Inspections
Regular Safety and Health InspectionApr 13 to Apr 16, 2026Inspectors 1 | Hours on site 5.75Began: Apr 13, 2026Ended: Apr 16, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 13, 2026
- Closed outINSPECTION_END_DT
- Apr 16, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03B7F9
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionMar 24, 2026Inspectors 1 | Hours on site 1.75Began: Mar 24, 2026Ended: Mar 24, 2026Activity: Spot InspectionInspectors: 1Hours on site: 1.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 24, 2026
- Closed outINSPECTION_END_DT
- Mar 24, 2026
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- F03B7F0
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 23, 2025Inspectors 1 | Hours on site 3.25Began: Jul 23, 2025Ended: Jul 23, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 23, 2025
- Closed outINSPECTION_END_DT
- Jul 23, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F0172FB
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 28, 2024Inspectors 1 | Hours on site 6.25Began: Aug 28, 2024Ended: Aug 28, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 28, 2024
- Closed outINSPECTION_END_DT
- Aug 28, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6904929
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 16 to May 17, 2023Inspectors 1 | Hours on site 4.25Began: May 16, 2023Ended: May 17, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 16, 2023
- Closed outINSPECTION_END_DT
- May 17, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6904738
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 15 to Jun 16, 2022Inspectors 1 | Hours on site 2.5Began: Jun 15, 2022Ended: Jun 16, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 15, 2022
- Closed outINSPECTION_END_DT
- Jun 16, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6901550
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionMar 30 to Mar 31, 2021Inspectors 1 | Hours on site 11.5Began: Mar 30, 2021Ended: Mar 31, 2021Activity: Spot InspectionInspectors: 1Hours on site: 11.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 30, 2021
- Closed outINSPECTION_END_DT
- Mar 31, 2021
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6839384
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 15, 2020Inspectors 1 | Hours on site 5Began: Dec 15, 2020Ended: Dec 15, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 15, 2020
- Closed outINSPECTION_END_DT
- Dec 15, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6839364
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionJun 22, 2020Inspectors 1 | Hours on site 1Began: Jun 22, 2020Ended: Jun 22, 2020Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 22, 2020
- Closed outINSPECTION_END_DT
- Jun 22, 2020
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6839174
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionJun 9, 2020Inspectors 1 | Hours on site 1Began: Jun 9, 2020Ended: Jun 9, 2020Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 9, 2020
- Closed outINSPECTION_END_DT
- Jun 9, 2020
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6839162
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 2, 2020Inspectors 1 | Hours on site 3.25Began: Jun 2, 2020Ended: Jun 2, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 2, 2020
- Closed outINSPECTION_END_DT
- Jun 2, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6839158
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionMay 8 to May 9, 2019Inspectors 1 | Hours on site 2.5Began: May 8, 2019Ended: May 9, 2019Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 8, 2019
- Closed outINSPECTION_END_DT
- May 9, 2019
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6831358
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 25, 2019Inspectors 1 | Hours on site 6Began: Apr 25, 2019Ended: Apr 25, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 25, 2019
- Closed outINSPECTION_END_DT
- Apr 25, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6831353
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 7, 2017Inspectors 1 | Hours on site 2.5Began: Nov 7, 2017Ended: Nov 7, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 7, 2017
- Closed outINSPECTION_END_DT
- Nov 7, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6744920
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 19, 2017Inspectors 1 | Hours on site 2.5Began: Apr 19, 2017Ended: Apr 19, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 19, 2017
- Closed outINSPECTION_END_DT
- Apr 19, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6707582
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 16, 2016Inspectors 1 | Hours on site 1.75Began: Mar 16, 2016Ended: Mar 16, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 16, 2016
- Closed outINSPECTION_END_DT
- Mar 16, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6707269
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionAug 26, 2015Inspectors 1 | Hours on site 0Began: Aug 26, 2015Ended: Aug 26, 2015Activity: Spot InspectionInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 26, 2015
- Closed outINSPECTION_END_DT
- Aug 26, 2015
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6637680
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 7, 2015Inspectors 1 | Hours on site 1.5Began: May 7, 2015Ended: May 7, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 7, 2015
- Closed outINSPECTION_END_DT
- May 7, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6638550
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 8, 2014Inspectors 1 | Hours on site 2Began: Jul 8, 2014Ended: Jul 8, 2014Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 8, 2014
- Closed outINSPECTION_END_DT
- Jul 8, 2014
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6638306
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionJun 18, 2014Inspectors 1 | Hours on site 1Began: Jun 18, 2014Ended: Jun 18, 2014Activity: Spot InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 18, 2014
- Closed outINSPECTION_END_DT
- Jun 18, 2014
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6638209
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 2
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionMar 11 to Mar 12, 2014Inspectors 1 | Hours on site 1Began: Mar 11, 2014Ended: Mar 12, 2014Activity: Spot InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 11, 2014
- Closed outINSPECTION_END_DT
- Mar 12, 2014
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6633357
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionOct 30, 2012Inspectors 1 | Hours on site 1.5Began: Oct 30, 2012Ended: Oct 30, 2012Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 30, 2012
- Closed outINSPECTION_END_DT
- Oct 30, 2012
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6579093
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 10 to Apr 11, 2012Inspectors 1 | Hours on site 9.25Began: Apr 10, 2012Ended: Apr 11, 2012Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 10, 2012
- Closed outINSPECTION_END_DT
- Apr 11, 2012
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6517355
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 17, 2011Inspectors 1 | Hours on site 1.5Began: Aug 17, 2011Ended: Aug 17, 2011Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 17, 2011
- Closed outINSPECTION_END_DT
- Aug 17, 2011
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6517058
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 31 to Sep 1, 2010Inspectors 1 | Hours on site 4Began: Aug 31, 2010Ended: Sep 1, 2010Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 31, 2010
- Closed outINSPECTION_END_DT
- Sep 1, 2010
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1012506
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4641
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Mine IDMINE_ID
- 4703558
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
25 most recent of 28 inspections and other MSHA visits since May 13, 2009; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Apr 13, 2026Type: CitationStandard: 56.14132(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117532
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1516
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 12, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 14, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Apr 14, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Apr 16, 2026
- Terminated, timeTERMINATION_TIME
- 0800
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 3, 2026
- Last actionLAST_ACTION_CD
- Proposed
- Last action dateLAST_ACTION_DT
- Jun 4, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- F03B7F9
- Inspection beganINSPECTION_BEGIN_DT
- Apr 13, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 13, 2026Type: CitationStandard: 56.14132(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117531
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1515
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 12, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 14, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Apr 14, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Apr 16, 2026
- Terminated, timeTERMINATION_TIME
- 0756
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 3, 2026
- Last actionLAST_ACTION_CD
- Proposed
- Last action dateLAST_ACTION_DT
- Jun 4, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- F03B7F9
- Inspection beganINSPECTION_BEGIN_DT
- Apr 13, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Mar 24, 2026Type: CitationStandard: 56.1000S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5117517
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 24, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1130
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 24, 2026
- 30 CFR part and sectionPART_SECTION
- 56.1000
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 24, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Mar 24, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Mar 24, 2026
- Terminated, timeTERMINATION_TIME
- 1135
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Apr 30, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 8, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 23, 2026
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- F03B7F0
- Inspection beganINSPECTION_BEGIN_DT
- Mar 24, 2026
- Inspection closed outINSPECTION_END_DT
- Mar 24, 2026
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 28, 2024Type: CitationStandard: 46.9(b)(5)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9627919
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 28, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0940
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 28, 2024
- 30 CFR part and sectionPART_SECTION
- 46.9(b)(5)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 28, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 28, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 28, 2024
- Terminated, timeTERMINATION_TIME
- 1043
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 2, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 3, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 7, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6904929
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2024
- Inspection closed outINSPECTION_END_DT
- Aug 28, 2024
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 28, 2024Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9627920
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 28, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0832
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 28, 2024
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 28, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Aug 28, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Aug 28, 2024
- Terminated, timeTERMINATION_TIME
- 0834
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 2, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 3, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 7, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6904929
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2024
- Inspection closed outINSPECTION_END_DT
- Aug 28, 2024
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 16, 2023Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9485545
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 16, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1520
- Date of occurrenceVIOLATION_OCCUR_DT
- May 16, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 17, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- May 17, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- May 17, 2023
- Terminated, timeTERMINATION_TIME
- 1231
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jun 28, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 2, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 12, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6904738
- Inspection beganINSPECTION_BEGIN_DT
- May 16, 2023
- Inspection closed outINSPECTION_END_DT
- May 17, 2023
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 16, 2023Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9485544
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 16, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1515
- Date of occurrenceVIOLATION_OCCUR_DT
- May 16, 2023
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 17, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- May 17, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- May 17, 2023
- Terminated, timeTERMINATION_TIME
- 1155
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jun 28, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 2, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 12, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6904738
- Inspection beganINSPECTION_BEGIN_DT
- May 16, 2023
- Inspection closed outINSPECTION_END_DT
- May 17, 2023
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 15, 2022Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8896133
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 15, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1100
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 15, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 16, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jun 16, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jun 16, 2022
- Terminated, timeTERMINATION_TIME
- 1208
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Aug 3, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 17, 2022
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6901550
- Inspection beganINSPECTION_BEGIN_DT
- Jun 15, 2022
- Inspection closed outINSPECTION_END_DT
- Jun 16, 2022
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 15, 2020Type: CitationStandard: 56.4203S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9441696
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 15, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 0955
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 15, 2020
- 30 CFR part and sectionPART_SECTION
- 56.4203
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 15, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Dec 15, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Dec 15, 2020
- Terminated, timeTERMINATION_TIME
- 1158
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Feb 3, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 14, 2021
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 28, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839364
- Inspection beganINSPECTION_BEGIN_DT
- Dec 15, 2020
- Inspection closed outINSPECTION_END_DT
- Dec 15, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 15, 2020Type: CitationStandard: 56.9300(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9441695
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 15, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 0936
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 15, 2020
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 15, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Dec 15, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Dec 15, 2020
- Terminated, timeTERMINATION_TIME
- 1203
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Feb 3, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 14, 2021
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 28, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839364
- Inspection beganINSPECTION_BEGIN_DT
- Dec 15, 2020
- Inspection closed outINSPECTION_END_DT
- Dec 15, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 22, 2020Type: CitationStandard: 56.14100(c)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9484066
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 22, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1426
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 22, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14100(c)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 22, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jun 22, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jun 22, 2020
- Terminated, timeTERMINATION_TIME
- 1454
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 30, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839174
- Inspection beganINSPECTION_BEGIN_DT
- Jun 22, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 22, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 2, 2020Type: CitationStandard: 56.14101(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9484042
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 2, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1644
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 2, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14101(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 4, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jun 16, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jun 22, 2020
- Terminated, timeTERMINATION_TIME
- 1439
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 30, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839158
- Inspection beganINSPECTION_BEGIN_DT
- Jun 2, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 2, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 2, 2020Type: CitationStandard: 56.18002(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9484044
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 2, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1746
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 2, 2020
- 30 CFR part and sectionPART_SECTION
- 56.18002(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 2, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1750
- Latest dueLATEST_TERM_DUE_DT
- Jun 2, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1750
- TerminatedTERMINATION_DT
- Jun 2, 2020
- Terminated, timeTERMINATION_TIME
- 1750
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 30, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839158
- Inspection beganINSPECTION_BEGIN_DT
- Jun 2, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 2, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 2, 2020Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9484043
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 2, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1708
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 2, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 5, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Jun 16, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Jun 22, 2020
- Terminated, timeTERMINATION_TIME
- 1452
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 30, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839158
- Inspection beganINSPECTION_BEGIN_DT
- Jun 2, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 2, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 2, 2020Type: CitationStandard: 56.14130(g)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9484040
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 2, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1558
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 2, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14130(g)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 2, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1558
- Latest dueLATEST_TERM_DUE_DT
- Jun 2, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1558
- TerminatedTERMINATION_DT
- Jun 2, 2020
- Terminated, timeTERMINATION_TIME
- 1558
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 30, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839158
- Inspection beganINSPECTION_BEGIN_DT
- Jun 2, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 2, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 2, 2020Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9484041
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 2, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1630
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 2, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 8, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jun 8, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jun 9, 2020
- Terminated, timeTERMINATION_TIME
- 1700
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 7, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 30, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6839158
- Inspection beganINSPECTION_BEGIN_DT
- Jun 2, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 2, 2020
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 25, 2019Type: CitationStandard: 56.4402S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8958874
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 25, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1005
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 25, 2019
- 30 CFR part and sectionPART_SECTION
- 56.4402
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 25, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 25, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 9, 2019
- Terminated, timeTERMINATION_TIME
- 0825
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 17, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 26, 2019
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6831353
- Inspection beganINSPECTION_BEGIN_DT
- Apr 25, 2019
- Inspection closed outINSPECTION_END_DT
- Apr 25, 2019
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 25, 2019Type: CitationStandard: 56.14100(b)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8958875
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 25, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1026
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 25, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 25, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 25, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 9, 2019
- Terminated, timeTERMINATION_TIME
- 0830
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 17, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 26, 2019
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6831353
- Inspection beganINSPECTION_BEGIN_DT
- Apr 25, 2019
- Inspection closed outINSPECTION_END_DT
- Apr 25, 2019
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 25, 2019Type: CitationStandard: 56.14101(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8958877
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 25, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1045
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 25, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14101(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- May 9, 2019
- Terminated, timeTERMINATION_TIME
- 0842
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 17, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 26, 2019
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6831353
- Inspection beganINSPECTION_BEGIN_DT
- Apr 25, 2019
- Inspection closed outINSPECTION_END_DT
- Apr 25, 2019
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 25, 2019Type: CitationStandard: 56.14100(c)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8958876
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 25, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1040
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 25, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14100(c)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 30, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Apr 30, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- May 9, 2019
- Terminated, timeTERMINATION_TIME
- 0840
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 17, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 26, 2019
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6831353
- Inspection beganINSPECTION_BEGIN_DT
- Apr 25, 2019
- Inspection closed outINSPECTION_END_DT
- Apr 25, 2019
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 26, 2015Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8848574
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 26, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1203
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 26, 2015
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 26, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Aug 26, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Aug 26, 2015
- Terminated, timeTERMINATION_TIME
- 1325
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Sep 30, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 5, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 18, 2015
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6637680
- Inspection beganINSPECTION_BEGIN_DT
- Aug 26, 2015
- Inspection closed outINSPECTION_END_DT
- Aug 26, 2015
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 10, 2012Type: CitationStandard: 56.14130(g)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6558605
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 10, 2012
- Time issuedVIOLATION_ISSUE_TIME
- 1456
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 10, 2012
- 30 CFR part and sectionPART_SECTION
- 56.14130(g)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
- Special assessmentSPECIAL_ASSESS
- Y
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 10, 2012
- Originally due, timeORIG_TERM_DUE_TIME
- 1457
- Latest dueLATEST_TERM_DUE_DT
- Apr 10, 2012
- Latest due, timeLATEST_TERM_DUE_TIME
- 1457
- TerminatedTERMINATION_DT
- Apr 10, 2012
- Terminated, timeTERMINATION_TIME
- 1457
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- May 30, 2012
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 6, 2012
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 19, 2012
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 6517355
- Inspection beganINSPECTION_BEGIN_DT
- Apr 10, 2012
- Inspection closed outINSPECTION_END_DT
- Apr 11, 2012
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2012
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 14, 2009Type: CitationStandard: 56.18002(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6189767
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 14, 2009
- Time issuedVIOLATION_ISSUE_TIME
- 0830
- Date of occurrenceVIOLATION_OCCUR_DT
- May 14, 2009
- 30 CFR part and sectionPART_SECTION
- 56.18002(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 14, 2009
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 14, 2009
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 20, 2009
- Terminated, timeTERMINATION_TIME
- 0855
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jul 1, 2009
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 7, 2009
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 16, 2009
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 1012085
- Inspection beganINSPECTION_BEGIN_DT
- May 13, 2009
- Inspection closed outINSPECTION_END_DT
- May 21, 2009
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 14, 2009Type: CitationStandard: 46.3(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6189766
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 14, 2009
- Time issuedVIOLATION_ISSUE_TIME
- 0820
- Date of occurrenceVIOLATION_OCCUR_DT
- May 14, 2009
- 30 CFR part and sectionPART_SECTION
- 46.3(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 20, 2009
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 20, 2009
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 20, 2009
- Terminated, timeTERMINATION_TIME
- 1544
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jul 1, 2009
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 7, 2009
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 16, 2009
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 1012085
- Inspection beganINSPECTION_BEGIN_DT
- May 13, 2009
- Inspection closed outINSPECTION_END_DT
- May 21, 2009
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 14, 2009Type: CitationStandard: 56.14100(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6189772
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 14, 2009
- Time issuedVIOLATION_ISSUE_TIME
- 0930
- Date of occurrenceVIOLATION_OCCUR_DT
- May 14, 2009
- 30 CFR part and sectionPART_SECTION
- 56.14100(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 14, 2009
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- May 14, 2009
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- May 14, 2009
- Terminated, timeTERMINATION_TIME
- 0950
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jul 1, 2009
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 7, 2009
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 16, 2009
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Peninsula Stone, Inc.
- Operator IDVIOLATOR_ID
- 0101666
- Controller IDCONTROLLER_ID
- 0085935
- Inspection eventEVENT_NO
- 1012085
- Inspection beganINSPECTION_BEGIN_DT
- May 13, 2009
- Inspection closed outINSPECTION_END_DT
- May 21, 2009
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
30 citations and orders since May 13, 2009: 30 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Apr 13, 2026Citation number: 5117532Standard: 56.14132(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117532
- Assessment control numberASSESS_CASE_NO
- 000642322
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 4, 2026
- Citation issuedISSUE_DT
- Apr 13, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 12, 2026
- Final order dateFINAL_ORDER_DT
- Aug 3, 2026
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 3, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2026
- Size of mineSIZE_OF_MINE
- 2026
- Controller hours workedCONTROLLER_HRS
- 2949
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2949
- History period startHISTORY_START_DT
- Jan 12, 2025
- History period endHISTORY_END_DT
- Apr 11, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B7F9
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 13, 2026Citation number: 5117531Standard: 56.14132(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117531
- Assessment control numberASSESS_CASE_NO
- 000642322
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 4, 2026
- Citation issuedISSUE_DT
- Apr 13, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 12, 2026
- Final order dateFINAL_ORDER_DT
- Aug 3, 2026
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 3, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2026
- Size of mineSIZE_OF_MINE
- 2026
- Controller hours workedCONTROLLER_HRS
- 2949
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2949
- History period startHISTORY_START_DT
- Jan 12, 2025
- History period endHISTORY_END_DT
- Apr 11, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B7F9
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Mar 24, 2026Citation number: 5117517Standard: 56.1000Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5117517
- Assessment control numberASSESS_CASE_NO
- 000640564
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 23, 2026
- Citation issuedISSUE_DT
- Mar 24, 2026
- Date of occurrenceOCCURRENCE_DT
- Mar 24, 2026
- Final order dateFINAL_ORDER_DT
- Jun 8, 2026
- Bill first printedBILL_PRINT_DT
- Apr 30, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 8, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.1000
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2026
- Size of mineSIZE_OF_MINE
- 2026
- Controller hours workedCONTROLLER_HRS
- 2949
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2949
- History period startHISTORY_START_DT
- Dec 24, 2024
- History period endHISTORY_END_DT
- Mar 23, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03B7F0
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (19)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 28, 2024Citation number: 9627919Standard: 46.9(b)(5)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9627919
- Assessment control numberASSESS_CASE_NO
- 000604007
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 6, 2025
- Citation issuedISSUE_DT
- Aug 28, 2024
- Date of occurrenceOCCURRENCE_DT
- Aug 28, 2024
- Final order dateFINAL_ORDER_DT
- Dec 3, 2024
- Bill first printedBILL_PRINT_DT
- Oct 2, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 3, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.9(b)(5)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.87
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 21
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5007
- Size of mineSIZE_OF_MINE
- 5007
- Controller hours workedCONTROLLER_HRS
- 5007
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 5007
- History period startHISTORY_START_DT
- May 28, 2023
- History period endHISTORY_END_DT
- Aug 27, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6904929
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (17)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 28, 2024Citation number: 9627920Standard: 50.30(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9627920
- Assessment control numberASSESS_CASE_NO
- 000604007
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 6, 2025
- Citation issuedISSUE_DT
- Aug 28, 2024
- Date of occurrenceOCCURRENCE_DT
- Aug 28, 2024
- Final order dateFINAL_ORDER_DT
- Dec 3, 2024
- Bill first printedBILL_PRINT_DT
- Oct 2, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 3, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.87
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 21
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5007
- Size of mineSIZE_OF_MINE
- 5007
- Controller hours workedCONTROLLER_HRS
- 5007
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 5007
- History period startHISTORY_START_DT
- May 28, 2023
- History period endHISTORY_END_DT
- Aug 27, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6904929
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (17)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 16, 2023Citation number: 9485545Standard: 56.14132(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9485545
- Assessment control numberASSESS_CASE_NO
- 000579987
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 12, 2023
- Citation issuedISSUE_DT
- May 16, 2023
- Date of occurrenceOCCURRENCE_DT
- May 16, 2023
- Final order dateFINAL_ORDER_DT
- Aug 2, 2023
- Bill first printedBILL_PRINT_DT
- Jun 28, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 2, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4795
- Size of mineSIZE_OF_MINE
- 4795
- Controller hours workedCONTROLLER_HRS
- 4795
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4795
- History period startHISTORY_START_DT
- Feb 16, 2022
- History period endHISTORY_END_DT
- May 15, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6904738
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 16, 2023Citation number: 9485544Standard: 56.4201(a)(2)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9485544
- Assessment control numberASSESS_CASE_NO
- 000579987
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 12, 2023
- Citation issuedISSUE_DT
- May 16, 2023
- Date of occurrenceOCCURRENCE_DT
- May 16, 2023
- Final order dateFINAL_ORDER_DT
- Aug 2, 2023
- Bill first printedBILL_PRINT_DT
- Jun 28, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 2, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4795
- Size of mineSIZE_OF_MINE
- 4795
- Controller hours workedCONTROLLER_HRS
- 4795
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4795
- History period startHISTORY_START_DT
- Feb 16, 2022
- History period endHISTORY_END_DT
- May 15, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6904738
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 15, 2022Citation number: 8896133Standard: 56.14132(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8896133
- Assessment control numberASSESS_CASE_NO
- 000559818
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 17, 2022
- Citation issuedISSUE_DT
- Jun 15, 2022
- Date of occurrenceOCCURRENCE_DT
- Jun 15, 2022
- Final order dateFINAL_ORDER_DT
- Sep 7, 2022
- Bill first printedBILL_PRINT_DT
- Aug 3, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5012
- Size of mineSIZE_OF_MINE
- 5012
- Controller hours workedCONTROLLER_HRS
- 5012
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 5012
- History period startHISTORY_START_DT
- Mar 15, 2021
- History period endHISTORY_END_DT
- Jun 14, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901550
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 15, 2020Citation number: 9441695Standard: 56.9300(a)Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9441695
- Assessment control numberASSESS_CASE_NO
- 000529274
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 26, 2021
- Citation issuedISSUE_DT
- Dec 15, 2020
- Date of occurrenceOCCURRENCE_DT
- Dec 15, 2020
- Final order dateFINAL_ORDER_DT
- Mar 14, 2021
- Bill first printedBILL_PRINT_DT
- Feb 3, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 14, 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Sep 15, 2019
- History period endHISTORY_END_DT
- Dec 14, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839364
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 15, 2020Citation number: 9441696Standard: 56.4203Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9441696
- Assessment control numberASSESS_CASE_NO
- 000529274
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 26, 2021
- Citation issuedISSUE_DT
- Dec 15, 2020
- Date of occurrenceOCCURRENCE_DT
- Dec 15, 2020
- Final order dateFINAL_ORDER_DT
- Mar 14, 2021
- Bill first printedBILL_PRINT_DT
- Feb 3, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 14, 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4203
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 3
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Sep 15, 2019
- History period endHISTORY_END_DT
- Dec 14, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839364
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 22, 2020Citation number: 9484066Standard: 56.14100(c)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9484066
- Assessment control numberASSESS_CASE_NO
- 000519371
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 28, 2020
- Citation issuedISSUE_DT
- Jun 22, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 22, 2020
- Final order dateFINAL_ORDER_DT
- Sep 7, 2020
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(c)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.333
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Mar 22, 2019
- History period endHISTORY_END_DT
- Jun 21, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839174
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 2, 2020Citation number: 9484044Standard: 56.18002(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9484044
- Assessment control numberASSESS_CASE_NO
- 000519371
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 28, 2020
- Citation issuedISSUE_DT
- Jun 2, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 2, 2020
- Final order dateFINAL_ORDER_DT
- Sep 7, 2020
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.18002(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Mar 2, 2019
- History period endHISTORY_END_DT
- Jun 1, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839158
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 2, 2020Citation number: 9484040Standard: 56.14130(g)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9484040
- Assessment control numberASSESS_CASE_NO
- 000519371
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 28, 2020
- Citation issuedISSUE_DT
- Jun 2, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 2, 2020
- Final order dateFINAL_ORDER_DT
- Sep 7, 2020
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14130(g)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Mar 2, 2019
- History period endHISTORY_END_DT
- Jun 1, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839158
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 2, 2020Citation number: 9484043Standard: 56.14132(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9484043
- Assessment control numberASSESS_CASE_NO
- 000519371
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 28, 2020
- Citation issuedISSUE_DT
- Jun 2, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 2, 2020
- Final order dateFINAL_ORDER_DT
- Sep 7, 2020
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Mar 2, 2019
- History period endHISTORY_END_DT
- Jun 1, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839158
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 2, 2020Citation number: 9484041Standard: 56.14100(b)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9484041
- Assessment control numberASSESS_CASE_NO
- 000519371
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 28, 2020
- Citation issuedISSUE_DT
- Jun 2, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 2, 2020
- Final order dateFINAL_ORDER_DT
- Sep 7, 2020
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Mar 2, 2019
- History period endHISTORY_END_DT
- Jun 1, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839158
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 2, 2020Citation number: 9484042Standard: 56.14101(a)(2)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9484042
- Assessment control numberASSESS_CASE_NO
- 000519371
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 28, 2020
- Citation issuedISSUE_DT
- Jun 2, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 2, 2020
- Final order dateFINAL_ORDER_DT
- Sep 7, 2020
- Bill first printedBILL_PRINT_DT
- Jul 29, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 7, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14101(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4325
- Size of mineSIZE_OF_MINE
- 4325
- Controller hours workedCONTROLLER_HRS
- 4325
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4325
- History period startHISTORY_START_DT
- Mar 2, 2019
- History period endHISTORY_END_DT
- Jun 1, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6839158
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 25, 2019Citation number: 8958877Standard: 56.14101(a)(2)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8958877
- Assessment control numberASSESS_CASE_NO
- 000492166
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 26, 2019
- Citation issuedISSUE_DT
- Apr 25, 2019
- Date of occurrenceOCCURRENCE_DT
- Apr 25, 2019
- Final order dateFINAL_ORDER_DT
- Jul 17, 2019
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 17, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14101(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4156
- Size of mineSIZE_OF_MINE
- 4156
- Controller hours workedCONTROLLER_HRS
- 4156
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4156
- History period startHISTORY_START_DT
- Jan 25, 2018
- History period endHISTORY_END_DT
- Apr 24, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6831353
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 25, 2019Citation number: 8958874Standard: 56.4402Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8958874
- Assessment control numberASSESS_CASE_NO
- 000492166
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 26, 2019
- Citation issuedISSUE_DT
- Apr 25, 2019
- Date of occurrenceOCCURRENCE_DT
- Apr 25, 2019
- Final order dateFINAL_ORDER_DT
- Jul 17, 2019
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 17, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4402
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4156
- Size of mineSIZE_OF_MINE
- 4156
- Controller hours workedCONTROLLER_HRS
- 4156
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4156
- History period startHISTORY_START_DT
- Jan 25, 2018
- History period endHISTORY_END_DT
- Apr 24, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6831353
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 25, 2019Citation number: 8958875Standard: 56.14100(b)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8958875
- Assessment control numberASSESS_CASE_NO
- 000492166
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 26, 2019
- Citation issuedISSUE_DT
- Apr 25, 2019
- Date of occurrenceOCCURRENCE_DT
- Apr 25, 2019
- Final order dateFINAL_ORDER_DT
- Jul 17, 2019
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 17, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4156
- Size of mineSIZE_OF_MINE
- 4156
- Controller hours workedCONTROLLER_HRS
- 4156
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4156
- History period startHISTORY_START_DT
- Jan 25, 2018
- History period endHISTORY_END_DT
- Apr 24, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6831353
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 25, 2019Citation number: 8958876Standard: 56.14100(c)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8958876
- Assessment control numberASSESS_CASE_NO
- 000492166
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 26, 2019
- Citation issuedISSUE_DT
- Apr 25, 2019
- Date of occurrenceOCCURRENCE_DT
- Apr 25, 2019
- Final order dateFINAL_ORDER_DT
- Jul 17, 2019
- Bill first printedBILL_PRINT_DT
- May 29, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 17, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(c)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4156
- Size of mineSIZE_OF_MINE
- 4156
- Controller hours workedCONTROLLER_HRS
- 4156
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 4156
- History period startHISTORY_START_DT
- Jan 25, 2018
- History period endHISTORY_END_DT
- Apr 24, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6831353
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 26, 2015Citation number: 8848574Standard: 50.30(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8848574
- Assessment control numberASSESS_CASE_NO
- 000393318
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 16, 2015
- Citation issuedISSUE_DT
- Aug 26, 2015
- Date of occurrenceOCCURRENCE_DT
- Aug 26, 2015
- Final order dateFINAL_ORDER_DT
- Nov 5, 2015
- Bill first printedBILL_PRINT_DT
- Sep 30, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 5, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 20
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3145
- Size of mineSIZE_OF_MINE
- 3145
- Controller hours workedCONTROLLER_HRS
- 3145
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 3145
- History period startHISTORY_START_DT
- May 26, 2014
- History period endHISTORY_END_DT
- Aug 25, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6637680
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (19)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 10, 2012Citation number: 6558605Standard: 56.14130(g)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6558605
- Assessment control numberASSESS_CASE_NO
- 000290917
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 19, 2012
- Citation issuedISSUE_DT
- Apr 10, 2012
- Date of occurrenceOCCURRENCE_DT
- Apr 10, 2012
- Final order dateFINAL_ORDER_DT
- Jul 6, 2012
- Bill first printedBILL_PRINT_DT
- May 30, 2012
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2012
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 6, 2012
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14130(g)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 3797
- Size of mineSIZE_OF_MINE
- 3797
- Controller hours workedCONTROLLER_HRS
- 3797
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 3797
- History period startHISTORY_START_DT
- Jan 10, 2011
- History period endHISTORY_END_DT
- Apr 9, 2012
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6517355
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 14, 2009Citation number: 6189771Standard: 56.14100(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6189771
- Assessment control numberASSESS_CASE_NO
- 000189907
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 15, 2009
- Citation issuedISSUE_DT
- May 14, 2009
- Date of occurrenceOCCURRENCE_DT
- May 14, 2009
- Final order dateFINAL_ORDER_DT
- Aug 7, 2009
- Bill first printedBILL_PRINT_DT
- Jul 1, 2009
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2009
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 7, 2009
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- History period startHISTORY_START_DT
- May 13, 2009
- History period endHISTORY_END_DT
- May 13, 2009
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1012085
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (20)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 14, 2009Citation number: 6189772Standard: 56.14100(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6189772
- Assessment control numberASSESS_CASE_NO
- 000189907
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 15, 2009
- Citation issuedISSUE_DT
- May 14, 2009
- Date of occurrenceOCCURRENCE_DT
- May 14, 2009
- Final order dateFINAL_ORDER_DT
- Aug 7, 2009
- Bill first printedBILL_PRINT_DT
- Jul 1, 2009
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2009
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 7, 2009
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- History period startHISTORY_START_DT
- May 13, 2009
- History period endHISTORY_END_DT
- May 13, 2009
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1012085
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (20)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 14, 2009Citation number: 6189770Standard: 56.14132(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6189770
- Assessment control numberASSESS_CASE_NO
- 000189907
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 15, 2009
- Citation issuedISSUE_DT
- May 14, 2009
- Date of occurrenceOCCURRENCE_DT
- May 14, 2009
- Final order dateFINAL_ORDER_DT
- Aug 7, 2009
- Bill first printedBILL_PRINT_DT
- Jul 1, 2009
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2009
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 7, 2009
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- History period startHISTORY_START_DT
- May 13, 2009
- History period endHISTORY_END_DT
- May 13, 2009
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Peninsula Stone, Inc.
- IDVIOLATOR_ID
- 0101666
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 13, 2009
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1012085
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4641
Recorded as 0 (20)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 30 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Employment and hours worked
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 1,100Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 1100
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1100
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 2Hours worked: 2,026Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 2026
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1013
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 4,000Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4000
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1333
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 5,007Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 5007
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1669
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 4,795Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4795
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1598
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 5,012Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 5012
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1671
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 2Hours worked: 3,422Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 3422
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1711
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 4,325Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 4325
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1442
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileCURR_MINE_NM
- Peninsula Stone, Inc.
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Marquette MI Field Office
- Nearest town
- Sturgeon Bay, WI
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 2
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Peninsula Stone, Inc.
- Mine IDMINE_ID
- 4703558
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Intermittent
- Status sinceCURRENT_STATUS_DT
- Jan 15, 2013
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDCURRENT_OPERATOR_ID
- 0101666
- Controller IDCURRENT_CONTROLLER_ID
- 0085935
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- May 13, 2009
Location and MSHA office
- StateSTATE
- WI
- Bureau of Mines state codeBOM_STATE_CD
- 47
- FIPS county codeFIPS_CNTY_CD
- 029
- FIPS county nameFIPS_CNTY_NM
- Door
- Nearest townNEAREST_TOWN
- Sturgeon Bay, WI
- MSHA districtDISTRICT
- M4
- MSHA office codeOFFICE_CD
- M4641
- MSHA officeOFFICE_NAME
- Marquette MI Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 214
- Most recent assessment control numberASSESS_CTRL_NO
- 000642322
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Dimension Limestone
- Primary commodity codePRIMARY_SIC_CD
- 141102
- Primary SIC codePRIMARY_SIC_CD_1
- 1411
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 02
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 2
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (15)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Peninsula Stone, Inc.From: May 13, 2009To: No end dateController: Not shownFrom : May 13, 2009To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Peninsula Stone, Inc.
- Operator IDOPERATOR_ID
- 0101666
- Operator fromOPERATOR_START_DT
- May 13, 2009
Controller
- Controller IDCONTROLLER_ID
- 0085935
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- May 13, 2009
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
Peninsula Stone, Inc.·Contact title President·Street not recorded, Sturgeon Bay WI 54235
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Peninsula Stone, Inc.
- Contact titleCONTACT_TITLE
- President
- CityCITY
- Sturgeon Bay
- StateSTATE_ABBR
- WI
- State nameSTATE
- Wisconsin
- ZIP codeZIP_CD
- 54235
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 55
Mine
- Mine IDMINE_ID
- 4703558
- Mine name in this fileMINE_NAME
- Peninsula Stone, Inc.
- Nearest townNEAREST_TOWN
- Sturgeon Bay, WI
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Intermittent
- Status sinceMINE_STATUS_DT
- Jan 15, 2013
- Primary commodity (SIC)PRIMARY_SIC_CD
- Dimension Limestone
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (4)
StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology