CHAD ROBERTSON CONTRACTING
5271 CLINTON STREET, ELMA, NY 14059 · NAICS 238110 Poured Concrete Foundation and Structure Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
May 20, 2005#308754415May 20, 2005Unprogrammed Related (G) · Complete scope, Safety#308754415$5101 viol.1 violation$510 in penalties
Inspection #308754415
Dates
- Opened
- May 20, 2005
- Closing Conference Date
- May 20, 2005
- Closed
- Aug 26, 2005
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $510
- Penalties on Record
- $510
- Site Address
- 5271 Clinton Street, Elma, NY 14059
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Serious | 1 | 2 | $510 | $510 | May 20, 2005 | - | - |
Jan 13, 2005#308464700Jan 13, 2005Programmed Related (I) · Partial scope, Safety#308464700$1,2754 viol.4 violations$1,275 in penalties
Inspection #308464700
Dates
- Opened
- Jan 13, 2005
- Closing Conference Date
- Jan 13, 2005
- Closed
- Apr 1, 2005
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 3 serious, 1 other-than-serious
- Initial Penalties
- $1,275
- Penalties on Record
- $1,275
- Site Address
- 5271 Clinton Street, Elma, NY 14059
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 B01 I | Serious | 1 | 1 | $225 | $225 | Mar 4, 2005 | - | - |
| 01002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B01 | Serious | 1 | 1 | $525 | $525 | Mar 7, 2005 | - | - |
| 01003 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 | Serious | 1 | 1 | $525 | $525 | Mar 7, 2005 | - | - |
| 02001 | 1926.153 Liquefied Petroleum Gas (LP-Gas) OSHA citation code: 19260153 G | Other | 1 | 4 | $0 | $0 | Mar 4, 2005 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
2 inspections, 2005 to 2005. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: poured concrete foundation and structure contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 10.7%; NAICS 23811 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source