Plant #14

Metal/Non-Metal, SurfaceCrushed, Broken Limestone NECDodge, WisconsinMine ID 4703262

Operator MICHELS ROAD & STONE, INCController M10 IncMSHA status Active since Nov 5, 2025

What MSHA has on file for this mine

Citations and orders
32
since Sep 9, 2003 · 25 to the operator, 7 to contractors · 4 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Jun 23 to Jun 24, 2026Inspectors 1 | Hours on site 5.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 23, 2026
Closed outINSPECTION_END_DT
Jun 24, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0413EE
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
12.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Feb 24 to Feb 26, 2026Inspectors 1 | Hours on site 14

The inspection

BeganINSPECTION_BEGIN_DT
Feb 24, 2026
Closed outINSPECTION_END_DT
Feb 26, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F02A5D4
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14
Total inspection hoursSUM_TOTAL_INSP_HOURS
30.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Compliance Follow-up Inspection
Aug 12, 2025Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Aug 12, 2025
Closed outINSPECTION_END_DT
Aug 12, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F01F83F
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 6, 2025Inspectors 1 | Hours on site 8.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 6, 2025
Closed outINSPECTION_END_DT
Aug 6, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F01F83C
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
18.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 5, 2023Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Oct 5, 2023
Closed outINSPECTION_END_DT
Oct 5, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6909851
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 8 to May 9, 2023Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
May 8, 2023
Closed outINSPECTION_END_DT
May 9, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6906000
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
May 4, 2022Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
May 4, 2022
Closed outINSPECTION_END_DT
May 4, 2022
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6905806
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Mar 22 to Mar 23, 2022Inspectors 1 | Hours on site 16.75

The inspection

BeganINSPECTION_BEGIN_DT
Mar 22, 2022
Closed outINSPECTION_END_DT
Mar 23, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905180
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
16.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
37.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Nov 9, 2020Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Nov 9, 2020
Closed outINSPECTION_END_DT
Nov 9, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6840702
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 14, 2020Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Jul 14, 2020
Closed outINSPECTION_END_DT
Jul 14, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6834866
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 22 to Jan 23, 2020Inspectors 1 | Hours on site 8.75

The inspection

BeganINSPECTION_BEGIN_DT
Jan 22, 2020
Closed outINSPECTION_END_DT
Jan 23, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6834828
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
21.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 10, 2019Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Jul 10, 2019
Closed outINSPECTION_END_DT
Jul 10, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6749786
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 2 to Apr 3, 2019Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Apr 2, 2019
Closed outINSPECTION_END_DT
Apr 3, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6749756
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
Sep 26, 2018Inspectors 1 | Hours on site 12

The inspection

BeganINSPECTION_BEGIN_DT
Sep 26, 2018
Closed outINSPECTION_END_DT
Sep 26, 2018
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6834002
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12
Total inspection hoursSUM_TOTAL_INSP_HOURS
23.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 14, 2018Inspectors 1 | Hours on site 4.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 14, 2018
Closed outINSPECTION_END_DT
Aug 14, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742993
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
Jul 31, 2018Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Jul 31, 2018
Closed outINSPECTION_END_DT
Jul 31, 2018
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6742990
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Mar 20 to Mar 21, 2018Inspectors 1 | Hours on site 6.75

The inspection

BeganINSPECTION_BEGIN_DT
Mar 20, 2018
Closed outINSPECTION_END_DT
Mar 21, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742959
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
25.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
Nov 28, 2017Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 28, 2017
Closed outINSPECTION_END_DT
Nov 28, 2017
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6742930
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 10, 2017Inspectors 1 | Hours on site 5.25

The inspection

BeganINSPECTION_BEGIN_DT
May 10, 2017
Closed outINSPECTION_END_DT
May 10, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742223
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Mar 22, 2017Inspectors 1 | Hours on site 4.75

The inspection

BeganINSPECTION_BEGIN_DT
Mar 22, 2017
Closed outINSPECTION_END_DT
Mar 22, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6742109
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 4, 2016Inspectors 1 | Hours on site 6.75

The inspection

BeganINSPECTION_BEGIN_DT
May 4, 2016
Closed outINSPECTION_END_DT
May 4, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6702944
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 9 to Jun 10, 2015Inspectors 1 | Hours on site 3.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 9, 2015
Closed outINSPECTION_END_DT
Jun 10, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6702050
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
7

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 8, 2014Inspectors 1 | Hours on site 11

The inspection

BeganINSPECTION_BEGIN_DT
Jul 8, 2014
Closed outINSPECTION_END_DT
Jul 8, 2014
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6636843
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
11
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Nov 13, 2013Inspectors 1 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Nov 13, 2013
Closed outINSPECTION_END_DT
Nov 13, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6636095
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jan 2 to Jan 3, 2013Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Jan 2, 2013
Closed outINSPECTION_END_DT
Jan 3, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6579436
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

25 most recent of 38 inspections and other MSHA visits since Oct 16, 2001; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Feb 25, 2026
Type: Citation
Standard: 56.16005
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5119235
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 25, 2026
Time issuedVIOLATION_ISSUE_TIME
0940
Date of occurrenceVIOLATION_OCCUR_DT
Feb 25, 2026
30 CFR part and sectionPART_SECTION
56.16005
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 25, 2026
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Feb 25, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Feb 25, 2026
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Apr 1, 2026
Final order dateFINAL_ORDER_ISSUE_DT
May 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 19, 2026
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
F02A5D4
Inspection beganINSPECTION_BEGIN_DT
Feb 24, 2026
Inspection closed outINSPECTION_END_DT
Feb 26, 2026
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Feb 25, 2026
Type: Citation
Standard: 56.14100(c)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5119234
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 25, 2026
Time issuedVIOLATION_ISSUE_TIME
0915
Date of occurrenceVIOLATION_OCCUR_DT
Feb 25, 2026
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 25, 2026
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Feb 25, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Feb 25, 2026
Terminated, timeTERMINATION_TIME
0930
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Apr 1, 2026
Final order dateFINAL_ORDER_ISSUE_DT
May 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 19, 2026
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
F02A5D4
Inspection beganINSPECTION_BEGIN_DT
Feb 24, 2026
Inspection closed outINSPECTION_END_DT
Feb 26, 2026
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 6, 2025
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
7838393
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1638
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2025
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2025
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Aug 26, 2025
Terminated, timeTERMINATION_TIME
1857
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Oct 29, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 6, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
QSP Utility LLC
Operator IDVIOLATOR_ID
B6126
Contractor IDCONTRACTOR_ID
B6126
Inspection eventEVENT_NO
F01F83C
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2025
Inspection closed outINSPECTION_END_DT
Aug 6, 2025
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Aug 6, 2025
Type: Citation
Standard: 56.9301
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $465.00
Details

The citation

Citation or order numberVIOLATION_NO
7838392
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1238
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2025
30 CFR part and sectionPART_SECTION
56.9301
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 11, 2025
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Aug 11, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Aug 12, 2025
Terminated, timeTERMINATION_TIME
1848
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
465
Current proposed assessmentAMOUNT_DUE
465
Amount paidAMOUNT_PAID
465
Bill first printedBILL_PRINT_DT
Oct 1, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 27, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 23, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
F01F83C
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2025
Inspection closed outINSPECTION_END_DT
Aug 6, 2025
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 6, 2025
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
7838395
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1640
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2025
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2025
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Aug 26, 2025
Terminated, timeTERMINATION_TIME
1901
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Oct 29, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 6, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
QSP Utility LLC
Operator IDVIOLATOR_ID
B6126
Contractor IDCONTRACTOR_ID
B6126
Inspection eventEVENT_NO
F01F83C
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2025
Inspection closed outINSPECTION_END_DT
Aug 6, 2025
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Aug 6, 2025
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
7838394
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1639
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2025
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2025
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Aug 26, 2025
Terminated, timeTERMINATION_TIME
1904
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Oct 29, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 6, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
QSP Utility LLC
Operator IDVIOLATOR_ID
B6126
Contractor IDCONTRACTOR_ID
B6126
Inspection eventEVENT_NO
F01F83C
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2025
Inspection closed outINSPECTION_END_DT
Aug 6, 2025
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Aug 6, 2025
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
7838396
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1641
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2025
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2025
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Aug 26, 2025
Terminated, timeTERMINATION_TIME
1902
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
19.33
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Oct 29, 2025
Last actionLAST_ACTION_CD
Treasury
Last action dateLAST_ACTION_DT
Feb 12, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
QSP Utility LLC
Operator IDVIOLATOR_ID
B6126
Contractor IDCONTRACTOR_ID
B6126
Inspection eventEVENT_NO
F01F83C
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2025
Inspection closed outINSPECTION_END_DT
Aug 6, 2025
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Oct 5, 2023
Type: Citation
Standard: 56.14112(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9694077
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2023
Time issuedVIOLATION_ISSUE_TIME
1012
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2023
30 CFR part and sectionPART_SECTION
56.14112(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 5, 2023
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Oct 5, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Oct 5, 2023
Terminated, timeTERMINATION_TIME
1100
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Nov 29, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Jan 3, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 1, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
6909851
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2023
Inspection closed outINSPECTION_END_DT
Oct 5, 2023
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 9, 2023
Type: Citation
Standard: 56.12013(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9690391
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 9, 2023
Time issuedVIOLATION_ISSUE_TIME
0912
Date of occurrenceVIOLATION_OCCUR_DT
May 9, 2023
30 CFR part and sectionPART_SECTION
56.12013(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
May 9, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
May 9, 2023
Terminated, timeTERMINATION_TIME
0947
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jun 28, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Dec 4, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 6, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
6906000
Inspection beganINSPECTION_BEGIN_DT
May 8, 2023
Inspection closed outINSPECTION_END_DT
May 9, 2023
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 9, 2023
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9690390
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 9, 2023
Time issuedVIOLATION_ISSUE_TIME
0845
Date of occurrenceVIOLATION_OCCUR_DT
May 9, 2023
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2023
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
May 9, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
May 9, 2023
Terminated, timeTERMINATION_TIME
0946
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Jun 28, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Dec 4, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 6, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
6906000
Inspection beganINSPECTION_BEGIN_DT
May 8, 2023
Inspection closed outINSPECTION_END_DT
May 9, 2023
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 5, 2022
Type: Citation
Standard: 56.18002(b)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9621464
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1215
Date of occurrenceVIOLATION_OCCUR_DT
Mar 15, 2022
30 CFR part and sectionPART_SECTION
56.18002(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 19, 2022
Originally due, timeORIG_TERM_DUE_TIME
1530
Latest dueLATEST_TERM_DUE_DT
Apr 19, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1530
TerminatedTERMINATION_DT
May 10, 2022
Terminated, timeTERMINATION_TIME
1700
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 24, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jun 30, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 10, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Orica USA Midwest
Operator IDVIOLATOR_ID
B5232
Contractor IDCONTRACTOR_ID
B5232
Inspection eventEVENT_NO
6905180
Inspection beganINSPECTION_BEGIN_DT
Mar 22, 2022
Inspection closed outINSPECTION_END_DT
Mar 23, 2022
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Mar 22, 2022
Type: Citation
Standard: 56.11003
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $378.00
Details

The citation

Citation or order numberVIOLATION_NO
9621453
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 22, 2022
Time issuedVIOLATION_ISSUE_TIME
0818
Date of occurrenceVIOLATION_OCCUR_DT
Mar 22, 2022
30 CFR part and sectionPART_SECTION
56.11003
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 22, 2022
Originally due, timeORIG_TERM_DUE_TIME
0833
Latest dueLATEST_TERM_DUE_DT
Mar 22, 2022
Latest due, timeLATEST_TERM_DUE_TIME
0833
TerminatedTERMINATION_DT
Mar 22, 2022
Terminated, timeTERMINATION_TIME
0842
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
378
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 4, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Oct 26, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 12, 2023

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDVIOLATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Inspection eventEVENT_NO
6905180
Inspection beganINSPECTION_BEGIN_DT
Mar 22, 2022
Inspection closed outINSPECTION_END_DT
Mar 23, 2022
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Mar 22, 2022
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9621455
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 22, 2022
Time issuedVIOLATION_ISSUE_TIME
1255
Date of occurrenceVIOLATION_OCCUR_DT
Mar 22, 2022
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 23, 2022
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Mar 23, 2022
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Mar 23, 2022
Terminated, timeTERMINATION_TIME
1043
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 25, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jul 6, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 27, 2022

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Northeast Asphalt Inc
Operator IDVIOLATOR_ID
B472
Contractor IDCONTRACTOR_ID
B472
Inspection eventEVENT_NO
6905180
Inspection beganINSPECTION_BEGIN_DT
Mar 22, 2022
Inspection closed outINSPECTION_END_DT
Mar 23, 2022
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Mar 22, 2022
Type: Citation
Standard: 56.4201(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9621454
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 22, 2022
Time issuedVIOLATION_ISSUE_TIME
1250
Date of occurrenceVIOLATION_OCCUR_DT
Mar 22, 2022
30 CFR part and sectionPART_SECTION
56.4201(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 22, 2022
Originally due, timeORIG_TERM_DUE_TIME
1530
Latest dueLATEST_TERM_DUE_DT
Mar 22, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1530
TerminatedTERMINATION_DT
Mar 22, 2022
Terminated, timeTERMINATION_TIME
1518
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
May 25, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Jul 6, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 27, 2022

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Northeast Asphalt Inc
Operator IDVIOLATOR_ID
B472
Contractor IDCONTRACTOR_ID
B472
Inspection eventEVENT_NO
6905180
Inspection beganINSPECTION_BEGIN_DT
Mar 22, 2022
Inspection closed outINSPECTION_END_DT
Mar 23, 2022
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Jul 14, 2020
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9445648
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 14, 2020
Time issuedVIOLATION_ISSUE_TIME
1355
Date of occurrenceVIOLATION_OCCUR_DT
Jul 14, 2020
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 14, 2020
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jul 14, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jul 14, 2020
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Sep 16, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 27, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6834866
Inspection beganINSPECTION_BEGIN_DT
Jul 14, 2020
Inspection closed outINSPECTION_END_DT
Jul 14, 2020
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jan 22, 2020
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9444350
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 22, 2020
Time issuedVIOLATION_ISSUE_TIME
1321
Date of occurrenceVIOLATION_OCCUR_DT
Jan 22, 2020
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 22, 2020
Originally due, timeORIG_TERM_DUE_TIME
1336
Latest dueLATEST_TERM_DUE_DT
Jan 22, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1336
TerminatedTERMINATION_DT
Jan 23, 2020
Terminated, timeTERMINATION_TIME
0800
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Mar 18, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Sep 20, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 25, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6834828
Inspection beganINSPECTION_BEGIN_DT
Jan 22, 2020
Inspection closed outINSPECTION_END_DT
Jan 23, 2020
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 10, 2019
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9444408
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2019
Time issuedVIOLATION_ISSUE_TIME
1645
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2019
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 10, 2019
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Jul 10, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Jul 10, 2019
Terminated, timeTERMINATION_TIME
1730
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Sep 4, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 7, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 22, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6749786
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2019
Inspection closed outINSPECTION_END_DT
Jul 10, 2019
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Apr 2, 2019
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9386550
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 2, 2019
Time issuedVIOLATION_ISSUE_TIME
1345
Date of occurrenceVIOLATION_OCCUR_DT
Apr 2, 2019
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Apr 2, 2019
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Apr 2, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Apr 3, 2019
Terminated, timeTERMINATION_TIME
0650
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
May 7, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Jun 12, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 20, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6749756
Inspection beganINSPECTION_BEGIN_DT
Apr 2, 2019
Inspection closed outINSPECTION_END_DT
Apr 3, 2019
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 14, 2018
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8957555
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 14, 2018
Time issuedVIOLATION_ISSUE_TIME
0908
Date of occurrenceVIOLATION_OCCUR_DT
Aug 14, 2018
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 14, 2018
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Aug 14, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Aug 14, 2018
Terminated, timeTERMINATION_TIME
0954
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Oct 3, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Nov 8, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 21, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6742993
Inspection beganINSPECTION_BEGIN_DT
Aug 14, 2018
Inspection closed outINSPECTION_END_DT
Aug 14, 2018
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Mar 20, 2018
Type: Citation
Standard: 56.9300(a)
S&S: Y
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $2,361.00
Details

The citation

Citation or order numberVIOLATION_NO
8957483
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 20, 2018
Time issuedVIOLATION_ISSUE_TIME
1312
Date of occurrenceVIOLATION_OCCUR_DT
Mar 20, 2018
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 20, 2018
Originally due, timeORIG_TERM_DUE_TIME
1330
Latest dueLATEST_TERM_DUE_DT
Mar 20, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1330
TerminatedTERMINATION_DT
Mar 20, 2018
Terminated, timeTERMINATION_TIME
1337
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2361
Current proposed assessmentAMOUNT_DUE
2361
Amount paidAMOUNT_PAID
2361
Bill first printedBILL_PRINT_DT
May 2, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Jul 15, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 28, 2019
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6742959
Inspection beganINSPECTION_BEGIN_DT
Mar 20, 2018
Inspection closed outINSPECTION_END_DT
Mar 21, 2018
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (2)

Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Mar 20, 2018
Type: Citation
Standard: 56.18002(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $2,361.00
Details

The citation

Citation or order numberVIOLATION_NO
8957484
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 20, 2018
Time issuedVIOLATION_ISSUE_TIME
1420
Date of occurrenceVIOLATION_OCCUR_DT
Mar 20, 2018
30 CFR part and sectionPART_SECTION
56.18002(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
8957483

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

TerminatedTERMINATION_DT
Mar 21, 2018
Terminated, timeTERMINATION_TIME
0755
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
2361
Current proposed assessmentAMOUNT_DUE
2361
Amount paidAMOUNT_PAID
2361
Bill first printedBILL_PRINT_DT
May 2, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Jul 15, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 11, 2019
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6742959
Inspection beganINSPECTION_BEGIN_DT
Mar 20, 2018
Inspection closed outINSPECTION_END_DT
Mar 21, 2018
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (16)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 9, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8849337
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 9, 2015
Time issuedVIOLATION_ISSUE_TIME
1315
Date of occurrenceVIOLATION_OCCUR_DT
Jun 9, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 9, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 9, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 9, 2015
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 29, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Aug 31, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 18, 2015
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6702050
Inspection beganINSPECTION_BEGIN_DT
Jun 9, 2015
Inspection closed outINSPECTION_END_DT
Jun 10, 2015
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Nov 13, 2013
Type: Citation
Standard: 56.20008(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8742820
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 13, 2013
Time issuedVIOLATION_ISSUE_TIME
0930
Date of occurrenceVIOLATION_OCCUR_DT
Nov 13, 2013
30 CFR part and sectionPART_SECTION
56.20008(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
3
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 13, 2013
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Nov 13, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Nov 13, 2013
Terminated, timeTERMINATION_TIME
1010
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jan 2, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Feb 7, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 22, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6636095
Inspection beganINSPECTION_BEGIN_DT
Nov 13, 2013
Inspection closed outINSPECTION_END_DT
Nov 13, 2013
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jan 2, 2013
Type: Citation
Standard: 56.11016
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $308.00
Details

The citation

Citation or order numberVIOLATION_NO
8735032
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 2, 2013
Time issuedVIOLATION_ISSUE_TIME
1330
Date of occurrenceVIOLATION_OCCUR_DT
Jan 2, 2013
30 CFR part and sectionPART_SECTION
56.11016
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 2, 2013
Originally due, timeORIG_TERM_DUE_TIME
1345
Latest dueLATEST_TERM_DUE_DT
Jan 2, 2013
Latest due, timeLATEST_TERM_DUE_TIME
1345
TerminatedTERMINATION_DT
Jan 2, 2013
Terminated, timeTERMINATION_TIME
1335
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
308
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Feb 27, 2013
Final order dateFINAL_ORDER_ISSUE_DT
Sep 30, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 30, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6579436
Inspection beganINSPECTION_BEGIN_DT
Jan 2, 2013
Inspection closed outINSPECTION_END_DT
Jan 3, 2013
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 28, 2012
Type: Citation
Standard: 56.14101(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6558409
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 28, 2012
Time issuedVIOLATION_ISSUE_TIME
1049
Date of occurrenceVIOLATION_OCCUR_DT
Aug 28, 2012
30 CFR part and sectionPART_SECTION
56.14101(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 28, 2012
Originally due, timeORIG_TERM_DUE_TIME
1130
Latest dueLATEST_TERM_DUE_DT
Aug 28, 2012
Latest due, timeLATEST_TERM_DUE_TIME
1130
TerminatedTERMINATION_DT
Aug 28, 2012
Terminated, timeTERMINATION_TIME
1110
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Nov 28, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Jan 3, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 18, 2012
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Michels Corporation
Operator IDVIOLATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Inspection eventEVENT_NO
6579304
Inspection beganINSPECTION_BEGIN_DT
Aug 28, 2012
Inspection closed outINSPECTION_END_DT
Aug 28, 2012
Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

32 citations and orders since Sep 9, 2003: 25 issued to the operator, 7 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Feb 25, 2026
Citation number: 5119234
Standard: 56.14100(c)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5119234
Assessment control numberASSESS_CASE_NO
000638533
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 14, 2026
Citation issuedISSUE_DT
Feb 25, 2026
Date of occurrenceOCCURRENCE_DT
Feb 25, 2026
Final order dateFINAL_ORDER_DT
May 9, 2026
Bill first printedBILL_PRINT_DT
Apr 1, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
39
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
9103
Size of mineSIZE_OF_MINE
9103
Controller hours workedCONTROLLER_HRS
151990
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
151990
History period startHISTORY_START_DT
Nov 25, 2024
History period endHISTORY_END_DT
Feb 24, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02A5D4
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 25, 2026
Citation number: 5119235
Standard: 56.16005
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5119235
Assessment control numberASSESS_CASE_NO
000638533
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 14, 2026
Citation issuedISSUE_DT
Feb 25, 2026
Date of occurrenceOCCURRENCE_DT
Feb 25, 2026
Final order dateFINAL_ORDER_DT
May 9, 2026
Bill first printedBILL_PRINT_DT
Apr 1, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.16005
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
9103
Size of mineSIZE_OF_MINE
9103
Controller hours workedCONTROLLER_HRS
151990
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
151990
History period startHISTORY_START_DT
Nov 25, 2024
History period endHISTORY_END_DT
Feb 24, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02A5D4
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 6, 2025
Citation number: 7838394
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
7838394
Assessment control numberASSESS_CASE_NO
000629083
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Sep 29, 2025
Citation issuedISSUE_DT
Aug 6, 2025
Date of occurrenceOCCURRENCE_DT
Aug 6, 2025
Final order dateFINAL_ORDER_DT
Oct 29, 2025
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 29, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Mine Act interestMINEACT_INTEREST_AMT
1.76
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.76

Penalty points

Violation history pointsPENALTY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
1114
Size of mineSIZE_OF_MINE
1114
History period startHISTORY_START_DT
May 6, 2024
History period endHISTORY_END_DT
Aug 5, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
QSP Utility LLC
IDVIOLATOR_ID
B6126
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 6, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01F83C
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Aug 6, 2025
Citation number: 7838396
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $19.33
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
7838396
Assessment control numberASSESS_CASE_NO
000629083
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Sep 29, 2025
Citation issuedISSUE_DT
Aug 6, 2025
Date of occurrenceOCCURRENCE_DT
Aug 6, 2025
Final order dateFINAL_ORDER_DT
Oct 29, 2025
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 29, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Mine Act interestMINEACT_INTEREST_AMT
1.76
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
19.33
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.76

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
1114
Size of mineSIZE_OF_MINE
1114
History period startHISTORY_START_DT
May 6, 2024
History period endHISTORY_END_DT
Aug 5, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
QSP Utility LLC
IDVIOLATOR_ID
B6126
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 6, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01F83C
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (18)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Aug 6, 2025
Citation number: 7838392
Standard: 56.9301
Proposed penalty: $465.00
Current assessment: $465.00
Paid against proposed penalty: $465.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
7838392
Assessment control numberASSESS_CASE_NO
000629769
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 22, 2026
Citation issuedISSUE_DT
Aug 6, 2025
Date of occurrenceOCCURRENCE_DT
Aug 6, 2025
Final order dateFINAL_ORDER_DT
Apr 27, 2026
Bill first printedBILL_PRINT_DT
Oct 1, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 17, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9301
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
465.00
Current assessmentCURRENT_ASSESSMENT_AMT
465.00
Mine Act interestMINEACT_INTEREST_AMT
0.71
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
465.00

Penalty points

Violation history pointsPENALTY_POINTS
74
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
6883
Size of mineSIZE_OF_MINE
6883
Controller hours workedCONTROLLER_HRS
142424
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
142424
History period startHISTORY_START_DT
May 6, 2024
History period endHISTORY_END_DT
Aug 5, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01F83C
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 6, 2025
Citation number: 7838395
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
7838395
Assessment control numberASSESS_CASE_NO
000629083
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Sep 29, 2025
Citation issuedISSUE_DT
Aug 6, 2025
Date of occurrenceOCCURRENCE_DT
Aug 6, 2025
Final order dateFINAL_ORDER_DT
Oct 29, 2025
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 29, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Mine Act interestMINEACT_INTEREST_AMT
1.76
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.76

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
1114
Size of mineSIZE_OF_MINE
1114
History period startHISTORY_START_DT
May 6, 2024
History period endHISTORY_END_DT
Aug 5, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
QSP Utility LLC
IDVIOLATOR_ID
B6126
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 6, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01F83C
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (18)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Aug 6, 2025
Citation number: 7838393
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Received
Details

The assessment

Citation or order numberVIOLATION_NO
7838393
Assessment control numberASSESS_CASE_NO
000629083
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Received
Case status dateASSESS_CASE_STATUS_DT
Sep 29, 2025
Citation issuedISSUE_DT
Aug 6, 2025
Date of occurrenceOCCURRENCE_DT
Aug 6, 2025
Final order dateFINAL_ORDER_DT
Oct 29, 2025
Bill first printedBILL_PRINT_DT
Sep 23, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 29, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Mine Act interestMINEACT_INTEREST_AMT
1.76
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.76

Penalty points

Violation history pointsPENALTY_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
1114
Size of mineSIZE_OF_MINE
1114
History period startHISTORY_START_DT
May 6, 2024
History period endHISTORY_END_DT
Aug 5, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
QSP Utility LLC
IDVIOLATOR_ID
B6126
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 6, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01F83C
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (18)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Oct 5, 2023
Citation number: 9694077
Standard: 56.14112(a)(1)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9694077
Assessment control numberASSESS_CASE_NO
000589986
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2023
Citation issuedISSUE_DT
Oct 5, 2023
Date of occurrenceOCCURRENCE_DT
Oct 5, 2023
Final order dateFINAL_ORDER_DT
Jan 3, 2024
Bill first printedBILL_PRINT_DT
Nov 29, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 3, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Mine Act interestMINEACT_INTEREST_AMT
0.81
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
6184
Size of mineSIZE_OF_MINE
6184
Controller hours workedCONTROLLER_HRS
135391
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
135391
History period startHISTORY_START_DT
Jul 5, 2022
History period endHISTORY_END_DT
Oct 4, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6909851
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 9, 2023
Citation number: 9690391
Standard: 56.12013(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9690391
Assessment control numberASSESS_CASE_NO
000579984
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 6, 2023
Citation issuedISSUE_DT
May 9, 2023
Date of occurrenceOCCURRENCE_DT
May 9, 2023
Final order dateFINAL_ORDER_DT
Dec 4, 2023
Bill first printedBILL_PRINT_DT
Jun 28, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 24, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12013(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
6184
Size of mineSIZE_OF_MINE
6184
Controller hours workedCONTROLLER_HRS
135391
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
135391
History period startHISTORY_START_DT
Feb 9, 2022
History period endHISTORY_END_DT
May 8, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6906000
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 9, 2023
Citation number: 9690390
Standard: 56.14107(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9690390
Assessment control numberASSESS_CASE_NO
000579984
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 6, 2023
Citation issuedISSUE_DT
May 9, 2023
Date of occurrenceOCCURRENCE_DT
May 9, 2023
Final order dateFINAL_ORDER_DT
Dec 4, 2023
Bill first printedBILL_PRINT_DT
Jun 28, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 24, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
34
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
6184
Size of mineSIZE_OF_MINE
6184
Controller hours workedCONTROLLER_HRS
135391
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
135391
History period startHISTORY_START_DT
Feb 9, 2022
History period endHISTORY_END_DT
May 8, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6906000
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 5, 2022
Citation number: 9621464
Standard: 56.18002(b)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9621464
Assessment control numberASSESS_CASE_NO
000555568
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 10, 2022
Citation issuedISSUE_DT
Apr 5, 2022
Date of occurrenceOCCURRENCE_DT
Mar 15, 2022
Final order dateFINAL_ORDER_DT
Jun 30, 2022
Bill first printedBILL_PRINT_DT
May 24, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 30, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
28
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
22019
Size of mineSIZE_OF_MINE
22019
History period startHISTORY_START_DT
Dec 15, 2020
History period endHISTORY_END_DT
Mar 14, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Orica USA Midwest
IDVIOLATOR_ID
B5232
Operator start at the mine, as assessedVIOLATOR_START_DT
Mar 15, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905180
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Mar 22, 2022
Citation number: 9621454
Standard: 56.4201(a)(1)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9621454
Assessment control numberASSESS_CASE_NO
000555702
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 24, 2022
Citation issuedISSUE_DT
Mar 22, 2022
Date of occurrenceOCCURRENCE_DT
Mar 22, 2022
Final order dateFINAL_ORDER_DT
Jul 6, 2022
Bill first printedBILL_PRINT_DT
May 25, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 6, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Dec 22, 2020
History period endHISTORY_END_DT
Mar 21, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Northeast Asphalt Inc
IDVIOLATOR_ID
B472
Operator start at the mine, as assessedVIOLATOR_START_DT
Mar 21, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905180
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Mar 22, 2022
Citation number: 9621455
Standard: 56.12028
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9621455
Assessment control numberASSESS_CASE_NO
000555702
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 24, 2022
Citation issuedISSUE_DT
Mar 22, 2022
Date of occurrenceOCCURRENCE_DT
Mar 22, 2022
Final order dateFINAL_ORDER_DT
Jul 6, 2022
Bill first printedBILL_PRINT_DT
May 25, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 6, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Dec 22, 2020
History period endHISTORY_END_DT
Mar 21, 2022

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Northeast Asphalt Inc
IDVIOLATOR_ID
B472
Operator start at the mine, as assessedVIOLATOR_START_DT
Mar 21, 2022
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905180
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Mar 22, 2022
Citation number: 9621453
Standard: 56.11003
Proposed penalty: $378.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9621453
Assessment control numberASSESS_CASE_NO
000554060
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 11, 2023
Citation issuedISSUE_DT
Mar 22, 2022
Date of occurrenceOCCURRENCE_DT
Mar 22, 2022
Final order dateFINAL_ORDER_DT
Oct 26, 2022
Bill first printedBILL_PRINT_DT
May 4, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 16, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11003
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
378.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Mine Act interestMINEACT_INTEREST_AMT
1.17
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
0.15

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
3362
Size of mineSIZE_OF_MINE
3362
Controller hours workedCONTROLLER_HRS
104802
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
104802
History period startHISTORY_START_DT
Nov 1, 2021
History period endHISTORY_END_DT
Mar 21, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
MICHELS ROAD & STONE, INC
IDVIOLATOR_ID
0179456
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2021
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905180
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 14, 2020
Citation number: 9445648
Standard: 56.12004
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9445648
Assessment control numberASSESS_CASE_NO
000522282
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 27, 2020
Citation issuedISSUE_DT
Jul 14, 2020
Date of occurrenceOCCURRENCE_DT
Jul 14, 2020
Final order dateFINAL_ORDER_DT
Oct 24, 2020
Bill first printedBILL_PRINT_DT
Sep 16, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1.33
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.333
Operator hours worked at the mineVIOLATOR_MINE_HRS
6408
Size of mineSIZE_OF_MINE
6408
Controller hours workedCONTROLLER_HRS
142825
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
142825
History period startHISTORY_START_DT
Apr 14, 2019
History period endHISTORY_END_DT
Jul 13, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6834866
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 22, 2020
Citation number: 9444350
Standard: 56.20003(a)
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9444350
Assessment control numberASSESS_CASE_NO
000511012
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 25, 2020
Citation issuedISSUE_DT
Jan 22, 2020
Date of occurrenceOCCURRENCE_DT
Jan 22, 2020
Final order dateFINAL_ORDER_DT
Sep 20, 2020
Bill first printedBILL_PRINT_DT
Mar 18, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 10, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
29
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2.5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
6408
Size of mineSIZE_OF_MINE
6408
Controller hours workedCONTROLLER_HRS
142825
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
142825
History period startHISTORY_START_DT
Oct 22, 2018
History period endHISTORY_END_DT
Jan 21, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6834828
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2019
Citation number: 9444408
Standard: 56.20003(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9444408
Assessment control numberASSESS_CASE_NO
000498538
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 20, 2019
Citation issuedISSUE_DT
Jul 10, 2019
Date of occurrenceOCCURRENCE_DT
Jul 10, 2019
Final order dateFINAL_ORDER_DT
Oct 7, 2019
Bill first printedBILL_PRINT_DT
Sep 4, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 7, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
39
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
6842
Size of mineSIZE_OF_MINE
6842
Controller hours workedCONTROLLER_HRS
127635
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
127635
History period startHISTORY_START_DT
Apr 10, 2018
History period endHISTORY_END_DT
Jul 9, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6749786
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Apr 2, 2019
Citation number: 9386550
Standard: 56.12004
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9386550
Assessment control numberASSESS_CASE_NO
000490212
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 20, 2019
Citation issuedISSUE_DT
Apr 2, 2019
Date of occurrenceOCCURRENCE_DT
Apr 2, 2019
Final order dateFINAL_ORDER_DT
Jun 12, 2019
Bill first printedBILL_PRINT_DT
May 7, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jun 12, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
6842
Size of mineSIZE_OF_MINE
6842
Controller hours workedCONTROLLER_HRS
127635
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
127635
History period startHISTORY_START_DT
Jan 2, 2018
History period endHISTORY_END_DT
Apr 1, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6749756
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 14, 2018
Citation number: 8957555
Standard: 56.14107(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8957555
Assessment control numberASSESS_CASE_NO
000474337
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 19, 2018
Citation issuedISSUE_DT
Aug 14, 2018
Date of occurrenceOCCURRENCE_DT
Aug 14, 2018
Final order dateFINAL_ORDER_DT
Nov 8, 2018
Bill first printedBILL_PRINT_DT
Oct 3, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 8, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
28
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
4546
Size of mineSIZE_OF_MINE
4546
Controller hours workedCONTROLLER_HRS
112358
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
112358
History period startHISTORY_START_DT
May 14, 2017
History period endHISTORY_END_DT
Aug 13, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742993
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 20, 2018
Citation number: 8957483
Standard: 56.9300(a)
Proposed penalty: $2,361.00
Current assessment: $2,361.00
Paid against proposed penalty: $2,361.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8957483
Assessment control numberASSESS_CASE_NO
000464024
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 11, 2019
Citation issuedISSUE_DT
Mar 20, 2018
Date of occurrenceOCCURRENCE_DT
Mar 20, 2018
Final order dateFINAL_ORDER_DT
Jul 15, 2019
Bill first printedBILL_PRINT_DT
May 2, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 5, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2361.00
Current assessmentCURRENT_ASSESSMENT_AMT
2361.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2361.00

Penalty points

Violation history pointsPENALTY_POINTS
88
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
35
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
4546
Size of mineSIZE_OF_MINE
4546
Controller hours workedCONTROLLER_HRS
112358
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
112358
History period startHISTORY_START_DT
Dec 20, 2016
History period endHISTORY_END_DT
Mar 19, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742959
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 20, 2018
Citation number: 8957484
Standard: 56.18002(a)
Proposed penalty: $2,361.00
Current assessment: $2,361.00
Paid against proposed penalty: $2,361.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8957484
Assessment control numberASSESS_CASE_NO
000464024
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 11, 2019
Citation issuedISSUE_DT
Mar 20, 2018
Date of occurrenceOCCURRENCE_DT
Mar 20, 2018
Final order dateFINAL_ORDER_DT
Jul 15, 2019
Bill first printedBILL_PRINT_DT
May 2, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 5, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
2361.00
Current assessmentCURRENT_ASSESSMENT_AMT
2361.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2361.00

Penalty points

Violation history pointsPENALTY_POINTS
68
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
4546
Size of mineSIZE_OF_MINE
4546
Controller hours workedCONTROLLER_HRS
112358
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
112358
History period startHISTORY_START_DT
Dec 20, 2016
History period endHISTORY_END_DT
Mar 19, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6742959
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (3)

Significant and substantialSIG_SUB_IND, Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 9, 2015
Citation number: 8849337
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8849337
Assessment control numberASSESS_CASE_NO
000388116
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 17, 2015
Citation issuedISSUE_DT
Jun 9, 2015
Date of occurrenceOCCURRENCE_DT
Jun 9, 2015
Final order dateFINAL_ORDER_DT
Aug 31, 2015
Bill first printedBILL_PRINT_DT
Jul 29, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 31, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
5326
Size of mineSIZE_OF_MINE
5326
Controller hours workedCONTROLLER_HRS
166516
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
166516
History period startHISTORY_START_DT
Mar 9, 2014
History period endHISTORY_END_DT
Jun 8, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6702050
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 13, 2013
Citation number: 8742820
Standard: 56.20008(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8742820
Assessment control numberASSESS_CASE_NO
000340367
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 22, 2014
Citation issuedISSUE_DT
Nov 13, 2013
Date of occurrenceOCCURRENCE_DT
Nov 13, 2013
Final order dateFINAL_ORDER_DT
Feb 7, 2014
Bill first printedBILL_PRINT_DT
Jan 2, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 7, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20008(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
4
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7589
Size of mineSIZE_OF_MINE
7589
Controller hours workedCONTROLLER_HRS
176250
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
176250
History period startHISTORY_START_DT
Aug 13, 2012
History period endHISTORY_END_DT
Nov 12, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6636095
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 2, 2013
Citation number: 8735032
Standard: 56.11016
Proposed penalty: $308.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8735032
Assessment control numberASSESS_CASE_NO
000315161
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 4, 2013
Citation issuedISSUE_DT
Jan 2, 2013
Date of occurrenceOCCURRENCE_DT
Jan 2, 2013
Final order dateFINAL_ORDER_DT
Sep 30, 2013
Bill first printedBILL_PRINT_DT
Feb 27, 2013
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 20, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11016
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
308.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
7589
Size of mineSIZE_OF_MINE
7589
Controller hours workedCONTROLLER_HRS
176250
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
176250
History period startHISTORY_START_DT
Oct 2, 2011
History period endHISTORY_END_DT
Jan 1, 2013

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6579436
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 28, 2012
Citation number: 6558409
Standard: 56.14101(a)(2)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6558409
Assessment control numberASSESS_CASE_NO
000307875
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 18, 2012
Citation issuedISSUE_DT
Aug 28, 2012
Date of occurrenceOCCURRENCE_DT
Aug 28, 2012
Final order dateFINAL_ORDER_DT
Jan 3, 2013
Bill first printedBILL_PRINT_DT
Nov 28, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 3, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
7414
Size of mineSIZE_OF_MINE
7414
Controller hours workedCONTROLLER_HRS
174693
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
174693
History period startHISTORY_START_DT
May 28, 2011
History period endHISTORY_END_DT
Aug 27, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Michels Corporation
IDVIOLATOR_ID
L18238
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6579304
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 32 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Dec 21, 2025
Citation issued: Aug 6, 2025
Docket: LAKE 2026-0047
Standard: 56.9301
Proposed penalty: $465.00
Penalty after decision: $465.00
Decided: Mar 17, 2026
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
7838392
Citation issuedCITATION_ISSUE_DT
Aug 6, 2025
Hearing request receivedCONTEST_DT
Dec 21, 2025
Docket numberDOCKET_NO
LAKE 2026-0047
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Alan
Judge, last nameJUDGE_LAST_NAME
Paez
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Mar 17, 2026
Petition duePETITION_DUE_DT
Feb 4, 2026
Petition filedPETITION_FILED_DT
Jan 30, 2026

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
465.00
Penalty after the decisionDECISION_PENALTY_AMT
465.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.9301
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Jul 18, 2023
Citation issued: May 9, 2023
Docket: LAKE 2023-0231
Standard: 56.14107(a)
Proposed penalty: $143.00
Penalty after decision: $143.00
Decided: Oct 24, 2023
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9690390
Citation issuedCITATION_ISSUE_DT
May 9, 2023
Hearing request receivedCONTEST_DT
Jul 18, 2023
Docket numberDOCKET_NO
LAKE 2023-0231
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Alan
Judge, last nameJUDGE_LAST_NAME
Paez
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Oct 24, 2023
Petition duePETITION_DUE_DT
Sep 1, 2023
Petition filedPETITION_FILED_DT
Aug 31, 2023

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
143.00
Penalty after the decisionDECISION_PENALTY_AMT
143.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Jul 18, 2023
Citation issued: May 9, 2023
Docket: LAKE 2023-0231
Standard: 56.12013(b)
Proposed penalty: $143.00
Penalty after decision: $143.00
Decided: Oct 24, 2023
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9690391
Citation issuedCITATION_ISSUE_DT
May 9, 2023
Hearing request receivedCONTEST_DT
Jul 18, 2023
Docket numberDOCKET_NO
LAKE 2023-0231
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Alan
Judge, last nameJUDGE_LAST_NAME
Paez
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Oct 24, 2023
Petition duePETITION_DUE_DT
Sep 1, 2023
Petition filedPETITION_FILED_DT
Aug 31, 2023

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
143.00
Penalty after the decisionDECISION_PENALTY_AMT
143.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12013(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: May 24, 2022
Citation issued: Mar 22, 2022
Docket: LAKE 2022-0157
Standard: 56.11003
Proposed penalty: $378.00
Penalty after decision: $133.00
Decided: Sep 15, 2022
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9621453
Citation issuedCITATION_ISSUE_DT
Mar 22, 2022
Hearing request receivedCONTEST_DT
May 24, 2022
Docket numberDOCKET_NO
LAKE 2022-0157
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
John
Judge, last nameJUDGE_LAST_NAME
Lewis
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Sep 15, 2022
Petition duePETITION_DUE_DT
Jul 8, 2022
Petition filedPETITION_FILED_DT
Jul 5, 2022

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
378.00
Penalty after the decisionDECISION_PENALTY_AMT
133.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.11003
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Apr 6, 2020
Citation issued: Jan 22, 2020
Docket: LAKE 2020-0142
Standard: 56.20003(a)
Proposed penalty: $123.00
Penalty after decision: $123.00
Decided: Aug 10, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9444350
Citation issuedCITATION_ISSUE_DT
Jan 22, 2020
Hearing request receivedCONTEST_DT
Apr 6, 2020
Docket numberDOCKET_NO
LAKE 2020-0142
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Jacqueline
Judge, last nameJUDGE_LAST_NAME
Bulluck
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Aug 10, 2020
Petition duePETITION_DUE_DT
May 21, 2020
Petition filedPETITION_FILED_DT
May 7, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
123.00
Penalty after the decisionDECISION_PENALTY_AMT
123.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.20003(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: May 17, 2018
Citation issued: Mar 20, 2018
Docket: LAKE 2018-0254
Standard: 56.9300(a)
Proposed penalty: $2,361.00
Penalty after decision: $2,361.00
Decided: Jun 4, 2019
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8957483
Citation issuedCITATION_ISSUE_DT
Mar 20, 2018
Hearing request receivedCONTEST_DT
May 17, 2018
Docket numberDOCKET_NO
LAKE 2018-0254
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jun 4, 2019
Petition duePETITION_DUE_DT
Jul 2, 2018
Petition filedPETITION_FILED_DT
Jun 8, 2018

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
2361.00
Penalty after the decisionDECISION_PENALTY_AMT
2361.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.9300(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(d)(1)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR500
MSHA representative officeMSHA_REP_OFFICE_NAME
Chicago

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: May 17, 2018
Citation issued: Mar 20, 2018
Docket: LAKE 2018-0254
Standard: 56.18002(a)
Proposed penalty: $2,361.00
Penalty after decision: $2,361.00
Decided: Jun 4, 2019
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8957484
Citation issuedCITATION_ISSUE_DT
Mar 20, 2018
Hearing request receivedCONTEST_DT
May 17, 2018
Docket numberDOCKET_NO
LAKE 2018-0254
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jun 4, 2019
Petition duePETITION_DUE_DT
Jul 2, 2018
Petition filedPETITION_FILED_DT
Jun 8, 2018

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
2361.00
Penalty after the decisionDECISION_PENALTY_AMT
2361.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.18002(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Order
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(d)(1)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR500
MSHA representative officeMSHA_REP_OFFICE_NAME
Chicago

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 8, 2013
Citation issued: Jan 2, 2013
Docket: LAKE 2013-352M
Standard: 56.11016
Proposed penalty: $308.00
Penalty after decision: $100.00
Decided: Aug 20, 2013
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8735032
Citation issuedCITATION_ISSUE_DT
Jan 2, 2013
Hearing request receivedCONTEST_DT
Mar 8, 2013
Docket numberDOCKET_NO
LAKE 2013-352M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Aug 20, 2013
Petition duePETITION_DUE_DT
Apr 22, 2013
Petition filedPETITION_FILED_DT
Mar 25, 2013

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
308.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.11016
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14

Other fields

ISSUING_FIELD_OFFICE
M4641

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

8 contested citations and orders; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

NO DYS AWY FRM WRK,NO RSTR ACT
4
DAYS AWAY FROM WORK ONLY
2
Date: Jul 15, 2025
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220251990004
DateACCIDENT_DT
Jul 15, 2025
TimeACCIDENT_TIME
1800
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
MACHINE-MILL,CLEANING PLT
Source of injury codeINJURY_SOURCE_CD
075
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jul 16, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Crusher, Breaker, Mills (ball and rod), Feeder breaker
Equipment codeMINING_EQUIP_CD
15
Equipment manufacturerEQUIP_MFR_NAME
Not on this list
Equipment manufacturer codeEQUIP_MFR_CD
119
Equipment model numberEQUIP_MODEL_NO
1515
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Controller at the timeCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID

Date: Nov 10, 2020
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220203180004
DateACCIDENT_DT
Nov 10, 2020
TimeACCIDENT_TIME
1100
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Permanently transferred or terminatedTRANS_TERM
Y
Returned to workRETURN_TO_WORK_DT
Nov 11, 2020

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Mar 10, 2015
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 37
Details

The report

Document numberDOCUMENT_NO
220151000005
DateACCIDENT_DT
Mar 10, 2015
TimeACCIDENT_TIME
0800
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320151520001

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
DRILL STEEL (ALL SIZES)
Source of injury codeINJURY_SOURCE_CD
082
Nature of injuryNATURE_INJURY
HERNIA;RUPTURE
Nature of injury codeNATURE_INJURY_CD
260
Part of bodyINJ_BODY_PART
HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
Part of body codeINJ_BODY_PART_CD
440
Days lostDAYS_LOST
37
Returned to workRETURN_TO_WORK_DT
Jun 1, 2015

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Contractor IDCONTRACTOR_ID
3CD
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (2)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO

Date: Jul 2, 2010
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220101930024
DateACCIDENT_DT
Jul 2, 2010
TimeACCIDENT_TIME
1550
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling coal, Rock, Ore
Activity codeACTIVITY_CD
026
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jul 2, 2010

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

Date: Jun 26, 2003
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220031900024
DateACCIDENT_DT
Jun 26, 2003
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
9999
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320031900019

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Returned to workRETURN_TO_WORK_DT
Jun 26, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2003
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Contractor IDCONTRACTOR_ID

Date: May 8, 2002
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: POWERED HAULAGE
Accident type: Struck against a moving object
Days lost: 3
Details

The report

Document numberDOCUMENT_NO
220021430036
DateACCIDENT_DT
May 8, 2002
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Struck against a moving object
Accident type codeACCIDENT_TYPE_CD
02
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13

Injury

Activity at the timeACTIVITY
Front-end loader
Activity codeACTIVITY_CD
053
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days lostDAYS_LOST
3
Returned to workRETURN_TO_WORK_DT
May 13, 2002

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
0310
Equipment model numberEQUIP_MODEL_NO
988F
FIPS state codeFIPS_STATE_CD
55

Who and period

Operator at the timeOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Controller at the timeCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2002
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2002
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Contractor IDCONTRACTOR_ID

6 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 7,488
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
7488
Average hours per employeeAVG_EMPLOYEE_HOURS
1498

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 9,103
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
9103
Average hours per employeeAVG_EMPLOYEE_HOURS
2276

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 6,883
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6883
Average hours per employeeAVG_EMPLOYEE_HOURS
2294

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 7,044
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
7044
Average hours per employeeAVG_EMPLOYEE_HOURS
2348

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 6,184
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6184
Average hours per employeeAVG_EMPLOYEE_HOURS
2061

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 6,976
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6976
Average hours per employeeAVG_EMPLOYEE_HOURS
2325

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 12,998
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
12998
Average hours per employeeAVG_EMPLOYEE_HOURS
2166

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 6,408
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6408
Average hours per employeeAVG_EMPLOYEE_HOURS
2136

Mine

Mine IDMINE_ID
4703262
Mine name in this fileCURR_MINE_NM
Plant #14
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Peru IL Field Office
Nearest town
Brownsville
Days worked per week
5
Hours per shift
10
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
1
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Plant #14
Mine IDMINE_ID
4703262
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Nov 5, 2025
Legal entity typeCOMPANY_TYPE
Corporation
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
55

Operator and controller

OperatorCURRENT_OPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDCURRENT_OPERATOR_ID
0179456
ControllerCURRENT_CONTROLLER_NAME
M10 Inc
Controller IDCURRENT_CONTROLLER_ID
0165247
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Nov 1, 2021

Location and MSHA office

StateSTATE
WI
Bureau of Mines state codeBOM_STATE_CD
47
FIPS county codeFIPS_CNTY_CD
027
FIPS county nameFIPS_CNTY_NM
Dodge
Congressional districtCONG_DIST_CD
02
Nearest townNEAREST_TOWN
Brownsville
MSHA districtDISTRICT
M4
MSHA office codeOFFICE_CD
M4821
MSHA officeOFFICE_NAME
Peru IL Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
102
Most recent assessment control numberASSESS_CTRL_NO
000638533

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Limestone NEC
Primary commodity codePRIMARY_SIC_CD
142200
Primary SIC codePRIMARY_SIC_CD_1
1422
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
10
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
1
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (12)

Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: MICHELS ROAD & STONE, INC
From: Nov 1, 2021
To: No end date
Controller: M10 Inc
From : Nov 1, 2021
To : No end date
Details

Operator

OperatorOPERATOR_NAME
MICHELS ROAD & STONE, INC
Operator IDOPERATOR_ID
0179456
Operator fromOPERATOR_START_DT
Nov 1, 2021

Controller

ControllerCONTROLLER_NAME
M10 Inc
Controller IDCONTROLLER_ID
0165247
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Nov 1, 2021

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT

Operator: Michels Corporation
From: Apr 1, 2001
To: Oct 31, 2021
Controller: Michels Corporation
From : Jun 26, 1996
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Michels Corporation
Operator IDOPERATOR_ID
L18238
Operator fromOPERATOR_START_DT
Apr 1, 2001
Operator toOPERATOR_END_DT
Oct 31, 2021

Controller

ControllerCONTROLLER_NAME
Michels Corporation
Controller IDCONTROLLER_ID
M00651
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jun 26, 1996

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

MICHELS ROAD & STONE, INC·Contact title CHIEF LEGAL OFFICER & SVP·817 MAIN STREET, BROWNSVILLE WI 53006

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
MICHELS ROAD & STONE, INC
Contact titleCONTACT_TITLE
CHIEF LEGAL OFFICER & SVP
StreetSTREET
817 MAIN STREET
CityCITY
BROWNSVILLE
StateSTATE_ABBR
WI
State nameSTATE
Wisconsin
ZIP codeZIP_CD
53006
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
55

Mine

Mine IDMINE_ID
4703262
Mine name in this fileMINE_NAME
Plant #14
Nearest townNEAREST_TOWN
Brownsville
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Nov 5, 2025
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Limestone NEC
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology