Citations and orders
58
since Aug 6, 2002 · 58 to the operator, 0 to contractors · 5 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Apr 28 to Apr 29, 2026Inspectors 1 | Hours on site 4.25

The inspection

BeganINSPECTION_BEGIN_DT
Apr 28, 2026
Closed outINSPECTION_END_DT
Apr 29, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F031312
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 1, 2025Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 1, 2025
Closed outINSPECTION_END_DT
Jul 1, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F028380
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 19 to Aug 21, 2024Inspectors 1 | Hours on site 5.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 19, 2024
Closed outINSPECTION_END_DT
Aug 21, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F00D0C3
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Apr 11, 2024Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Apr 11, 2024
Closed outINSPECTION_END_DT
Apr 11, 2024
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6954120
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 26, 2023Inspectors 1 | Hours on site 2.75

The inspection

BeganINSPECTION_BEGIN_DT
Jun 26, 2023
Closed outINSPECTION_END_DT
Jun 26, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6909428
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Verbal Hazard Complaint Inspections
Jun 26, 2023Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Jun 26, 2023
Closed outINSPECTION_END_DT
Jun 26, 2023
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
6909427
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 26 to Jul 27, 2022Inspectors 1 | Hours on site 4.75

The inspection

BeganINSPECTION_BEGIN_DT
Jul 26, 2022
Closed outINSPECTION_END_DT
Jul 27, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905922
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 29 to Jun 30, 2021Inspectors 1 | Hours on site 21

The inspection

BeganINSPECTION_BEGIN_DT
Jun 29, 2021
Closed outINSPECTION_END_DT
Jun 30, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905005
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
21
Total inspection hoursSUM_TOTAL_INSP_HOURS
37

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Oct 14, 2020Inspectors 1 | Hours on site 1.25

The inspection

BeganINSPECTION_BEGIN_DT
Oct 14, 2020
Closed outINSPECTION_END_DT
Oct 14, 2020
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6834897
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 27, 2020Inspectors 1 | Hours on site 3.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 27, 2020
Closed outINSPECTION_END_DT
Aug 27, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6840516
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 14 to May 15, 2019Inspectors 1 | Hours on site 9.25

The inspection

BeganINSPECTION_BEGIN_DT
May 14, 2019
Closed outINSPECTION_END_DT
May 15, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6834422
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
18.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 11 to Jul 12, 2018Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 11, 2018
Closed outINSPECTION_END_DT
Jul 12, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6749701
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 11 to Jul 12, 2017Inspectors 1 | Hours on site 4.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 11, 2017
Closed outINSPECTION_END_DT
Jul 12, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6705884
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 12 to Jul 13, 2016Inspectors 1 | Hours on site 6.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 12, 2016
Closed outINSPECTION_END_DT
Jul 13, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6702492
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Oct 29 to Oct 30, 2015Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Oct 29, 2015
Closed outINSPECTION_END_DT
Oct 30, 2015
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6710205
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 10, 2015Inspectors 1 | Hours on site 3.75

The inspection

BeganINSPECTION_BEGIN_DT
Sep 10, 2015
Closed outINSPECTION_END_DT
Sep 10, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6640675
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Apr 14 to Apr 15, 2015Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Apr 14, 2015
Closed outINSPECTION_END_DT
Apr 15, 2015
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6640463
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 5 to Aug 6, 2014Inspectors 1 | Hours on site 10.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 5, 2014
Closed outINSPECTION_END_DT
Aug 6, 2014
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6636686
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Feb 19, 2014Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 19, 2014
Closed outINSPECTION_END_DT
Feb 19, 2014
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6636633
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 24, 2013Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Sep 24, 2013
Closed outINSPECTION_END_DT
Sep 24, 2013
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6636317
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
9

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 4, 2013Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Jun 4, 2013
Closed outINSPECTION_END_DT
Jun 4, 2013
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6580660
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Apr 10, 2013Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Apr 10, 2013
Closed outINSPECTION_END_DT
Apr 10, 2013
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6572893
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Mar 12, 2013Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 12, 2013
Closed outINSPECTION_END_DT
Mar 12, 2013
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6580713
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 11 to Jul 12, 2012Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Jul 11, 2012
Closed outINSPECTION_END_DT
Jul 12, 2012
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6580126
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Nov 1, 2011Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Nov 1, 2011
Closed outINSPECTION_END_DT
Nov 1, 2011
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6572515
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4821
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Mine IDMINE_ID
4703287
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 46 inspections and other MSHA visits since Aug 29, 2001; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Aug 20, 2024
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695310
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 20, 2024
Time issuedVIOLATION_ISSUE_TIME
0955
Date of occurrenceVIOLATION_OCCUR_DT
Aug 20, 2024
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 20, 2024
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Aug 20, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Aug 20, 2024
Terminated, timeTERMINATION_TIME
1005
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 10, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 15, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 14, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
F00D0C3
Inspection beganINSPECTION_BEGIN_DT
Aug 19, 2024
Inspection closed outINSPECTION_END_DT
Aug 21, 2024
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 20, 2024
Type: Citation
Standard: 56.3200
S&S: Y
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $161.00
Details

The citation

Citation or order numberVIOLATION_NO
9695311
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 20, 2024
Time issuedVIOLATION_ISSUE_TIME
1045
Date of occurrenceVIOLATION_OCCUR_DT
Aug 20, 2024
30 CFR part and sectionPART_SECTION
56.3200
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 20, 2024
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Aug 20, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Aug 20, 2024
Terminated, timeTERMINATION_TIME
1133
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
161
Current proposed assessmentAMOUNT_DUE
161
Amount paidAMOUNT_PAID
161
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Feb 20, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 9, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
F00D0C3
Inspection beganINSPECTION_BEGIN_DT
Aug 19, 2024
Inspection closed outINSPECTION_END_DT
Aug 21, 2024
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 20, 2024
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695306
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 20, 2024
Time issuedVIOLATION_ISSUE_TIME
0825
Date of occurrenceVIOLATION_OCCUR_DT
Aug 20, 2024
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 21, 2024
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Aug 21, 2024
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Aug 20, 2024
Terminated, timeTERMINATION_TIME
1247
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Feb 20, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 9, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
F00D0C3
Inspection beganINSPECTION_BEGIN_DT
Aug 19, 2024
Inspection closed outINSPECTION_END_DT
Aug 21, 2024
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 20, 2024
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695308
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 20, 2024
Time issuedVIOLATION_ISSUE_TIME
0907
Date of occurrenceVIOLATION_OCCUR_DT
Aug 20, 2024
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 21, 2024
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Aug 21, 2024
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Aug 20, 2024
Terminated, timeTERMINATION_TIME
1228
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Feb 20, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 9, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
F00D0C3
Inspection beganINSPECTION_BEGIN_DT
Aug 19, 2024
Inspection closed outINSPECTION_END_DT
Aug 21, 2024
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 20, 2024
Type: Citation
Standard: 56.12004
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695307
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 20, 2024
Time issuedVIOLATION_ISSUE_TIME
0852
Date of occurrenceVIOLATION_OCCUR_DT
Aug 20, 2024
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 20, 2024
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Aug 20, 2024
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Aug 20, 2024
Terminated, timeTERMINATION_TIME
0858
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 10, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 15, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 14, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
F00D0C3
Inspection beganINSPECTION_BEGIN_DT
Aug 19, 2024
Inspection closed outINSPECTION_END_DT
Aug 21, 2024
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 20, 2024
Type: Citation
Standard: 56.12004
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9695309
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 20, 2024
Time issuedVIOLATION_ISSUE_TIME
0914
Date of occurrenceVIOLATION_OCCUR_DT
Aug 20, 2024
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 20, 2024
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Aug 20, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Aug 20, 2024
Terminated, timeTERMINATION_TIME
0918
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Feb 20, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 9, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
F00D0C3
Inspection beganINSPECTION_BEGIN_DT
Aug 19, 2024
Inspection closed outINSPECTION_END_DT
Aug 21, 2024
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 26, 2023
Type: Citation
Standard: 47.41(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9691565
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 26, 2023
Time issuedVIOLATION_ISSUE_TIME
1440
Date of occurrenceVIOLATION_OCCUR_DT
Jun 26, 2023
30 CFR part and sectionPART_SECTION
47.41(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 26, 2023
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 26, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 26, 2023
Terminated, timeTERMINATION_TIME
1447
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Aug 10, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Sep 23, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 21, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6909428
Inspection beganINSPECTION_BEGIN_DT
Jun 26, 2023
Inspection closed outINSPECTION_END_DT
Jun 26, 2023
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 27, 2022
Type: Citation
Standard: 56.9300(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9621171
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 27, 2022
Time issuedVIOLATION_ISSUE_TIME
0806
Date of occurrenceVIOLATION_OCCUR_DT
Jul 27, 2022
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 28, 2022
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 28, 2022
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 27, 2022
Terminated, timeTERMINATION_TIME
1030
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Sep 8, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Oct 13, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 24, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6905922
Inspection beganINSPECTION_BEGIN_DT
Jul 26, 2022
Inspection closed outINSPECTION_END_DT
Jul 27, 2022
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 27, 2022
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9621170
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 27, 2022
Time issuedVIOLATION_ISSUE_TIME
0755
Date of occurrenceVIOLATION_OCCUR_DT
Jul 27, 2022
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 28, 2022
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 28, 2022
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 27, 2022
Terminated, timeTERMINATION_TIME
1026
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Sep 8, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Oct 13, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 24, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6905922
Inspection beganINSPECTION_BEGIN_DT
Jul 26, 2022
Inspection closed outINSPECTION_END_DT
Jul 27, 2022
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 29, 2021
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9387708
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 29, 2021
Time issuedVIOLATION_ISSUE_TIME
1041
Date of occurrenceVIOLATION_OCCUR_DT
Jun 29, 2021
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 29, 2021
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jun 29, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 29, 2021
Terminated, timeTERMINATION_TIME
1615
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Aug 12, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Sep 16, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 22, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6905005
Inspection beganINSPECTION_BEGIN_DT
Jun 29, 2021
Inspection closed outINSPECTION_END_DT
Jun 30, 2021
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 29, 2021
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9387707
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 29, 2021
Time issuedVIOLATION_ISSUE_TIME
0937
Date of occurrenceVIOLATION_OCCUR_DT
Jun 29, 2021
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 29, 2021
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jun 29, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 29, 2021
Terminated, timeTERMINATION_TIME
1613
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Aug 12, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Sep 16, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 22, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6905005
Inspection beganINSPECTION_BEGIN_DT
Jun 29, 2021
Inspection closed outINSPECTION_END_DT
Jun 30, 2021
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 27, 2020
Type: Citation
Standard: 47.44(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9445378
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 27, 2020
Time issuedVIOLATION_ISSUE_TIME
1127
Date of occurrenceVIOLATION_OCCUR_DT
Aug 27, 2020
30 CFR part and sectionPART_SECTION
47.44(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 27, 2020
Originally due, timeORIG_TERM_DUE_TIME
1145
Latest dueLATEST_TERM_DUE_DT
Aug 27, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1145
TerminatedTERMINATION_DT
Aug 27, 2020
Terminated, timeTERMINATION_TIME
1130
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Oct 8, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Nov 16, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 27, 2021
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6840516
Inspection beganINSPECTION_BEGIN_DT
Aug 27, 2020
Inspection closed outINSPECTION_END_DT
Aug 27, 2020
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 14, 2019
Type: Citation
Standard: 56.14100(c)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9386150
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 14, 2019
Time issuedVIOLATION_ISSUE_TIME
1107
Date of occurrenceVIOLATION_OCCUR_DT
May 14, 2019
30 CFR part and sectionPART_SECTION
56.14100(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 14, 2019
Originally due, timeORIG_TERM_DUE_TIME
1122
Latest dueLATEST_TERM_DUE_DT
May 14, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1122
TerminatedTERMINATION_DT
May 14, 2019
Terminated, timeTERMINATION_TIME
1416
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Aug 19, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 27, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6834422
Inspection beganINSPECTION_BEGIN_DT
May 14, 2019
Inspection closed outINSPECTION_END_DT
May 15, 2019
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 14, 2019
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9386149
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 14, 2019
Time issuedVIOLATION_ISSUE_TIME
0916
Date of occurrenceVIOLATION_OCCUR_DT
May 14, 2019
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 14, 2019
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
May 14, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
May 14, 2019
Terminated, timeTERMINATION_TIME
1407
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Aug 19, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 27, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6834422
Inspection beganINSPECTION_BEGIN_DT
May 14, 2019
Inspection closed outINSPECTION_END_DT
May 15, 2019
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 14, 2019
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9386148
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 14, 2019
Time issuedVIOLATION_ISSUE_TIME
0830
Date of occurrenceVIOLATION_OCCUR_DT
May 14, 2019
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 14, 2019
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
May 14, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
May 14, 2019
Terminated, timeTERMINATION_TIME
1401
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Aug 19, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 27, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6834422
Inspection beganINSPECTION_BEGIN_DT
May 14, 2019
Inspection closed outINSPECTION_END_DT
May 15, 2019
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 14, 2019
Type: Citation
Standard: 56.14132(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
9386151
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 14, 2019
Time issuedVIOLATION_ISSUE_TIME
1127
Date of occurrenceVIOLATION_OCCUR_DT
May 14, 2019
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 14, 2019
Originally due, timeORIG_TERM_DUE_TIME
1142
Latest dueLATEST_TERM_DUE_DT
May 14, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1142
TerminatedTERMINATION_DT
May 14, 2019
Terminated, timeTERMINATION_TIME
1426
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Aug 19, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 24, 2020
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6834422
Inspection beganINSPECTION_BEGIN_DT
May 14, 2019
Inspection closed outINSPECTION_END_DT
May 15, 2019
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 11, 2018
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
9386452
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 11, 2018
Time issuedVIOLATION_ISSUE_TIME
0935
Date of occurrenceVIOLATION_OCCUR_DT
Jul 11, 2018
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 12, 2018
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 12, 2018
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 12, 2018
Terminated, timeTERMINATION_TIME
0840
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Aug 14, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Sep 19, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6749701
Inspection beganINSPECTION_BEGIN_DT
Jul 11, 2018
Inspection closed outINSPECTION_END_DT
Jul 12, 2018
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 12, 2016
Type: Citation
Standard: 56.11003
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8944217
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 12, 2016
Time issuedVIOLATION_ISSUE_TIME
1100
Date of occurrenceVIOLATION_OCCUR_DT
Jul 12, 2016
30 CFR part and sectionPART_SECTION
56.11003
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 12, 2016
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 12, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 12, 2016
Terminated, timeTERMINATION_TIME
1340
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Aug 16, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Sep 24, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 1, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6702492
Inspection beganINSPECTION_BEGIN_DT
Jul 12, 2016
Inspection closed outINSPECTION_END_DT
Jul 13, 2016
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 12, 2016
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8944219
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 12, 2016
Time issuedVIOLATION_ISSUE_TIME
1224
Date of occurrenceVIOLATION_OCCUR_DT
Jul 12, 2016
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 13, 2016
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Jul 13, 2016
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Jul 13, 2016
Terminated, timeTERMINATION_TIME
1004
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Aug 16, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Sep 24, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 1, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6702492
Inspection beganINSPECTION_BEGIN_DT
Jul 12, 2016
Inspection closed outINSPECTION_END_DT
Jul 13, 2016
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 12, 2016
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8944218
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 12, 2016
Time issuedVIOLATION_ISSUE_TIME
1126
Date of occurrenceVIOLATION_OCCUR_DT
Jul 12, 2016
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 13, 2016
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Jul 13, 2016
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Jul 13, 2016
Terminated, timeTERMINATION_TIME
0735
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Aug 16, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Sep 24, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 1, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6702492
Inspection beganINSPECTION_BEGIN_DT
Jul 12, 2016
Inspection closed outINSPECTION_END_DT
Jul 13, 2016
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 30, 2015
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8889010
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 30, 2015
Time issuedVIOLATION_ISSUE_TIME
1033
Date of occurrenceVIOLATION_OCCUR_DT
Oct 30, 2015
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 30, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Oct 30, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Oct 30, 2015
Terminated, timeTERMINATION_TIME
1225
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 21, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6710205
Inspection beganINSPECTION_BEGIN_DT
Oct 29, 2015
Inspection closed outINSPECTION_END_DT
Oct 30, 2015
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 30, 2015
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8889009
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 30, 2015
Time issuedVIOLATION_ISSUE_TIME
1032
Date of occurrenceVIOLATION_OCCUR_DT
Oct 30, 2015
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 30, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Oct 30, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Oct 30, 2015
Terminated, timeTERMINATION_TIME
1225
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 21, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6710205
Inspection beganINSPECTION_BEGIN_DT
Oct 29, 2015
Inspection closed outINSPECTION_END_DT
Oct 30, 2015
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 30, 2015
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8889008
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 30, 2015
Time issuedVIOLATION_ISSUE_TIME
1031
Date of occurrenceVIOLATION_OCCUR_DT
Oct 30, 2015
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 30, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Oct 30, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Oct 30, 2015
Terminated, timeTERMINATION_TIME
1225
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 21, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6710205
Inspection beganINSPECTION_BEGIN_DT
Oct 29, 2015
Inspection closed outINSPECTION_END_DT
Oct 30, 2015
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 29, 2015
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8889007
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 29, 2015
Time issuedVIOLATION_ISSUE_TIME
0852
Date of occurrenceVIOLATION_OCCUR_DT
Oct 29, 2015
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 29, 2015
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Oct 29, 2015
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Oct 29, 2015
Terminated, timeTERMINATION_TIME
0855
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Jan 21, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 21, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6710205
Inspection beganINSPECTION_BEGIN_DT
Oct 29, 2015
Inspection closed outINSPECTION_END_DT
Oct 30, 2015
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 10, 2015
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8886319
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 10, 2015
Time issuedVIOLATION_ISSUE_TIME
0915
Date of occurrenceVIOLATION_OCCUR_DT
Jul 16, 2015
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 10, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Sep 10, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Sep 10, 2015
Terminated, timeTERMINATION_TIME
0945
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 13, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Nov 18, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 22, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Allied Stone LLC
Operator IDVIOLATOR_ID
0073963
Controller IDCONTROLLER_ID
0040824
Inspection eventEVENT_NO
6640675
Inspection beganINSPECTION_BEGIN_DT
Sep 10, 2015
Inspection closed outINSPECTION_END_DT
Sep 10, 2015
Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

58 citations and orders since Aug 6, 2002: 58 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Aug 20, 2024
Citation number: 9695310
Standard: 56.12004
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695310
Assessment control numberASSESS_CASE_NO
000605820
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 14, 2024
Citation issuedISSUE_DT
Aug 20, 2024
Date of occurrenceOCCURRENCE_DT
Aug 20, 2024
Final order dateFINAL_ORDER_DT
Nov 15, 2024
Bill first printedBILL_PRINT_DT
Oct 10, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 15, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
719
Size of mineSIZE_OF_MINE
719
Controller hours workedCONTROLLER_HRS
1326
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1326
History period startHISTORY_START_DT
May 20, 2023
History period endHISTORY_END_DT
Aug 19, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00D0C3
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 20, 2024
Citation number: 9695306
Standard: 56.14107(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695306
Assessment control numberASSESS_CASE_NO
000613390
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 7, 2025
Citation issuedISSUE_DT
Aug 20, 2024
Date of occurrenceOCCURRENCE_DT
Aug 20, 2024
Final order dateFINAL_ORDER_DT
Feb 20, 2025
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 20, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
31
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
719
Size of mineSIZE_OF_MINE
719
Controller hours workedCONTROLLER_HRS
1326
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1326
History period startHISTORY_START_DT
May 20, 2023
History period endHISTORY_END_DT
Aug 19, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00D0C3
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 20, 2024
Citation number: 9695308
Standard: 56.20003(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695308
Assessment control numberASSESS_CASE_NO
000613390
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 7, 2025
Citation issuedISSUE_DT
Aug 20, 2024
Date of occurrenceOCCURRENCE_DT
Aug 20, 2024
Final order dateFINAL_ORDER_DT
Feb 20, 2025
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 20, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
719
Size of mineSIZE_OF_MINE
719
Controller hours workedCONTROLLER_HRS
1326
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1326
History period startHISTORY_START_DT
May 20, 2023
History period endHISTORY_END_DT
Aug 19, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00D0C3
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 20, 2024
Citation number: 9695311
Standard: 56.3200
Proposed penalty: $161.00
Current assessment: $161.00
Paid against proposed penalty: $161.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695311
Assessment control numberASSESS_CASE_NO
000613390
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 7, 2025
Citation issuedISSUE_DT
Aug 20, 2024
Date of occurrenceOCCURRENCE_DT
Aug 20, 2024
Final order dateFINAL_ORDER_DT
Feb 20, 2025
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 20, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.3200
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
161.00
Current assessmentCURRENT_ASSESSMENT_AMT
161.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
161.00

Penalty points

Violation history pointsPENALTY_POINTS
61
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
719
Size of mineSIZE_OF_MINE
719
Controller hours workedCONTROLLER_HRS
1326
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1326
History period startHISTORY_START_DT
May 20, 2023
History period endHISTORY_END_DT
Aug 19, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00D0C3
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 20, 2024
Citation number: 9695309
Standard: 56.12004
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695309
Assessment control numberASSESS_CASE_NO
000613390
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 7, 2025
Citation issuedISSUE_DT
Aug 20, 2024
Date of occurrenceOCCURRENCE_DT
Aug 20, 2024
Final order dateFINAL_ORDER_DT
Feb 20, 2025
Bill first printedBILL_PRINT_DT
Jan 9, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 20, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
719
Size of mineSIZE_OF_MINE
719
Controller hours workedCONTROLLER_HRS
1326
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1326
History period startHISTORY_START_DT
May 20, 2023
History period endHISTORY_END_DT
Aug 19, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00D0C3
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 20, 2024
Citation number: 9695307
Standard: 56.12004
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9695307
Assessment control numberASSESS_CASE_NO
000605820
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 14, 2024
Citation issuedISSUE_DT
Aug 20, 2024
Date of occurrenceOCCURRENCE_DT
Aug 20, 2024
Final order dateFINAL_ORDER_DT
Nov 15, 2024
Bill first printedBILL_PRINT_DT
Oct 10, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 15, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
719
Size of mineSIZE_OF_MINE
719
Controller hours workedCONTROLLER_HRS
1326
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1326
History period startHISTORY_START_DT
May 20, 2023
History period endHISTORY_END_DT
Aug 19, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00D0C3
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 26, 2023
Citation number: 9691565
Standard: 47.41(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9691565
Assessment control numberASSESS_CASE_NO
000582674
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 21, 2023
Citation issuedISSUE_DT
Jun 26, 2023
Date of occurrenceOCCURRENCE_DT
Jun 26, 2023
Final order dateFINAL_ORDER_DT
Sep 23, 2023
Bill first printedBILL_PRINT_DT
Aug 10, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 23, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.41(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
785
Size of mineSIZE_OF_MINE
785
Controller hours workedCONTROLLER_HRS
1625
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1625
History period startHISTORY_START_DT
Mar 26, 2022
History period endHISTORY_END_DT
Jun 25, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6909428
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 27, 2022
Citation number: 9621170
Standard: 56.20003(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9621170
Assessment control numberASSESS_CASE_NO
000562644
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 24, 2022
Citation issuedISSUE_DT
Jul 27, 2022
Date of occurrenceOCCURRENCE_DT
Jul 27, 2022
Final order dateFINAL_ORDER_DT
Oct 13, 2022
Bill first printedBILL_PRINT_DT
Sep 8, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 13, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
647
Size of mineSIZE_OF_MINE
647
Controller hours workedCONTROLLER_HRS
883
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
883
History period startHISTORY_START_DT
Apr 27, 2021
History period endHISTORY_END_DT
Jul 26, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905922
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 27, 2022
Citation number: 9621171
Standard: 56.9300(a)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9621171
Assessment control numberASSESS_CASE_NO
000562644
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 24, 2022
Citation issuedISSUE_DT
Jul 27, 2022
Date of occurrenceOCCURRENCE_DT
Jul 27, 2022
Final order dateFINAL_ORDER_DT
Oct 13, 2022
Bill first printedBILL_PRINT_DT
Sep 8, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 13, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
647
Size of mineSIZE_OF_MINE
647
Controller hours workedCONTROLLER_HRS
883
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
883
History period startHISTORY_START_DT
Apr 27, 2021
History period endHISTORY_END_DT
Jul 26, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905922
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 29, 2021
Citation number: 9387708
Standard: 56.12004
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9387708
Assessment control numberASSESS_CASE_NO
000540216
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 22, 2021
Citation issuedISSUE_DT
Jun 29, 2021
Date of occurrenceOCCURRENCE_DT
Jun 29, 2021
Final order dateFINAL_ORDER_DT
Sep 16, 2021
Bill first printedBILL_PRINT_DT
Aug 12, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 16, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
769
Size of mineSIZE_OF_MINE
769
Controller hours workedCONTROLLER_HRS
1137
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1137
History period startHISTORY_START_DT
Mar 29, 2020
History period endHISTORY_END_DT
Jun 28, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905005
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 29, 2021
Citation number: 9387707
Standard: 56.14107(a)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9387707
Assessment control numberASSESS_CASE_NO
000540216
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 22, 2021
Citation issuedISSUE_DT
Jun 29, 2021
Date of occurrenceOCCURRENCE_DT
Jun 29, 2021
Final order dateFINAL_ORDER_DT
Sep 16, 2021
Bill first printedBILL_PRINT_DT
Aug 12, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 16, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
769
Size of mineSIZE_OF_MINE
769
Controller hours workedCONTROLLER_HRS
1137
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1137
History period startHISTORY_START_DT
Mar 29, 2020
History period endHISTORY_END_DT
Jun 28, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905005
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 27, 2020
Citation number: 9445378
Standard: 47.44(b)
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9445378
Assessment control numberASSESS_CASE_NO
000523801
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2021
Citation issuedISSUE_DT
Aug 27, 2020
Date of occurrenceOCCURRENCE_DT
Aug 27, 2020
Final order dateFINAL_ORDER_DT
Nov 16, 2020
Bill first printedBILL_PRINT_DT
Oct 8, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2021
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 16, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.44(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Mine Act interestMINEACT_INTEREST_AMT
0.59
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
495
Size of mineSIZE_OF_MINE
495
Controller hours workedCONTROLLER_HRS
1677
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1677
History period startHISTORY_START_DT
May 27, 2019
History period endHISTORY_END_DT
Aug 26, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6840516
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 14, 2019
Citation number: 9386149
Standard: 56.4201(a)(2)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9386149
Assessment control numberASSESS_CASE_NO
000495203
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
May 14, 2019
Date of occurrenceOCCURRENCE_DT
May 14, 2019
Final order dateFINAL_ORDER_DT
Aug 19, 2019
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 19, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Mine Act interestMINEACT_INTEREST_AMT
1.32
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.32

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
231
Size of mineSIZE_OF_MINE
231
Controller hours workedCONTROLLER_HRS
231
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
231
History period startHISTORY_START_DT
Feb 14, 2018
History period endHISTORY_END_DT
May 13, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6834422
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 14, 2019
Citation number: 9386151
Standard: 56.14132(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9386151
Assessment control numberASSESS_CASE_NO
000495203
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
May 14, 2019
Date of occurrenceOCCURRENCE_DT
May 14, 2019
Final order dateFINAL_ORDER_DT
Aug 19, 2019
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 19, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Mine Act interestMINEACT_INTEREST_AMT
1.32
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.32

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
231
Size of mineSIZE_OF_MINE
231
Controller hours workedCONTROLLER_HRS
231
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
231
History period startHISTORY_START_DT
Feb 14, 2018
History period endHISTORY_END_DT
May 13, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6834422
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 14, 2019
Citation number: 9386148
Standard: 56.14107(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9386148
Assessment control numberASSESS_CASE_NO
000495203
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
May 14, 2019
Date of occurrenceOCCURRENCE_DT
May 14, 2019
Final order dateFINAL_ORDER_DT
Aug 19, 2019
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 19, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Mine Act interestMINEACT_INTEREST_AMT
1.32
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.32

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
231
Size of mineSIZE_OF_MINE
231
Controller hours workedCONTROLLER_HRS
231
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
231
History period startHISTORY_START_DT
Feb 14, 2018
History period endHISTORY_END_DT
May 13, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6834422
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (10)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 14, 2019
Citation number: 9386150
Standard: 56.14100(c)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9386150
Assessment control numberASSESS_CASE_NO
000495203
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2020
Citation issuedISSUE_DT
May 14, 2019
Date of occurrenceOCCURRENCE_DT
May 14, 2019
Final order dateFINAL_ORDER_DT
Aug 19, 2019
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 19, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Mine Act interestMINEACT_INTEREST_AMT
1.32
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.32

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
231
Size of mineSIZE_OF_MINE
231
Controller hours workedCONTROLLER_HRS
231
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
231
History period startHISTORY_START_DT
Feb 14, 2018
History period endHISTORY_END_DT
May 13, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6834422
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (12)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 11, 2018
Citation number: 9386452
Standard: 56.14107(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9386452
Assessment control numberASSESS_CASE_NO
000471182
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Jul 11, 2018
Date of occurrenceOCCURRENCE_DT
Jul 11, 2018
Final order dateFINAL_ORDER_DT
Sep 19, 2018
Bill first printedBILL_PRINT_DT
Aug 14, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 19, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
352
Size of mineSIZE_OF_MINE
352
Controller hours workedCONTROLLER_HRS
352
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
352
History period startHISTORY_START_DT
Apr 11, 2017
History period endHISTORY_END_DT
Jul 10, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6749701
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 12, 2016
Citation number: 8944218
Standard: 56.20003(a)
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8944218
Assessment control numberASSESS_CASE_NO
000417557
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2016
Citation issuedISSUE_DT
Jul 12, 2016
Date of occurrenceOCCURRENCE_DT
Jul 12, 2016
Final order dateFINAL_ORDER_DT
Sep 24, 2016
Bill first printedBILL_PRINT_DT
Aug 16, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 24, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
369
Size of mineSIZE_OF_MINE
369
Controller hours workedCONTROLLER_HRS
369
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
369
History period startHISTORY_START_DT
Apr 12, 2015
History period endHISTORY_END_DT
Jul 11, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6702492
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 12, 2016
Citation number: 8944217
Standard: 56.11003
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8944217
Assessment control numberASSESS_CASE_NO
000417557
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2016
Citation issuedISSUE_DT
Jul 12, 2016
Date of occurrenceOCCURRENCE_DT
Jul 12, 2016
Final order dateFINAL_ORDER_DT
Sep 24, 2016
Bill first printedBILL_PRINT_DT
Aug 16, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 24, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11003
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
369
Size of mineSIZE_OF_MINE
369
Controller hours workedCONTROLLER_HRS
369
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
369
History period startHISTORY_START_DT
Apr 12, 2015
History period endHISTORY_END_DT
Jul 11, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6702492
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 12, 2016
Citation number: 8944219
Standard: 56.14132(a)
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8944219
Assessment control numberASSESS_CASE_NO
000417557
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2016
Citation issuedISSUE_DT
Jul 12, 2016
Date of occurrenceOCCURRENCE_DT
Jul 12, 2016
Final order dateFINAL_ORDER_DT
Sep 24, 2016
Bill first printedBILL_PRINT_DT
Aug 16, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 24, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
369
Size of mineSIZE_OF_MINE
369
Controller hours workedCONTROLLER_HRS
369
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
369
History period startHISTORY_START_DT
Apr 12, 2015
History period endHISTORY_END_DT
Jul 11, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6702492
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 30, 2015
Citation number: 8889010
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8889010
Assessment control numberASSESS_CASE_NO
000399154
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 21, 2016
Citation issuedISSUE_DT
Oct 30, 2015
Date of occurrenceOCCURRENCE_DT
Oct 30, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
635
Size of mineSIZE_OF_MINE
635
Controller hours workedCONTROLLER_HRS
635
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
635
History period startHISTORY_START_DT
Jul 30, 2014
History period endHISTORY_END_DT
Oct 29, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6710205
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 30, 2015
Citation number: 8889009
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8889009
Assessment control numberASSESS_CASE_NO
000399154
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 21, 2016
Citation issuedISSUE_DT
Oct 30, 2015
Date of occurrenceOCCURRENCE_DT
Oct 30, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
635
Size of mineSIZE_OF_MINE
635
Controller hours workedCONTROLLER_HRS
635
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
635
History period startHISTORY_START_DT
Jul 30, 2014
History period endHISTORY_END_DT
Oct 29, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6710205
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 30, 2015
Citation number: 8889008
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8889008
Assessment control numberASSESS_CASE_NO
000399154
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 21, 2016
Citation issuedISSUE_DT
Oct 30, 2015
Date of occurrenceOCCURRENCE_DT
Oct 30, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
635
Size of mineSIZE_OF_MINE
635
Controller hours workedCONTROLLER_HRS
635
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
635
History period startHISTORY_START_DT
Jul 30, 2014
History period endHISTORY_END_DT
Oct 29, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6710205
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 29, 2015
Citation number: 8889007
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8889007
Assessment control numberASSESS_CASE_NO
000399154
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 21, 2016
Citation issuedISSUE_DT
Oct 29, 2015
Date of occurrenceOCCURRENCE_DT
Oct 29, 2015
Final order dateFINAL_ORDER_DT
Jan 21, 2016
Bill first printedBILL_PRINT_DT
Dec 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 21, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
635
Size of mineSIZE_OF_MINE
635
Controller hours workedCONTROLLER_HRS
635
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
635
History period startHISTORY_START_DT
Jul 29, 2014
History period endHISTORY_END_DT
Oct 28, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6710205
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 10, 2015
Citation number: 8886319
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8886319
Assessment control numberASSESS_CASE_NO
000394465
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 20, 2015
Citation issuedISSUE_DT
Sep 10, 2015
Date of occurrenceOCCURRENCE_DT
Jul 16, 2015
Final order dateFINAL_ORDER_DT
Nov 18, 2015
Bill first printedBILL_PRINT_DT
Oct 13, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 18, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
40
Size of mineSIZE_OF_MINE
40
Controller hours workedCONTROLLER_HRS
40
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
40
History period startHISTORY_START_DT
Apr 16, 2014
History period endHISTORY_END_DT
Jul 15, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Allied Stone LLC
IDVIOLATOR_ID
0073963
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2006
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6640675
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4821

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 58 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.14108
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jan 4, 2013
Decision type: Prevail
Details

The contest

Citation or order numberCITATION_NO
6499839
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Prevail
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14108
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.14107(a)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jan 4, 2013
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6499833
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.14107(a)
Proposed penalty: $100.00
Penalty after decision: $0.00
Decided: Jan 4, 2013
Decision type: Vacate
Details

The contest

Citation or order numberCITATION_NO
6499836
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Vacate
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.4501
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jan 4, 2013
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6499834
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.4501
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
LowNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.14107(a)
Proposed penalty: $100.00
Penalty after decision: $0.00
Decided: Jan 4, 2013
Decision type: Vacate
Details

The contest

Citation or order numberCITATION_NO
6499838
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Vacate
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 46.3(a)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jan 4, 2013
Decision type: Prevail
Details

The contest

Citation or order numberCITATION_NO
6499842
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Prevail
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
46.3(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as 0 (2)

Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.3131
Proposed penalty: $243.00
Penalty after decision: $100.00
Decided: Jan 4, 2013
Decision type: Prevail
Details

The contest

Citation or order numberCITATION_NO
6499835
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Prevail
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
243.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.3131
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.14107(a)
Proposed penalty: $100.00
Penalty after decision: $75.00
Decided: Jan 4, 2013
Decision type: Prevail
Details

The contest

Citation or order numberCITATION_NO
6499837
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Prevail
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
75.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 19, 2010
Citation issued: Jul 21, 2010
Docket: LAKE 2011-47M
Standard: 56.12004
Proposed penalty: $100.00
Penalty after decision: $75.00
Decided: Jan 4, 2013
Decision type: Prevail
Details

The contest

Citation or order numberCITATION_NO
6499840
Citation issuedCITATION_ISSUE_DT
Jul 21, 2010
Hearing request receivedCONTEST_DT
Oct 19, 2010
Docket numberDOCKET_NO
LAKE 2011-47M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Michael
Judge, last nameJUDGE_LAST_NAME
Zielinski
Decision typeDOCKET_DECISION_TYPE_CODE
Prevail
DecidedDECISION_DT
Jan 4, 2013
Petition duePETITION_DUE_DT
Dec 3, 2010
Petition filedPETITION_FILED_DT
Dec 3, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
75.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12004
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M6000
MSHA representative officeMSHA_REP_OFFICE_NAME
Denver District

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1

Other fields

ISSUING_FIELD_OFFICE
M4821

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

9 contested citations and orders; decision types are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 6
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
6
Average hours per employeeAVG_EMPLOYEE_HOURS
6

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 602
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
602
Average hours per employeeAVG_EMPLOYEE_HOURS
301

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 8
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
8
Average hours per employeeAVG_EMPLOYEE_HOURS
8

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 772
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
772
Average hours per employeeAVG_EMPLOYEE_HOURS
386

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 12
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
12
Average hours per employeeAVG_EMPLOYEE_HOURS
12

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 570
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
570
Average hours per employeeAVG_EMPLOYEE_HOURS
285

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 20
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
20
Average hours per employeeAVG_EMPLOYEE_HOURS
20

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 719
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
719
Average hours per employeeAVG_EMPLOYEE_HOURS
240

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 30
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
30
Average hours per employeeAVG_EMPLOYEE_HOURS
30

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 785
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
785
Average hours per employeeAVG_EMPLOYEE_HOURS
393

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 22
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
22
Average hours per employeeAVG_EMPLOYEE_HOURS
22

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 647
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
647
Average hours per employeeAVG_EMPLOYEE_HOURS
216

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 769
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
769
Average hours per employeeAVG_EMPLOYEE_HOURS
256

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 495
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
495
Average hours per employeeAVG_EMPLOYEE_HOURS
248

Mine

Mine IDMINE_ID
4703287
Mine name in this fileCURR_MINE_NM
Allied Stone LLC Portable #1
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Peru IL Field Office
Nearest town
Platteville
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
2
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Allied Stone LLC Portable #1
Mine IDMINE_ID
4703287
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Aug 4, 2014
Legal entity typeCOMPANY_TYPE
Other
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
55

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Allied Stone LLC
Operator IDCURRENT_OPERATOR_ID
0073963
Controller IDCURRENT_CONTROLLER_ID
0040824
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jul 1, 2006

Location and MSHA office

StateSTATE
WI
Bureau of Mines state codeBOM_STATE_CD
47
FIPS county codeFIPS_CNTY_CD
043
FIPS county nameFIPS_CNTY_NM
Grant
Congressional districtCONG_DIST_CD
03
Nearest townNEAREST_TOWN
Platteville
MSHA districtDISTRICT
M4
MSHA office codeOFFICE_CD
M4821
MSHA officeOFFICE_NAME
Peru IL Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
200
Most recent assessment control numberASSESS_CTRL_NO
000613390

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Limestone NEC
Primary commodity codePRIMARY_SIC_CD
142200
Primary SIC codePRIMARY_SIC_CD_1
1422
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
2
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (13)

ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Allied Stone LLC
From: Jul 1, 2006
To: No end date
Controller: Not shown
From : Jul 1, 2006
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Operator fromOPERATOR_START_DT
Jul 1, 2006

Controller

Controller IDCONTROLLER_ID
0040824
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2006

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Allied Stone LLC
From: Jul 1, 2006
To: No end date
Controller: Not shown
From : Jul 1, 2006
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Allied Stone LLC
Operator IDOPERATOR_ID
0073963
Operator fromOPERATOR_START_DT
Jul 1, 2006

Controller

Controller IDCONTROLLER_ID
0040824
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2006

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Lancaster Quality Stone LLC
From: Aug 29, 2001
To: Jun 30, 2006
Controller: Not shown
From : Aug 29, 2001
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Lancaster Quality Stone LLC
Operator IDOPERATOR_ID
0050443
Operator fromOPERATOR_START_DT
Aug 29, 2001
Operator toOPERATOR_END_DT
Jun 30, 2006

Controller

Controller IDCONTROLLER_ID
0040824
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Aug 29, 2001

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Lancaster Quality Stone LLC
From: Aug 29, 2001
To: Jun 30, 2006
Controller: Not shown
From : Aug 29, 2001
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Lancaster Quality Stone LLC
Operator IDOPERATOR_ID
0050443
Operator fromOPERATOR_START_DT
Aug 29, 2001
Operator toOPERATOR_END_DT
Jun 30, 2006

Controller

Controller IDCONTROLLER_ID
0040824
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Aug 29, 2001

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

Allied Stone LLC·Contact title Member·Street not recorded, Fennimore WI 53809

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Allied Stone LLC
Contact titleCONTACT_TITLE
Member
CityCITY
Fennimore
StateSTATE_ABBR
WI
State nameSTATE
Wisconsin
ZIP codeZIP_CD
53809
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
55

Mine

Mine IDMINE_ID
4703287
Mine name in this fileMINE_NAME
Allied Stone LLC Portable #1
Nearest townNEAREST_TOWN
Platteville
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Aug 4, 2014
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Limestone NEC
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology