CORE TECH INTERNATIONAL CORPORATION
298 WASHINGTON DR GEORGE WASHINGTON HIGH SCHOOL, MANGILAO, GU 96913 · NAICS 236220 Commercial and Institutional Building Construction
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 8, 2026#348676081Jan 8, 2026Planned (H) · Complete scope, Safety#348676081$00 viol.0 violations$0 in penalties
Inspection #348676081
Dates
- Opened
- Jan 8, 2026
- Closing Conference Date
- Jan 8, 2026
- Closed
- Apr 13, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 70
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 298 Washington Dr George Washington High School, Mangilao, GU 96913
- Industry
- 236220 Commercial and Institutional Building Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jan 7, 2026#348676065Jan 7, 2026Planned (H) · Complete scope, Safety#348676065$4,9654 viol.4 violations$4,965 in penalties
Inspection #348676065
Dates
- Opened
- Jan 7, 2026
- Closing Conference Date
- Jan 7, 2026
- Final Order
- Mar 23, 2026
- Closed
- Mar 27, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 339
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 2 serious, 2 other-than-serious
- Initial Penalties
- $7,093
- Penalties on Record
- $4,965
- Site Address
- 298 Washington Drive Guam Community College, Mangilao, GU 96913
- Industry
- 212312 Crushed and Broken Limestone Mining and Quarrying
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.403 Electrical - General Requirements (Construction) OSHA citation code: 19260403 B02 | Serious | 1 | 4 | $7,093 | $4,965 | - | Mar 23, 2026 | |
| 01001B | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 J01 I | Serious | 1 | 4 | $0 | $0 | - | Mar 23, 2026 | |
| 02001 | 1910.305 Wiring methods, components, and equipment for general use OSHA citation code: 19100305 G01 IV A | Other | 1 | 4 | $0 | $0 | Mar 20, 2026 | - | Mar 23, 2026 |
| 02002 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 IV | Other | 1 | 4 | $0 | $0 | Mar 20, 2026 | - | Mar 23, 2026 |
Jun 4, 2009#313117962Jun 4, 2009Planned (H) · Complete scope, Safety#313117962$1,4454 viol.4 violations$1,445 in penalties
Inspection #313117962
Dates
- Opened
- Jun 4, 2009
- Closing Conference Date
- Jun 4, 2009
- Closed
- Nov 12, 2009
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 40
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 1 serious, 3 other-than-serious
- Initial Penalties
- $1,700
- Penalties on Record
- $1,445
- Site Address
- Guam Community College Allied Health Center Proj., Mangilao, GU 96913
- Industry
- 236220 Commercial and Institutional Building Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G04 I | Serious | 1 | 2 | $1,700 | $1,445 | Aug 13, 2009 | - | - |
| 02001 | 1926.95 Criteria for personal protective equipment OSHA citation code: 19260095 A | Other | 1 | 1 | $0 | $0 | Jul 30, 2009 | - | - |
| 02002 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 V | Other | 1 | 3 | $0 | $0 | Aug 13, 2009 | - | - |
| 02003 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B20 | Other | 1 | 2 | $0 | $0 | Jul 30, 2009 | - | - |
Jun 3, 2009#313117939Jun 3, 2009Planned (H) · Complete scope, Safety#313117939$2002 viol.2 violations$200 in penalties
Inspection #313117939
Dates
- Opened
- Jun 3, 2009
- Closing Conference Date
- Jun 3, 2009
- Closed
- Sep 10, 2009
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 39
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 repeat, 1 other-than-serious
- Initial Penalties
- $200
- Penalties on Record
- $200
- Site Address
- Adacao Elementary School Project, Mangilao, GU 96913
- Industry
- 236220 Commercial and Institutional Building Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F06 | Repeat | 1 | 1 | $200 | $200 | Jul 17, 2009 | - | - |
| 02001 | 1926.416 Electrical - Safety Requirements (Construction) OSHA citation code: 19260416 E01 | Other | 1 | 1 | $0 | $0 | Jul 17, 2009 | - | - |
Mar 13, 2009#312931769Mar 13, 2009Planned (H) · Complete scope, Safety#312931769$5731 viol.1 violation$573 in penalties
Inspection #312931769
Dates
- Opened
- Mar 13, 2009
- Closing Conference Date
- Mar 13, 2009
- Closed
- Aug 20, 2010
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 33
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $573
- Penalties on Record
- $573
- Site Address
- Guam Comm College, Allied Health Center, Mangilao, GU 96923
- Industry
- 236220 Commercial and Institutional Building Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Serious | 2 | 4 | $573 | $573 | Jun 3, 2009 | - | - |
Oct 28, 2008#312791593Oct 28, 2008Planned (H) · Complete scope, Safety#312791593$1,2001 viol.1 violation$1,200 in penalties
Inspection #312791593
Dates
- Opened
- Oct 28, 2008
- Closing Conference Date
- Oct 28, 2008
- Closed
- Jan 11, 2011
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 118
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $1,200
- Penalties on Record
- $1,200
- Site Address
- Water Tank, Guam Community College, Mangilao, GU 96913
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.102 Eye and face protection OSHA citation code: 19260102 A01 | Serious | 1 | 1 | $1,200 | $1,200 | Mar 26, 2009 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
6 inspections, 2008 to 2026. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
Construction of Buildings, 202,676 employers with OSHA inspections. Arithmetic from DOL records.