Skip to content
SafetyRecord logoSafetyRecord
CANDELARIO PEREZ
$9,125
penalties
5
viol.
2
insp.

CANDELARIO PEREZ

19650 W. 201ST ST., SPRING HILL, KS 66083NAICS 238130 Framing Contractors

Inspections
2
Sep 2024 to Sep 2024 · 1 safety, 1 health
Violations
5
across 2 inspections
Penalties on record
$9,125
latest amounts in DOL records
By classification
Serious 5Willful 0Repeat 0Other 0

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Sep 19, 2024Planned (H) · Complete scope, Health#347972911$2,4891 viol.

Inspection #347972911

Dates

Opened
Sep 19, 2024
Closing Conference Date
Sep 19, 2024
Final Order
Feb 5, 2025
Closed
Jan 29, 2026

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5
Related Activity
1 referral

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$4,148
Penalties on Record
$2,489
Site Address
19650 W. 201st St., Spring Hill, KS 66083
Industry
238130 Framing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.1200
Hazard Communication
OSHA citation code: 19101200 H02 III
Serious23$4,148$2,489Feb 7, 2025-Feb 5, 2025
Sep 19, 2024Final Order RecordedPlanned (H) · Complete scope, Safety#347972895$6,6364 viol.

Inspection #347972895

Dates

Opened
Sep 19, 2024
Closing Conference Date
Sep 19, 2024
Final Order
Feb 5, 2025
Closed
No close date in inspection feed

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
4
Violation Types
4 serious
Initial Penalties
$11,061
Penalties on Record
$6,636
Site Address
19650 W. 201st St., Spring Hill, KS 66083
Industry
238130 Framing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

OSHA's inspection feed still shows no close date for this record. However, the citation records tied to this inspection show final orders recorded through Feb 5, 2025.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.178
Powered Industrial Trucks
OSHA citation code: 19100178 L01 II
Serious13$3,457$2,074Feb 7, 2025-Feb 5, 2025
01001B1910.178
Powered Industrial Trucks
OSHA citation code: 19100178 L06
Serious13$0$0Feb 7, 2025-Feb 5, 2025
010021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B13
Serious13$4,839$2,903Feb 7, 2025-Feb 5, 2025
010031926.1053
Ladders (Construction)
OSHA citation code: 19261053 B01
Serious23$2,765$1,659Feb 7, 2025-Feb 5, 2025
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.178Powered Industrial Trucks2 citations · $2,074
1910.1200Hazard Communication1 citation · $2,489
1926.501Fall Protection - Duty to Have Fall Protection1 citation · $2,903

Industry comparison

Violations per inspection
This employer2.5
Industry average2.1
Penalties per inspection
This employer$4,563
Industry average$2,541

Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: framing contractors reported 4.6 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.8%; NAICS 23813 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SPRING HILL, KS

All employers in SPRING HILL →