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Nov 5, 2018Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 5, 2018
Closed outINSPECTION_END_DT
Nov 5, 2018
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6831551
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 30 to Oct 31, 2018Inspectors 1 | Hours on site 5.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 30, 2018
Closed outINSPECTION_END_DT
Oct 31, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6831549
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
12.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Oct 24, 2017Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Oct 24, 2017
Closed outINSPECTION_END_DT
Oct 24, 2017
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6744470
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 11 to Oct 18, 2017Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 11, 2017
Closed outINSPECTION_END_DT
Oct 18, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6744468
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
31.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 15, 2017Inspectors 1 | Hours on site 6.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 15, 2017
Closed outINSPECTION_END_DT
Feb 15, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6744145
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Nov 29, 2016Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Nov 29, 2016
Closed outINSPECTION_END_DT
Nov 29, 2016
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6744131
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 57 inspections and other MSHA visits since Mar 15, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Mar 19, 2026
Type: Citation
Standard: 56.15005
S&S: Y
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $561.00
Details

The citation

Citation or order numberVIOLATION_NO
5117314
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 19, 2026
Time issuedVIOLATION_ISSUE_TIME
1141
Date of occurrenceVIOLATION_OCCUR_DT
Mar 19, 2026
30 CFR part and sectionPART_SECTION
56.15005
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Highly
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

TerminatedTERMINATION_DT
Mar 19, 2026
Terminated, timeTERMINATION_TIME
1419
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
561
Current proposed assessmentAMOUNT_DUE
561
Amount paidAMOUNT_PAID
561
Bill first printedBILL_PRINT_DT
Apr 28, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 5, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 17, 2026
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
F016F6E
Inspection beganINSPECTION_BEGIN_DT
Mar 19, 2026
Inspection closed outINSPECTION_END_DT
Mar 19, 2026
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (17)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 19, 2026
Type: Order
Standard: Not recorded
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
5117313
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Mar 19, 2026
Time issuedVIOLATION_ISSUE_TIME
1140
Date of occurrenceVIOLATION_OCCUR_DT
Mar 19, 2026
Section of the Act, primarySECTION_OF_ACT_1
107(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Abatement

TerminatedTERMINATION_DT
Mar 19, 2026
Terminated, timeTERMINATION_TIME
1419
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
F016F6E
Inspection beganINSPECTION_BEGIN_DT
Mar 19, 2026
Inspection closed outINSPECTION_END_DT
Mar 19, 2026
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (31)

30 CFR part and sectionPART_SECTION, Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 19, 2026
Type: Citation
Standard: 56.1000
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5117315
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 19, 2026
Time issuedVIOLATION_ISSUE_TIME
1200
Date of occurrenceVIOLATION_OCCUR_DT
Mar 19, 2026
30 CFR part and sectionPART_SECTION
56.1000
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 19, 2026
Originally due, timeORIG_TERM_DUE_TIME
1201
Latest dueLATEST_TERM_DUE_DT
Mar 19, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1201
TerminatedTERMINATION_DT
Mar 19, 2026
Terminated, timeTERMINATION_TIME
1215
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Apr 28, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Jun 5, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 17, 2026
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
F016F6E
Inspection beganINSPECTION_BEGIN_DT
Mar 19, 2026
Inspection closed outINSPECTION_END_DT
Mar 19, 2026
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 15, 2024
Type: Citation
Standard: 56.14101(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9627732
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 15, 2024
Time issuedVIOLATION_ISSUE_TIME
1243
Date of occurrenceVIOLATION_OCCUR_DT
Aug 15, 2024
30 CFR part and sectionPART_SECTION
56.14101(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2024
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Aug 15, 2024
Terminated, timeTERMINATION_TIME
1425
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 1, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 9, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 4, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6951052
Inspection beganINSPECTION_BEGIN_DT
Aug 15, 2024
Inspection closed outINSPECTION_END_DT
Aug 15, 2024
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 1, 2023
Type: Citation
Standard: 46.7(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626659
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2023
Time issuedVIOLATION_ISSUE_TIME
1012
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2023
30 CFR part and sectionPART_SECTION
46.7(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2023
Originally due, timeORIG_TERM_DUE_TIME
1045
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1045
TerminatedTERMINATION_DT
Nov 1, 2023
Terminated, timeTERMINATION_TIME
1038
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6904778
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2023
Inspection closed outINSPECTION_END_DT
Nov 1, 2023
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 1, 2023
Type: Citation
Standard: 56.14100(c)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626660
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 1, 2023
Time issuedVIOLATION_ISSUE_TIME
1218
Date of occurrenceVIOLATION_OCCUR_DT
Nov 1, 2023
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2023
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Nov 1, 2023
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6904778
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2023
Inspection closed outINSPECTION_END_DT
Nov 1, 2023
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 31, 2023
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626658
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 31, 2023
Time issuedVIOLATION_ISSUE_TIME
1601
Date of occurrenceVIOLATION_OCCUR_DT
Oct 31, 2023
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2023
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2023
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Nov 1, 2023
Terminated, timeTERMINATION_TIME
0903
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6904778
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2023
Inspection closed outINSPECTION_END_DT
Nov 1, 2023
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 31, 2023
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9626657
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 31, 2023
Time issuedVIOLATION_ISSUE_TIME
1600
Date of occurrenceVIOLATION_OCCUR_DT
Oct 31, 2023
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 1, 2023
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Nov 1, 2023
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Nov 1, 2023
Terminated, timeTERMINATION_TIME
0859
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 24, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6904778
Inspection beganINSPECTION_BEGIN_DT
Oct 31, 2023
Inspection closed outINSPECTION_END_DT
Nov 1, 2023
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 1, 2023
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
8741856
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 1, 2023
Time issuedVIOLATION_ISSUE_TIME
1055
Date of occurrenceVIOLATION_OCCUR_DT
Feb 1, 2023
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 1, 2023
Terminated, timeTERMINATION_TIME
1056
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Mar 28, 2023
Final order dateFINAL_ORDER_ISSUE_DT
May 12, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 11, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6905453
Inspection beganINSPECTION_BEGIN_DT
Jan 31, 2023
Inspection closed outINSPECTION_END_DT
Feb 2, 2023
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 1, 2023
Type: Citation
Standard: 56.12004
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
8741855
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 1, 2023
Time issuedVIOLATION_ISSUE_TIME
0946
Date of occurrenceVIOLATION_OCCUR_DT
Feb 1, 2023
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Feb 1, 2023
Terminated, timeTERMINATION_TIME
1145
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Mar 28, 2023
Final order dateFINAL_ORDER_ISSUE_DT
May 12, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 11, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6905453
Inspection beganINSPECTION_BEGIN_DT
Jan 31, 2023
Inspection closed outINSPECTION_END_DT
Feb 2, 2023
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 5, 2022
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9626014
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1030
Date of occurrenceVIOLATION_OCCUR_DT
Apr 5, 2022
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Apr 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Apr 5, 2022
Terminated, timeTERMINATION_TIME
1320
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 31, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jul 15, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 22, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6839859
Inspection beganINSPECTION_BEGIN_DT
Apr 4, 2022
Inspection closed outINSPECTION_END_DT
Apr 5, 2022
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 1, 2020
Type: Citation
Standard: 56.11001
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
8892066
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 1, 2020
Time issuedVIOLATION_ISSUE_TIME
0754
Date of occurrenceVIOLATION_OCCUR_DT
Dec 1, 2020
30 CFR part and sectionPART_SECTION
56.11001
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 2, 2020
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Dec 2, 2020
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Dec 1, 2020
Terminated, timeTERMINATION_TIME
1815
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Feb 2, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Mar 14, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 24, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6839285
Inspection beganINSPECTION_BEGIN_DT
Nov 30, 2020
Inspection closed outINSPECTION_END_DT
Dec 1, 2020
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 1, 2020
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
8892067
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 1, 2020
Time issuedVIOLATION_ISSUE_TIME
0825
Date of occurrenceVIOLATION_OCCUR_DT
Dec 1, 2020
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 1, 2020
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Dec 1, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Dec 1, 2020
Terminated, timeTERMINATION_TIME
1053
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Feb 2, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Mar 14, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 24, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6839285
Inspection beganINSPECTION_BEGIN_DT
Nov 30, 2020
Inspection closed outINSPECTION_END_DT
Dec 1, 2020
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 29, 2019
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9441045
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 29, 2019
Time issuedVIOLATION_ISSUE_TIME
0838
Date of occurrenceVIOLATION_OCCUR_DT
Oct 29, 2019
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 30, 2019
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Oct 30, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Oct 29, 2019
Terminated, timeTERMINATION_TIME
0840
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Dec 3, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Jan 8, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 6, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6831884
Inspection beganINSPECTION_BEGIN_DT
Oct 29, 2019
Inspection closed outINSPECTION_END_DT
Oct 30, 2019
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 30, 2018
Type: Citation
Standard: 56.20011
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8949188
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 30, 2018
Time issuedVIOLATION_ISSUE_TIME
1103
Date of occurrenceVIOLATION_OCCUR_DT
Oct 29, 2018
30 CFR part and sectionPART_SECTION
56.20011
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 31, 2018
Originally due, timeORIG_TERM_DUE_TIME
0300
Latest dueLATEST_TERM_DUE_DT
Oct 31, 2018
Latest due, timeLATEST_TERM_DUE_TIME
0300
TerminatedTERMINATION_DT
Nov 5, 2018
Terminated, timeTERMINATION_TIME
1405
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Jan 2, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Feb 16, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 28, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6831549
Inspection beganINSPECTION_BEGIN_DT
Oct 30, 2018
Inspection closed outINSPECTION_END_DT
Oct 31, 2018
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 18, 2017
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8949901
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 18, 2017
Time issuedVIOLATION_ISSUE_TIME
1013
Date of occurrenceVIOLATION_OCCUR_DT
Oct 18, 2017
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 19, 2017
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 19, 2017
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 18, 2017
Terminated, timeTERMINATION_TIME
1515
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Nov 28, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Dec 31, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 7, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6744468
Inspection beganINSPECTION_BEGIN_DT
Oct 11, 2017
Inspection closed outINSPECTION_END_DT
Oct 18, 2017
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 18, 2017
Type: Citation
Standard: 56.14100(c)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8949902
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 18, 2017
Time issuedVIOLATION_ISSUE_TIME
1255
Date of occurrenceVIOLATION_OCCUR_DT
Oct 18, 2017
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 23, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Oct 23, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Oct 24, 2017
Terminated, timeTERMINATION_TIME
1240
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Nov 28, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Dec 31, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 7, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6744468
Inspection beganINSPECTION_BEGIN_DT
Oct 11, 2017
Inspection closed outINSPECTION_END_DT
Oct 18, 2017
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 11, 2017
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8949900
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 11, 2017
Time issuedVIOLATION_ISSUE_TIME
1708
Date of occurrenceVIOLATION_OCCUR_DT
Oct 11, 2017
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 12, 2017
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Oct 12, 2017
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Oct 18, 2017
Terminated, timeTERMINATION_TIME
0915
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Nov 28, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Dec 31, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 7, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6744468
Inspection beganINSPECTION_BEGIN_DT
Oct 11, 2017
Inspection closed outINSPECTION_END_DT
Oct 18, 2017
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 15, 2017
Type: Citation
Standard: 56.12006
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8898149
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 15, 2017
Time issuedVIOLATION_ISSUE_TIME
1225
Date of occurrenceVIOLATION_OCCUR_DT
Feb 15, 2017
30 CFR part and sectionPART_SECTION
56.12006
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 15, 2017
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Feb 15, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Feb 15, 2017
Terminated, timeTERMINATION_TIME
1435
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Mar 28, 2017
Final order dateFINAL_ORDER_ISSUE_DT
May 4, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 18, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6744145
Inspection beganINSPECTION_BEGIN_DT
Feb 15, 2017
Inspection closed outINSPECTION_END_DT
Feb 15, 2017
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 6, 2016
Type: Citation
Standard: 56.14115(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8892674
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 6, 2016
Time issuedVIOLATION_ISSUE_TIME
1315
Date of occurrenceVIOLATION_OCCUR_DT
Apr 6, 2016
30 CFR part and sectionPART_SECTION
56.14115(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 6, 2016
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Apr 6, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Apr 6, 2016
Terminated, timeTERMINATION_TIME
1320
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
May 31, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Jul 4, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 29, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6638942
Inspection beganINSPECTION_BEGIN_DT
Apr 5, 2016
Inspection closed outINSPECTION_END_DT
Apr 8, 2016
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Apr 6, 2016
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8892673
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 6, 2016
Time issuedVIOLATION_ISSUE_TIME
0928
Date of occurrenceVIOLATION_OCCUR_DT
Apr 6, 2016
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 6, 2016
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Apr 6, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Apr 6, 2016
Terminated, timeTERMINATION_TIME
1355
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
May 31, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Jul 4, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 29, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6638942
Inspection beganINSPECTION_BEGIN_DT
Apr 5, 2016
Inspection closed outINSPECTION_END_DT
Apr 8, 2016
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 24, 2015
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8892416
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 24, 2015
Time issuedVIOLATION_ISSUE_TIME
0912
Date of occurrenceVIOLATION_OCCUR_DT
Jun 24, 2015
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 24, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 24, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 24, 2015
Terminated, timeTERMINATION_TIME
1117
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 30, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 9, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6638842
Inspection beganINSPECTION_BEGIN_DT
Jun 24, 2015
Inspection closed outINSPECTION_END_DT
Jun 24, 2015
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 24, 2015
Type: Citation
Standard: 56.14207
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8892415
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 24, 2015
Time issuedVIOLATION_ISSUE_TIME
0907
Date of occurrenceVIOLATION_OCCUR_DT
Jun 24, 2015
30 CFR part and sectionPART_SECTION
56.14207
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 24, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 24, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 24, 2015
Terminated, timeTERMINATION_TIME
0910
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 29, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Nov 1, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 30, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6638842
Inspection beganINSPECTION_BEGIN_DT
Jun 24, 2015
Inspection closed outINSPECTION_END_DT
Jun 24, 2015
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 28, 2014
Type: Citation
Standard: 56.12006
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8736565
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 28, 2014
Time issuedVIOLATION_ISSUE_TIME
1123
Date of occurrenceVIOLATION_OCCUR_DT
May 28, 2014
30 CFR part and sectionPART_SECTION
56.12006
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 30, 2014
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 30, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 4, 2014
Terminated, timeTERMINATION_TIME
0830
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Aug 4, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 5, 2014
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6579591
Inspection beganINSPECTION_BEGIN_DT
May 28, 2014
Inspection closed outINSPECTION_END_DT
Jun 4, 2014
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 28, 2014
Type: Citation
Standard: 56.12032
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8736567
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 28, 2014
Time issuedVIOLATION_ISSUE_TIME
1146
Date of occurrenceVIOLATION_OCCUR_DT
May 28, 2014
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 30, 2014
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 30, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 4, 2014
Terminated, timeTERMINATION_TIME
0900
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Aug 4, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 5, 2014
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MCC, Inc.
Operator IDVIOLATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Inspection eventEVENT_NO
6579591
Inspection beganINSPECTION_BEGIN_DT
May 28, 2014
Inspection closed outINSPECTION_END_DT
Jun 4, 2014
Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

76 citations and orders since May 2, 2000: 75 issued to the operator, 1 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Mar 19, 2026
Citation number: 5117315
Standard: 56.1000
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117315
Assessment control numberASSESS_CASE_NO
000640157
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 17, 2026
Citation issuedISSUE_DT
Mar 19, 2026
Date of occurrenceOCCURRENCE_DT
Mar 19, 2026
Final order dateFINAL_ORDER_DT
Jun 5, 2026
Bill first printedBILL_PRINT_DT
Apr 28, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 5, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.1000
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
24
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
20760
Size of mineSIZE_OF_MINE
20760
Controller hours workedCONTROLLER_HRS
79457
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
79457
History period startHISTORY_START_DT
Dec 19, 2024
History period endHISTORY_END_DT
Mar 18, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F016F6E
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 19, 2026
Citation number: 5117314
Standard: 56.15005
Proposed penalty: $561.00
Current assessment: $561.00
Paid against proposed penalty: $561.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5117314
Assessment control numberASSESS_CASE_NO
000640157
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 17, 2026
Citation issuedISSUE_DT
Mar 19, 2026
Date of occurrenceOCCURRENCE_DT
Mar 19, 2026
Final order dateFINAL_ORDER_DT
Jun 5, 2026
Bill first printedBILL_PRINT_DT
Apr 28, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 5, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.15005
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
561.00
Current assessmentCURRENT_ASSESSMENT_AMT
561.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
561.00

Penalty points

Violation history pointsPENALTY_POINTS
75
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
40
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
20760
Size of mineSIZE_OF_MINE
20760
Controller hours workedCONTROLLER_HRS
79457
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
79457
History period startHISTORY_START_DT
Dec 19, 2024
History period endHISTORY_END_DT
Mar 18, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F016F6E
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 15, 2024
Citation number: 9627732
Standard: 56.14101(a)(2)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9627732
Assessment control numberASSESS_CASE_NO
000603602
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 4, 2024
Citation issuedISSUE_DT
Aug 15, 2024
Date of occurrenceOCCURRENCE_DT
Aug 15, 2024
Final order dateFINAL_ORDER_DT
Nov 9, 2024
Bill first printedBILL_PRINT_DT
Oct 1, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 9, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.8
Operator hours worked at the mineVIOLATOR_MINE_HRS
31743
Size of mineSIZE_OF_MINE
31743
Controller hours workedCONTROLLER_HRS
84932
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
84932
History period startHISTORY_START_DT
May 15, 2023
History period endHISTORY_END_DT
Aug 14, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6951052
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2023
Citation number: 9626659
Standard: 46.7(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626659
Assessment control numberASSESS_CASE_NO
000591493
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2024
Citation issuedISSUE_DT
Nov 1, 2023
Date of occurrenceOCCURRENCE_DT
Nov 1, 2023
Final order dateFINAL_ORDER_DT
Feb 16, 2024
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
46.7(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
60
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
25635
Size of mineSIZE_OF_MINE
25635
Controller hours workedCONTROLLER_HRS
76342
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
76342
History period startHISTORY_START_DT
Aug 1, 2022
History period endHISTORY_END_DT
Oct 31, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904778
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 1, 2023
Citation number: 9626660
Standard: 56.14100(c)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626660
Assessment control numberASSESS_CASE_NO
000591493
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2024
Citation issuedISSUE_DT
Nov 1, 2023
Date of occurrenceOCCURRENCE_DT
Nov 1, 2023
Final order dateFINAL_ORDER_DT
Feb 16, 2024
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
60
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
25635
Size of mineSIZE_OF_MINE
25635
Controller hours workedCONTROLLER_HRS
76342
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
76342
History period startHISTORY_START_DT
Aug 1, 2022
History period endHISTORY_END_DT
Oct 31, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904778
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 31, 2023
Citation number: 9626658
Standard: 56.14107(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626658
Assessment control numberASSESS_CASE_NO
000591493
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2024
Citation issuedISSUE_DT
Oct 31, 2023
Date of occurrenceOCCURRENCE_DT
Oct 31, 2023
Final order dateFINAL_ORDER_DT
Feb 16, 2024
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
25635
Size of mineSIZE_OF_MINE
25635
Controller hours workedCONTROLLER_HRS
76342
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
76342
History period startHISTORY_START_DT
Jul 31, 2022
History period endHISTORY_END_DT
Oct 30, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904778
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 31, 2023
Citation number: 9626657
Standard: 56.14107(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626657
Assessment control numberASSESS_CASE_NO
000591493
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2024
Citation issuedISSUE_DT
Oct 31, 2023
Date of occurrenceOCCURRENCE_DT
Oct 31, 2023
Final order dateFINAL_ORDER_DT
Feb 16, 2024
Bill first printedBILL_PRINT_DT
Jan 2, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
25635
Size of mineSIZE_OF_MINE
25635
Controller hours workedCONTROLLER_HRS
76342
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
76342
History period startHISTORY_START_DT
Jul 31, 2022
History period endHISTORY_END_DT
Oct 30, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6904778
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 1, 2023
Citation number: 8741855
Standard: 56.12004
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8741855
Assessment control numberASSESS_CASE_NO
000573706
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 11, 2023
Citation issuedISSUE_DT
Feb 1, 2023
Date of occurrenceOCCURRENCE_DT
Feb 1, 2023
Final order dateFINAL_ORDER_DT
May 12, 2023
Bill first printedBILL_PRINT_DT
Mar 28, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
45
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
25635
Size of mineSIZE_OF_MINE
25635
Controller hours workedCONTROLLER_HRS
75804
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
75804
History period startHISTORY_START_DT
Nov 1, 2021
History period endHISTORY_END_DT
Jan 31, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905453
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 1, 2023
Citation number: 8741856
Standard: 56.12004
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8741856
Assessment control numberASSESS_CASE_NO
000573706
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 11, 2023
Citation issuedISSUE_DT
Feb 1, 2023
Date of occurrenceOCCURRENCE_DT
Feb 1, 2023
Final order dateFINAL_ORDER_DT
May 12, 2023
Bill first printedBILL_PRINT_DT
Mar 28, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
25635
Size of mineSIZE_OF_MINE
25635
Controller hours workedCONTROLLER_HRS
75804
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
75804
History period startHISTORY_START_DT
Nov 1, 2021
History period endHISTORY_END_DT
Jan 31, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905453
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 5, 2022
Citation number: 9626014
Standard: 56.14107(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9626014
Assessment control numberASSESS_CASE_NO
000555979
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 22, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Apr 5, 2022
Final order dateFINAL_ORDER_DT
Jul 15, 2022
Bill first printedBILL_PRINT_DT
May 31, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
45
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
22413
Size of mineSIZE_OF_MINE
22413
Controller hours workedCONTROLLER_HRS
71392
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
71392
History period startHISTORY_START_DT
Jan 5, 2021
History period endHISTORY_END_DT
Apr 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6839859
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 1, 2020
Citation number: 8892067
Standard: 56.14112(a)(1)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8892067
Assessment control numberASSESS_CASE_NO
000529127
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 24, 2021
Citation issuedISSUE_DT
Dec 1, 2020
Date of occurrenceOCCURRENCE_DT
Dec 1, 2020
Final order dateFINAL_ORDER_DT
Mar 14, 2021
Bill first printedBILL_PRINT_DT
Feb 2, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 14, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
45
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
21212
Size of mineSIZE_OF_MINE
21212
Controller hours workedCONTROLLER_HRS
63535
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
63535
History period startHISTORY_START_DT
Sep 1, 2019
History period endHISTORY_END_DT
Nov 30, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6839285
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 1, 2020
Citation number: 8892066
Standard: 56.11001
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8892066
Assessment control numberASSESS_CASE_NO
000529127
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 24, 2021
Citation issuedISSUE_DT
Dec 1, 2020
Date of occurrenceOCCURRENCE_DT
Dec 1, 2020
Final order dateFINAL_ORDER_DT
Mar 14, 2021
Bill first printedBILL_PRINT_DT
Feb 2, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 14, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
21212
Size of mineSIZE_OF_MINE
21212
Controller hours workedCONTROLLER_HRS
63535
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
63535
History period startHISTORY_START_DT
Sep 1, 2019
History period endHISTORY_END_DT
Nov 30, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6839285
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 29, 2019
Citation number: 9441045
Standard: 56.14207
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9441045
Assessment control numberASSESS_CASE_NO
000504480
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 6, 2020
Citation issuedISSUE_DT
Oct 29, 2019
Date of occurrenceOCCURRENCE_DT
Oct 29, 2019
Final order dateFINAL_ORDER_DT
Jan 8, 2020
Bill first printedBILL_PRINT_DT
Dec 3, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 8, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
17485
Size of mineSIZE_OF_MINE
17485
Controller hours workedCONTROLLER_HRS
55793
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
55793
History period startHISTORY_START_DT
Jul 29, 2018
History period endHISTORY_END_DT
Oct 28, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6831884
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 30, 2018
Citation number: 8949188
Standard: 56.20011
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949188
Assessment control numberASSESS_CASE_NO
000480329
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 24, 2019
Citation issuedISSUE_DT
Oct 30, 2018
Date of occurrenceOCCURRENCE_DT
Oct 29, 2018
Final order dateFINAL_ORDER_DT
Feb 16, 2019
Bill first printedBILL_PRINT_DT
Jan 2, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20011
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
39
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
19002
Size of mineSIZE_OF_MINE
19002
Controller hours workedCONTROLLER_HRS
61544
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
61544
History period startHISTORY_START_DT
Jul 29, 2017
History period endHISTORY_END_DT
Oct 28, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6831549
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 18, 2017
Citation number: 8949901
Standard: 56.14107(a)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949901
Assessment control numberASSESS_CASE_NO
000453290
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 5, 2018
Citation issuedISSUE_DT
Oct 18, 2017
Date of occurrenceOCCURRENCE_DT
Oct 18, 2017
Final order dateFINAL_ORDER_DT
Dec 31, 2017
Bill first printedBILL_PRINT_DT
Nov 28, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 31, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
45
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
23991
Size of mineSIZE_OF_MINE
23991
Controller hours workedCONTROLLER_HRS
66482
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
66482
History period startHISTORY_START_DT
Jul 18, 2016
History period endHISTORY_END_DT
Oct 17, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744468
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 18, 2017
Citation number: 8949902
Standard: 56.14100(c)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949902
Assessment control numberASSESS_CASE_NO
000453290
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 5, 2018
Citation issuedISSUE_DT
Oct 18, 2017
Date of occurrenceOCCURRENCE_DT
Oct 18, 2017
Final order dateFINAL_ORDER_DT
Dec 31, 2017
Bill first printedBILL_PRINT_DT
Nov 28, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 31, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
30
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
23991
Size of mineSIZE_OF_MINE
23991
Controller hours workedCONTROLLER_HRS
66482
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
66482
History period startHISTORY_START_DT
Jul 18, 2016
History period endHISTORY_END_DT
Oct 17, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744468
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 11, 2017
Citation number: 8949900
Standard: 56.14107(a)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949900
Assessment control numberASSESS_CASE_NO
000453290
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 5, 2018
Citation issuedISSUE_DT
Oct 11, 2017
Date of occurrenceOCCURRENCE_DT
Oct 11, 2017
Final order dateFINAL_ORDER_DT
Dec 31, 2017
Bill first printedBILL_PRINT_DT
Nov 28, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 31, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
23991
Size of mineSIZE_OF_MINE
23991
Controller hours workedCONTROLLER_HRS
66482
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
66482
History period startHISTORY_START_DT
Jul 11, 2016
History period endHISTORY_END_DT
Oct 10, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744468
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 15, 2017
Citation number: 8898149
Standard: 56.12006
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8898149
Assessment control numberASSESS_CASE_NO
000434836
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 18, 2017
Citation issuedISSUE_DT
Feb 15, 2017
Date of occurrenceOCCURRENCE_DT
Feb 15, 2017
Final order dateFINAL_ORDER_DT
May 4, 2017
Bill first printedBILL_PRINT_DT
Mar 28, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 4, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12006
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
23991
Size of mineSIZE_OF_MINE
23991
Controller hours workedCONTROLLER_HRS
66482
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
66482
History period startHISTORY_START_DT
Nov 15, 2015
History period endHISTORY_END_DT
Feb 14, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744145
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 6, 2016
Citation number: 8892674
Standard: 56.14115(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8892674
Assessment control numberASSESS_CASE_NO
000411583
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 28, 2016
Citation issuedISSUE_DT
Apr 6, 2016
Date of occurrenceOCCURRENCE_DT
Apr 6, 2016
Final order dateFINAL_ORDER_DT
Jul 4, 2016
Bill first printedBILL_PRINT_DT
May 31, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 4, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14115(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
23583
Size of mineSIZE_OF_MINE
23583
Controller hours workedCONTROLLER_HRS
73088
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
73088
History period startHISTORY_START_DT
Jan 6, 2015
History period endHISTORY_END_DT
Apr 5, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638942
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 6, 2016
Citation number: 8892673
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8892673
Assessment control numberASSESS_CASE_NO
000411583
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 28, 2016
Citation issuedISSUE_DT
Apr 6, 2016
Date of occurrenceOCCURRENCE_DT
Apr 6, 2016
Final order dateFINAL_ORDER_DT
Jul 4, 2016
Bill first printedBILL_PRINT_DT
May 31, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 4, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
40
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
23583
Size of mineSIZE_OF_MINE
23583
Controller hours workedCONTROLLER_HRS
73088
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
73088
History period startHISTORY_START_DT
Jan 6, 2015
History period endHISTORY_END_DT
Apr 5, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638942
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 24, 2015
Citation number: 8892415
Standard: 56.14207
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8892415
Assessment control numberASSESS_CASE_NO
000393097
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 29, 2015
Citation issuedISSUE_DT
Jun 24, 2015
Date of occurrenceOCCURRENCE_DT
Jun 24, 2015
Final order dateFINAL_ORDER_DT
Nov 1, 2015
Bill first printedBILL_PRINT_DT
Sep 29, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 1, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14207
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Mine Act interestMINEACT_INTEREST_AMT
0.61
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
45
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
20380
Size of mineSIZE_OF_MINE
20380
Controller hours workedCONTROLLER_HRS
68988
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
68988
History period startHISTORY_START_DT
Mar 24, 2014
History period endHISTORY_END_DT
Jun 23, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638842
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 24, 2015
Citation number: 8892416
Standard: 56.14132(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8892416
Assessment control numberASSESS_CASE_NO
000387851
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 9, 2015
Citation issuedISSUE_DT
Jun 24, 2015
Date of occurrenceOCCURRENCE_DT
Jun 24, 2015
Final order dateFINAL_ORDER_DT
Aug 30, 2015
Bill first printedBILL_PRINT_DT
Jul 28, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 30, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
45
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
3
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
20380
Size of mineSIZE_OF_MINE
20380
Controller hours workedCONTROLLER_HRS
68988
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
68988
History period startHISTORY_START_DT
Mar 24, 2014
History period endHISTORY_END_DT
Jun 23, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638842
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 28, 2014
Citation number: 8736567
Standard: 56.12032
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8736567
Assessment control numberASSESS_CASE_NO
000355132
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 5, 2014
Citation issuedISSUE_DT
May 28, 2014
Date of occurrenceOCCURRENCE_DT
May 28, 2014
Final order dateFINAL_ORDER_DT
Aug 4, 2014
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 4, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
39
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
14730
Size of mineSIZE_OF_MINE
14730
Controller hours workedCONTROLLER_HRS
78257
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
78257
History period startHISTORY_START_DT
Feb 28, 2013
History period endHISTORY_END_DT
May 27, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6579591
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 28, 2014
Citation number: 8736569
Standard: 56.4502(c)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8736569
Assessment control numberASSESS_CASE_NO
000355132
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 5, 2014
Citation issuedISSUE_DT
May 28, 2014
Date of occurrenceOCCURRENCE_DT
May 28, 2014
Final order dateFINAL_ORDER_DT
Aug 4, 2014
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 4, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4502(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
39
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
14730
Size of mineSIZE_OF_MINE
14730
Controller hours workedCONTROLLER_HRS
78257
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
78257
History period startHISTORY_START_DT
Feb 28, 2013
History period endHISTORY_END_DT
May 27, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6579591
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 28, 2014
Citation number: 8736566
Standard: 56.12004
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8736566
Assessment control numberASSESS_CASE_NO
000355132
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 5, 2014
Citation issuedISSUE_DT
May 28, 2014
Date of occurrenceOCCURRENCE_DT
May 28, 2014
Final order dateFINAL_ORDER_DT
Aug 4, 2014
Bill first printedBILL_PRINT_DT
Jul 1, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 4, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
14730
Size of mineSIZE_OF_MINE
14730
Controller hours workedCONTROLLER_HRS
78257
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
78257
History period startHISTORY_START_DT
Feb 28, 2013
History period endHISTORY_END_DT
May 27, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MCC, Inc.
IDVIOLATOR_ID
L04446
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 1, 1991
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6579591
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 75 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Imminent danger orders, section 107(a)

Issued: Mar 19, 2026
Order number: 5117313
Terminated: Mar 19, 2026
Issued to: Operator
Details

The order

Order numberVIOLATION_NO
5117313
IssuedVIOLATION_DATE_ISSUED
Mar 19, 2026
TerminatedTERMINATION_DATE
Mar 19, 2026
Issued toVIOLATOR_TYPE
Operator

Who

Operator at the timeOPERATOR_NAME_VIOLATIONS
MCC, Inc.
Controller IDCONTROLLER_ID_VIOLATIONS
M00687

Mine

Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
StateSTATE_ABBREVIATION
WI
Coal or Metal/Non-MetalCOAL_OR_METAL
M

Not recorded by MSHA (3)

Controller at the timeCONTROLLER_NAME_VIOLATIONS, ContractorCONTRACTOR_NAME, Contractor IDCONTRACTOR_ID

1 imminent danger order in MSHA's list, which starts July 1, 2010.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

DAYS AWAY FROM WORK ONLY
6
NO DYS AWY FRM WRK,NO RSTR ACT
5
DAYS RESTRICTED ACTIVITY ONLY
4
DYS AWY FRM WRK & RESTRCTD ACT
2
OCCUPATNAL ILLNESS NOT DEG 1-6
1
Date: Dec 12, 2025
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220253500001
DateACCIDENT_DT
Dec 12, 2025
TimeACCIDENT_TIME
0645
Shift beganSHIFT_BEGIN_TIME
0450
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Dec 12, 2025
Returned to Duty document numberCLOSED_DOC_NO
320262110004

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520
Days of restricted workDAYS_RESTRICT
3
Returned to workRETURN_TO_WORK_DT
Dec 16, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Conveyor, Belt feeder, Stage loader, Hopper shaker, Belt structure
Equipment codeMINING_EQUIP_CD
13
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
36"" x 60'
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 4, 2024
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Struck by falling object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220241870002
DateACCIDENT_DT
Jun 4, 2024
TimeACCIDENT_TIME
1415
Shift beganSHIFT_BEGIN_TIME
0517
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by falling object
Accident type codeACCIDENT_TYPE_CD
04
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Jun 4, 2024

Injury

Activity at the timeACTIVITY
Electrical maintenance
Activity codeACTIVITY_CD
020
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Days of restricted workDAYS_RESTRICT
4
Returned to workRETURN_TO_WORK_DT
Jun 11, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 1, 2024
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion NEC
Days lost: 20
Details

The report

Document numberDOCUMENT_NO
220240430002
DateACCIDENT_DT
Feb 1, 2024
TimeACCIDENT_TIME
1130
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Feb 1, 2024
Returned to Duty document numberCLOSED_DOC_NO
320241450001

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
PASS CARS,PICKUP TRUCKS
Source of injury codeINJURY_SOURCE_CD
103
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Days of restricted workDAYS_RESTRICT
56
Days lostDAYS_LOST
20
Returned to workRETURN_TO_WORK_DT
May 20, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 14, 2023
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 3
Details

The report

Document numberDOCUMENT_NO
220232280001
DateACCIDENT_DT
Aug 14, 2023
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Aug 15, 2023
Returned to Duty document numberCLOSED_DOC_NO
320232420001

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
BLOCKING
Source of injury codeINJURY_SOURCE_CD
113
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
10
Days lostDAYS_LOST
3
Returned to workRETURN_TO_WORK_DT
Aug 28, 2023

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 14, 2023
Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6
Classification: RESPIRATORY CONDITIONS (TOXIC AGENTS)
Accident type: Inhalation of radiations, caustics, toxic and noxious substances
Days lost: 7
Details

The report

Document numberDOCUMENT_NO
220230580003
DateACCIDENT_DT
Feb 14, 2023
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
OCCUPATNAL ILLNESS NOT DEG 1-6
Degree of injury codeDEGREE_INJURY_CD
07
ClassificationCLASSIFICATION
RESPIRATORY CONDITIONS (TOXIC AGENTS)
Classification codeCLASSIFICATION_CD
28
Accident typeACCIDENT_TYPE
Inhalation of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
36
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Feb 17, 2023
Returned to Duty document numberCLOSED_DOC_NO
320230650001

Injury

Activity at the timeACTIVITY
Surface equipment, NEC
Activity codeACTIVITY_CD
072
Source of injuryINJURY_SOURCE
PULVERIZED MINERAL (DUST)
Source of injury codeINJURY_SOURCE_CD
092
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Days lostDAYS_LOST
7
Returned to workRETURN_TO_WORK_DT
Feb 28, 2023

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 1, 2022
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220221590004
DateACCIDENT_DT
Jun 1, 2022
TimeACCIDENT_TIME
1630
Shift beganSHIFT_BEGIN_TIME
0500
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Jun 3, 2022
Returned to Duty document numberCLOSED_DOC_NO
320221590001

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
CROWBAR,PRY BAR
Source of injury codeINJURY_SOURCE_CD
048
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
3
Returned to workRETURN_TO_WORK_DT
Jun 6, 2022

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 17, 2022
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220221450005
DateACCIDENT_DT
May 17, 2022
TimeACCIDENT_TIME
1445
Shift beganSHIFT_BEGIN_TIME
0500
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
May 18, 2022
Returned to Duty document numberCLOSED_DOC_NO
320221520001

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
WRIST
Part of body codeINJ_BODY_PART_CD
320
Days of restricted workDAYS_RESTRICT
8
Returned to workRETURN_TO_WORK_DT
May 26, 2022

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Nordberb&Rexnord
Equipment manufacturer codeEQUIP_MFR_CD
082
Equipment model numberEQUIP_MODEL_NO
LP C125 VF
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Nov 24, 2021
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 77
Details

The report

Document numberDOCUMENT_NO
220221150003
DateACCIDENT_DT
Nov 24, 2021
TimeACCIDENT_TIME
0445
Shift beganSHIFT_BEGIN_TIME
0330
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Apr 14, 2022
Returned to Duty document numberCLOSED_DOC_NO
320221380002

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
BOILR,PRES VSL,AIR HOS,OX
Source of injury codeINJURY_SOURCE_CD
003
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days lostDAYS_LOST
77
Returned to workRETURN_TO_WORK_DT
May 16, 2022

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 27, 2021
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Fall from ladders
Days lost: 9
Details

The report

Document numberDOCUMENT_NO
220210320007
DateACCIDENT_DT
Jan 27, 2021
TimeACCIDENT_TIME
0400
Shift beganSHIFT_BEGIN_TIME
1700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall from ladders
Accident type codeACCIDENT_TYPE_CD
14
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320210490009

Injury

Activity at the timeACTIVITY
Climb scaffolds, Ladders
Activity codeACTIVITY_CD
013
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520
Days lostDAYS_LOST
9
Returned to workRETURN_TO_WORK_DT
Feb 10, 2021

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Nordberb&Rexnord
Equipment manufacturer codeEQUIP_MFR_CD
082
Equipment model numberEQUIP_MODEL_NO
C125 Jaw
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Oct 30, 2008
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: POWERED HAULAGE
Accident type: Struck by powered moving object
Days lost: 2
Details

The report

Document numberDOCUMENT_NO
220083080019
DateACCIDENT_DT
Oct 30, 2008
TimeACCIDENT_TIME
0530
Shift beganSHIFT_BEGIN_TIME
0500
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Struck by powered moving object
Accident type codeACCIDENT_TYPE_CD
07
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320083150009

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
LOWER EXTREMITIES, MULTIPLE PARTS
Part of body codeINJ_BODY_PART_CD
550
Days lostDAYS_LOST
2
Returned to workRETURN_TO_WORK_DT
Nov 3, 2008

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Case
Equipment manufacturer codeEQUIP_MFR_CD
017
Equipment model numberEQUIP_MODEL_NO
N7M463654
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 10, 2007
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 18
Details

The report

Document numberDOCUMENT_NO
220073450024
DateACCIDENT_DT
Dec 10, 2007
TimeACCIDENT_TIME
0945
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320080800012

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
ARM,NEC
Part of body codeINJ_BODY_PART_CD
310
Days lostDAYS_LOST
18
Returned to workRETURN_TO_WORK_DT
Mar 10, 2008

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 29, 2006
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: OTHER
Accident type: Absorption of radiations, caustics, toxic and noxious substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220062830130
DateACCIDENT_DT
Sep 29, 2006
TimeACCIDENT_TIME
1200
Shift beganSHIFT_BEGIN_TIME
0500
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Absorption of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
38
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Front-end loader
Activity codeACTIVITY_CD
053
Source of injuryINJURY_SOURCE
ANIMALS,INSCTS,BRDS,REPTL
Source of injury codeINJURY_SOURCE_CD
001
Nature of injuryNATURE_INJURY
POISONING,SYSTEMIC
Nature of injury codeNATURE_INJURY_CD
280
Part of bodyINJ_BODY_PART
BODY SYSTEMS
Part of body codeINJ_BODY_PART_CD
600
Returned to workRETURN_TO_WORK_DT
Sep 30, 2006

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2006
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2006
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 20, 2004
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220042220077
DateACCIDENT_DT
Jul 20, 2004
TimeACCIDENT_TIME
1430
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Returned to workRETURN_TO_WORK_DT
Jul 20, 2004

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2004
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2004
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 17, 2003
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: ELECTRICAL
Accident type: Struck by flying object
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220030620035
DateACCIDENT_DT
Feb 17, 2003
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
ELECTRICAL
Classification codeCLASSIFICATION_CD
01
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13

Injury

Activity at the timeACTIVITY
Blow gun, Airlance
Activity codeACTIVITY_CD
004
Source of injuryINJURY_SOURCE
ELECTRICAL APPARATUS,NEC
Source of injury codeINJURY_SOURCE_CD
043
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FACE, MULTIPLE PARTS
Part of body codeINJ_BODY_PART_CD
144
Returned to workRETURN_TO_WORK_DT
Feb 17, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Air compressor
Equipment codeMINING_EQUIP_CD
02
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2003
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (7)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 16, 2003
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Fall from machine
Days lost: 14
Details

The report

Document numberDOCUMENT_NO
220030450045
DateACCIDENT_DT
Jan 16, 2003
TimeACCIDENT_TIME
1300
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall from machine
Accident type codeACCIDENT_TYPE_CD
12
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320030490012

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
ANKLE
Part of body codeINJ_BODY_PART_CD
520
Days lostDAYS_LOST
14
Returned to workRETURN_TO_WORK_DT
Feb 3, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2003
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 10, 2002
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck against stationary object
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220021610127
DateACCIDENT_DT
May 10, 2002
TimeACCIDENT_TIME
1430
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320022130013

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Returned to workRETURN_TO_WORK_DT
May 10, 2002

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2002
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2002
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (6)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 26, 2001
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220012150032
DateACCIDENT_DT
Jul 26, 2001
TimeACCIDENT_TIME
1945
Shift beganSHIFT_BEGIN_TIME
1500
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320012150002

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
HEAD,NEC
Part of body codeINJ_BODY_PART_CD
100
Returned to workRETURN_TO_WORK_DT
Jul 27, 2001

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2001
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2001
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (6)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 29, 2001
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 263
Details

The report

Document numberDOCUMENT_NO
220012150008
DateACCIDENT_DT
Jun 29, 2001
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320020990013

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
CONDCTR,ELCT,CBL,TROL POL
Source of injury codeINJURY_SOURCE_CD
042
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Days lostDAYS_LOST
263
Returned to workRETURN_TO_WORK_DT
May 3, 2002

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Controller IDCONTROLLER_ID
M00687
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2001
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2001
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

18 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2,258
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2258
Average hours per employeeAVG_EMPLOYEE_HOURS
2258

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 10
Hours worked: 16,220
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
10
Hours workedANNUAL_HRS
16220
Average hours per employeeAVG_EMPLOYEE_HOURS
1622

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2,179
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2179
Average hours per employeeAVG_EMPLOYEE_HOURS
2179

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 10
Hours worked: 20,760
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
10
Hours workedANNUAL_HRS
20760
Average hours per employeeAVG_EMPLOYEE_HOURS
2076

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 3,784
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3784
Average hours per employeeAVG_EMPLOYEE_HOURS
1892

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 12
Hours worked: 24,011
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
12
Hours workedANNUAL_HRS
24011
Average hours per employeeAVG_EMPLOYEE_HOURS
2001

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 3,003
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3003
Average hours per employeeAVG_EMPLOYEE_HOURS
1502

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 16
Hours worked: 31,743
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
16
Hours workedANNUAL_HRS
31743
Average hours per employeeAVG_EMPLOYEE_HOURS
1984

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 2,979
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2979
Average hours per employeeAVG_EMPLOYEE_HOURS
1490

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 11
Hours worked: 25,635
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
11
Hours workedANNUAL_HRS
25635
Average hours per employeeAVG_EMPLOYEE_HOURS
2330

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 4,578
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
4578
Average hours per employeeAVG_EMPLOYEE_HOURS
2289

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 22,413
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
22413
Average hours per employeeAVG_EMPLOYEE_HOURS
3202

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 2,960
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2960
Average hours per employeeAVG_EMPLOYEE_HOURS
1480

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 24,717
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
24717
Average hours per employeeAVG_EMPLOYEE_HOURS
3531

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 3,393
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3393
Average hours per employeeAVG_EMPLOYEE_HOURS
1697

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 21,212
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
21212
Average hours per employeeAVG_EMPLOYEE_HOURS
3030

Mine

Mine IDMINE_ID
4702937
Mine name in this fileCURR_MINE_NM
Plant 1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Marquette MI Field Office
Nearest town
Appleton, WI
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
7
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Plant 1
Mine IDMINE_ID
4702937
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Oct 1, 2020
Legal entity typeCOMPANY_TYPE
Corporation
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
55

Operator and controller

OperatorCURRENT_OPERATOR_NAME
MCC, Inc.
Operator IDCURRENT_OPERATOR_ID
L04446
Controller IDCURRENT_CONTROLLER_ID
M00687
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Sep 1, 1991

Location and MSHA office

StateSTATE
WI
Bureau of Mines state codeBOM_STATE_CD
47
FIPS county codeFIPS_CNTY_CD
087
FIPS county nameFIPS_CNTY_NM
Outagamie
Nearest townNEAREST_TOWN
Appleton, WI
MSHA districtDISTRICT
M4
MSHA office codeOFFICE_CD
M4641
MSHA officeOFFICE_NAME
Marquette MI Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
255
Most recent assessment control numberASSESS_CTRL_NO
000640157

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Limestone NEC
Primary commodity codePRIMARY_SIC_CD
142200
Primary SIC codePRIMARY_SIC_CD_1
1422
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
7
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: MCC, Inc.
From: Sep 1, 1991
To: No end date
Controller: Not shown
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
MCC, Inc.
Operator IDOPERATOR_ID
L04446
Operator fromOPERATOR_START_DT
Sep 1, 1991

Controller

Controller IDCONTROLLER_ID
M00687
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

MCC, Inc.·Contact title Safety Coordinator·Street not recorded, Appleton WI 54911

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
MCC, Inc.
Contact titleCONTACT_TITLE
Safety Coordinator
CityCITY
Appleton
StateSTATE_ABBR
WI
State nameSTATE
Wisconsin
ZIP codeZIP_CD
54911
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
55

Mine

Mine IDMINE_ID
4702937
Mine name in this fileMINE_NAME
Plant 1
Nearest townNEAREST_TOWN
Appleton, WI
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Oct 1, 2020
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Limestone NEC
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology