Skip to content
SafetyRecord logoSafetyRecord
CNMS JOINT VENTURE
$1,100
penalties
3
viol.
2
insp.

CNMS JOINT VENTURE

BUILDING 1102 PACAF HEADQUARTERS, HICKAM AFB, HI 96853NAICS 236210 Industrial Building Construction

Inspections
2
Oct 2014 to Aug 2015 · 2 safety, 0 health
Violations
3
across 2 inspections
Penalties on record
$1,100
latest amounts in DOL records
By classification
Serious 0Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Aug 14, 2015Planned (H) · Complete scope, Safety#340849694$1,1002 viol.

Inspection #340849694

Dates

Opened
Aug 14, 2015
Closing Conference Date
Aug 14, 2015
Final Order
Sep 21, 2015
Closed
Sep 24, 2015

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
44

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$2,100
Penalties on Record
$1,100
Site Address
Building 1102 Pacaf Headquarters, Hickam Afb, HI 96853
Industry
236210 Industrial Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 I02 I
Other25$2,100$1,100-Sep 21, 2015
020011926.56
Illumination
OSHA citation code: 19260056 A
Other15$0$0-Sep 21, 2015
Oct 29, 2014Planned (H) · Complete scope, Safety#340085182$01 viol.

Inspection #340085182

Dates

Opened
Oct 29, 2014
Closing Conference Date
Oct 29, 2014
Final Order
Jan 6, 2015
Closed
Jan 6, 2015

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
44

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Pacaf Hqb1102, Hickam Afb, HI 96853
Industry
236210 Industrial Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 B01
Other244$0$0-Jan 6, 2015
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.56Illumination1 citation · $0
1926.403Electrical - General Requirements (Construction)1 citation · $1,100
1926.405Electrical - Wiring Methods (Construction)1 citation · $0

Industry comparison

Violations per inspection
This employer1.5
Industry average1.5
Penalties per inspection
This employer$550
Industry average$1,285

Construction of Buildings, 202,638 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: nonresidential building construction reported 1.9 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 6.8%; NAICS 2362 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in HICKAM AFB, HI

All employers in HICKAM AFB →