Skip to content
SafetyRecord logoSafetyRecord
COMMERCIAL SOLUTIONS SPECIALISTS, INC.
$500
penalties
1
viol.
3
insp.

COMMERCIAL SOLUTIONS SPECIALISTS, INC.

4100 GLENWOOD AVENUE, RALEIGH, NC 27612NAICS 238160 Roofing Contractors

Inspections
3
Jan 2010 to Oct 2026 · 3 safety, 0 health
Violations
1
across 3 inspections
Penalties on record
$500
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 0Other 0

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Oct 28, 2026OpenPlanned (H) · Complete scope, Safety#349255133$00 viol.

Inspection #349255133

Dates

Opened
Oct 28, 2026
Closing Conference Date
Oct 28, 2026
Closed
Open

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
9

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
3101 Edwards Mill Rd, Raleigh, NC 27612
Industry
238160 Roofing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

OSHA's inspection record does not currently show a close date for this case. Citation-level records on this page may still show later contest, penalty, or failure-to-abate activity.
Feb 9, 2011Programmed Related (I) · Complete scope, Safety#314878083$5001 viol.

Inspection #314878083

Dates

Opened
Feb 9, 2011
Closing Conference Date
Feb 9, 2011
Closed
Apr 5, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$500
Penalties on Record
$500
Site Address
4100 Glenwood Avenue, Raleigh, NC 27612
Industry
238160 Roofing Contractors

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 IV
Serious12$500$500Mar 7, 2011--
Jan 19, 2010Planned (H) · Partial scope, Safety#313825911$00 viol.

Inspection #313825911

Dates

Opened
Jan 19, 2010
Closing Conference Date
Jan 19, 2010
Closed
Jan 27, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
12

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
200 Martin Street, Suite 220, Raleigh, NC 27606
Industry
238160 Roofing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.405Electrical - Wiring Methods (Construction)1 citation · $500

Industry comparison

Violations per inspection
This employer0.3
Industry average2.1
Penalties per inspection
This employer$167
Industry average$2,530

Specialty Trade Contractors, 551,857 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: roofing contractors reported 2.4 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.7%; NAICS 23816 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in RALEIGH, NC

All employers in RALEIGH →